{{#Wiki_filter:Exelon Nuclear Job Performance Measure | {{#Wiki_filter:Exelon Nuclear Job Performance Measure CRD - CROSSTIE FOR ALTERNATE INJECTION JPM Number: S-N-i Revision Number: 07 Date: 02/12 EXAM MATERIAL Developed By: | ||
Instructor Date Approved By: | |||
Facility Representative Date | |||
Job Performance Measure (JPM) | |||
S-N-i | Revision Record (Summary) | ||
Revision 06 Bank JPM. | |||
Revision 07 Revised for ILT 11-1 (2012-301) NRC Exam. | |||
S-N-i Page 2 of 8 | |||
Job Performance Measure (JPM) | Job Performance Measure (JPM) | ||
SIMULATOR SETUP INSTRUCTIONS | |||
: 1. None, this is an in | : 1. None, this is an in-plant JPM. | ||
-plant JPM. DOCUMENT PREPARATION | DOCUMENT PREPARATION | ||
: 1. Clean copy of DEOP 0500 | : 1. Clean copy of DEOP 0500-03. | ||
-03. | S-N-i Page 3 of 8 | ||
Job Performance Measure (JPM) | Job Performance Measure (JPM) | ||
INITIAL CONDITIONS | |||
: 1. You are the Unit 2 Aux NSO. 2. Unit 2 has been manually scrammed following a loss of Feedwater | : 1. You are the Unit 2 Aux NSO. | ||
: 2. Unit 2 has been manually scrammed following a loss of Feedwater. | |||
: 3. The 2B CRD pump is OOS AND the 2A pump has tripped AND CANNOT be restarted. | |||
: 4. HPCI was started AND returned Reactor water level to +15" before an oil leak developed requiring HPCI to be shutdown. | |||
: 5. The 3A CRD pump is OOS. | |||
: 1. The Unit Supervisor has directed you to IMMEDIATELY perform the in | : 6. The 3B CRD pump is running. | ||
-plant manipulations to crosstie Unit 2 to the Unit 3 CRD pump discharge header for Unit 2 RPV injection in accordance with DEOP 0500 | INITIATING CUE | ||
-03. 2. Inform the Unit Supervisor when the task is complete. | : 1. The Unit Supervisor has directed you to IMMEDIATELY perform the in-plant manipulations to crosstie Unit 2 to the Unit 3 CRD pump discharge header for Unit 2 RPV injection in accordance with DEOP 0500-03. | ||
: 2. Inform the Unit Supervisor when the task is complete. | |||
Fill in the JPM Start Time when the student acknowledges the Initiating Cue. | Fill in the JPM Start Time when the student acknowledges the Initiating Cue. | ||
Information For | Information For Evaluators Use: | ||
UNSAT requires written comments on respective step. | UNSAT requires written comments on respective step. | ||
* Denotes critical steps. | * Denotes critical steps. | ||
Denotes critical elements of a critical step. | * Denotes critical elements of a critical step. | ||
Number any comments in the | Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations. | ||
Some operations that are performed from outside of the control room may require multiple steps. | Some operations that are performed from outside of the control room may require multiple steps. | ||
These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed. | These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed. | ||
The timeclock starts when the candidate acknowledges the initiating cue. | The timeclock starts when the candidate acknowledges the initiating cue. | ||
S-N-i Page 4 of 8 | |||
Job Performance Measure (JPM) | Job Performance Measure (JPM) | ||
JPM Start Time: _________ | |||
UNSAT Comment PERFORMANCE CHECKLIST STANDARDS SAT NOTE: | |||
Provide the examinee with the supplied copy of DEOP 0500-03. | |||
: 1. Verify the Unit 3 CRD system Establishes parameters of current and communication with the cooling flow. Unit 3 control room. _____ _____ _____ | |||
_____ | CUE: | ||
.Report the following parameters: 3B CRD Pump current of 25 amps and cooling flow of 45 gpm. | |||
NOTE: | |||
Verifies 3 | .CRD system key is required to open locked valves. Do NOT allow examinee to check out key. | ||
-0301-1B rising stem full out AND/OR handwheel is full CCW. | : 2. Verify 3-0301-1B CRD PMP Verifies 3-0301-1B rising DISCH VLV is OPEN. stem full out AND/OR handwheel is full CCW. _____ _____ _____ | ||
_____ | CUE: | ||
The component is in the condition you described. | The component is in the condition you described. | ||
* 3. Closes 3-0399-604, U3 CRD Rotates 3-0399-604 PMP DISCH HDR MIN FLOW handwheel CW until THROTTLING VLV. handwheel is full CW. _____ _____ _____ | |||
CUE: | CUE: | ||
The component is in the condition you described. | The component is in the condition you described. | ||
* 4. Open 2/3-0301-163 U2 & U3 Rotates 2/3-0301-163 CRD SYS CROSSTIE VLV. handwheel CCW until handwheel is full CCW. _____ _____ _____ | |||
* 4. Open 2/3-0301-163 U2 & U3 | S-N-i Page 5 of 8 | ||
Rotates 2/3 | |||
-0301-163 handwheel CCW until handwheel is full CCW. | |||
_____ | |||
Job Performance Measure (JPM) | Job Performance Measure (JPM) | ||
UNSAT Comment PERFORMANCE CHECKLIST STANDARDS SAT CUE: | |||
The component is in the condition you described. | |||
* 5. Throttle open 2/3-0301-162 Adjusts 2/3-0301-162 U2 & U3 CRD SYS handwheel CCW in small CROSSTIE VLV while increments, while _____ _____ _____ | |||
maintaining CRD pp current maintaining | |||
<39 amps and CRD Suction communication other pressure >18 Hg vacuum. Operators to ensure amps and suction pressure stay within limits. | |||
CUE: | |||
* 2/3-0301-162 handwheel is full CCW. | |||
* Unit 3 CRD system cooling water flow is 45 gpm. | |||
* Unit 2 CRD system cooling water flow is 44 gpm. | |||
* 3B CRD pump current is 35 amps. | |||
* 3B CRD pump suction pressure is 5 Hg vacuum. | |||
NOTE: | |||
The above cues are intended to inform the examinee that the 2/3-0301-162 handwheel is full open and all parameters are within band. | |||
: 6. Reports to the Unit Unit Supervisor notified. | |||
Supervisor that the in-plant actions are complete. _____ _____ _____ | |||
CUE: | CUE: | ||
Acknowledge report of task completion. | |||
END JPM Stop Time:_________ | |||
S-N-i Page 6 of 8 | |||
:_________ | |||
Job Performance Measure (JPM) | Job Performance Measure (JPM) | ||
Operators Name: | |||
Job Title: | Job Title: RO SRO JPM Title: CRD - CROSSTIE FOR ALTERNATE INJECTION Revision Number: 07 JPM Number: S-N-i Task Number and Title: 295L092, Crosstie CRD systems for alternate injection. | ||
JPM Number: | K/A Number and Importance: 295031.A1.08 3.8 / 3.9 Suggested Testing Environment: In-Plant Actual Testing Environment: Simulator Control Room In-Plant Testing Method: Simulate Alternate Path: Yes No Perform SRO Only: Yes No Time Critical: Yes No Estimated Time to Complete: 10 minutes Actual Time Used: minutes | ||
. | |||
K/A Number and Importance: | |||
295031.A1.08 | |||
Suggested Testing Environment: | |||
In-Plant | |||
Simulator | |||
Simulate Alternate Path | |||
: | |||
Yes | |||
10 minutes Actual Time Used: | |||
minutes | |||
==References:== | ==References:== | ||
DEOP 0500-03, rev 20 EVALUATION | |||
DEOP 0500-03, rev 20 | |||
==SUMMARY== | ==SUMMARY== | ||
: | : | ||
Were all the Critical Elements performed satisfactorily? | Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: Satisfactory Unsatisfactory Comments: | ||
Yes | Evaluators Name (Print): | ||
Satisfactory Unsatisfactory | Evaluators Signature: Date: | ||
S-N-i Page 7 of 8 | |||
Job Performance Measure (JPM) | Job Performance Measure (JPM) | ||
INITIAL CONDITIONS | |||
: 1. You are the Unit 2 Aux NSO. | : 1. You are the Unit 2 Aux NSO. | ||
: 2. Unit 2 has been manually scrammed following a loss of Feedwater | : 2. Unit 2 has been manually scrammed following a loss of Feedwater. | ||
: 3. The 2B CRD pump is OOS AND the 2A pump has tripped AND CANNOT be restarted. | |||
: 4. HPCI was started AND returned Reactor water level to +15" before an oil leak developed requiring HPCI to be shutdown. | |||
: 5. The 3A CRD pump is OOS. | |||
: 6. The 3B CRD pump is running. | |||
: 1. The Unit Supervisor has directed you to IMMEDIATELY perform the in | INITIATING CUE | ||
-plant manipulations to crosstie Unit 2 to the Unit 3 CRD pump discharge header for Unit 2 RPV injection in accordance with DEOP 0500 | : 1. The Unit Supervisor has directed you to IMMEDIATELY perform the in-plant manipulations to crosstie Unit 2 to the Unit 3 CRD pump discharge header for Unit 2 RPV injection in accordance with DEOP 0500-03. | ||
-03. 2. Inform the Unit Supervisor when the task is complete. | : 2. Inform the Unit Supervisor when the task is complete. | ||
S-N-i Page 8 of 8 | |||
Exelon Nuclear Job Performance Measure | Exelon Nuclear Job Performance Measure ISO COND - LOCAL MAKEUP PUMP OPERATION, WITH COOLING WATER FAILURE JPM Number: S-N-j Revision Number: 00 Date: 02/12 EXAM MATERIAL Developed By: | ||
Instructor Date Approved By: | |||
Facility Representative Date | |||
Job Performance Measure (JPM) | |||
S-N-j | Revision Record (Summary) | ||
Revision 00 New JPM developed for ILT 11-1 (2012-301) NRC Exam. | |||
S-N-j Page 2 of 9 | |||
Job Performance Measure (JPM) | Job Performance Measure (JPM) | ||
SIMULATOR SETUP INSTRUCTIONS | |||
: 1. None, this is an in | : 1. None, this is an in-plant JPM. | ||
-plant JPM. DOCUMENT PREPARATION | DOCUMENT PREPARATION | ||
: 1. Clean copy of | : 1. Clean copy of DSSP 0100-CR, attachment I. | ||
S-N-j Page 3 of 9 | |||
Job Performance Measure (JPM) | Job Performance Measure (JPM) | ||
INITIAL CONDITIONS | |||
: 1. You are the Unit 2 Aux NSO. | : 1. You are the Unit 2 Aux NSO. | ||
: 2. Smoke in the Control Room has led to a Control Room Evacuation | : 2. Smoke in the Control Room has led to a Control Room Evacuation. | ||
: 3. The Unit 2 Isolation Condenser is in service and makeup to the shell side is required. | |||
: 4. The 2-4399-74, CLEAN DEMIN VLV, valve is open. | |||
INITIATING CUE | |||
: 1. The Unit Supervisor has directed you to start an Isolation Condenser Makeup Pump in accordance with DSSP 0100-CR Attachment I | : 1. The Unit Supervisor has directed you to start an Isolation Condenser Makeup Pump in accordance with DSSP 0100-CR Attachment I. | ||
: 2. Inform the Unit Supervisor when the task is complete. | |||
Fill in the JPM Start Time when the student acknowledges the Initiating Cue. | Fill in the JPM Start Time when the student acknowledges the Initiating Cue. | ||
Information For | Information For Evaluators Use: | ||
UNSAT requires written comments on respective step. | UNSAT requires written comments on respective step. | ||
* Denotes critical steps. | * Denotes critical steps. | ||
Denotes critical elements of a critical step. | * Denotes critical elements of a critical step. | ||
Number any comments in the | Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations. | ||
Some operations that are performed from outside of the control room may require multiple steps. | Some operations that are performed from outside of the control room may require multiple steps. | ||
These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed. | These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed. | ||
The timeclock starts when the candidate acknowledges the initiating cue. | The timeclock starts when the candidate acknowledges the initiating cue. | ||
S-N-j Page 4 of 9 | |||
Job Performance Measure (JPM) | Job Performance Measure (JPM) | ||
JPM Start Time: _________ | |||
UNSAT Comment PERFORMANCE CHECKLIST STANDARDS SAT NOTE: | |||
Provide the examinee with the supplied copy of DSSP 0100-CR, attachment I. | |||
CB-1 key is required for entry into the Iso Cond makeup pump building. | |||
The candidate may choose to start either engine. | The candidate may choose to start either engine. | ||
* 1. Place the REMOTE | * 1. Place the REMOTE-OFF- Switch at panel 2223-126A RUN toggle switch for either or B, placed in RUN. | ||
-OFF-RUN toggle switch for either | _____ _____ _____ | ||
engine in RUN. | |||
_____ | CUE: | ||
The component is in the condition you described. | The component is in the condition you described. | ||
: 2. Verify engine starts and Engine RPM indicator on comes up to stable speed. panel 2223-126A or B is | |||
_____ _____ _____ | |||
-126A or B is | checked. | ||
CUE: | |||
The engine has started and is running at 1802 RPM. | |||
Oil Pressure | NOTE: | ||
_____ | The indicator is an LCD display that scrolls through the parameters, (only while the engine is running). | ||
BEGIN ALTERNATE PATH Provide the following engine parameter values | : 3. Monitor the following engine Checks the parameters on parameters to ensure limits the LCD display. | ||
are NOT exceeded: | |||
* Oil Pressure | |||
_____ _____ _____ | |||
* Water Temperature | |||
* RPM BEGIN ALTERNATE PATH CUE: | |||
Provide the following engine parameter values: | |||
* Oil pressure: 55 psi | |||
* Water Temperature 215oF | |||
* RPM 1802 rpm | |||
: 4. Recognizes that water > 205oF. | |||
temperature has exceeded the high limit. _____ _____ _____ | |||
S-N-j Page 5 of 9 | |||
Job Performance Measure (JPM) | Job Performance Measure (JPM) | ||
UNSAT Comment PERFORMANCE CHECKLIST STANDARDS SAT | |||
* 5. Stops running engine by placing the REMOTE-OFF- | * 5. Stops running engine by Switch at panel 2223-126A placing the REMOTE-OFF- or B, placed in OFF. | ||
RUN toggle switch to OFF. _____ _____ _____ | |||
CUE: | |||
. _____ | The component is in the condition you described. | ||
* 6. Starts the opposite IC Switch at panel 2223-126A Makeup Pump, than was or B, placed in RUN. | |||
. | originally started. _____ _____ _____ | ||
* 6. Starts the opposite IC | CUE: | ||
Switch at panel 2223 | The component is in the condition you described. | ||
-126A or B, placed in RUN. | : 7. Verify engine starts and Engine RPM indicator on comes up to stable speed. panel 2223-126A or B is | ||
_____ | _____ _____ _____ | ||
The component is in the condition you described. | checked. | ||
CUE: | |||
-126A or B is | |||
The engine has started and is running. | The engine has started and is running. | ||
: 8. Monitor the following engine Checks the parameters on parameters to ensure limits the LCD display. | |||
Oil Pressure Water Temperature | are NOT exceeded: | ||
_____ | * Oil Pressure | ||
* Water Temperature | |||
_____ _____ _____ | |||
* RPM CUE: | |||
Provide the following engine parameter values: | Provide the following engine parameter values: | ||
* Oil pressure: 59 psi | |||
* Water Temperature 185oF | |||
_____ | * RPM 1799 rpm | ||
: 9. Notifies SM/U2 US that an Iso Notifies appropriate Cond Makeup Pump is in individual. | |||
_____ _____ _____ | |||
operation. | |||
S-N-j Page 6 of 9 | |||
Job Performance Measure (JPM) | Job Performance Measure (JPM) | ||
UNSAT Comment PERFORMANCE CHECKLIST STANDARDS SAT CUE: | |||
Inform the candidate that another Operator will perform monitoring duties. | |||
: 10. Reports to the SM/U2 US SM/U2 US notified. | |||
that the task is complete. | |||
_____ _____ _____ | |||
CUE: | |||
Acknowledge report of task completion. | Acknowledge report of task completion. | ||
END JPM Stop Time:_________ | |||
:_________ | S-N-j Page 7 of 9 | ||
Job Performance Measure (JPM) | Job Performance Measure (JPM) | ||
Operators Name: | |||
Job Title: | Job Title: RO SRO JPM Title: ISO COND - LOCAL MAKEUP PUMP OPERATION, WITH COOLING WATER FAILURE Revision Number: 00 JPM Number: S-N-j Task Number and Title: 207N020, Start Isolation Condenser Makeup Pump. | ||
JPM Number: | K/A Number and Importance: 207000.A2.05 4.0 / 4.0 Suggested Testing Environment: In-Plant Actual Testing Environment: Simulator Control Room In-Plant Testing Method: Simulate Alternate Path: Yes No Perform SRO Only: Yes No Time Critical: Yes No Estimated Time to Complete: 10 minutes Actual Time Used: minutes | ||
. | |||
K/A Number and Importance: 207000.A2.05 | |||
Suggested Testing Environment: | |||
Simulator | |||
Simulate Alternate Path | |||
: | |||
Yes | |||
10 minutes Actual Time Used: | |||
minutes | |||
==References:== | ==References:== | ||
DSSP 0100-CR, rev 43 EVALUATION | |||
DSSP | |||
==SUMMARY== | ==SUMMARY== | ||
: | : | ||
Were all the Critical Elements performed satisfactorily? | Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: Satisfactory Unsatisfactory Comments: | ||
Yes | Evaluators Name (Print): | ||
Satisfactory Unsatisfactory Comments: | Evaluators Signature: Date: | ||
Date: | S-N-j Page 8 of 9 | ||
Job Performance Measure (JPM) | Job Performance Measure (JPM) | ||
INITIAL CONDITIONS | |||
: 1. You are the Unit 2 Aux NSO. | : 1. You are the Unit 2 Aux NSO. | ||
: 2. Smoke in the Control Room has led to a Control Room Evacuation | : 2. Smoke in the Control Room has led to a Control Room Evacuation. | ||
: 3. The Unit 2 Isolation Condenser is in service and makeup to the shell side is required. | |||
: 4. The 2-4399-74, CLEAN DEMIN VLV, valve is open. | |||
: 1. The Unit Supervisor has directed you to start an Isolation Condenser Makeup Pump in accordance with DSSP 0100-CR Attachment I | INITIATING CUE | ||
: 1. The Unit Supervisor has directed you to start an Isolation Condenser Makeup Pump in accordance with DSSP 0100-CR Attachment I. | |||
: 2. Inform the Unit Supervisor when the task is complete. | |||
S-N-j Page 9 of 9 | |||
Exelon Nuclear Job Performance Measure | Exelon Nuclear Job Performance Measure INST AIR - CROSS CONNECT 3C IAC TO UNIT 2 ONLY JPM Number: S-N-k Revision Number: 00 Date: 02/12 EXAM MATERIAL Developed By: | ||
Instructor Date Approved By: | |||
Facility Representative Date | |||
Job Performance Measure (JPM) | |||
S-N-k | Revision Record (Summary) | ||
Revision 00 New JPM developed for ILT 11-1 (2012-301) NRC Exam. | |||
S-N-k Page 2 of 8 | |||
Job Performance Measure (JPM) | Job Performance Measure (JPM) | ||
SIMULATOR SETUP INSTRUCTIONS | |||
: 1. None, this is an in | : 1. None, this is an in-plant JPM. | ||
-plant JPM. DOCUMENT PREPARATION | DOCUMENT PREPARATION | ||
: 1. Clean copy of DOP 4700-03. | : 1. Clean copy of DOP 4700-03. | ||
S-N-k Page 3 of 8 | |||
Job Performance Measure (JPM) | Job Performance Measure (JPM) | ||
INITIAL CONDITIONS | |||
: 1. You are an extra NSO. 2. Both units are operating at near rated power. | : 1. You are an extra NSO. | ||
: 3. The Unit 2A Instrument Air compressor is O.O.S | : 2. Both units are operating at near rated power. | ||
: 3. The Unit 2A Instrument Air compressor is O.O.S. | |||
: 4. The Unit 2B Instrument Air compressor is having difficulty keeping up with the Unit 2 Instrument Air demand. | |||
: 5. The Unit 3C Instrument Air compressor is operating but is isolated from both units. | : 5. The Unit 3C Instrument Air compressor is operating but is isolated from both units. | ||
INITIATING CUE | INITIATING CUE | ||
: 1. The Unit Supervisor has directed you to align the Unit 3C Instrument Air compressor to Unit 2 only, per DOP 4700 | : 1. The Unit Supervisor has directed you to align the Unit 3C Instrument Air compressor to Unit 2 only, per DOP 4700-03, step g.9. | ||
-03, step g.9. | |||
: 2. Inform the Unit Supervisor when the task is complete. | : 2. Inform the Unit Supervisor when the task is complete. | ||
Fill in the JPM Start Time when the student acknowledges the Initiating Cue. | Fill in the JPM Start Time when the student acknowledges the Initiating Cue. | ||
Information For | Information For Evaluators Use: | ||
UNSAT requires written comments on respective step. | UNSAT requires written comments on respective step. | ||
* Denotes critical steps. | * Denotes critical steps. | ||
Denotes critical elements of a critical step. | * Denotes critical elements of a critical step. | ||
Number any comments in the | Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations. | ||
Some operations that are performed from outside of the control room may require multiple steps. | Some operations that are performed from outside of the control room may require multiple steps. | ||
These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed. | These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed. | ||
The timeclock starts when the candidate acknowledges the initiating cue. | The timeclock starts when the candidate acknowledges the initiating cue. | ||
S-N-k Page 4 of 8 | |||
Job Performance Measure (JPM) | Job Performance Measure (JPM) | ||
JPM Start Time: _________ | |||
UNSAT Comment PERFORMANCE CHECKLIST STANDARDS SAT NOTE: | |||
Provide the examinee with the supplied copy of DOP 4700-03. | |||
: 1. Candidate may call control Contacts control room. | |||
The 3C Instrument Air Compressor is running, the air dryers are valved in, | room and ask if the 3C IAC is in operation, with air dryers _____ _____ _____ | ||
valved in. | |||
-4799-501A, 3C IAC DISCH TO U 3 INST AIR HEADER ISOL VLV. | CUE: | ||
The 3C Instrument Air Compressor is running, the air dryers are valved in, but the compressor is isolated from both units headers. | |||
_____ | : 2. Verify closed 3-4799-501A, Valve handwheel is in the 3C IAC DISCH TO U 3 INST full CW position. | ||
_____ | AIR HEADER ISOL VLV. _____ _____ _____ | ||
CUE: | |||
The component is in the condition you described. | The component is in the condition you described. | ||
* 3. Close 2/3-4799-424, U2/U3 X Valve handwheel is in the TIE SV. full CW position. | |||
_____ _____ _____ | |||
CUE: | CUE: | ||
The component is in the condition you described. | The component is in the condition you described. | ||
* 4. Open 2/3-4799-425, 3C IAC Valve handwheel is in the TO U2 AIR SYS X TIE SV. full CCW position. | |||
_____ _____ _____ | |||
CUE: | CUE: | ||
The component is in the condition you described. | The component is in the condition you described. | ||
* 5. Open 2-47350-500, U2 INST Valve handwheel is in the AIR SYS XTIE FROM THE full CCW position. | |||
U3 INST AIR SYS. _____ _____ _____ | |||
CUE: | CUE: | ||
The component is in the condition you described. | |||
S-N-k Page 5 of 8 | |||
Job Performance Measure (JPM) | Job Performance Measure (JPM) | ||
UNSAT Comment PERFORMANCE CHECKLIST STANDARDS SAT | |||
* 6. Open 2-47350-329, U2 INST AIR HDR ISOL VLV. | * 6. Open 2-47350-329, U2 INST Valve handwheel is in the AIR HDR ISOL VLV. full CCW position. | ||
_____ _____ _____ | |||
_____ | CUE: | ||
The component is in the condition you described. | |||
: 7. Reports to the Unit 2 Unit 2 Supervisor notified. | |||
_____ | Supervisor that the task is complete. _____ _____ _____ | ||
CUE: | |||
Acknowledge report of task completion. | Acknowledge report of task completion. | ||
END JPM Stop Time:_________ | |||
:_________ | S-N-k Page 6 of 8 | ||
Job Performance Measure (JPM) | Job Performance Measure (JPM) | ||
Operators Name: | |||
Job Title: | Job Title: RO SRO JPM Title: INST AIR - CROSS CONNECT 3C IAC TO UNIT 2 ONLY Revision Number: 00 JPM Number: S-N-k Task Number and Title: 278N011, Crosstie the Unit 2 and Unit 3 Instrument Air systems. | ||
JPM Number: | K/A Number and Importance: 300000.G.2.1.30 4.4 / 4.0 Suggested Testing Environment: In-plant Actual Testing Environment: Simulator Control Room In-Plant Testing Method: Simulate Alternate Path: Yes No Perform SRO Only: Yes No Time Critical: Yes No Estimated Time to Complete: 12 minutes Actual Time Used: minutes | ||
K/A Number and Importance: 300000.G.2.1.30 | |||
Suggested Testing Environment: | |||
In-plant | |||
Simulator | |||
Simulate Alternate Path | |||
: | |||
Yes | |||
minutes | |||
==References:== | ==References:== | ||
DOP 4700-03, rev 16 EVALUATION | DOP 4700-03, rev 16 EVALUATION | ||
==SUMMARY== | ==SUMMARY== | ||
: | : | ||
Were all the Critical Elements performed satisfactorily? | Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: Satisfactory Unsatisfactory Comments: | ||
Yes | Evaluators Name (Print): | ||
Satisfactory Unsatisfactory Comments: | Evaluators Signature: Date: | ||
Date: | S-N-k Page 7 of 8 | ||
Job Performance Measure (JPM) | Job Performance Measure (JPM) | ||
INITIAL CONDITIONS | |||
: 1. You are an extra NSO. 2. Both units are operating at near rated power. | : 1. You are an extra NSO. | ||
: 3. The Unit 2A Instrument Air compressor is O.O.S | : 2. Both units are operating at near rated power. | ||
: 3. The Unit 2A Instrument Air compressor is O.O.S. | |||
: 5. The Unit 3C Instrument Air compressor is operating but is isolated from both units. INITIATING CUE | : 4. The Unit 2B Instrument Air compressor is having difficulty keeping up with the Unit 2 Instrument Air demand. | ||
: 1. The Unit Supervisor has directed you to align the Unit 3C Instrument Air compressor to Unit 2 only, per DOP 4700 | : 5. The Unit 3C Instrument Air compressor is operating but is isolated from both units. | ||
-03, step g.9. | INITIATING CUE | ||
: 2. Inform the Unit Supervisor when the task is complete.}} | : 1. The Unit Supervisor has directed you to align the Unit 3C Instrument Air compressor to Unit 2 only, per DOP 4700-03, step g.9. | ||
: 2. Inform the Unit Supervisor when the task is complete. | |||
S-N-k Page 8 of 8}} |
Revision as of 21:29, 11 November 2019
ML12284A235 | |
Person / Time | |
---|---|
Site: | Dresden |
Issue date: | 09/26/2012 |
From: | Nelson J, David Reeser Operations Branch III |
To: | Exelon Generation Co |
Shared Package | |
ML11354A119 | List: |
References | |
Download: ML12284A235 (25) | |
Text
Exelon Nuclear Job Performance Measure CRD - CROSSTIE FOR ALTERNATE INJECTION JPM Number: S-N-i Revision Number: 07 Date: 02/12 EXAM MATERIAL Developed By:
Instructor Date Approved By:
Facility Representative Date
Revision Record (Summary)
Revision 06 Bank JPM.
Revision 07 Revised for ILT 11-1 (2012-301) NRC Exam.
S-N-i Page 2 of 8
SIMULATOR SETUP INSTRUCTIONS
- 1. None, this is an in-plant JPM.
DOCUMENT PREPARATION
- 1. Clean copy of DEOP 0500-03.
S-N-i Page 3 of 8
INITIAL CONDITIONS
- 1. You are the Unit 2 Aux NSO.
- 2. Unit 2 has been manually scrammed following a loss of Feedwater.
- 4. HPCI was started AND returned Reactor water level to +15" before an oil leak developed requiring HPCI to be shutdown.
- 6. The 3B CRD pump is running.
INITIATING CUE
- 1. The Unit Supervisor has directed you to IMMEDIATELY perform the in-plant manipulations to crosstie Unit 2 to the Unit 3 CRD pump discharge header for Unit 2 RPV injection in accordance with DEOP 0500-03.
- 2. Inform the Unit Supervisor when the task is complete.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Information For Evaluators Use:
UNSAT requires written comments on respective step.
- Denotes critical steps.
- Denotes critical elements of a critical step.
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.
Some operations that are performed from outside of the control room may require multiple steps.
These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
S-N-i Page 4 of 8
JPM Start Time: _________
UNSAT Comment PERFORMANCE CHECKLIST STANDARDS SAT NOTE:
Provide the examinee with the supplied copy of DEOP 0500-03.
- 1. Verify the Unit 3 CRD system Establishes parameters of current and communication with the cooling flow. Unit 3 control room. _____ _____ _____
CUE:
.Report the following parameters: 3B CRD Pump current of 25 amps and cooling flow of 45 gpm.
NOTE:
.CRD system key is required to open locked valves. Do NOT allow examinee to check out key.
- 2. Verify 3-0301-1B CRD PMP Verifies 3-0301-1B rising DISCH VLV is OPEN. stem full out AND/OR handwheel is full CCW. _____ _____ _____
CUE:
The component is in the condition you described.
- 3. Closes 3-0399-604, U3 CRD Rotates 3-0399-604 PMP DISCH HDR MIN FLOW handwheel CW until THROTTLING VLV. handwheel is full CW. _____ _____ _____
CUE:
The component is in the condition you described.
- 4. Open 2/3-0301-163 U2 & U3 Rotates 2/3-0301-163 CRD SYS CROSSTIE VLV. handwheel CCW until handwheel is full CCW. _____ _____ _____
S-N-i Page 5 of 8
UNSAT Comment PERFORMANCE CHECKLIST STANDARDS SAT CUE:
The component is in the condition you described.
- 5. Throttle open 2/3-0301-162 Adjusts 2/3-0301-162 U2 & U3 CRD SYS handwheel CCW in small CROSSTIE VLV while increments, while _____ _____ _____
maintaining CRD pp current maintaining
<39 amps and CRD Suction communication other pressure >18 Hg vacuum. Operators to ensure amps and suction pressure stay within limits.
CUE:
- 2/3-0301-162 handwheel is full CCW.
- Unit 3 CRD system cooling water flow is 45 gpm.
- Unit 2 CRD system cooling water flow is 44 gpm.
- 3B CRD pump current is 35 amps.
- 3B CRD pump suction pressure is 5 Hg vacuum.
NOTE:
The above cues are intended to inform the examinee that the 2/3-0301-162 handwheel is full open and all parameters are within band.
- 6. Reports to the Unit Unit Supervisor notified.
Supervisor that the in-plant actions are complete. _____ _____ _____
CUE:
Acknowledge report of task completion.
END JPM Stop Time:_________
S-N-i Page 6 of 8
Operators Name:
Job Title: RO SRO JPM Title: CRD - CROSSTIE FOR ALTERNATE INJECTION Revision Number: 07 JPM Number: S-N-i Task Number and Title: 295L092, Crosstie CRD systems for alternate injection.
K/A Number and Importance: 295031.A1.08 3.8 / 3.9 Suggested Testing Environment: In-Plant Actual Testing Environment: Simulator Control Room In-Plant Testing Method: Simulate Alternate Path: Yes No Perform SRO Only: Yes No Time Critical: Yes No Estimated Time to Complete: 10 minutes Actual Time Used: minutes
References:
DEOP 0500-03, rev 20 EVALUATION
SUMMARY
Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: Satisfactory Unsatisfactory Comments:
Evaluators Name (Print):
Evaluators Signature: Date:
S-N-i Page 7 of 8
INITIAL CONDITIONS
- 1. You are the Unit 2 Aux NSO.
- 2. Unit 2 has been manually scrammed following a loss of Feedwater.
- 4. HPCI was started AND returned Reactor water level to +15" before an oil leak developed requiring HPCI to be shutdown.
- 6. The 3B CRD pump is running.
INITIATING CUE
- 1. The Unit Supervisor has directed you to IMMEDIATELY perform the in-plant manipulations to crosstie Unit 2 to the Unit 3 CRD pump discharge header for Unit 2 RPV injection in accordance with DEOP 0500-03.
- 2. Inform the Unit Supervisor when the task is complete.
S-N-i Page 8 of 8
Exelon Nuclear Job Performance Measure ISO COND - LOCAL MAKEUP PUMP OPERATION, WITH COOLING WATER FAILURE JPM Number: S-N-j Revision Number: 00 Date: 02/12 EXAM MATERIAL Developed By:
Instructor Date Approved By:
Facility Representative Date
Revision Record (Summary)
Revision 00 New JPM developed for ILT 11-1 (2012-301) NRC Exam.
S-N-j Page 2 of 9
SIMULATOR SETUP INSTRUCTIONS
- 1. None, this is an in-plant JPM.
DOCUMENT PREPARATION
- 1. Clean copy of DSSP 0100-CR, attachment I.
S-N-j Page 3 of 9
INITIAL CONDITIONS
- 1. You are the Unit 2 Aux NSO.
- 2. Smoke in the Control Room has led to a Control Room Evacuation.
- 3. The Unit 2 Isolation Condenser is in service and makeup to the shell side is required.
- 4. The 2-4399-74, CLEAN DEMIN VLV, valve is open.
INITIATING CUE
- 1. The Unit Supervisor has directed you to start an Isolation Condenser Makeup Pump in accordance with DSSP 0100-CR Attachment I.
- 2. Inform the Unit Supervisor when the task is complete.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Information For Evaluators Use:
UNSAT requires written comments on respective step.
- Denotes critical steps.
- Denotes critical elements of a critical step.
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.
Some operations that are performed from outside of the control room may require multiple steps.
These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
S-N-j Page 4 of 9
JPM Start Time: _________
UNSAT Comment PERFORMANCE CHECKLIST STANDARDS SAT NOTE:
Provide the examinee with the supplied copy of DSSP 0100-CR, attachment I.
CB-1 key is required for entry into the Iso Cond makeup pump building.
The candidate may choose to start either engine.
- 1. Place the REMOTE-OFF- Switch at panel 2223-126A RUN toggle switch for either or B, placed in RUN.
_____ _____ _____
engine in RUN.
CUE:
The component is in the condition you described.
- 2. Verify engine starts and Engine RPM indicator on comes up to stable speed. panel 2223-126A or B is
_____ _____ _____
checked.
CUE:
The engine has started and is running at 1802 RPM.
NOTE:
The indicator is an LCD display that scrolls through the parameters, (only while the engine is running).
- 3. Monitor the following engine Checks the parameters on parameters to ensure limits the LCD display.
are NOT exceeded:
- Oil Pressure
_____ _____ _____
- Water Temperature
- RPM BEGIN ALTERNATE PATH CUE:
Provide the following engine parameter values:
- Oil pressure: 55 psi
- Water Temperature 215oF
- RPM 1802 rpm
- 4. Recognizes that water > 205oF.
temperature has exceeded the high limit. _____ _____ _____
S-N-j Page 5 of 9
UNSAT Comment PERFORMANCE CHECKLIST STANDARDS SAT
- 5. Stops running engine by Switch at panel 2223-126A placing the REMOTE-OFF- or B, placed in OFF.
RUN toggle switch to OFF. _____ _____ _____
CUE:
The component is in the condition you described.
- 6. Starts the opposite IC Switch at panel 2223-126A Makeup Pump, than was or B, placed in RUN.
originally started. _____ _____ _____
CUE:
The component is in the condition you described.
- 7. Verify engine starts and Engine RPM indicator on comes up to stable speed. panel 2223-126A or B is
_____ _____ _____
checked.
CUE:
The engine has started and is running.
- 8. Monitor the following engine Checks the parameters on parameters to ensure limits the LCD display.
are NOT exceeded:
- Oil Pressure
- Water Temperature
_____ _____ _____
- RPM CUE:
Provide the following engine parameter values:
- Oil pressure: 59 psi
- Water Temperature 185oF
- RPM 1799 rpm
- 9. Notifies SM/U2 US that an Iso Notifies appropriate Cond Makeup Pump is in individual.
_____ _____ _____
operation.
S-N-j Page 6 of 9
UNSAT Comment PERFORMANCE CHECKLIST STANDARDS SAT CUE:
Inform the candidate that another Operator will perform monitoring duties.
- 10. Reports to the SM/U2 US SM/U2 US notified.
that the task is complete.
_____ _____ _____
CUE:
Acknowledge report of task completion.
END JPM Stop Time:_________
S-N-j Page 7 of 9
Operators Name:
Job Title: RO SRO JPM Title: ISO COND - LOCAL MAKEUP PUMP OPERATION, WITH COOLING WATER FAILURE Revision Number: 00 JPM Number: S-N-j Task Number and Title: 207N020, Start Isolation Condenser Makeup Pump.
K/A Number and Importance: 207000.A2.05 4.0 / 4.0 Suggested Testing Environment: In-Plant Actual Testing Environment: Simulator Control Room In-Plant Testing Method: Simulate Alternate Path: Yes No Perform SRO Only: Yes No Time Critical: Yes No Estimated Time to Complete: 10 minutes Actual Time Used: minutes
References:
DSSP 0100-CR, rev 43 EVALUATION
SUMMARY
Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: Satisfactory Unsatisfactory Comments:
Evaluators Name (Print):
Evaluators Signature: Date:
S-N-j Page 8 of 9
INITIAL CONDITIONS
- 1. You are the Unit 2 Aux NSO.
- 2. Smoke in the Control Room has led to a Control Room Evacuation.
- 3. The Unit 2 Isolation Condenser is in service and makeup to the shell side is required.
- 4. The 2-4399-74, CLEAN DEMIN VLV, valve is open.
INITIATING CUE
- 1. The Unit Supervisor has directed you to start an Isolation Condenser Makeup Pump in accordance with DSSP 0100-CR Attachment I.
- 2. Inform the Unit Supervisor when the task is complete.
S-N-j Page 9 of 9
Exelon Nuclear Job Performance Measure INST AIR - CROSS CONNECT 3C IAC TO UNIT 2 ONLY JPM Number: S-N-k Revision Number: 00 Date: 02/12 EXAM MATERIAL Developed By:
Instructor Date Approved By:
Facility Representative Date
Revision Record (Summary)
Revision 00 New JPM developed for ILT 11-1 (2012-301) NRC Exam.
S-N-k Page 2 of 8
SIMULATOR SETUP INSTRUCTIONS
- 1. None, this is an in-plant JPM.
DOCUMENT PREPARATION
- 1. Clean copy of DOP 4700-03.
S-N-k Page 3 of 8
INITIAL CONDITIONS
- 1. You are an extra NSO.
- 2. Both units are operating at near rated power.
- 3. The Unit 2A Instrument Air compressor is O.O.S.
- 4. The Unit 2B Instrument Air compressor is having difficulty keeping up with the Unit 2 Instrument Air demand.
- 5. The Unit 3C Instrument Air compressor is operating but is isolated from both units.
INITIATING CUE
- 1. The Unit Supervisor has directed you to align the Unit 3C Instrument Air compressor to Unit 2 only, per DOP 4700-03, step g.9.
- 2. Inform the Unit Supervisor when the task is complete.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Information For Evaluators Use:
UNSAT requires written comments on respective step.
- Denotes critical steps.
- Denotes critical elements of a critical step.
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.
Some operations that are performed from outside of the control room may require multiple steps.
These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
S-N-k Page 4 of 8
JPM Start Time: _________
UNSAT Comment PERFORMANCE CHECKLIST STANDARDS SAT NOTE:
Provide the examinee with the supplied copy of DOP 4700-03.
- 1. Candidate may call control Contacts control room.
room and ask if the 3C IAC is in operation, with air dryers _____ _____ _____
valved in.
CUE:
The 3C Instrument Air Compressor is running, the air dryers are valved in, but the compressor is isolated from both units headers.
- 2. Verify closed 3-4799-501A, Valve handwheel is in the 3C IAC DISCH TO U 3 INST full CW position.
AIR HEADER ISOL VLV. _____ _____ _____
CUE:
The component is in the condition you described.
- 3. Close 2/3-4799-424, U2/U3 X Valve handwheel is in the TIE SV. full CW position.
_____ _____ _____
CUE:
The component is in the condition you described.
_____ _____ _____
CUE:
The component is in the condition you described.
- 5. Open 2-47350-500, U2 INST Valve handwheel is in the AIR SYS XTIE FROM THE full CCW position.
U3 INST AIR SYS. _____ _____ _____
CUE:
The component is in the condition you described.
S-N-k Page 5 of 8
UNSAT Comment PERFORMANCE CHECKLIST STANDARDS SAT
_____ _____ _____
CUE:
The component is in the condition you described.
- 7. Reports to the Unit 2 Unit 2 Supervisor notified.
Supervisor that the task is complete. _____ _____ _____
CUE:
Acknowledge report of task completion.
END JPM Stop Time:_________
S-N-k Page 6 of 8
Operators Name:
Job Title: RO SRO JPM Title: INST AIR - CROSS CONNECT 3C IAC TO UNIT 2 ONLY Revision Number: 00 JPM Number: S-N-k Task Number and Title: 278N011, Crosstie the Unit 2 and Unit 3 Instrument Air systems.
K/A Number and Importance: 300000.G.2.1.30 4.4 / 4.0 Suggested Testing Environment: In-plant Actual Testing Environment: Simulator Control Room In-Plant Testing Method: Simulate Alternate Path: Yes No Perform SRO Only: Yes No Time Critical: Yes No Estimated Time to Complete: 12 minutes Actual Time Used: minutes
References:
DOP 4700-03, rev 16 EVALUATION
SUMMARY
Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: Satisfactory Unsatisfactory Comments:
Evaluators Name (Print):
Evaluators Signature: Date:
S-N-k Page 7 of 8
INITIAL CONDITIONS
- 1. You are an extra NSO.
- 2. Both units are operating at near rated power.
- 3. The Unit 2A Instrument Air compressor is O.O.S.
- 4. The Unit 2B Instrument Air compressor is having difficulty keeping up with the Unit 2 Instrument Air demand.
- 5. The Unit 3C Instrument Air compressor is operating but is isolated from both units.
INITIATING CUE
- 1. The Unit Supervisor has directed you to align the Unit 3C Instrument Air compressor to Unit 2 only, per DOP 4700-03, step g.9.
- 2. Inform the Unit Supervisor when the task is complete.
S-N-k Page 8 of 8