{{#Wiki_filter:Exelon Nuclear Job Performance Measure
{{#Wiki_filter:Exelon Nuclear Job Performance Measure CRD - CROSSTIE FOR ALTERNATE INJECTION JPM Number: S-N-i Revision Number: 07 Date: 02/12 EXAM MATERIAL Developed By:
Instructor                    Date Approved By:
Facility Representative        Date


CRD - CROSSTIE FOR ALTERNATE INJECTION JPM Number:
Job Performance Measure (JPM)
S-N-i Revision Number: 0 7  Date: 02/1 2   EXAM MATERIAL
Revision Record (Summary)
Revision 06 Bank JPM.
Revision 07 Revised for ILT 11-1 (2012-301) NRC Exam.
S-N-i                                                     Page 2 of 8


Developed By:
Instructor Date    Approved By:
Facility Representative Date Job Performance Measure (JPM)
S-N-i  Page 2 of 8  Revision Record (Summary)
Revision 0 6 Bank JPM. Revision 0 7 Revised for ILT 11-1 (2012-301) NRC Exam.
Job Performance Measure (JPM)
Job Performance Measure (JPM)
S-N-i  Page 3 of 8  SIMULATOR SETUP INSTRUCTIONS
SIMULATOR SETUP INSTRUCTIONS
: 1. None, this is an in
: 1. None, this is an in-plant JPM.
-plant JPM. DOCUMENT PREPARATION
DOCUMENT PREPARATION
: 1. Clean copy of DEOP 0500
: 1. Clean copy of DEOP 0500-03.
-03.
S-N-i                                                      Page 3 of 8
 
Job Performance Measure (JPM)
Job Performance Measure (JPM)
S-N-i  Page 4 of 8  INITIAL CONDITIONS
INITIAL CONDITIONS
: 1. You are the Unit 2 Aux NSO. 2. Unit 2 has been manually scrammed following a loss of Feedwater
: 1. You are the Unit 2 Aux NSO.
. 3. The 2B CRD pump is OOS AND the 2A pump has tripped AND CANNOT 4. HPCI was started AND returned Reactor water level to +15" before an oil leak developed requiring HPCI to be shutdown. be restarted
: 2. Unit 2 has been manually scrammed following a loss of Feedwater.
. 5. The 3A CRD pump is OOS
: 3. The 2B CRD pump is OOS AND the 2A pump has tripped AND CANNOT be restarted.
. 6. The 3B CRD pump is running
: 4. HPCI was started AND returned Reactor water level to +15" before an oil leak developed requiring HPCI to be shutdown.
. INITIATING CUE
: 5. The 3A CRD pump is OOS.
: 1. The Unit Supervisor has directed you to IMMEDIATELY perform the in
: 6. The 3B CRD pump is running.
-plant manipulations to crosstie Unit 2 to the Unit 3 CRD pump discharge header for Unit 2 RPV injection in accordance with DEOP 0500
INITIATING CUE
-03. 2. Inform the Unit Supervisor when the task is complete.
: 1. The Unit Supervisor has directed you to IMMEDIATELY perform the in-plant manipulations to crosstie Unit 2 to the Unit 3 CRD pump discharge header for Unit 2 RPV injection in accordance with DEOP 0500-03.
: 2. Inform the Unit Supervisor when the task is complete.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Information For Evaluator's Use:
Information For Evaluators Use:
UNSAT requires written comments on respective step.
UNSAT requires written comments on respective step.
* Denotes critical steps.
* Denotes critical steps.
Denotes critical elements of a critical step.
* Denotes critical elements of a critical step.
Number any comments in the "Comment Number" column on the following pages. Then annotate that comment in the "Comments" section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.
Some operations that are performed from outside of the control room may require multiple steps.
Some operations that are performed from outside of the control room may require multiple steps.
These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
The timeclock starts when the candidate acknowledges the initiating cue.
S-N-i                                                                          Page 4 of 8


Job Performance Measure (JPM)
Job Performance Measure (JPM)
S-N-i  Page 5 of 8  JPM Start Time
JPM Start Time: _________
: PERFORMANCE CHECKLIST
UNSAT    Comment PERFORMANCE CHECKLIST                     STANDARDS                 SAT NOTE:
_________ STANDARDS SAT UNSAT Comment Provide the examinee with the supplied copy of DEOP 0500-03. NOTE: 1. Verify the Unit 3 CRD system parameters of current and cooling flow.
Provide the examinee with the supplied copy of DEOP 0500-03.
Establishes communication with the Unit 3 control room.
: 1. Verify the Unit 3 CRD system   Establishes parameters of current and     communication with the cooling flow.                 Unit 3 control room.         _____       _____     _____
_____         _____         _____
CUE:
.Report the following parameters: 3B CRD Pump current of 25 amps and cooling flow of 45 gpm.
    .Report the following parameters: 3B CRD Pump current of 25 amps and cooling flow of 45 gpm.
CUE: .CRD system key is required to open locked valves. Do NOT allow examinee to check out key. NOTE: 2. Verify 3-0301-1B CRD PMP DISCH VLV is OPEN.
NOTE:
Verifies 3
    .CRD system key is required to open locked valves. Do NOT allow examinee to check out key.
-0301-1B rising stem full out AND/OR handwheel is full CCW.
: 2. Verify 3-0301-1B CRD PMP       Verifies 3-0301-1B rising DISCH VLV is OPEN.            stem full out AND/OR handwheel is full CCW.       _____       _____     _____
_____         _____         _____
CUE:
The component is in the condition you described.
The component is in the condition you described.
* 3. Closes 3-0399-604, U3 CRD      Rotates 3-0399-604 PMP DISCH HDR MIN FLOW        handwheel CW until THROTTLING VLV.                handwheel is full CW.        _____        _____      _____
CUE:
CUE:
* 3. Closes 3-0399-604, U3 CRD PMP DISCH HDR MIN FLOW THROTTLING VLV.
Rotates 3-0399-604 handwheel CW until handwheel is full CW.
_____        _____        _____
The component is in the condition you described.
The component is in the condition you described.
CUE:
* 4. Open 2/3-0301-163 U2 & U3     Rotates 2/3-0301-163 CRD SYS CROSSTIE VLV.          handwheel CCW until handwheel is full CCW.       _____       _____     _____
* 4. Open 2/3-0301-163 U2 & U3 CRD SYS CROSSTIE VLV.
S-N-i                                                                        Page 5 of 8
Rotates 2/3
-0301-163 handwheel CCW until handwheel is full CCW.
_____         _____         _____


Job Performance Measure (JPM)
Job Performance Measure (JPM)
S-N-i  Page 6 of 8  PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment The component is in the condition you described.
UNSAT    Comment PERFORMANCE CHECKLIST                       STANDARDS                 SAT CUE:
The component is in the condition you described.
* 5. Throttle open 2/3-0301-162      Adjusts 2/3-0301-162 U2 & U3 CRD SYS                  handwheel CCW in small CROSSTIE VLV while              increments, while            _____      _____      _____
maintaining CRD pp current      maintaining
        <39 amps and CRD Suction        communication other pressure >18 Hg vacuum.        Operators to ensure amps and suction pressure stay within limits.
CUE:
* 2/3-0301-162 handwheel is full CCW.
* Unit 3 CRD system cooling water flow is 45 gpm.
* Unit 2 CRD system cooling water flow is 44 gpm.
* 3B CRD pump current is 35 amps.
* 3B CRD pump suction pressure is 5 Hg vacuum.
NOTE:
The above cues are intended to inform the examinee that the 2/3-0301-162 handwheel is full open and all parameters are within band.
: 6. Reports to the Unit              Unit Supervisor notified.
Supervisor that the in-plant actions are complete.                                          _____      _____      _____
CUE:
CUE:
* 5. Throttle open 2/3
Acknowledge report of task completion.
-0301-162 U2 & U3 CRD SYS CROSSTIE VLV while maintaining CRD pp current <39 amps and CRD Suction pressure >18" Hg vacuum.
END JPM Stop Time:_________
Adjusts 2/3
S-N-i                                                                        Page 6 of 8
-0301-162 handwheel CCW in small increments, while maintaining communication other Operators to ensure amps and suction pressure stay within limits.
 
_____        _____        _____
2/3-0301-162 handwheel is full CCW.
CUE:  Unit 3 CRD system cooling water flow is 45 gpm.
Unit 2 CRD system cooling water flow is 44 gpm.
3B CRD pump current is 35 amps.
3B CRD pump suction pressure is 5" Hg vacuum.
The above cues are intended to inform the examinee that                                                                              the 2/3-0301-162 handwheel is full open and all parameters are within band.
NOTE:  6. Reports to the Unit Supervisor that the in-plant actions are complete. Unit Supervisor notified.
_____        _____        _____ Acknowledge report of task completion.
CUE:  END   JPM Stop Time
:_________
Job Performance Measure (JPM)
Job Performance Measure (JPM)
S-N-i  Page 7 of 8  Operator's Name:
Operators Name:
Job Title:     RO SRO       JPM Title: CRD - CROSSTIE FOR ALTERNATE INJECTION Revision Number: 0 7
Job Title:   RO           SRO JPM Title: CRD - CROSSTIE FOR ALTERNATE INJECTION Revision Number: 07 JPM Number: S-N-i Task Number and Title: 295L092, Crosstie CRD systems for alternate injection.
JPM Number: S-N-i Task Number and Title: 295L092, Crosstie CRD systems for alternate injection
K/A Number and Importance: 295031.A1.08         3.8 / 3.9 Suggested Testing Environment:       In-Plant Actual Testing Environment:             Simulator       Control Room         In-Plant Testing Method:         Simulate           Alternate Path:     Yes           No Perform               SRO Only:       Yes           No Time Critical:           Yes         No Estimated Time to Complete: 10 minutes           Actual Time Used:           minutes
.  
 
K/A Number and Importance:
295031.A1.08     3.8 / 3.9
 
Suggested Testing Environment:
In-Plant Actual Testing Environment:
Simulator Control Room In-Plant Testing Method:
Simulate Alternate Path
: Yes No Perform SRO Only: Yes No Time Critical:
Yes No Estimated Time to Complete:
10 minutes Actual Time Used:
minutes


==References:==
==References:==
 
DEOP 0500-03, rev 20 EVALUATION  
DEOP 0500-03, rev 20 EVALUATION  


==SUMMARY==
==SUMMARY==
:
:
Were all the Critical Elements performed satisfactorily?
Were all the Critical Elements performed satisfactorily?           Yes           No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be:                   Satisfactory               Unsatisfactory Comments:
Yes No The operator's performance was evaluated against the standards contained in this JPM, and has been determined to be:
Evaluators Name (Print):
Satisfactory Unsatisfactory
Evaluators Signature:                                                Date:
S-N-i                                                                        Page 7 of 8


Comments:                Evaluator's Name (Print):      Evaluator's Signature:
Date:
Job Performance Measure (JPM)
Job Performance Measure (JPM)
S-N-i  Page 8 of 8  INITIAL CONDITIONS
INITIAL CONDITIONS
: 1. You are the Unit 2 Aux NSO.
: 1. You are the Unit 2 Aux NSO.
: 2. Unit 2 has been manually scrammed following a loss of Feedwater
: 2. Unit 2 has been manually scrammed following a loss of Feedwater.
. 3. The 2B CRD pump is OOS AND the 2A pump has tripped AND CANNOT be restarted. 4. HPCI was started AND returned Reactor water level to +15" before an oil leak developed requiring HPCI to be shutdown
: 3. The 2B CRD pump is OOS AND the 2A pump has tripped AND CANNOT be restarted.
. 5. The 3A CRD pump is OOS
: 4. HPCI was started AND returned Reactor water level to +15" before an oil leak developed requiring HPCI to be shutdown.
. 6. The 3B CRD pump is running
: 5. The 3A CRD pump is OOS.
. INITIATING CUE
: 6. The 3B CRD pump is running.
: 1. The Unit Supervisor has directed you to IMMEDIATELY perform the in
INITIATING CUE
-plant manipulations to crosstie Unit 2 to the Unit 3 CRD pump discharge header for Unit 2 RPV injection in accordance with DEOP 0500
: 1. The Unit Supervisor has directed you to IMMEDIATELY perform the in-plant manipulations to crosstie Unit 2 to the Unit 3 CRD pump discharge header for Unit 2 RPV injection in accordance with DEOP 0500-03.
-03. 2. Inform the Unit Supervisor when the task is complete.
: 2. Inform the Unit Supervisor when the task is complete.
S-N-i                                                              Page 8 of 8


Exelon Nuclear Job Performance Measure
Exelon Nuclear Job Performance Measure ISO COND - LOCAL MAKEUP PUMP OPERATION, WITH COOLING WATER FAILURE JPM Number: S-N-j Revision Number: 00 Date: 02/12 EXAM MATERIAL Developed By:
Instructor                    Date Approved By:
Facility Representative        Date


ISO COND - LOCAL MAKEUP PUMP OPERATION,                                      WITH COOLING WATER FAILURE  JPM Number:
Job Performance Measure (JPM)
S-N-j Revision Number: 0 0  Date: 02/1 2   EXAM MATERIAL
Revision Record (Summary)
Revision 00 New JPM developed for ILT 11-1 (2012-301) NRC Exam.
S-N-j                                                           Page 2 of 9


Developed By:
Instructor Da te    Approved By:
Facility Representative Date Job Performance Measure (JPM)
S-N-j  Page 2 of 9  Revision Record (Summary)
Revision 0 0 New JPM developed for ILT 11-1 (2012-301) NRC Exam.
Job Performance Measure (JPM)
Job Performance Measure (JPM)
S-N-j  Page 3 of 9  SIMULATOR SETUP INSTRUCTIONS
SIMULATOR SETUP INSTRUCTIONS
: 1. None, this is an in
: 1. None, this is an in-plant JPM.
-plant JPM. DOCUMENT PREPARATION
DOCUMENT PREPARATION
: 1. Clean copy of DSS P 0 100-CR, attachment I.
: 1. Clean copy of DSSP 0100-CR, attachment I.
S-N-j                                                      Page 3 of 9


Job Performance Measure (JPM)
Job Performance Measure (JPM)
S-N-j  Page 4 of 9  INITIAL CONDITIONS
INITIAL CONDITIONS
: 1. You are the Unit 2 Aux NSO.
: 1. You are the Unit 2 Aux NSO.
: 2. Smoke in the Control Room has led to a Control Room Evacuation
: 2. Smoke in the Control Room has led to a Control Room Evacuation.
. 3. The Unit 2 Isolation Condenser is in service and makeup to the shell side is required
: 3. The Unit 2 Isolation Condenser is in service and makeup to the shell side is required.
. 4. The 2-4399-74 , CLEAN DEMIN VLV, valve is open
: 4. The 2-4399-74, CLEAN DEMIN VLV, valve is open.
. INITIATING CUE
INITIATING CUE
: 1. The Unit Supervisor has directed you to start an Isolation Condenser Makeup Pump in accordance with DSSP 0100-CR Attachment I
: 1. The Unit Supervisor has directed you to start an Isolation Condenser Makeup Pump in accordance with DSSP 0100-CR Attachment I.
. 2. Inform the Unit Supervisor when the task is complete.
: 2. Inform the Unit Supervisor when the task is complete.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Information For Evaluator's Use:
Information For Evaluators Use:
UNSAT requires written comments on respective step.
UNSAT requires written comments on respective step.
* Denotes critical steps.
* Denotes critical steps.
Denotes critical elements of a critical step.
* Denotes critical elements of a critical step.
Number any comments in the "Comment Number" column on the following pages. Then annotate that comment in the "Comments" section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.
Some operations that are performed from outside of the control room may require multiple steps.
Some operations that are performed from outside of the control room may require multiple steps.
These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
The timeclock starts when the candidate acknowledges the initiating cue.
S-N-j                                                                          Page 4 of 9


Job Performance Measure (JPM)
Job Performance Measure (JPM)
S-N-j  Page 5 of 9  JPM Start Time
JPM Start Time: _________
: PERFORMANCE CHECKLIST
UNSAT    Comment PERFORMANCE CHECKLIST                         STANDARDS                   SAT NOTE:
_________ STANDARDS SAT UNSAT Comment Provide the examinee with the supplied copy of DSSP 0 100-CR, attachment I.
Provide the examinee with the supplied copy of DSSP 0100-CR, attachment I.
NOTE: CB-1 key is required for entry into the Iso Cond makeup pump building.
CB-1 key is required for entry into the Iso Cond makeup pump building.
The candidate may choose to start either engine.
The candidate may choose to start either engine.
* 1. Place the REMOTE
* 1. Place the REMOTE-OFF-           Switch at panel 2223-126A RUN toggle switch for either     or B, placed in RUN.
-OFF-RUN toggle switch for either engine in RUN.
_____       _____     _____
Switch at panel 22 23-126A or B, placed in RUN.
engine in RUN.
_____         _____         _____
CUE:
The component is in the condition you described.
The component is in the condition you described.
CUE: 2. Verify engine starts and comes up to stable speed.
: 2. Verify engine starts and         Engine RPM indicator on comes up to stable speed.       panel 2223-126A or B is
Engine RPM indicator on panel 2223
_____       _____     _____
-126A or B is checked. _____         _____         _____ The engine has started and is running at 1802 RPM
checked.
. CUE: The indicator is an LCD display that scrolls through the parameters, (only while the engine is running).
CUE:
NOTE: 3. Monitor the following engine parameters to ensure limits are NOT exceeded:
The engine has started and is running at 1802 RPM.
Oil Pressure Water Temperature RPM Checks the parameters on the LCD display.
NOTE:
_____         _____         _____
The indicator is an LCD display that scrolls through the parameters, (only while the engine is running).
BEGIN ALTERNATE PATH Provide the following engine parameter values
: 3. Monitor the following engine     Checks the parameters on parameters to ensure limits     the LCD display.
: CUE:  Oil pressure: 55 psi Water Temperature 215 o RPM 180 2 rpm 4. Recognizes that water temperature has exceeded the high limit.
are NOT exceeded:
> 205 o F. _____         _____         _____
* Oil Pressure
_____       _____     _____
* Water Temperature
* RPM BEGIN ALTERNATE PATH CUE:
Provide the following engine parameter values:
* Oil pressure: 55 psi
* Water Temperature 215oF
* RPM 1802 rpm
: 4. Recognizes that water           > 205oF.
temperature has exceeded the high limit.                                               _____       _____     _____
S-N-j                                                                            Page 5 of 9


Job Performance Measure (JPM)
Job Performance Measure (JPM)
S-N-j  Page 6 of 9  PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment
UNSAT    Comment PERFORMANCE CHECKLIST                         STANDARDS                   SAT
* 5. Stops running engine by placing the REMOTE-OFF-RUN toggle switch to OFF
* 5. Stops running engine by         Switch at panel 2223-126A placing the REMOTE-OFF-         or B, placed in OFF.
. Switch at panel 2223
RUN toggle switch to OFF.                                       _____      _____     _____
-126A or B, placed in OFF
CUE:
. _____         _____         _
The component is in the condition you described.
____ The component is in the condition you described
* 6. Starts the opposite IC           Switch at panel 2223-126A Makeup Pump, than was            or B, placed in RUN.
. CUE:
originally started.                                              _____     _____     _____
* 6. Starts the opposite IC Makeup Pump, than was originally started.
CUE:
Switch at panel 2223
The component is in the condition you described.
-126A or B, placed in RUN.
: 7. Verify engine starts and         Engine RPM indicator on comes up to stable speed.       panel 2223-126A or B is
_____         _____         _____
_____     _____     _____
The component is in the condition you described. CUE: 7. Verify engine starts and comes up to stable speed.
checked.
Engine RPM indicator on panel 2223
CUE:
-126A or B is checked. _____         _____         _____
The engine has started and is running.
The engine has started and is running.
CUE: 8. Monitor the following engine parameters to ensure limits are NOT exceeded:
: 8. Monitor the following engine     Checks the parameters on parameters to ensure limits     the LCD display.
Oil Pressure Water Temperature RPM Checks the parameters on the LCD display.
are NOT exceeded:
_____         _____         _____
* Oil Pressure
* Water Temperature
_____     _____     _____
* RPM CUE:
Provide the following engine parameter values:
Provide the following engine parameter values:
CUE:  Oil pressure: 59 psi Water Temperature 185 o RPM 1799 rpm 9. Notifies SM/U2 US that an Iso Cond Makeup Pump is in operation.
* Oil pressure: 59 psi
Notifies appropriate individual.
* Water Temperature 185oF
_____         _____         _____
* RPM 1799 rpm
: 9. Notifies SM/U2 US that an Iso   Notifies appropriate Cond Makeup Pump is in           individual.
_____     _____     _____
operation.
S-N-j                                                                            Page 6 of 9


Job Performance Measure (JPM)
Job Performance Measure (JPM)
S-N-j  Page 7 of 9  PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment Inform the candidate that another Operator will perform monitoring duties
UNSAT    Comment PERFORMANCE CHECKLIST                       STANDARDS                 SAT CUE:
. CUE: 10. Reports to the SM/U2 US that the task is complete. SM/U2 US notified. _____         _____         _____
Inform the candidate that another Operator will perform monitoring duties.
: 10. Reports to the SM/U2 US         SM/U2 US notified.
that the task is complete.
_____     _____       _____
CUE:
Acknowledge report of task completion.
Acknowledge report of task completion.
CUE:  END   JPM Stop Time
END JPM Stop Time:_________
:_________
S-N-j                                                                      Page 7 of 9
 
Job Performance Measure (JPM)
Job Performance Measure (JPM)
S-N-j  Page 8 of 9  Operator's Name:
Operators Name:
Job Title:     RO SRO       JPM Title: ISO COND - LOCAL MAKEUP PUMP OPERATION, WITH COOLING WATER FAILURE Revision Number: 0 0
Job Title:   RO           SRO JPM Title: ISO COND - LOCAL MAKEUP PUMP OPERATION, WITH COOLING WATER FAILURE Revision Number: 00 JPM Number: S-N-j Task Number and Title: 207N020, Start Isolation Condenser Makeup Pump.
JPM Number: S-N-j Task Number and Title: 207N020, Start Isolation Condenser Makeup Pump
K/A Number and Importance: 207000.A2.05         4.0 / 4.0 Suggested Testing Environment:       In-Plant Actual Testing Environment:             Simulator       Control Room         In-Plant Testing Method:         Simulate           Alternate Path:     Yes           No Perform                SRO Only:       Yes           No Time Critical:           Yes         No Estimated Time to Complete: 10 minutes           Actual Time Used:           minutes
.  
 
K/A Number and Importance: 207000.A2.05     4.0 / 4.0
 
Suggested Testing Environment:   In-Plant Actual Testing Environment:
Simulator Control Room In-Plant Testing Method:
Simulate Alternate Path
: Yes No Perfor m SRO Only: Yes No Time Critical:
Yes No Estimated Time to Complete:
10 minutes Actual Time Used:
minutes


==References:==
==References:==
 
DSSP 0100-CR, rev 43 EVALUATION  
DSSP 0 100-CR, rev 4 3  EVALUATION  


==SUMMARY==
==SUMMARY==
:
:
Were all the Critical Elements performed satisfactorily?
Were all the Critical Elements performed satisfactorily?           Yes           No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be:                   Satisfactory               Unsatisfactory Comments:
Yes No The operator's performance was evaluated against the standards contained in this JPM, and has been determined to be:
Evaluators Name (Print):
Satisfactory Unsatisfactory Comments:                 Evaluator's Name (Print):     Evaluator's Signature:
Evaluators Signature:                                                 Date:
Date:
S-N-j                                                                        Page 8 of 9
 
Job Performance Measure (JPM)
Job Performance Measure (JPM)
S-N-j  Page 9 of 9  INITIAL CONDITIONS
INITIAL CONDITIONS
: 1. You are the Unit 2 Aux NSO.
: 1. You are the Unit 2 Aux NSO.
: 2. Smoke in the Control Room has led to a Control Room Evacuation
: 2. Smoke in the Control Room has led to a Control Room Evacuation.
. 3. The Unit 2 Isolation Condenser is in service and makeup to the shell side is required. 4. The 2-4399-74, CLEAN DEMIN VLV, valve is open
: 3. The Unit 2 Isolation Condenser is in service and makeup to the shell side is required.
. INITIATING CUE
: 4. The 2-4399-74, CLEAN DEMIN VLV, valve is open.
: 1. The Unit Supervisor has directed you to start an Isolation Condenser Makeup Pump in accordance with DSSP 0100-CR Attachment I
INITIATING CUE
. 2. Inform the Unit Supervisor when the task is complete.
: 1. The Unit Supervisor has directed you to start an Isolation Condenser Makeup Pump in accordance with DSSP 0100-CR Attachment I.
: 2. Inform the Unit Supervisor when the task is complete.
S-N-j                                                                Page 9 of 9


Exelon Nuclear Job Performance Measure
Exelon Nuclear Job Performance Measure INST AIR - CROSS CONNECT 3C IAC TO UNIT 2 ONLY JPM Number: S-N-k Revision Number: 00 Date: 02/12 EXAM MATERIAL Developed By:
Instructor                      Date Approved By:
Facility Representative          Date


INST AIR - CROSS CONNECT 3C IAC TO UNIT 2 ONLY JPM Number:
Job Performance Measure (JPM)
S-N-k Revision Number: 0 0  Date: 02/1 2   EXAM MATERIAL
Revision Record (Summary)
Revision 00 New JPM developed for ILT 11-1 (2012-301) NRC Exam.
S-N-k                                                           Page 2 of 8


Developed By:
Instructor Date    Approved By:
Facility Representative Date Job Performance Measure (JPM)
S-N-k  Page 2 of 8  Revision Record (Summary)
Revision 0 0 New JPM developed for ILT 11-1 (2012-301) NRC Exam.
Job Performance Measure (JPM)
Job Performance Measure (JPM)
S-N-k  Page 3 of 8  SIMULATOR SETUP INSTRUCTIONS
SIMULATOR SETUP INSTRUCTIONS
: 1. None, this is an in
: 1. None, this is an in-plant JPM.
-plant JPM. DOCUMENT PREPARATION
DOCUMENT PREPARATION
: 1. Clean copy of DOP 4700-03.
: 1. Clean copy of DOP 4700-03.
S-N-k                                                      Page 3 of 8
Job Performance Measure (JPM)
Job Performance Measure (JPM)
S-N-k  Page 4 of 8  INITIAL CONDITIONS
INITIAL CONDITIONS
: 1. You are an extra NSO. 2. Both units are operating at near rated power.
: 1. You are an extra NSO.
: 3. The Unit 2A Instrument Air compressor is O.O.S
: 2. Both units are operating at near rated power.
. 4. The Unit 2B Instrument Air compressor is having difficulty keeping up with the Unit 2 Instrument Air demand.
: 3. The Unit 2A Instrument Air compressor is O.O.S.
: 4. The Unit 2B Instrument Air compressor is having difficulty keeping up with the Unit 2 Instrument Air demand.
: 5. The Unit 3C Instrument Air compressor is operating but is isolated from both units.
: 5. The Unit 3C Instrument Air compressor is operating but is isolated from both units.
INITIATING CUE
INITIATING CUE
: 1. The Unit Supervisor has directed you to align the Unit 3C Instrument Air compressor to Unit 2 only, per DOP 4700
: 1. The Unit Supervisor has directed you to align the Unit 3C Instrument Air compressor to Unit 2 only, per DOP 4700-03, step g.9.
-03, step g.9.
: 2. Inform the Unit Supervisor when the task is complete.
: 2. Inform the Unit Supervisor when the task is complete.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Information For Evaluator's Use:
Information For Evaluators Use:
UNSAT requires written comments on respective step.
UNSAT requires written comments on respective step.
* Denotes critical steps.
* Denotes critical steps.
Denotes critical elements of a critical step.
* Denotes critical elements of a critical step.
Number any comments in the "Comment Number" column on the following pages. Then annotate that comment in the "Comments" section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.
Some operations that are performed from outside of the control room may require multiple steps.
Some operations that are performed from outside of the control room may require multiple steps.
These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
The timeclock starts when the candidate acknowledges the initiating cue.
S-N-k                                                                          Page 4 of 8


Job Performance Measure (JPM)
Job Performance Measure (JPM)
S-N-k  Page 5 of 8  JPM Start Time
JPM Start Time: _________
: PERFORMANCE CHECKLIST
UNSAT    Comment PERFORMANCE CHECKLIST                     STANDARDS                 SAT NOTE:
_________ STANDARDS SAT UNSAT Comment Provide the examinee with the supplied copy of DOP 4700-03. NOTE: 1. Candidate may call control room and ask if the 3C IAC is in operation, with air dryers valved in. Contacts control room.
Provide the examinee with the supplied copy of DOP 4700-03.
_____        _____        _____
: 1. Candidate may call control     Contacts control room.
The 3C Instrument Air Compressor is running, the air dryers are valved in,                                       but the compressor is isolated from both units headers.
room and ask if the 3C IAC is in operation, with air dryers                               _____      _____      _____
CUE: 2. Verify closed 3
valved in.
-4799-501A, 3C IAC DISCH TO U 3 INST AIR HEADER ISOL VLV.
CUE:
Valve handwheel is in the full CW position.
The 3C Instrument Air Compressor is running, the air dryers are valved in, but the compressor is isolated from both units headers.
_____
: 2. Verify closed 3-4799-501A,     Valve handwheel is in the 3C IAC DISCH TO U 3 INST       full CW position.
_____         _____
AIR HEADER ISOL VLV.                                         _____       _____       _____
CUE:
The component is in the condition you described.
The component is in the condition you described.
* 3. Close 2/3-4799-424, U2/U3 X    Valve handwheel is in the TIE SV.                        full CW position.
_____      _____      _____
CUE:
CUE:
* 3. Close 2/3-4799-424, U2/U3 X TIE SV. Valve handwheel is in the full CW position.
_____        _____        _____
The component is in the condition you described.
The component is in the condition you described.
* 4. Open 2/3-4799-425, 3C IAC      Valve handwheel is in the TO U2 AIR SYS X TIE SV.        full CCW position.
_____      _____      _____
CUE:
CUE:
* 4. Open 2/3-4799-425, 3C IAC TO U2 AIR SYS X TIE SV.
Valve handwheel is in the full CCW position.
_____        _____        _____
The component is in the condition you described
. CUE:
* 5. Open 2-47350-500, U2 INST AIR SYS XTIE FROM THE U3 INST AIR SYS.
Valve handwheel is in the full CCW position.
_____        _____        _____
The component is in the condition you described.
The component is in the condition you described.
* 5. Open 2-47350-500, U2 INST      Valve handwheel is in the AIR SYS XTIE FROM THE          full CCW position.
U3 INST AIR SYS.                                            _____      _____      _____
CUE:
CUE:
The component is in the condition you described.
S-N-k                                                                      Page 5 of 8
Job Performance Measure (JPM)
Job Performance Measure (JPM)
S-N-k  Page 6 of 8  PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment
UNSAT    Comment PERFORMANCE CHECKLIST                     STANDARDS                 SAT
* 6. Open 2-47350-329, U2 INST AIR HDR ISOL VLV.
* 6. Open 2-47350-329, U2 INST       Valve handwheel is in the AIR HDR ISOL VLV.               full CCW position.
Valve handwheel is in the full CCW position.
_____     _____      _____
_____         _____         __
CUE:
___ The component is in the condition you described.
The component is in the condition you described.
CUE: 7. Reports to the Unit 2 Supervisor that the task is complete. Unit 2 Supervisor notified.
: 7. Reports to the Unit 2          Unit 2 Supervisor notified.
_____         _____         _____
Supervisor that the task is complete.                                                     _____     _____     _____
CUE:
Acknowledge report of task completion.
Acknowledge report of task completion.
CUE:  END   JPM Stop Time
END JPM Stop Time:_________
:_________
S-N-k                                                                        Page 6 of 8
 
Job Performance Measure (JPM)
Job Performance Measure (JPM)
S-N-k  Page 7 of 8  Operator's Name:
Operators Name:
Job Title:     RO SRO       JPM Title: INST AIR - CROSS CONNECT 3C IAC TO UNIT 2 ONLY Revision Number: 0 0
Job Title:   RO           SRO JPM Title: INST AIR - CROSS CONNECT 3C IAC TO UNIT 2 ONLY Revision Number: 00 JPM Number: S-N-k Task Number and Title: 278N011, Crosstie the Unit 2 and Unit 3 Instrument Air systems.
JPM Number: S-N-k Task Number and Title: 278N011, Crosstie the Unit 2 and Unit 3 Instrument Air systems.
K/A Number and Importance: 300000.G.2.1.30       4.4 / 4.0 Suggested Testing Environment:       In-plant Actual Testing Environment:             Simulator     Control Room           In-Plant Testing Method:         Simulate         Alternate Path:     Yes           No Perform               SRO Only:       Yes           No Time Critical:           Yes         No Estimated Time to Complete: 12 minutes           Actual Time Used:           minutes
 
K/A Number and Importance: 300000.G.2.1.30     4.4 / 4.0  
 
Suggested Testing Environment:
In-plant Actual Testing Environment:
Simulator Control Room In-Plant Testing Method:
Simulate Alternate Path
: Yes No   Perform SRO Only: Yes No Time Critical:
Yes No Estimated Time to Complete:
1 2 minutes Actual Time Used:
minutes


==References:==
==References:==
DOP 4700-03, rev 16 EVALUATION  
DOP 4700-03, rev 16 EVALUATION  


==SUMMARY==
==SUMMARY==
:
:
Were all the Critical Elements performed satisfactorily?
Were all the Critical Elements performed satisfactorily?         Yes             No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be:                   Satisfactory             Unsatisfactory Comments:
Yes No The operator's performance was evaluated against the standards contained in this JPM, and has been determined to be:
Evaluators Name (Print):
Satisfactory Unsatisfactory Comments:                 Evaluator's Name (Print):     Evaluator's Signature:
Evaluators Signature:                                               Date:
Date:
S-N-k                                                                      Page 7 of 8
 
Job Performance Measure (JPM)
Job Performance Measure (JPM)
S-N-k  Page 8 of 8  INITIAL CONDITIONS
INITIAL CONDITIONS
: 1. You are an extra NSO. 2. Both units are operating at near rated power.
: 1. You are an extra NSO.
: 3. The Unit 2A Instrument Air compressor is O.O.S
: 2. Both units are operating at near rated power.
. 4. The Unit 2B Instrument Air compressor is having difficulty keeping up with the Unit 2 Instrument Air demand.
: 3. The Unit 2A Instrument Air compressor is O.O.S.
: 5. The Unit 3C Instrument Air compressor is operating but is isolated from both units. INITIATING CUE
: 4. The Unit 2B Instrument Air compressor is having difficulty keeping up with the Unit 2 Instrument Air demand.
: 1. The Unit Supervisor has directed you to align the Unit 3C Instrument Air compressor to Unit 2 only, per DOP 4700
: 5. The Unit 3C Instrument Air compressor is operating but is isolated from both units.
-03, step g.9.
INITIATING CUE
: 2. Inform the Unit Supervisor when the task is complete.}}
: 1. The Unit Supervisor has directed you to align the Unit 3C Instrument Air compressor to Unit 2 only, per DOP 4700-03, step g.9.
: 2. Inform the Unit Supervisor when the task is complete.
S-N-k                                                                Page 8 of 8}}

Revision as of 21:29, 11 November 2019

2012 Dresden Nuclear Power Station Initial License Examination as Administered In-Plant JPMs
ML12284A235
Person / Time
Site: Dresden  Constellation icon.png
Issue date: 09/26/2012
From: Nelson J, David Reeser
Operations Branch III
To:
Exelon Generation Co
Shared Package
ML11354A119 List:
References
Download: ML12284A235 (25)


Text

Exelon Nuclear Job Performance Measure CRD - CROSSTIE FOR ALTERNATE INJECTION JPM Number: S-N-i Revision Number: 07 Date: 02/12 EXAM MATERIAL Developed By:

Instructor Date Approved By:

Facility Representative Date

Job Performance Measure (JPM)

Revision Record (Summary)

Revision 06 Bank JPM.

Revision 07 Revised for ILT 11-1 (2012-301) NRC Exam.

S-N-i Page 2 of 8

Job Performance Measure (JPM)

SIMULATOR SETUP INSTRUCTIONS

1. None, this is an in-plant JPM.

DOCUMENT PREPARATION

1. Clean copy of DEOP 0500-03.

S-N-i Page 3 of 8

Job Performance Measure (JPM)

INITIAL CONDITIONS

1. You are the Unit 2 Aux NSO.
2. Unit 2 has been manually scrammed following a loss of Feedwater.
3. The 2B CRD pump is OOS AND the 2A pump has tripped AND CANNOT be restarted.
4. HPCI was started AND returned Reactor water level to +15" before an oil leak developed requiring HPCI to be shutdown.
5. The 3A CRD pump is OOS.
6. The 3B CRD pump is running.

INITIATING CUE

1. The Unit Supervisor has directed you to IMMEDIATELY perform the in-plant manipulations to crosstie Unit 2 to the Unit 3 CRD pump discharge header for Unit 2 RPV injection in accordance with DEOP 0500-03.
2. Inform the Unit Supervisor when the task is complete.

Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

Information For Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes critical steps.
  • Denotes critical elements of a critical step.

Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.

Some operations that are performed from outside of the control room may require multiple steps.

These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

S-N-i Page 4 of 8

Job Performance Measure (JPM)

JPM Start Time: _________

UNSAT Comment PERFORMANCE CHECKLIST STANDARDS SAT NOTE:

Provide the examinee with the supplied copy of DEOP 0500-03.

1. Verify the Unit 3 CRD system Establishes parameters of current and communication with the cooling flow. Unit 3 control room. _____ _____ _____

CUE:

.Report the following parameters: 3B CRD Pump current of 25 amps and cooling flow of 45 gpm.

NOTE:

.CRD system key is required to open locked valves. Do NOT allow examinee to check out key.

2. Verify 3-0301-1B CRD PMP Verifies 3-0301-1B rising DISCH VLV is OPEN. stem full out AND/OR handwheel is full CCW. _____ _____ _____

CUE:

The component is in the condition you described.

  • 3. Closes 3-0399-604, U3 CRD Rotates 3-0399-604 PMP DISCH HDR MIN FLOW handwheel CW until THROTTLING VLV. handwheel is full CW. _____ _____ _____

CUE:

The component is in the condition you described.

  • 4. Open 2/3-0301-163 U2 & U3 Rotates 2/3-0301-163 CRD SYS CROSSTIE VLV. handwheel CCW until handwheel is full CCW. _____ _____ _____

S-N-i Page 5 of 8

Job Performance Measure (JPM)

UNSAT Comment PERFORMANCE CHECKLIST STANDARDS SAT CUE:

The component is in the condition you described.

  • 5. Throttle open 2/3-0301-162 Adjusts 2/3-0301-162 U2 & U3 CRD SYS handwheel CCW in small CROSSTIE VLV while increments, while _____ _____ _____

maintaining CRD pp current maintaining

<39 amps and CRD Suction communication other pressure >18 Hg vacuum. Operators to ensure amps and suction pressure stay within limits.

CUE:

  • 2/3-0301-162 handwheel is full CCW.
  • Unit 3 CRD system cooling water flow is 45 gpm.
  • Unit 2 CRD system cooling water flow is 44 gpm.
  • 3B CRD pump current is 35 amps.
  • 3B CRD pump suction pressure is 5 Hg vacuum.

NOTE:

The above cues are intended to inform the examinee that the 2/3-0301-162 handwheel is full open and all parameters are within band.

6. Reports to the Unit Unit Supervisor notified.

Supervisor that the in-plant actions are complete. _____ _____ _____

CUE:

Acknowledge report of task completion.

END JPM Stop Time:_________

S-N-i Page 6 of 8

Job Performance Measure (JPM)

Operators Name:

Job Title: RO SRO JPM Title: CRD - CROSSTIE FOR ALTERNATE INJECTION Revision Number: 07 JPM Number: S-N-i Task Number and Title: 295L092, Crosstie CRD systems for alternate injection.

K/A Number and Importance: 295031.A1.08 3.8 / 3.9 Suggested Testing Environment: In-Plant Actual Testing Environment: Simulator Control Room In-Plant Testing Method: Simulate Alternate Path: Yes No Perform SRO Only: Yes No Time Critical: Yes No Estimated Time to Complete: 10 minutes Actual Time Used: minutes

References:

DEOP 0500-03, rev 20 EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: Satisfactory Unsatisfactory Comments:

Evaluators Name (Print):

Evaluators Signature: Date:

S-N-i Page 7 of 8

Job Performance Measure (JPM)

INITIAL CONDITIONS

1. You are the Unit 2 Aux NSO.
2. Unit 2 has been manually scrammed following a loss of Feedwater.
3. The 2B CRD pump is OOS AND the 2A pump has tripped AND CANNOT be restarted.
4. HPCI was started AND returned Reactor water level to +15" before an oil leak developed requiring HPCI to be shutdown.
5. The 3A CRD pump is OOS.
6. The 3B CRD pump is running.

INITIATING CUE

1. The Unit Supervisor has directed you to IMMEDIATELY perform the in-plant manipulations to crosstie Unit 2 to the Unit 3 CRD pump discharge header for Unit 2 RPV injection in accordance with DEOP 0500-03.
2. Inform the Unit Supervisor when the task is complete.

S-N-i Page 8 of 8

Exelon Nuclear Job Performance Measure ISO COND - LOCAL MAKEUP PUMP OPERATION, WITH COOLING WATER FAILURE JPM Number: S-N-j Revision Number: 00 Date: 02/12 EXAM MATERIAL Developed By:

Instructor Date Approved By:

Facility Representative Date

Job Performance Measure (JPM)

Revision Record (Summary)

Revision 00 New JPM developed for ILT 11-1 (2012-301) NRC Exam.

S-N-j Page 2 of 9

Job Performance Measure (JPM)

SIMULATOR SETUP INSTRUCTIONS

1. None, this is an in-plant JPM.

DOCUMENT PREPARATION

1. Clean copy of DSSP 0100-CR, attachment I.

S-N-j Page 3 of 9

Job Performance Measure (JPM)

INITIAL CONDITIONS

1. You are the Unit 2 Aux NSO.
2. Smoke in the Control Room has led to a Control Room Evacuation.
3. The Unit 2 Isolation Condenser is in service and makeup to the shell side is required.
4. The 2-4399-74, CLEAN DEMIN VLV, valve is open.

INITIATING CUE

1. The Unit Supervisor has directed you to start an Isolation Condenser Makeup Pump in accordance with DSSP 0100-CR Attachment I.
2. Inform the Unit Supervisor when the task is complete.

Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

Information For Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes critical steps.
  • Denotes critical elements of a critical step.

Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.

Some operations that are performed from outside of the control room may require multiple steps.

These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

S-N-j Page 4 of 9

Job Performance Measure (JPM)

JPM Start Time: _________

UNSAT Comment PERFORMANCE CHECKLIST STANDARDS SAT NOTE:

Provide the examinee with the supplied copy of DSSP 0100-CR, attachment I.

CB-1 key is required for entry into the Iso Cond makeup pump building.

The candidate may choose to start either engine.

  • 1. Place the REMOTE-OFF- Switch at panel 2223-126A RUN toggle switch for either or B, placed in RUN.

_____ _____ _____

engine in RUN.

CUE:

The component is in the condition you described.

2. Verify engine starts and Engine RPM indicator on comes up to stable speed. panel 2223-126A or B is

_____ _____ _____

checked.

CUE:

The engine has started and is running at 1802 RPM.

NOTE:

The indicator is an LCD display that scrolls through the parameters, (only while the engine is running).

3. Monitor the following engine Checks the parameters on parameters to ensure limits the LCD display.

are NOT exceeded:

  • Oil Pressure

_____ _____ _____

  • Water Temperature
  • RPM BEGIN ALTERNATE PATH CUE:

Provide the following engine parameter values:

  • Oil pressure: 55 psi
  • Water Temperature 215oF
4. Recognizes that water > 205oF.

temperature has exceeded the high limit. _____ _____ _____

S-N-j Page 5 of 9

Job Performance Measure (JPM)

UNSAT Comment PERFORMANCE CHECKLIST STANDARDS SAT

  • 5. Stops running engine by Switch at panel 2223-126A placing the REMOTE-OFF- or B, placed in OFF.

RUN toggle switch to OFF. _____ _____ _____

CUE:

The component is in the condition you described.

  • 6. Starts the opposite IC Switch at panel 2223-126A Makeup Pump, than was or B, placed in RUN.

originally started. _____ _____ _____

CUE:

The component is in the condition you described.

7. Verify engine starts and Engine RPM indicator on comes up to stable speed. panel 2223-126A or B is

_____ _____ _____

checked.

CUE:

The engine has started and is running.

8. Monitor the following engine Checks the parameters on parameters to ensure limits the LCD display.

are NOT exceeded:

  • Oil Pressure
  • Water Temperature

_____ _____ _____

Provide the following engine parameter values:

  • Oil pressure: 59 psi
  • Water Temperature 185oF
9. Notifies SM/U2 US that an Iso Notifies appropriate Cond Makeup Pump is in individual.

_____ _____ _____

operation.

S-N-j Page 6 of 9

Job Performance Measure (JPM)

UNSAT Comment PERFORMANCE CHECKLIST STANDARDS SAT CUE:

Inform the candidate that another Operator will perform monitoring duties.

10. Reports to the SM/U2 US SM/U2 US notified.

that the task is complete.

_____ _____ _____

CUE:

Acknowledge report of task completion.

END JPM Stop Time:_________

S-N-j Page 7 of 9

Job Performance Measure (JPM)

Operators Name:

Job Title: RO SRO JPM Title: ISO COND - LOCAL MAKEUP PUMP OPERATION, WITH COOLING WATER FAILURE Revision Number: 00 JPM Number: S-N-j Task Number and Title: 207N020, Start Isolation Condenser Makeup Pump.

K/A Number and Importance: 207000.A2.05 4.0 / 4.0 Suggested Testing Environment: In-Plant Actual Testing Environment: Simulator Control Room In-Plant Testing Method: Simulate Alternate Path: Yes No Perform SRO Only: Yes No Time Critical: Yes No Estimated Time to Complete: 10 minutes Actual Time Used: minutes

References:

DSSP 0100-CR, rev 43 EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: Satisfactory Unsatisfactory Comments:

Evaluators Name (Print):

Evaluators Signature: Date:

S-N-j Page 8 of 9

Job Performance Measure (JPM)

INITIAL CONDITIONS

1. You are the Unit 2 Aux NSO.
2. Smoke in the Control Room has led to a Control Room Evacuation.
3. The Unit 2 Isolation Condenser is in service and makeup to the shell side is required.
4. The 2-4399-74, CLEAN DEMIN VLV, valve is open.

INITIATING CUE

1. The Unit Supervisor has directed you to start an Isolation Condenser Makeup Pump in accordance with DSSP 0100-CR Attachment I.
2. Inform the Unit Supervisor when the task is complete.

S-N-j Page 9 of 9

Exelon Nuclear Job Performance Measure INST AIR - CROSS CONNECT 3C IAC TO UNIT 2 ONLY JPM Number: S-N-k Revision Number: 00 Date: 02/12 EXAM MATERIAL Developed By:

Instructor Date Approved By:

Facility Representative Date

Job Performance Measure (JPM)

Revision Record (Summary)

Revision 00 New JPM developed for ILT 11-1 (2012-301) NRC Exam.

S-N-k Page 2 of 8

Job Performance Measure (JPM)

SIMULATOR SETUP INSTRUCTIONS

1. None, this is an in-plant JPM.

DOCUMENT PREPARATION

1. Clean copy of DOP 4700-03.

S-N-k Page 3 of 8

Job Performance Measure (JPM)

INITIAL CONDITIONS

1. You are an extra NSO.
2. Both units are operating at near rated power.
3. The Unit 2A Instrument Air compressor is O.O.S.
4. The Unit 2B Instrument Air compressor is having difficulty keeping up with the Unit 2 Instrument Air demand.
5. The Unit 3C Instrument Air compressor is operating but is isolated from both units.

INITIATING CUE

1. The Unit Supervisor has directed you to align the Unit 3C Instrument Air compressor to Unit 2 only, per DOP 4700-03, step g.9.
2. Inform the Unit Supervisor when the task is complete.

Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

Information For Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes critical steps.
  • Denotes critical elements of a critical step.

Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.

Some operations that are performed from outside of the control room may require multiple steps.

These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

S-N-k Page 4 of 8

Job Performance Measure (JPM)

JPM Start Time: _________

UNSAT Comment PERFORMANCE CHECKLIST STANDARDS SAT NOTE:

Provide the examinee with the supplied copy of DOP 4700-03.

1. Candidate may call control Contacts control room.

room and ask if the 3C IAC is in operation, with air dryers _____ _____ _____

valved in.

CUE:

The 3C Instrument Air Compressor is running, the air dryers are valved in, but the compressor is isolated from both units headers.

2. Verify closed 3-4799-501A, Valve handwheel is in the 3C IAC DISCH TO U 3 INST full CW position.

AIR HEADER ISOL VLV. _____ _____ _____

CUE:

The component is in the condition you described.

  • 3. Close 2/3-4799-424, U2/U3 X Valve handwheel is in the TIE SV. full CW position.

_____ _____ _____

CUE:

The component is in the condition you described.

  • 4. Open 2/3-4799-425, 3C IAC Valve handwheel is in the TO U2 AIR SYS X TIE SV. full CCW position.

_____ _____ _____

CUE:

The component is in the condition you described.

  • 5. Open 2-47350-500, U2 INST Valve handwheel is in the AIR SYS XTIE FROM THE full CCW position.

U3 INST AIR SYS. _____ _____ _____

CUE:

The component is in the condition you described.

S-N-k Page 5 of 8

Job Performance Measure (JPM)

UNSAT Comment PERFORMANCE CHECKLIST STANDARDS SAT

  • 6. Open 2-47350-329, U2 INST Valve handwheel is in the AIR HDR ISOL VLV. full CCW position.

_____ _____ _____

CUE:

The component is in the condition you described.

7. Reports to the Unit 2 Unit 2 Supervisor notified.

Supervisor that the task is complete. _____ _____ _____

CUE:

Acknowledge report of task completion.

END JPM Stop Time:_________

S-N-k Page 6 of 8

Job Performance Measure (JPM)

Operators Name:

Job Title: RO SRO JPM Title: INST AIR - CROSS CONNECT 3C IAC TO UNIT 2 ONLY Revision Number: 00 JPM Number: S-N-k Task Number and Title: 278N011, Crosstie the Unit 2 and Unit 3 Instrument Air systems.

K/A Number and Importance: 300000.G.2.1.30 4.4 / 4.0 Suggested Testing Environment: In-plant Actual Testing Environment: Simulator Control Room In-Plant Testing Method: Simulate Alternate Path: Yes No Perform SRO Only: Yes No Time Critical: Yes No Estimated Time to Complete: 12 minutes Actual Time Used: minutes

References:

DOP 4700-03, rev 16 EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: Satisfactory Unsatisfactory Comments:

Evaluators Name (Print):

Evaluators Signature: Date:

S-N-k Page 7 of 8

Job Performance Measure (JPM)

INITIAL CONDITIONS

1. You are an extra NSO.
2. Both units are operating at near rated power.
3. The Unit 2A Instrument Air compressor is O.O.S.
4. The Unit 2B Instrument Air compressor is having difficulty keeping up with the Unit 2 Instrument Air demand.
5. The Unit 3C Instrument Air compressor is operating but is isolated from both units.

INITIATING CUE

1. The Unit Supervisor has directed you to align the Unit 3C Instrument Air compressor to Unit 2 only, per DOP 4700-03, step g.9.
2. Inform the Unit Supervisor when the task is complete.

S-N-k Page 8 of 8