ML13063A018: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(3 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML13063A018
| number = ML13063A018
| issue date = 02/27/2013
| issue date = 02/27/2013
| title = Response to Request for Additional Information Regarding Relief Request 2-ISI-28 (TAC No. ME8779)
| title = Response to Request for Additional Information Regarding Relief Request 2-ISI-28
| author name = Shea J W
| author name = Shea J
| author affiliation = Tennessee Valley Authority
| author affiliation = Tennessee Valley Authority
| addressee name =  
| addressee name =  
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:Tennessee Valley Authority, 1101 Market Street, Chattanooga, Tennessee 37402 February 27, 2013 10 CFR 50.4 1OCFR 50.55a ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, D.C. 20555-0001 Browns Ferry Nuclear Plant, Unit 2 Renewed Facility Operating License No. DPR-52 NRC Docket No. 50-260  
{{#Wiki_filter:Tennessee Valley Authority, 1101 Market Street, Chattanooga, Tennessee 37402 February 27, 2013 10 CFR 50.4 10CFR 50.55a ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, D.C. 20555-0001 Browns Ferry Nuclear Plant, Unit 2 Renewed Facility Operating License No. DPR-52 NRC Docket No. 50-260


==Subject:==
==Subject:==
Line 24: Line 24:


==References:==
==References:==
: 1. Letter from TVA to NRC, "American Society of Mechanical Engineers, Section XI Code, Inservice Inspection Program for the Unit 2 Third Ten-Year Inspection Interval, Request for Relief 2-ISI-28," dated May 24, 2012 2. Letter from NRC to TVA, "Browns Ferry Nuclear Plant, Unit 2 -Request for Additional Information Regarding Relief Request 2-ISI-28 (TAC NO. ME8779)," dated November 2, 2012 (ADAMS No. ML12306A352)
: 1. Letter from TVA to NRC, "American Society of Mechanical Engineers, Section XI Code, Inservice Inspection Program for the Unit 2 Third Ten-Year Inspection Interval, Request for Relief 2-ISI-28," dated May 24, 2012
On May 24, 2012, the Tennessee Valley Authority (TVA) submitted "American Society of Mechanical Engineers, Section Xl Code, Inservice Inspection Program for the Unit 2 Third Ten-Year Inspection Interval, Request for Relief 2-1SI-28 (Reference 1). By NRC letter dated November 2, 2012 (Reference 2), TVA received a Request for Additional Information (RAI) regarding Relief Request 2-ISI-28 for Browns Ferry Nuclear Plant (BFN) Unit 2. The NRC requested the response within 90 days from the date of issuance.
: 2. Letter from NRC to TVA, "Browns Ferry Nuclear Plant, Unit 2 -
Per email dated January 30, 2013, TVA requested and was granted a 21-day extension for the response to the RAI letter. Per email dated February 15, 2013, TVA requested and was granted a 7-day extension for the response to the RAI letter. Therefore, the response is due 118 days from date of issuance, i.e., by February 27, 2013.4DY47 Printed on recycled paper U.S. Nuclear Regulatory Commission Page 2 February 27, 2013 The enclosure to this letter provides the TVA response to the NRC RAI letter.This letter does not include any new regulatory commitments.
Request for Additional Information Regarding Relief Request 2-ISI-28 (TAC NO. ME8779)," dated November 2, 2012 (ADAMS No. ML12306A352)
Please direct any questions concerning this matter to Tom Hess at (423) 751-3487.NRespectfu J. W. Shea Vice President, Nuclear Licensing  
On May 24, 2012, the Tennessee Valley Authority (TVA) submitted "American Society of Mechanical Engineers, Section Xl Code, Inservice Inspection Program for the Unit 2 Third Ten-Year Inspection Interval, Request for Relief 2-1SI-28 (Reference 1). By NRC letter dated November 2, 2012 (Reference 2), TVA received a Request for Additional Information (RAI) regarding Relief Request 2-ISI-28 for Browns Ferry Nuclear Plant (BFN) Unit 2. The NRC requested the response within 90 days from the date of issuance. Per email dated January 30, 2013, TVA requested and was granted a 21-day extension for the response to the RAI letter. Per email dated February 15, 2013, TVA requested and was granted a 7-day extension for the response to the RAI letter. Therefore, the response is due 118 days from date of issuance, i.e., by February 27, 2013.
4DY47 Printed on recycled paper
 
U.S. Nuclear Regulatory Commission Page 2 February 27, 2013 The enclosure to this letter provides the TVA response to the NRC RAI letter.
This letter does not include any new regulatory commitments. Please direct any questions concerning this matter to Tom Hess at (423) 751-3487.
NRespectfu J. W. Shea Vice President, Nuclear Licensing


==Enclosure:==
==Enclosure:==


TVA Response to NRC Request for Information cc: (Enclosure):
TVA Response to NRC Request for Information cc: (Enclosure):
NRC Regional Administrator  
NRC Regional Administrator - Region II NRC Senior Resident Inspector - Browns Ferry Nuclear Plant Alabama State Department of Public Health
-Region II NRC Senior Resident Inspector  
 
-Browns Ferry Nuclear Plant Alabama State Department of Public Health Response to Request for Additional Information Regarding Relief Request 2.1SI.28 TVA Response to NRC Request for Information NRC Request for Additional Information Question 1 The Table on page E-6 indicates that the request is for two welds. For each sketch provided, identify the weld(s) that relief is being requested by using standard American Welding Society weld symbols pointing to each weld face to identify that weld. If a weld face contains more than one weld designation, identify this on each sketch TVA Response Request for Relief 2-1SI-28 requests relief from weld examination coverage requirements for one reactor pressure vessel nozzle-to-vessel full penetration weld and nozzle inside radius section.Attachment 1 shows the nozzle to vessel weld (N 10-NV), including the requested weld symbols. A built up pad machined to form a socket for connection of Standby Liquid Control (SLC) piping is present on the inner radius of the nozzle forging. Details of the inner radius configuration are provided in Attachment 2.NRC Request for Additional Information Question 2 Identify the American Society of Mechanical Engineers material designation for each part of each weld. If a material is clad with Stainless Steel or other metal, clearly identify that material.TVA Response The SLC nozzle is located in the lower head upper segment of the bottom head assembly.
Response to Request for Additional Information Regarding Relief Request 2.1SI.28 TVA Response to NRC Request for Information NRC Request for Additional Information Question 1 The Table on page E-6 indicates that the request is for two welds. Foreach sketch provided, identify the weld(s) that relief is being requested by using standardAmerican Welding Society weld symbols pointing to each weld face to identify that weld. If a weld face contains more than one weld designation,identify this on each sketch TVA Response Request for Relief 2-1SI-28 requests relief from weld examination coverage requirements for one reactor pressure vessel nozzle-to-vessel full penetration weld and nozzle inside radius section. shows the nozzle to vessel weld (N 10-NV), including the requested weld symbols. A built up pad machined to form a socket for connection of Standby Liquid Control (SLC) piping is present on the inner radius of the nozzle forging. Details of the inner radius configuration are provided in .
The SLC nozzle forging is fabricated from ASTM A 508, Class 2 manganese-molybdenum steel conforming to ASME Code Case 1332-2 and welded to the lower head using E9016-G. The lower head upper segment is clad with E309L.NRC Request for Additional Information Question 3 Provide specific details of the basis that 100 percent ultrasonic testing cannot be accomplished, such as the specific design and the conditions that prevent the welds from being examined 100 percent by the ultrasonic testing technique.
NRC Request for Additional Information Question 2 Identify the American Society of Mechanical Engineers material designation for each part of each weld. If a materialis clad with Stainless Steel or other metal, clearly identify that material.
TVA Response Specifically, the limitations are due to the radius of curvature in the transition area between the nozzle and the vessel shell, and geometric design configurations limiting access to a single side of the weld. In order to meet the Code requirements, the nozzles and/or subject vessels would have to be modified to facilitate access for ultrasonic search units.E-1 NRC Request for Additional Information Question 4 Address whether any indications, detected on the RPV nozzle-to-vessel welds, were evaluated to be either relevant or nonrelevant indications.
TVA Response The SLC nozzle is located in the lower head upper segment of the bottom head assembly. The SLC nozzle forging is fabricated from ASTM A 508, Class 2 manganese-molybdenum steel conforming to ASME Code Case 1332-2 and welded to the lower head using E9016-G. The lower head upper segment is clad with E309L.
If any indications were detected, discuss the disposition of these indications.
NRC Request for Additional Information Question 3 Provide specific details of the basis that 100 percent ultrasonictesting cannot be accomplished, such as the specific design and the conditions that prevent the welds from being examined 100 percent by the ultrasonic testing technique.
TVA Response There were no recordable indications identified during the inspection of Welds N10-NV and N10-1R.NRC Request for Additional Information Question 5 Address how the coverage for the NIO-IR inner radius examination was calculated.
TVA Response Specifically, the limitations are due to the radius of curvature in the transition area between the nozzle and the vessel shell, and geometric design configurations limiting access to a single side of the weld. In order to meet the Code requirements, the nozzles and/or subject vessels would have to be modified to facilitate access for ultrasonic search units.
Provide a coverage map showing the areas that were missed.TVA Response Modeling report IR-2004-43 was developed by the EPRI NDE Center. The essential geometric parameters of the Browns Ferry Standby Liquid Control nozzle and the qualified procedure essential variables were input into the EPRI software to calculate the coverage obtained.'Attachment 3 provides the coverage map for the limited volume of coverage.NRC Request for Additional Information Question 6 From the Coverage Data Sheets (CDSs), CDS-01 shows that the 60-degree probe can approach very close to the edge of the fillet. In CDS-02, the drawing shows that the 50-degree probe stops much earlier and the line labeled "50°0' appears to be drawn with an angle of 60 degrees. Provide a drawing that shows the regions inspected by the 50-and 60-degree probes.TVA Response The area of limitation, calculated in CDS-01, is based on the index point of the 60 degree transducer, when the front (nose) is butted up against the outside nozzle radius. The index point location, in this case, can be marked by the extrapolation of the dashed arrow that is depicted exiting the Code Required Volume of Coverage (CRV). Note that the solid arrow that points to the vessel toe of the outside radius is for reference only, and does not apply to the transducer exit point, nor was used in the calculation of the achieved volume. The depiction of transducer angles presented in CDS-02 are representative of the compound angles of skew (+/- 13 to 40 degrees) coupled with the angle of propagation (50 degree shear) within the material, at the minimum and maximum radial transducer positions.
E-1
This results in a parallax.However, the two-dimensional (single-slice) drawing depicts that the 50 degree shear transducer at the maximum radial position with a skew of +/- 40 degrees strikes the ID at the outer limit (vessel side of weld) of the CRV. Likewise, the 50 degree shear transducer at the minimum radial position with a skew of +/- 13 degrees strikes the ID at the inner limit (nozzle side of weld) of the CRV. Modeling report IR-2003-31 was developed by the EPRI NDE Center utilizing modeling software.
 
The essential geometric parameters of the Browns Ferry Standby Liquid Control nozzle and the qualified procedure essential variables were input into the software to calculate the coverage obtained.
NRC Request for AdditionalInformation Question 4 Address whether any indications,detected on the RPV nozzle-to-vessel welds, were evaluated to be either relevant or nonrelevantindications. If any indications were detected, discuss the disposition of these indications.
The coverage plot on CDS-02 combines the E-2 details of the modeling report IR-2003-31, Figure 2-4 and Figure 2-5, for the calculation of the extent of circumferential coverage.NRC Request for Additional Information Question 7 In CDS-02, showing the circumferential examination for axial flaws, the drawing appears to show that the weld was inspected using a 50-and 60-degree skew. This drawing appears to be a drawing of the axial inspection.
TVA Response There were no recordable indications identified during the inspection of Welds N10-NV and N10-1R.
Please verify the skew angles used to calculate the coverage of the circumferential examination.
NRC Request for AdditionalInformation Question 5 Address how the coverage for the NIO-IR inner radius examination was calculated.Provide a coverage map showing the areas that were missed.
TVA Response The depiction in CDS-02 uses compound angles (incident angle plus skew angles) resulting in a parallax, as rendered in the two-dimensional drawing. However, the skew angles used for the 50 degree shear transducer were +/- 13 degrees to +/- 40 degrees, which results in a maximum misorientation angle of 0 degrees (perpendicular to an axial flaw), for the circumferential exam.CDS-02 is correctly identified as circumferential exam coverage.NRC Request for Additional Information Question 8 For Weld NIO-NV, the calculation for circumferential ultrasonic examination coverage gives a higher weight to the lower 15 percent than the upper 85 percent. From the CDSs, it appears that the Composite Axial plus Circumferential Coverage is 81.7 percent, not 86.2 percent. Confirm that the Composite Axial plus Circumferential Coverage is 86.2 percent. If not, address the discrepancy.
TVA Response Modeling report IR-2004-43 was developed by the EPRI NDE Center. The essential geometric parameters of the Browns Ferry Standby Liquid Control nozzle and the qualified procedure essential variables were input into the EPRI software to calculate the coverage obtained.
TVA Response The correct value of the Composite Axial plus Circumferential Coverage is 81.7 percent. The calculation in the examination report determined the percentage of coverage obtained.
'Attachment 3 provides the coverage map for the limited volume of coverage.
But, during calculation of the circumferential coverage of the upper 85% of thickness (T), the calculation did not include the appropriateweighting factor of 85% (0.85). The value should have been multiplied by 85% (0.85) prior to composite.
NRC Request for Additional Information Question 6 From the Coverage Data Sheets (CDSs), CDS-01 shows that the 60-degree probe can approach very close to the edge of the fillet. In CDS-02, the drawing shows that the 50-degree probe stops much earlierand the line labeled "50°0' appears to be drawn with an angle of 60 degrees. Provide a drawingthat shows the regions inspected by the 50-and 60-degree probes.
This error has been entered into TVA's Corrective Action Program.E-3 ATTACHMENTS:
TVA Response The area of limitation, calculated in CDS-01, is based on the index point of the 60 degree transducer, when the front (nose) is butted up against the outside nozzle radius. The index point location, in this case, can be marked by the extrapolation of the dashed arrow that is depicted exiting the Code Required Volume of Coverage (CRV). Note that the solid arrow that points to the vessel toe of the outside radius is for reference only, and does not apply to the transducer exit point, nor was used in the calculation of the achieved volume. The depiction of transducer angles presented in CDS-02 are representative of the compound angles of skew
: 1. Detail B, Drawing 122858E-1 1, Lower Head Upper Segment Drawing 2. Detail B, Drawing 151863E, Modification of 2" Liquid Control Nozzle 3. IR 2004-43, Figures 4 and 5 E-4 Attachment 1 Detail B, Drawing 122858E-1 1, Lower Head Upper Segmelnt Drawing _..I IIJ t'V L x BE 7.4L& 3 Attachment 2 Detail B, Drawing 151863E, Modification of 2" Liquid Control Nozzle'MontF#. .4b as --j-.1- A=,`/ I 7Vj R WR I I IOWFA)~*.w 0 bIA Attachment 3 IR 2004-43, Figures 4 and 5 Figure 4 shows the minimum and maximum probe radial positions and the portion of the examination volume covered by the vessel shell detection technique, 70/(2 to 23)v, for probes scanned at the azimuth angle of 00.Browns Ferry Standby Liquid Control Nozzle (N10);70/(2 to 23)vs 134 between the dotted lines represents 130 the non inspected z area. I A 0 2 4 8 R 10 12 14 16 Figure 4. Browns Ferry Standby Liquid Control Nozzle (N 10): Probe Scan Limits and Examination Coverage for Vessel Shell Detection Technique, 70/(2 to 23)v.Figure 5 shows the minimum and maximum probe radial positions and the portion of the examination volume covered by the vessel shell detection technique, 65/(1 to 1O)v, for probes scanned at the azimuth angle of 0'.Browns Ferry Standby Liquid Control Nozzle (N10);651(1 to 1O)vs 134 Z 0 4 8 R 10 12 14 16 Figure 5. Browns Ferry Standby Liquid Control Nozzle (N 10): Probe Scan Limits and Examination Coverage for Vessel Shell Detection Technique, 65/(1 to 10)v.6}}
(+/- 13 to 40 degrees) coupled with the angle of propagation (50 degree shear) within the material, at the minimum and maximum radial transducer positions. This results in a parallax.
However, the two-dimensional (single-slice) drawing depicts that the 50 degree shear transducer at the maximum radial position with a skew of +/- 40 degrees strikes the ID at the outer limit (vessel side of weld) of the CRV. Likewise, the 50 degree shear transducer at the minimum radial position with a skew of +/- 13 degrees strikes the ID at the inner limit (nozzle side of weld) of the CRV. Modeling report IR-2003-31 was developed by the EPRI NDE Center utilizing modeling software. The essential geometric parameters of the Browns Ferry Standby Liquid Control nozzle and the qualified procedure essential variables were input into the software to calculate the coverage obtained. The coverage plot on CDS-02 combines the E-2
 
details of the modeling report IR-2003-31, Figure 2-4 and Figure 2-5, for the calculation of the extent of circumferential coverage.
NRC Request for Additional Information Question 7 In CDS-02, showing the circumferentialexamination for axial flaws, the drawing appearsto show that the weld was inspected using a 50-and 60-degree skew. This drawing appearsto be a drawing of the axial inspection. Please verify the skew angles used to calculate the coverage of the circumferentialexamination.
TVA Response The depiction in CDS-02 uses compound angles (incident angle plus skew angles) resulting in a parallax, as rendered in the two-dimensional drawing. However, the skew angles used for the 50 degree shear transducer were +/- 13 degrees to +/- 40 degrees, which results in a maximum misorientation angle of 0 degrees (perpendicular to an axial flaw), for the circumferential exam.
CDS-02 is correctly identified as circumferential exam coverage.
NRC Request for AdditionalInformation Question 8 For Weld NIO-NV, the calculationfor circumferential ultrasonicexamination coverage gives a higher weight to the lower 15 percent than the upper 85 percent. From the CDSs, it appearsthat the Composite Axial plus CircumferentialCoverage is 81.7 percent, not 86.2 percent. Confirm that the Composite Axial plus CircumferentialCoverage is 86.2 percent. If not, addressthe discrepancy.
TVA Response The correct value of the Composite Axial plus Circumferential Coverage is 81.7 percent. The calculation in the examination report determined the percentage of coverage obtained. But, during calculation of the circumferential coverage of the upper 85% of thickness (T), the calculation did not include the appropriateweighting factor of 85% (0.85). The value should have been multiplied by 85% (0.85) prior to composite. This error has been entered into TVA's Corrective Action Program.
E-3
 
ATTACHMENTS:
: 1. Detail B, Drawing 122858E-1 1, Lower Head Upper Segment Drawing
: 2. Detail B, Drawing 151863E, Modification of 2" Liquid Control Nozzle
: 3. IR 2004-43, Figures 4 and 5 E-4
 
Attachment 1 Detail B, Drawing 122858E-1 1, Lower Head I    IIJ Segmelntt Drawing Upper                _..
L      *'#,y\                                                        'V BE 7.4L&3 x
 
Attachment 2 Detail B, Drawing 151863E, Modification of 2" Liquid Control Nozzle
                                            'MontF#.   . 4b as --j-
                                                  . 1- A=,
`/I   7Vj R WR I I IOWFA)
                                                                  ~*.w 0 bIA
 
Attachment 3 IR 2004-43, Figures 4 and 5 Figure 4 shows the minimum and maximum probe radial positions and the portion of the examination volume covered by the vessel shell detection technique, 70/(2 to 23)v, for probes scanned at the azimuth angle of 00.
Browns Ferry Standby Liquid Control Nozzle (N10);
70/(2 to 23)vs 134 between the dotted lines represents               130 the non inspected             z area.                           IA 0     2     4             8     10     12     14 16 R
Figure 4. Browns Ferry Standby Liquid Control Nozzle (N 10): Probe Scan Limits and Examination Coverage for Vessel Shell Detection Technique, 70/(2 to 23)v.
Figure 5 shows the minimum and maximum probe radial positions and the portion of the examination volume covered by the vessel shell detection technique, 65/(1 to 1O)v, for probes scanned at the azimuth angle of 0'.
Browns Ferry Standby Liquid Control Nozzle (N10);
651(1 to 1O)vs 134 Z
0             4             8     10     12     14 16 R
Figure 5. Browns Ferry Standby Liquid Control Nozzle (N 10): Probe Scan Limits and Examination Coverage for Vessel Shell Detection Technique, 65/(1 to 10)v.
6}}

Latest revision as of 16:20, 11 November 2019

Response to Request for Additional Information Regarding Relief Request 2-ISI-28
ML13063A018
Person / Time
Site: Browns Ferry Tennessee Valley Authority icon.png
Issue date: 02/27/2013
From: James Shea
Tennessee Valley Authority
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
2-ISI-28, TAC ME8779
Download: ML13063A018 (9)


Text

Tennessee Valley Authority, 1101 Market Street, Chattanooga, Tennessee 37402 February 27, 2013 10 CFR 50.4 10CFR 50.55a ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, D.C. 20555-0001 Browns Ferry Nuclear Plant, Unit 2 Renewed Facility Operating License No. DPR-52 NRC Docket No. 50-260

Subject:

Response to Request for Additional Information Regarding Relief Request 2-ISI-28 (TAC NO. ME8779)

References:

1. Letter from TVA to NRC, "American Society of Mechanical Engineers,Section XI Code, Inservice Inspection Program for the Unit 2 Third Ten-Year Inspection Interval, Request for Relief 2-ISI-28," dated May 24, 2012
2. Letter from NRC to TVA, "Browns Ferry Nuclear Plant, Unit 2 -

Request for Additional Information Regarding Relief Request 2-ISI-28 (TAC NO. ME8779)," dated November 2, 2012 (ADAMS No. ML12306A352)

On May 24, 2012, the Tennessee Valley Authority (TVA) submitted "American Society of Mechanical Engineers, Section Xl Code, Inservice Inspection Program for the Unit 2 Third Ten-Year Inspection Interval, Request for Relief 2-1SI-28 (Reference 1). By NRC letter dated November 2, 2012 (Reference 2), TVA received a Request for Additional Information (RAI) regarding Relief Request 2-ISI-28 for Browns Ferry Nuclear Plant (BFN) Unit 2. The NRC requested the response within 90 days from the date of issuance. Per email dated January 30, 2013, TVA requested and was granted a 21-day extension for the response to the RAI letter. Per email dated February 15, 2013, TVA requested and was granted a 7-day extension for the response to the RAI letter. Therefore, the response is due 118 days from date of issuance, i.e., by February 27, 2013.

4DY47 Printed on recycled paper

U.S. Nuclear Regulatory Commission Page 2 February 27, 2013 The enclosure to this letter provides the TVA response to the NRC RAI letter.

This letter does not include any new regulatory commitments. Please direct any questions concerning this matter to Tom Hess at (423) 751-3487.

NRespectfu J. W. Shea Vice President, Nuclear Licensing

Enclosure:

TVA Response to NRC Request for Information cc: (Enclosure):

NRC Regional Administrator - Region II NRC Senior Resident Inspector - Browns Ferry Nuclear Plant Alabama State Department of Public Health

Response to Request for Additional Information Regarding Relief Request 2.1SI.28 TVA Response to NRC Request for Information NRC Request for Additional Information Question 1 The Table on page E-6 indicates that the request is for two welds. Foreach sketch provided, identify the weld(s) that relief is being requested by using standardAmerican Welding Society weld symbols pointing to each weld face to identify that weld. If a weld face contains more than one weld designation,identify this on each sketch TVA Response Request for Relief 2-1SI-28 requests relief from weld examination coverage requirements for one reactor pressure vessel nozzle-to-vessel full penetration weld and nozzle inside radius section. shows the nozzle to vessel weld (N 10-NV), including the requested weld symbols. A built up pad machined to form a socket for connection of Standby Liquid Control (SLC) piping is present on the inner radius of the nozzle forging. Details of the inner radius configuration are provided in .

NRC Request for Additional Information Question 2 Identify the American Society of Mechanical Engineers material designation for each part of each weld. If a materialis clad with Stainless Steel or other metal, clearly identify that material.

TVA Response The SLC nozzle is located in the lower head upper segment of the bottom head assembly. The SLC nozzle forging is fabricated from ASTM A 508, Class 2 manganese-molybdenum steel conforming to ASME Code Case 1332-2 and welded to the lower head using E9016-G. The lower head upper segment is clad with E309L.

NRC Request for Additional Information Question 3 Provide specific details of the basis that 100 percent ultrasonictesting cannot be accomplished, such as the specific design and the conditions that prevent the welds from being examined 100 percent by the ultrasonic testing technique.

TVA Response Specifically, the limitations are due to the radius of curvature in the transition area between the nozzle and the vessel shell, and geometric design configurations limiting access to a single side of the weld. In order to meet the Code requirements, the nozzles and/or subject vessels would have to be modified to facilitate access for ultrasonic search units.

E-1

NRC Request for AdditionalInformation Question 4 Address whether any indications,detected on the RPV nozzle-to-vessel welds, were evaluated to be either relevant or nonrelevantindications. If any indications were detected, discuss the disposition of these indications.

TVA Response There were no recordable indications identified during the inspection of Welds N10-NV and N10-1R.

NRC Request for AdditionalInformation Question 5 Address how the coverage for the NIO-IR inner radius examination was calculated.Provide a coverage map showing the areas that were missed.

TVA Response Modeling report IR-2004-43 was developed by the EPRI NDE Center. The essential geometric parameters of the Browns Ferry Standby Liquid Control nozzle and the qualified procedure essential variables were input into the EPRI software to calculate the coverage obtained.

'Attachment 3 provides the coverage map for the limited volume of coverage.

NRC Request for Additional Information Question 6 From the Coverage Data Sheets (CDSs), CDS-01 shows that the 60-degree probe can approach very close to the edge of the fillet. In CDS-02, the drawing shows that the 50-degree probe stops much earlierand the line labeled "50°0' appears to be drawn with an angle of 60 degrees. Provide a drawingthat shows the regions inspected by the 50-and 60-degree probes.

TVA Response The area of limitation, calculated in CDS-01, is based on the index point of the 60 degree transducer, when the front (nose) is butted up against the outside nozzle radius. The index point location, in this case, can be marked by the extrapolation of the dashed arrow that is depicted exiting the Code Required Volume of Coverage (CRV). Note that the solid arrow that points to the vessel toe of the outside radius is for reference only, and does not apply to the transducer exit point, nor was used in the calculation of the achieved volume. The depiction of transducer angles presented in CDS-02 are representative of the compound angles of skew

(+/- 13 to 40 degrees) coupled with the angle of propagation (50 degree shear) within the material, at the minimum and maximum radial transducer positions. This results in a parallax.

However, the two-dimensional (single-slice) drawing depicts that the 50 degree shear transducer at the maximum radial position with a skew of +/- 40 degrees strikes the ID at the outer limit (vessel side of weld) of the CRV. Likewise, the 50 degree shear transducer at the minimum radial position with a skew of +/- 13 degrees strikes the ID at the inner limit (nozzle side of weld) of the CRV. Modeling report IR-2003-31 was developed by the EPRI NDE Center utilizing modeling software. The essential geometric parameters of the Browns Ferry Standby Liquid Control nozzle and the qualified procedure essential variables were input into the software to calculate the coverage obtained. The coverage plot on CDS-02 combines the E-2

details of the modeling report IR-2003-31, Figure 2-4 and Figure 2-5, for the calculation of the extent of circumferential coverage.

NRC Request for Additional Information Question 7 In CDS-02, showing the circumferentialexamination for axial flaws, the drawing appearsto show that the weld was inspected using a 50-and 60-degree skew. This drawing appearsto be a drawing of the axial inspection. Please verify the skew angles used to calculate the coverage of the circumferentialexamination.

TVA Response The depiction in CDS-02 uses compound angles (incident angle plus skew angles) resulting in a parallax, as rendered in the two-dimensional drawing. However, the skew angles used for the 50 degree shear transducer were +/- 13 degrees to +/- 40 degrees, which results in a maximum misorientation angle of 0 degrees (perpendicular to an axial flaw), for the circumferential exam.

CDS-02 is correctly identified as circumferential exam coverage.

NRC Request for AdditionalInformation Question 8 For Weld NIO-NV, the calculationfor circumferential ultrasonicexamination coverage gives a higher weight to the lower 15 percent than the upper 85 percent. From the CDSs, it appearsthat the Composite Axial plus CircumferentialCoverage is 81.7 percent, not 86.2 percent. Confirm that the Composite Axial plus CircumferentialCoverage is 86.2 percent. If not, addressthe discrepancy.

TVA Response The correct value of the Composite Axial plus Circumferential Coverage is 81.7 percent. The calculation in the examination report determined the percentage of coverage obtained. But, during calculation of the circumferential coverage of the upper 85% of thickness (T), the calculation did not include the appropriateweighting factor of 85% (0.85). The value should have been multiplied by 85% (0.85) prior to composite. This error has been entered into TVA's Corrective Action Program.

E-3

ATTACHMENTS:

1. Detail B, Drawing 122858E-1 1, Lower Head Upper Segment Drawing
2. Detail B, Drawing 151863E, Modification of 2" Liquid Control Nozzle
3. IR 2004-43, Figures 4 and 5 E-4

Attachment 1 Detail B, Drawing 122858E-1 1, Lower Head I IIJ Segmelntt Drawing Upper _..

L *'#,y\ 'V BE 7.4L&3 x

Attachment 2 Detail B, Drawing 151863E, Modification of 2" Liquid Control Nozzle

'MontF#. . 4b as --j-

. 1- A=,

`/I 7Vj R WR I I IOWFA)

~*.w 0 bIA

Attachment 3 IR 2004-43, Figures 4 and 5 Figure 4 shows the minimum and maximum probe radial positions and the portion of the examination volume covered by the vessel shell detection technique, 70/(2 to 23)v, for probes scanned at the azimuth angle of 00.

Browns Ferry Standby Liquid Control Nozzle (N10);

70/(2 to 23)vs 134 between the dotted lines represents 130 the non inspected z area. IA 0 2 4 8 10 12 14 16 R

Figure 4. Browns Ferry Standby Liquid Control Nozzle (N 10): Probe Scan Limits and Examination Coverage for Vessel Shell Detection Technique, 70/(2 to 23)v.

Figure 5 shows the minimum and maximum probe radial positions and the portion of the examination volume covered by the vessel shell detection technique, 65/(1 to 1O)v, for probes scanned at the azimuth angle of 0'.

Browns Ferry Standby Liquid Control Nozzle (N10);

651(1 to 1O)vs 134 Z

0 4 8 10 12 14 16 R

Figure 5. Browns Ferry Standby Liquid Control Nozzle (N 10): Probe Scan Limits and Examination Coverage for Vessel Shell Detection Technique, 65/(1 to 10)v.

6