| issue date = 02/02/2016
| title = Letter to Michael Dougherty, Chairperson, Sac and Fox Nation of Missouri; Re.,Requesting Section 106 Consultation Re Amendment Application for License Termination Plan for the Zion Nuclear Power Station
| title = Letter to Michael Dougherty, Chairperson, Sac and Fox Nation of Missouri; Re.,Requesting Section 106 Consultation Re Amendment Application for License Termination Plan for the Zion Nuclear Power Station
| author name = Erlanger C G
| author name = Erlanger C
| author affiliation = NRC/NMSS/DFCSE
| author affiliation = NRC/NMSS/DFCSE
| addressee name = Dougherty M
| addressee name = Dougherty M
Line 9: Line 9:
| docket = 05000295, 05000304
| docket = 05000295, 05000304
| license number =  
| license number =  
| contact person = Bjornsen A B
| contact person = Bjornsen A
| package number = ML15203A207
| package number = ML15203A207
| document type = Letter
| document type = Letter
| page count = 5
| page count = 5
| project =
| stage = Other
}}
}}


=Text=
=Text=
{{#Wiki_filter:February 2, 2016 Mr. Michael Dougherty, Chairperson Sac and Fox Nation of Missouri 305 N. Main Street Reserve, KS 66434
{{#Wiki_filter:February 2, 2016 Mr. Michael Dougherty, Chairperson Sac and Fox Nation of Missouri 305 N. Main Street Reserve, KS 66434


==SUBJECT:==
==SUBJECT:==
NATIONAL HISTORIC PRESERVATION ACT, SECTION 106  
NATIONAL HISTORIC PRESERVATION ACT, SECTION 106 - NOTIFICATION OF ACCEPTANCE OF AMENDMENT APPLICATION FOR LICENSE TERMINATION PLAN FOR THE ZION NUCLEAR POWER STATION
- NOTIFICATION OF ACCEPTANCE OF AMENDMENT APPLICATION FOR LICENSE TERMINATION PLAN FOR THE ZION NUCLEAR POWER STATION Dear Chairperson Dougherty
:  On December 19 , 2014 , the U.S. Nuclear Regulatory Commission (NRC) received an application for a license amendment request from Zion Solutions, LLC (ZS).
ZS is the owner of the Zion Nuclear Power Station (ZNPS), which is a shut-down nuclear power reactor facility located near Zion, Illinois (Lake County) on the western shore of Lake Michigan.
ZS holds NRC operating licenses for ZNPS Units 1 and 2, which are the two reactor units at the site.
The ZS license amendment application request s the NRC's approval of a license termination plan (LTP) for ZNPS Units 1 and 2.
The ZNPS site is approximately 40 miles north of Chicago, Illinois and 42 miles south of Milwaukee, Wisconsin (Enclosure 1 is a map that shows the general location for the ZNPS site). The ZNPS site is approximately 331 acres, including an approximate 87
-acre, fence
-enclosed area, in which both Units 1 and 2 and the ZNPS Independent Spent Fuel Storage Installation (ISFSI) are located. Under the Atomic Energy Act of 1954, as amended, the NRC issued operating licenses for both Units 1 and 2 in 1973 (License No. DPR
-39, Docket No. 50
-295 for Unit 1, and License No.
DPR-48, Docket No. 50
-304 for Unit 2). Specifically, the NRC issued the operating licenses for ZNPS Units 1 and 2 under its regulations at Title 10 of the Code of Federal Regulation s  (10 CFR) Part 50. Both units generated electricity for portions of northern Illinois and southern Wisconsin for over 20 years. Unit 1 ceased operation in 1997 and Unit 2 ceased operation in 1996. ZS is completing the decommissioning of both units.
All spent fuel has been removed from the ZNPS spent fuel pool and ZS completed the final transfer in January 2015. ZS now stores the spent fuel assemblies in large steel cylinder
-encased, pre
-cast concrete casks located at the ZNPS ISFSI, which is located in the southwest portion of the ZNPS site.
Spent fuel that has been removed from a reactor's spent fuel pool is typically stored in casks at a nuclear power plant's ISFSI.


M. Dougherty 2  The submission of the LTP occurs towards the end of a nuclear power plant's decommissioning process. The stated objective of the ZS LTP is to demonstrate to the NRC that ZS will successfully reduce the level of residual radioactivity to levels that will permit the release of the ZNPS site for unrestricted use and therefore allow for the termination of the NRC licenses (except for the ZNPS ISFSI, which is described below). The NRC's radiological criteria to release a site for unrestricted use is described in the NRC's regulation at 10 CFR 20.1402. ZS has indicated that upon license termination, it will transfer ownership and control of the ZNPS site (including the ZNPS ISFSI) to Exelon Nuclear Generation, LLC (Exelon).
==Dear Chairperson Dougherty:==
Proposed Undertaking ZS submitted the LTP in accordance with NRC regulation 10 CFR 50.82(a)(9). The NRC, when it approves an LTP, is approving the following: (a) the adequacy of the licensee's decommissioning funding plan to assure that sufficient funding is available to complete the remaining radiological remediation activities; (b) the radiation
-release criteria for license termination; and (c) the adequacy of the design of the final site survey to verify that the radiological release criteria have been met. The final status survey is the radiological survey performed after an area has been fully characterized, remediation has been completed, and the area is ready to be released. In accordance with NRC regulation, 10 CFR 50.82(a)(11), the NRC shall terminate the ZNPS reactor operating licenses (except for the ZNPS ISFSI) upon ZS' demonstration, through its final site radiation survey, that it has met the radiological release criteria of 10 CFR 20.1402.
Although 10 CFR 50.82(a)(9) requires the licensee to identify remaining dismantlement activities in its LTP, the NRC's regulatory purpose in approving the LTP is limited to the concerns described in the previous paragraph.
The identification of the remaining dismantlement activities are for the purpose of ensuring that the licensee will have adequate funds to reduce the residual radioactivity to the required levels. In order for the NRC to approve the LTP, ZS must show how it will demonstrate, in a final site survey, the residual radioactivity remaining at the licensed site is within the 10 CFR 20.1402 regulatory limits
. ZNPS ISFSI


The ZNPS ISFSI will remain under NRC's regulatory jurisdiction and is not part of this undertaking. The ZNPS 10 CFR Part 50 operating licenses will remain in effect for the ZNPS ISFSI only. If the LTP is approved, and if ZS demonstrates that it has met the 10 CFR 20.1402 regulatory criteria
On December 19, 2014, the U.S. Nuclear Regulatory Commission (NRC) received an application for a license amendment request from Zion Solutions, LLC (ZS). ZS is the owner of the Zion Nuclear Power Station (ZNPS), which is a shut-down nuclear power reactor facility located near Zion, Illinois (Lake County) on the western shore of Lake Michigan. ZS holds NRC operating licenses for ZNPS Units 1 and 2, which are the two reactor units at the site. The ZS license amendment application requests the NRCs approval of a license termination plan (LTP) for ZNPS Units 1 and 2.
, the ZNPS licenses will be considered terminated in all other aspects. The ZNPS ISFSI is
The ZNPS site is approximately 40 miles north of Chicago, Illinois and 42 miles south of Milwaukee, Wisconsin (Enclosure 1 is a map that shows the general location for the ZNPS site).
, and will continue to be
The ZNPS site is approximately 331 acres, including an approximate 87-acre, fence-enclosed area, in which both Units 1 and 2 and the ZNPS Independent Spent Fuel Storage Installation (ISFSI) are located.
, governed by the NRC's general license regulations for ISFSIs at Subpart K of 10 CFR Part 72. ZS will remain responsible for complying with the Subpart K regulations until the planned transfer of ownership to Exelon. A t that point Exelon will assume responsibility for complying with the Subpart K regulations. The ZNPS ISFSI will remain in operation indefinitely, until such time as a deep geologic repository becomes available to accept spent fuel or other spent fuel disposal arrangements are made. The ZNPS ISFSI is enclosed by a separate security fence within the larger fenced 87
Under the Atomic Energy Act of 1954, as amended, the NRC issued operating licenses for both Units 1 and 2 in 1973 (License No. DPR-39, Docket No. 50-295 for Unit 1, and License No.
-acre area. The ZNPS ISFSI is excluded from the Area of Potential Effects, which is described below.
DPR-48, Docket No. 50-304 for Unit 2). Specifically, the NRC issued the operating licenses for ZNPS Units 1 and 2 under its regulations at Title 10 of the Code of Federal Regulations (10 CFR) Part 50. Both units generated electricity for portions of northern Illinois and southern Wisconsin for over 20 years. Unit 1 ceased operation in 1997 and Unit 2 ceased operation in 1996. ZS is completing the decommissioning of both units. All spent fuel has been removed from the ZNPS spent fuel pool and ZS completed the final transfer in January 2015. ZS now stores the spent fuel assemblies in large steel cylinder-encased, pre-cast concrete casks located at the ZNPS ISFSI, which is located in the southwest portion of the ZNPS site. Spent fuel that has been removed from a reactors spent fuel pool is typically stored in casks at a nuclear power plants ISFSI.


M. Dougherty 3  Definition of Area of Potential Effects
M. Dougherty                                       2 The submission of the LTP occurs towards the end of a nuclear power plants decommissioning process. The stated objective of the ZS LTP is to demonstrate to the NRC that ZS will successfully reduce the level of residual radioactivity to levels that will permit the release of the ZNPS site for unrestricted use and therefore allow for the termination of the NRC licenses (except for the ZNPS ISFSI, which is described below). The NRCs radiological criteria to release a site for unrestricted use is described in the NRCs regulation at 10 CFR 20.1402. ZS has indicated that upon license termination, it will transfer ownership and control of the ZNPS site (including the ZNPS ISFSI) to Exelon Nuclear Generation, LLC (Exelon).
Proposed Undertaking ZS submitted the LTP in accordance with NRC regulation 10 CFR 50.82(a)(9). The NRC, when it approves an LTP, is approving the following: (a) the adequacy of the licensees decommissioning funding plan to assure that sufficient funding is available to complete the remaining radiological remediation activities; (b) the radiation-release criteria for license termination; and (c) the adequacy of the design of the final site survey to verify that the radiological release criteria have been met. The final status survey is the radiological survey performed after an area has been fully characterized, remediation has been completed, and the area is ready to be released. In accordance with NRC regulation, 10 CFR 50.82(a)(11), the NRC shall terminate the ZNPS reactor operating licenses (except for the ZNPS ISFSI) upon ZS demonstration, through its final site radiation survey, that it has met the radiological release criteria of 10 CFR 20.1402.
Although 10 CFR 50.82(a)(9) requires the licensee to identify remaining dismantlement activities in its LTP, the NRCs regulatory purpose in approving the LTP is limited to the concerns described in the previous paragraph. The identification of the remaining dismantlement activities are for the purpose of ensuring that the licensee will have adequate funds to reduce the residual radioactivity to the required levels. In order for the NRC to approve the LTP, ZS must show how it will demonstrate, in a final site survey, the residual radioactivity remaining at the licensed site is within the 10 CFR 20.1402 regulatory limits.
ZNPS ISFSI The ZNPS ISFSI will remain under NRCs regulatory jurisdiction and is not part of this undertaking. The ZNPS 10 CFR Part 50 operating licenses will remain in effect for the ZNPS ISFSI only. If the LTP is approved, and if ZS demonstrates that it has met the 10 CFR 20.1402 regulatory criteria, the ZNPS licenses will be considered terminated in all other aspects. The ZNPS ISFSI is, and will continue to be, governed by the NRCs general license regulations for ISFSIs at Subpart K of 10 CFR Part 72. ZS will remain responsible for complying with the Subpart K regulations until the planned transfer of ownership to Exelon. At that point Exelon will assume responsibility for complying with the Subpart K regulations. The ZNPS ISFSI will remain in operation indefinitely, until such time as a deep geologic repository becomes available to accept spent fuel or other spent fuel disposal arrangements are made. The ZNPS ISFSI is enclosed by a separate security fence within the larger fenced 87-acre area. The ZNPS ISFSI is excluded from the Area of Potential Effects, which is described below.


The ZNPS site is approximately 331 acres (all owner controlled). The NRC considers the direct Area of Potential Effects (APE) to be the approximate 87
M. Dougherty                                        3 Definition of Area of Potential Effects The ZNPS site is approximately 331 acres (all owner controlled). The NRC considers the direct Area of Potential Effects (APE) to be the approximate 87-acre, fence-enclosed site that includes all of the major buildings of the ZNPS, including Units 1 and 2. Virtually all NRC licensed activities occurred within the direct APE. The NRC anticipates that most radiological remediation activities will occur within the direct APE. The NRC considers the remaining 244 acres to be an indirect APE.
-acre, fence
The direct APE is zoned for industrial use in accordance with The City of Zion, Illinois, Comprehensive Plan 2010. In addition to Units 1 and 2, other major buildings and facilities include the turbine building, containment buildings, the spent fuel building, which are in the process of being decommissioned and dismantled. The switchyard, ZNPS ISFSI, parking areas, rail lines, and haul paths are to remain in-place at license termination. The direct APE will continue to be an industrial-zoned property for the foreseeable future. The ZNPS ISFSI is located within the direct APE but is excluded, as it will remain under NRC license and thus, under NRCs regulatory jurisdiction. The indirect APE (244-acre parcel) consists mostly of open land. Other than radiological surveys, which may include small-scale soil sampling, no radiological remediation activities are expected to occur in the indirect APE.
-enclosed site that includes all of the major buildings of the ZNPS, including Units 1 and 2. Virtually all NRC licensed activities occurred within the direct APE. The NRC anticipates that most radiological remediation activities will occur within the direct APE. The NRC considers the remaining 244 acres to be an indirect APE.
Illinois Historic Preservation Agency Determination of No Historic Properties Affected By letter dated August 24, 2015, the NRC initiated consultation with the Illinois Historic Preservation Agency (IHPA) in accordance with Section 106 of the National Historic Preservation Act (NHPA). In a letter dated September 16, 2015, the IHPA determined that no historic properties are affected by the proposed undertaking and as such, the IHPA concluded that it had no objection to the proposed undertaking being approved by the NRC. IHPA has assigned Log #017022414 to this matter.
The direct APE is zoned for industrial use in accordance with "The City of Zion, Illinois, Comprehensive Plan 2010.In addition to Units 1 and 2, other major buildings and facilities include the turbine building, containment buildings, the spent fuel building, which are in the process of being decommissioned and dismantled.
The NRC concurs with the IHPA determination that no historic properties are affected. Please advise us if there are traditional cultural properties of interest to your tribe in the APEs. Please note that a traditional cultural property may, or may not, meet the definition of historic property, as that term is defined in 36 CFR 800.16(l). If your Tribe determines there are traditional cultural properties within the APE that it wants to bring to the attention of the NRC, please complete the Tribal Response Form (Enclosure 2), and return it to the NRC within 30 days of receipt of this letter.
The switchyard, ZNPS ISFSI, parking areas, rail lines, and haul paths are to remain in
If you have concerns about the confidentiality of information that you may submit, we are available to discuss such concerns and will take all measures, as prescribed by applicable law, to protect the confidentiality of such information. Please note that, according to NRC policy, correspondence provided to the NRC, including those provided by e-mail, may be made publicly available. Therefore, the NRC recommends that the Tribe avoid including any information in its submission that your Tribal officials do not want to be publicly disclosed (e.g., personal e-mail addresses or other personal contact information). If your Tribal officials do not wish for their personal e-mail addresses to be made public, please use an alternate e-mail address when corresponding with the NRC.
-place at license termination. The direct APE will continue to be an industrial
 
-zoned property for the foreseeable future. The ZNPS ISFSI is located within the direct APE but is excluded, as it will remain under NRC license and thus, under NRC's regulatory jurisdiction. The indirect APE (244
M. Dougherty                                   4 For additional information regarding the proposed action, ZSs license amendment application is publicly available from the NRC's Agency Wide Documents Access and Management System (ADAMS), which can be accessed online at: http://www.nrc.gov/reading-rm/adams.html. The ADAMS accession number for ZSs application is ML15005A336.
-acre parcel) consists mostly of open land. Other than radiological surveys, which may include small
If you have any questions or comments on the proposed ZNPS LTP Project, or need any additional information regarding ZSs license amendment application, please contact Mr. John Hickman by telephone at (301) 415-3017 or via email at: John.HickmanNMSS@nrc.gov. For information about the NHPA Section 106 process for this project, please contact Ms. Jessie Muir-Quintero by telephone at (301) 415-7476, or via email at: Jessie.Muir-Quintero@nrc.gov.
-scale soil sampling, no radiological remediation activities are expected to occur in the indirect APE.
Sincerely,
Illinois Historic Preservation Agency Determination of No Historic Properties Affected By letter dated August 24, 2015, the NRC initiated consultation with the Illinois Historic Preservation Agency (IHPA) in accordance with Section 106 of the National Historic Preservation Act (NHPA). In a letter dated September 16, 2015, the IHPA determined that "no historic properties are affected" by the proposed undertaking and as such, the IHPA concluded that it had no objection to the proposed undertaking being approved by the NRC. IHPA has assigned Log #017022414 to this matter.
                                            /RA/
The NRC concurs with the IHPA determination that "no historic properties are affected.Please advise us if there are traditional cultural properties of interest to your tribe in the APE s. Please note that a traditional cultural property may, or may not, meet the definition of "historic property," as that term is defined in 36 CFR 800.16(l).
Craig G. Erlanger, Acting Director Division of Fuel Cycle Safety, Safeguards, and Environmental Review Office of Nuclear Material Safety and Safeguards Docket Nos.: 50-295 50-304
If your Tribe determines there are traditional cultural properties within the AP E that it wants to bring to the attention of the NRC, please complete the Tribal Response Form (Enclosure 2), and return it to the NRC within 30 days of receipt of this letter.
 
If you have concerns about the confidentiality of information that you may submit, we are available to discuss such concerns and will take all measures, as prescribed by applicable law, to protect the confidentiality of such information.
==Enclosures:==
Please note that
: 1. Map of ZNPS Location
, according to NRC policy, correspondence provided to the NRC, including those provided by e
: 2. Tribal Response Form cc w/o encls.:
-mail, may be made publicly available. Therefore, the NRC recommends that the Tribe avoid including any information in its submission that your Tribal officials do not want to be publicly disclosed (e.g., personal e
-mail addresses or other personal contact information). If your Tribal officials do not wish for their personal e
-mail addresses to be made public, please use an alternate e
-mail address when corresponding with the NRC.
M. Dougherty 4 For additional information regarding the proposed action, ZS's license amendment application is publicly available from the NRC's Agency Wide Documents Access and Management System (ADAMS), which can be accessed online at: http://www.nrc.gov/reading
-rm/adams.html
. The ADAMS accession number for ZS's application is ML15005A336.
If you have any questions or comments on the proposed ZNPS LTP Project, or need any additional information regarding ZS's license amendment application, please contact Mr. John Hickman by telephone at (301) 415-3017 or via email at: John.HickmanNMSS@nrc.gov. For information about the NHPA Section 106 process for this project, please contact M s. Jessie Muir-Quintero by telephone at (301) 415-7476, or via email at: Jessie.Muir
-Quintero@nrc.gov
. Sincerely, /RA/
Craig G. Erlanger
, Acting Director Division of Fuel Cycle Safety, Safeguards
,   and Environmental Review Office of Nuclear Material Safety and Safeguard s  Docket No s.: 50-295 50-304 Enclosure s: 1. Map of ZNPS Location 2. Tribal Response Form cc w/o encls.:
Mr. Gerard Van Noordennen, ZS Mr. Edmore Green Sac and Fox Nation of Missouri
Mr. Gerard Van Noordennen, ZS Mr. Edmore Green Sac and Fox Nation of Missouri


M. Dougherty 4   For additional information regarding the proposed action, ZS's license amendment application is publicly available from the NRC's Agency Wide Documents Access and Management System (ADAMS), which can be accessed online at: http://www.nrc.gov/reading
M. Dougherty                                   4 For additional information regarding the proposed action, ZSs license amendment application is publicly available from the NRC's Agency Wide Documents Access and Management System (ADAMS), which can be accessed online at: http://www.nrc.gov/reading-rm/adams.html. The ADAMS accession number for ZSs application is ML15005A336.
-rm/adams.html. The ADAMS accession number for ZS's application is ML15005A336.
If you have any questions or comments on the proposed ZNPS LTP Project, or need any additional information regarding ZSs license amendment application, please contact Mr. John Hickman by telephone at (301) 415-3017 or via email at: John.HickmanNMSS@nrc.gov. For information about the NHPA Section 106 process for this project, please contact Ms. Jessie Muir-Quintero by telephone at (301) 415-7476, or via email at: Jessie.Muir-Quintero@nrc.gov.
If you have any questions or comments on the proposed ZNPS LTP Project, or need any additional information regarding ZS's license amendment application, please contact Mr. John Hickman by telephone at (301) 415-3017 or via email at: John.HickmanNMSS@nrc.gov. For information about the NHPA Section 106 process for this project, please contact M
Sincerely,
: s. Jessie Muir-Quintero by telephone at (301) 415-7476, or via email at:
                                            /RA/
Jessie.Muir
Craig G. Erlanger, Acting Director Division of Fuel Cycle Safety, Safeguards, and Environmental Review Office of Nuclear Material Safety and Safeguards Docket Nos.: 50-295 50-304
-Quintero@nrc.gov
. Sincerely, /RA/
Craig G. Erlanger, Acting Director Division of Fuel Cycle Safety, Safeguards,   and Environmental Review Office of Nuclear Material Safety and Safeguards Docket Nos.: 50
-295 50-304


==Enclosures:==
==Enclosures:==
: 1. Map of ZNPS Location
: 1. Map of ZNPS Location
: 2. Tribal Response Form
: 2. Tribal Response Form cc w/o encls.:
Mr. Gerard Van Noordennen, ZS Mr. Edmore Green Sac and Fox Nation of Missouri DISTRIBUTION:
APersinko              BWatson ML15203A207 OFC          FCSE/ERB            FCSE/ERB            DUWP/RDB NAME          ABjornsen          AWalker-Smith            JHickman DATE          12/03/15            12/02/15              12/11/15 OFC              OGC              FCSE/ERB            NMSS/FCSE NAME            APessin              LChang              CErlanger DATE      02/05/16 via email        1/6/16              02/02/16 OFFICIAL RECORD COPY
 
February 2, 2016 Mr. Michael Dougherty, Chairperson Sac and Fox Nation of Missouri 305 N. Main Street Reserve, KS 66434


cc w/o encls.:
==SUBJECT:==
Mr. Gerard Van Noordennen, ZS Mr. Edmore Green Sac and Fox Nation of Missouri DISTRIBUTION
NATIONAL HISTORIC PRESERVATION ACT, SECTION 106 - NOTIFICATION OF ACCEPTANCE OF AMENDMENT APPLICATION FOR LICENSE TERMINATION PLAN FOR THE ZION NUCLEAR POWER STATION
:  APersinko  BWatson  ML15203A207 OFC FCSE/ERB FCSE/ERB DUWP/RDB NAME ABjornsen AWalker-Smith JHickman DATE 12/03/15 12/02/15 12/11/15 OFC OGC  FCSE/ERB  NMSS/FCSE NAME APessin LChang CErlanger DATE 02/05/16 via email 1/6/16 02/02/1 6 OFFICIAL RECORD COPY


February 2, 2016 Mr. Michael Dougherty, Chairperson Sac and Fox Nation of Missouri 305 N. Main Street Reserve, KS  66434
==Dear Chairperson Dougherty:==


==SUBJECT:==
On December 19, 2014, the U.S. Nuclear Regulatory Commission (NRC) received an application for a license amendment request from Zion Solutions, LLC (ZS). ZS is the owner of the Zion Nuclear Power Station (ZNPS), which is a shut-down nuclear power reactor facility located near Zion, Illinois (Lake County) on the western shore of Lake Michigan. ZS holds NRC operating licenses for ZNPS Units 1 and 2, which are the two reactor units at the site. The ZS license amendment application requests the NRCs approval of a license termination plan (LTP) for ZNPS Units 1 and 2.
NATIONAL HISTORIC PRESERVATION ACT, SECTION 106
The ZNPS site is approximately 40 miles north of Chicago, Illinois and 42 miles south of Milwaukee, Wisconsin (Enclosure 1 is a map that shows the general location for the ZNPS site).
- NOTIFICATION OF ACCEPTANCE OF AMENDMENT APPLICATION FOR LICENSE TERMINATION PLAN FOR THE ZION NUCLEAR POWER STATION Dear Chairperson Dougherty
The ZNPS site is approximately 331 acres, including an approximate 87-acre, fence-enclosed area, in which both Units 1 and 2 and the ZNPS Independent Spent Fuel Storage Installation (ISFSI) are located.
On December 19 , 2014 , the U.S. Nuclear Regulatory Commission (NRC) received an application for a license amendment request from Zion Solutions, LLC (ZS).
Under the Atomic Energy Act of 1954, as amended, the NRC issued operating licenses for both Units 1 and 2 in 1973 (License No. DPR-39, Docket No. 50-295 for Unit 1, and License No.
ZS is the owner of the Zion Nuclear Power Station (ZNPS), which is a shut-down nuclear power reactor facility located near Zion, Illinois (Lake County) on the western shore of Lake Michigan.
DPR-48, Docket No. 50-304 for Unit 2). Specifically, the NRC issued the operating licenses for ZNPS Units 1 and 2 under its regulations at Title 10 of the Code of Federal Regulations (10 CFR) Part 50. Both units generated electricity for portions of northern Illinois and southern Wisconsin for over 20 years. Unit 1 ceased operation in 1997 and Unit 2 ceased operation in 1996. ZS is completing the decommissioning of both units. All spent fuel has been removed from the ZNPS spent fuel pool and ZS completed the final transfer in January 2015. ZS now stores the spent fuel assemblies in large steel cylinder-encased, pre-cast concrete casks located at the ZNPS ISFSI, which is located in the southwest portion of the ZNPS site. Spent fuel that has been removed from a reactors spent fuel pool is typically stored in casks at a nuclear power plants ISFSI.
ZS holds NRC operating licenses for ZNPS Units 1 and 2, which are the two reactor units at the site.
The ZS license amendment application request s the NRC's approval of a license termination plan (LTP) for ZNPS Units 1 and 2.
The ZNPS site is approximately 40 miles north of Chicago, Illinois and 42 miles south of Milwaukee, Wisconsin (Enclosure 1 is a map that shows the general location for the ZNPS site). The ZNPS site is approximately 331 acres, including an approximate 87
-acre, fence
-enclosed area, in which both Units 1 and 2 and the ZNPS Independent Spent Fuel Storage Installation (ISFSI) are located. Under the Atomic Energy Act of 1954, as amended, the NRC issued operating licenses for both Units 1 and 2 in 1973 (License No. DPR
-39, Docket No. 50
-295 for Unit 1, and License No.
DPR-48, Docket No. 50
-304 for Unit 2). Specifically, the NRC issued the operating licenses for ZNPS Units 1 and 2 under its regulations at Title 10 of the Code of Federal Regulation s  (10 CFR) Part 50. Both units generated electricity for portions of northern Illinois and southern Wisconsin for over 20 years. Unit 1 ceased operation in 1997 and Unit 2 ceased operation in 1996. ZS is completing the decommissioning of both units.
All spent fuel has been removed from the ZNPS spent fuel pool and ZS completed the final transfer in January 2015. ZS now stores the spent fuel assemblies in large steel cylinder
-encased, pre
-cast concrete casks located at the ZNPS ISFSI, which is located in the southwest portion of the ZNPS site.
Spent fuel that has been removed from a reactor's spent fuel pool is typically stored in casks at a nuclear power plant's ISFSI.


M. Dougherty 2 The submission of the LTP occurs towards the end of a nuclear power plant's decommissioning process. The stated objective of the ZS LTP is to demonstrate to the NRC that ZS will successfully reduce the level of residual radioactivity to levels that will permit the release of the ZNPS site for unrestricted use and therefore allow for the termination of the NRC licenses (except for the ZNPS ISFSI, which is described below). The NRC's radiological criteria to release a site for unrestricted use is described in the NRC's regulation at 10 CFR 20.1402. ZS has indicated that upon license termination, it will transfer ownership and control of the ZNPS site (including the ZNPS ISFSI) to Exelon Nuclear Generation, LLC (Exelon).
M. Dougherty                                       2 The submission of the LTP occurs towards the end of a nuclear power plants decommissioning process. The stated objective of the ZS LTP is to demonstrate to the NRC that ZS will successfully reduce the level of residual radioactivity to levels that will permit the release of the ZNPS site for unrestricted use and therefore allow for the termination of the NRC licenses (except for the ZNPS ISFSI, which is described below). The NRCs radiological criteria to release a site for unrestricted use is described in the NRCs regulation at 10 CFR 20.1402. ZS has indicated that upon license termination, it will transfer ownership and control of the ZNPS site (including the ZNPS ISFSI) to Exelon Nuclear Generation, LLC (Exelon).
Proposed Undertaking ZS submitted the LTP in accordance with NRC regulation 10 CFR 50.82(a)(9). The NRC, when it approves an LTP, is approving the following: (a) the adequacy of the licensee's decommissioning funding plan to assure that sufficient funding is available to complete the remaining radiological remediation activities; (b) the radiation
Proposed Undertaking ZS submitted the LTP in accordance with NRC regulation 10 CFR 50.82(a)(9). The NRC, when it approves an LTP, is approving the following: (a) the adequacy of the licensees decommissioning funding plan to assure that sufficient funding is available to complete the remaining radiological remediation activities; (b) the radiation-release criteria for license termination; and (c) the adequacy of the design of the final site survey to verify that the radiological release criteria have been met. The final status survey is the radiological survey performed after an area has been fully characterized, remediation has been completed, and the area is ready to be released. In accordance with NRC regulation, 10 CFR 50.82(a)(11), the NRC shall terminate the ZNPS reactor operating licenses (except for the ZNPS ISFSI) upon ZS demonstration, through its final site radiation survey, that it has met the radiological release criteria of 10 CFR 20.1402.
-release criteria for license termination; and (c) the adequacy of the design of the final site survey to verify that the radiological release criteria have been met. The final status survey is the radiological survey performed after an area has been fully characterized, remediation has been completed, and the area is ready to be released. In accordance with NRC regulation, 10 CFR 50.82(a)(11), the NRC shall terminate the ZNPS reactor operating licenses (except for the ZNPS ISFSI) upon ZS' demonstration, through its final site radiation survey, that it has met the radiological release criteria of 10 CFR 20.1402.
Although 10 CFR 50.82(a)(9) requires the licensee to identify remaining dismantlement activities in its LTP, the NRCs regulatory purpose in approving the LTP is limited to the concerns described in the previous paragraph. The identification of the remaining dismantlement activities are for the purpose of ensuring that the licensee will have adequate funds to reduce the residual radioactivity to the required levels. In order for the NRC to approve the LTP, ZS must show how it will demonstrate, in a final site survey, the residual radioactivity remaining at the licensed site is within the 10 CFR 20.1402 regulatory limits.
Although 10 CFR 50.82(a)(9) requires the licensee to identify remaining dismantlement activities in its LTP, the NRC's regulatory purpose in approving the LTP is limited to the concerns described in the previous paragraph.
ZNPS ISFSI The ZNPS ISFSI will remain under NRCs regulatory jurisdiction and is not part of this undertaking. The ZNPS 10 CFR Part 50 operating licenses will remain in effect for the ZNPS ISFSI only. If the LTP is approved, and if ZS demonstrates that it has met the 10 CFR 20.1402 regulatory criteria, the ZNPS licenses will be considered terminated in all other aspects. The ZNPS ISFSI is, and will continue to be, governed by the NRCs general license regulations for ISFSIs at Subpart K of 10 CFR Part 72. ZS will remain responsible for complying with the Subpart K regulations until the planned transfer of ownership to Exelon. At that point Exelon will assume responsibility for complying with the Subpart K regulations. The ZNPS ISFSI will remain in operation indefinitely, until such time as a deep geologic repository becomes available to accept spent fuel or other spent fuel disposal arrangements are made. The ZNPS ISFSI is enclosed by a separate security fence within the larger fenced 87-acre area. The ZNPS ISFSI is excluded from the Area of Potential Effects, which is described below.
The identification of the remaining dismantlement activities are for the purpose of ensuring that the licensee will have adequate funds to reduce the residual radioactivity to the required levels. In order for the NRC to approve the LTP, ZS must show how it will demonstrate, in a final site survey, the residual radioactivity remaining at the licensed site is within the 10 CFR 20.1402 regulatory limits
. ZNPS ISFSI


The ZNPS ISFSI will remain under NRC's regulatory jurisdiction and is not part of this undertaking. The ZNPS 10 CFR Part 50 operating licenses will remain in effect for the ZNPS ISFSI only. If the LTP is approved, and if ZS demonstrates that it has met the 10 CFR 20.1402 regulatory criteria
M. Dougherty                                        3 Definition of Area of Potential Effects The ZNPS site is approximately 331 acres (all owner controlled). The NRC considers the direct Area of Potential Effects (APE) to be the approximate 87-acre, fence-enclosed site that includes all of the major buildings of the ZNPS, including Units 1 and 2. Virtually all NRC licensed activities occurred within the direct APE. The NRC anticipates that most radiological remediation activities will occur within the direct APE. The NRC considers the remaining 244 acres to be an indirect APE.
, the ZNPS licenses will be considered terminated in all other aspects. The ZNPS ISFSI is
The direct APE is zoned for industrial use in accordance with The City of Zion, Illinois, Comprehensive Plan 2010. In addition to Units 1 and 2, other major buildings and facilities include the turbine building, containment buildings, the spent fuel building, which are in the process of being decommissioned and dismantled. The switchyard, ZNPS ISFSI, parking areas, rail lines, and haul paths are to remain in-place at license termination. The direct APE will continue to be an industrial-zoned property for the foreseeable future. The ZNPS ISFSI is located within the direct APE but is excluded, as it will remain under NRC license and thus, under NRCs regulatory jurisdiction. The indirect APE (244-acre parcel) consists mostly of open land. Other than radiological surveys, which may include small-scale soil sampling, no radiological remediation activities are expected to occur in the indirect APE.
, and will continue to be
Illinois Historic Preservation Agency Determination of No Historic Properties Affected By letter dated August 24, 2015, the NRC initiated consultation with the Illinois Historic Preservation Agency (IHPA) in accordance with Section 106 of the National Historic Preservation Act (NHPA). In a letter dated September 16, 2015, the IHPA determined that no historic properties are affected by the proposed undertaking and as such, the IHPA concluded that it had no objection to the proposed undertaking being approved by the NRC. IHPA has assigned Log #017022414 to this matter.
, governed by the NRC's general license regulations for ISFSIs at Subpart K of 10 CFR Part 72. ZS will remain responsible for complying with the Subpart K regulations until the planned transfer of ownership to Exelon. A t that point Exelon will assume responsibility for complying with the Subpart K regulations. The ZNPS ISFSI will remain in operation indefinitely, until such time as a deep geologic repository becomes available to accept spent fuel or other spent fuel disposal arrangements are made. The ZNPS ISFSI is enclosed by a separate security fence within the larger fenced 87
The NRC concurs with the IHPA determination that no historic properties are affected. Please advise us if there are traditional cultural properties of interest to your tribe in the APEs. Please note that a traditional cultural property may, or may not, meet the definition of historic property, as that term is defined in 36 CFR 800.16(l). If your Tribe determines there are traditional cultural properties within the APE that it wants to bring to the attention of the NRC, please complete the Tribal Response Form (Enclosure 2), and return it to the NRC within 30 days of receipt of this letter.
-acre area. The ZNPS ISFSI is excluded from the Area of Potential Effects, which is described below.
If you have concerns about the confidentiality of information that you may submit, we are available to discuss such concerns and will take all measures, as prescribed by applicable law, to protect the confidentiality of such information. Please note that, according to NRC policy, correspondence provided to the NRC, including those provided by e-mail, may be made publicly available. Therefore, the NRC recommends that the Tribe avoid including any information in its submission that your Tribal officials do not want to be publicly disclosed (e.g., personal e-mail addresses or other personal contact information). If your Tribal officials do not wish for their personal e-mail addresses to be made public, please use an alternate e-mail address when corresponding with the NRC.


M. Dougherty 3  Definition of Area of Potential Effects
M. Dougherty                                   4 For additional information regarding the proposed action, ZSs license amendment application is publicly available from the NRC's Agency Wide Documents Access and Management System (ADAMS), which can be accessed online at: http://www.nrc.gov/reading-rm/adams.html. The ADAMS accession number for ZSs application is ML15005A336.
If you have any questions or comments on the proposed ZNPS LTP Project, or need any additional information regarding ZSs license amendment application, please contact Mr. John Hickman by telephone at (301) 415-3017 or via email at: John.HickmanNMSS@nrc.gov. For information about the NHPA Section 106 process for this project, please contact Ms. Jessie Muir-Quintero by telephone at (301) 415-7476, or via email at: Jessie.Muir-Quintero@nrc.gov.
Sincerely,
                                            /RA/
Craig G. Erlanger, Acting Director Division of Fuel Cycle Safety, Safeguards, and Environmental Review Office of Nuclear Material Safety and Safeguards Docket Nos.: 50-295 50-304


The ZNPS site is approximately 331 acres (all owner controlled). The NRC considers the direct Area of Potential Effects (APE) to be the approximate 87
==Enclosures:==
-acre, fence
: 1. Map of ZNPS Location
-enclosed site that includes all of the major buildings of the ZNPS, including Units 1 and 2. Virtually all NRC licensed activities occurred within the direct APE. The NRC anticipates that most radiological remediation activities will occur within the direct APE. The NRC considers the remaining 244 acres to be an indirect APE.
: 2. Tribal Response Form cc w/o encls.:
The direct APE is zoned for industrial use in accordance with "The City of Zion, Illinois, Comprehensive Plan 2010."  In addition to Units 1 and 2, other major buildings and facilities include the turbine building, containment buildings, the spent fuel building, which are in the process of being decommissioned and dismantled.
The switchyard, ZNPS ISFSI, parking areas, rail lines, and haul paths are to remain in
-place at license termination. The direct APE will continue to be an industrial
-zoned property for the foreseeable future. The ZNPS ISFSI is located within the direct APE but is excluded, as it will remain under NRC license and thus, under NRC's regulatory jurisdiction. The indirect APE (244
-acre parcel) consists mostly of open land. Other than radiological surveys, which may include small
-scale soil sampling, no radiological remediation activities are expected to occur in the indirect APE.
Illinois Historic Preservation Agency Determination of No Historic Properties Affected By letter dated August 24, 2015, the NRC initiated consultation with the Illinois Historic Preservation Agency (IHPA) in accordance with Section 106 of the National Historic Preservation Act (NHPA). In a letter dated September 16, 2015, the IHPA determined that "no historic properties are affected" by the proposed undertaking and as such, the IHPA concluded that it had no objection to the proposed undertaking being approved by the NRC. IHPA has assigned Log #017022414 to this matter.
The NRC concurs with the IHPA determination that "no historic properties are affected."  Please advise us if there are traditional cultural properties of interest to your tribe in the APE s. Please note that a traditional cultural property may, or may not, meet the definition of "historic property," as that term is defined in 36 CFR 800.16(l).
If your Tribe determines there are traditional cultural properties within the AP E that it wants to bring to the attention of the NRC, please complete the Tribal Response Form (Enclosure 2), and return it to the NRC within 30 days of receipt of this letter.
If you have concerns about the confidentiality of information that you may submit, we are available to discuss such concerns and will take all measures, as prescribed by applicable law, to protect the confidentiality of such information.
Please note that
, according to NRC policy, correspondence provided to the NRC, including those provided by e
-mail, may be made publicly available. Therefore, the NRC recommends that the Tribe avoid including any information in its submission that your Tribal officials do not want to be publicly disclosed (e.g., personal e
-mail addresses or other personal contact information). If your Tribal officials do not wish for their personal e
-mail addresses to be made public, please use an alternate e
-mail address when corresponding with the NRC.
M. Dougherty 4  For additional information regarding the proposed action, ZS's license amendment application is publicly available from the NRC's Agency Wide Documents Access and Management System (ADAMS), which can be accessed online at:  http://www.nrc.gov/reading
-rm/adams.html
. The ADAMS accession number for ZS's application is ML15005A336.
If you have any questions or comments on the proposed ZNPS LTP Project, or need any additional information regarding ZS's license amendment application, please contact Mr. John Hickman by telephone at (301) 415-3017 or via email at:  John.HickmanNMSS@nrc.gov. For information about the NHPA Section 106 process for this project, please contact M s. Jessie Muir-Quintero by telephone at (301) 415-7476, or via email at:  Jessie.Muir
-Quintero@nrc.gov
. Sincerely,  /RA/
Craig G. Erlanger
, Acting Director Division of Fuel Cycle Safety, Safeguards
,  and Environmental Review Office of Nuclear Material Safety and Safeguard s  Docket No s.:  50-295 50-304  Enclosure s: 1. Map of ZNPS Location 2. Tribal Response Form cc w/o encls.:
Mr. Gerard Van Noordennen, ZS Mr. Edmore Green Sac and Fox Nation of Missouri
Mr. Gerard Van Noordennen, ZS Mr. Edmore Green Sac and Fox Nation of Missouri


M. Dougherty 4   For additional information regarding the proposed action, ZS's license amendment application is publicly available from the NRC's Agency Wide Documents Access and Management System (ADAMS), which can be accessed online at: http://www.nrc.gov/reading
M. Dougherty                                   4 For additional information regarding the proposed action, ZSs license amendment application is publicly available from the NRC's Agency Wide Documents Access and Management System (ADAMS), which can be accessed online at: http://www.nrc.gov/reading-rm/adams.html. The ADAMS accession number for ZSs application is ML15005A336.
-rm/adams.html. The ADAMS accession number for ZS's application is ML15005A336.
If you have any questions or comments on the proposed ZNPS LTP Project, or need any additional information regarding ZSs license amendment application, please contact Mr. John Hickman by telephone at (301) 415-3017 or via email at: John.HickmanNMSS@nrc.gov. For information about the NHPA Section 106 process for this project, please contact Ms. Jessie Muir-Quintero by telephone at (301) 415-7476, or via email at: Jessie.Muir-Quintero@nrc.gov.
If you have any questions or comments on the proposed ZNPS LTP Project, or need any additional information regarding ZS's license amendment application, please contact Mr. John Hickman by telephone at (301) 415-3017 or via email at: John.HickmanNMSS@nrc.gov. For information about the NHPA Section 106 process for this project, please contact M
Sincerely,
: s. Jessie Muir-Quintero by telephone at (301) 415-7476, or via email at:
                                            /RA/
Jessie.Muir
Craig G. Erlanger, Acting Director Division of Fuel Cycle Safety, Safeguards, and Environmental Review Office of Nuclear Material Safety and Safeguards Docket Nos.: 50-295 50-304
-Quintero@nrc.gov
. Sincerely, /RA/
Craig G. Erlanger, Acting Director Division of Fuel Cycle Safety, Safeguards,   and Environmental Review Office of Nuclear Material Safety and Safeguards Docket Nos.: 50
-295 50-304


==Enclosures:==
==Enclosures:==
: 1. Map of ZNPS Location
: 1. Map of ZNPS Location
: 2. Tribal Response Form
: 2. Tribal Response Form cc w/o encls.:
 
Mr. Gerard Van Noordennen, ZS Mr. Edmore Green Sac and Fox Nation of Missouri DISTRIBUTION:
cc w/o encls.:
APersinko             BWatson ML15203A207 OFC           FCSE/ERB             FCSE/ERB             DUWP/RDB NAME         ABjornsen         AWalker-Smith           JHickman DATE           12/03/15             12/02/15               12/11/15 OFC             OGC               FCSE/ERB             NMSS/FCSE NAME           APessin             LChang               CErlanger DATE       02/05/16 via email         1/6/16               02/02/16 OFFICIAL RECORD COPY}}
Mr. Gerard Van Noordennen, ZS Mr. Edmore Green Sac and Fox Nation of Missouri DISTRIBUTION
APersinko BWatson ML15203A207 OFC FCSE/ERB FCSE/ERB DUWP/RDB NAME ABjornsen AWalker-Smith JHickman DATE 12/03/15 12/02/15 12/11/15 OFC OGC FCSE/ERB NMSS/FCSE NAME APessin LChang CErlanger DATE 02/05/16 via email 1/6/16 02/02/1 6 OFFICIAL RECORD COPY}}

Latest revision as of 22:54, 10 November 2019

Letter to Michael Dougherty, Chairperson, Sac and Fox Nation of Missouri; Re.,Requesting Section 106 Consultation Re Amendment Application for License Termination Plan for the Zion Nuclear Power Station
ML15296A463
Person / Time
Site: Zion  File:ZionSolutions icon.png
Issue date: 02/02/2016
From: Craig Erlanger
Division of Fuel Cycle Safety, Safeguards, and Environmental Review
To: Dougherty M
Sac & Fox Tribe of Missouri in Kansas
Bjornsen A
Shared Package
ML15203A207 List:
References
Download: ML15296A463 (5)


Text

February 2, 2016 Mr. Michael Dougherty, Chairperson Sac and Fox Nation of Missouri 305 N. Main Street Reserve, KS 66434

SUBJECT:

NATIONAL HISTORIC PRESERVATION ACT, SECTION 106 - NOTIFICATION OF ACCEPTANCE OF AMENDMENT APPLICATION FOR LICENSE TERMINATION PLAN FOR THE ZION NUCLEAR POWER STATION

Dear Chairperson Dougherty:

On December 19, 2014, the U.S. Nuclear Regulatory Commission (NRC) received an application for a license amendment request from Zion Solutions, LLC (ZS). ZS is the owner of the Zion Nuclear Power Station (ZNPS), which is a shut-down nuclear power reactor facility located near Zion, Illinois (Lake County) on the western shore of Lake Michigan. ZS holds NRC operating licenses for ZNPS Units 1 and 2, which are the two reactor units at the site. The ZS license amendment application requests the NRCs approval of a license termination plan (LTP) for ZNPS Units 1 and 2.

The ZNPS site is approximately 40 miles north of Chicago, Illinois and 42 miles south of Milwaukee, Wisconsin (Enclosure 1 is a map that shows the general location for the ZNPS site).

The ZNPS site is approximately 331 acres, including an approximate 87-acre, fence-enclosed area, in which both Units 1 and 2 and the ZNPS Independent Spent Fuel Storage Installation (ISFSI) are located.

Under the Atomic Energy Act of 1954, as amended, the NRC issued operating licenses for both Units 1 and 2 in 1973 (License No. DPR-39, Docket No. 50-295 for Unit 1, and License No.

DPR-48, Docket No. 50-304 for Unit 2). Specifically, the NRC issued the operating licenses for ZNPS Units 1 and 2 under its regulations at Title 10 of the Code of Federal Regulations (10 CFR) Part 50. Both units generated electricity for portions of northern Illinois and southern Wisconsin for over 20 years. Unit 1 ceased operation in 1997 and Unit 2 ceased operation in 1996. ZS is completing the decommissioning of both units. All spent fuel has been removed from the ZNPS spent fuel pool and ZS completed the final transfer in January 2015. ZS now stores the spent fuel assemblies in large steel cylinder-encased, pre-cast concrete casks located at the ZNPS ISFSI, which is located in the southwest portion of the ZNPS site. Spent fuel that has been removed from a reactors spent fuel pool is typically stored in casks at a nuclear power plants ISFSI.

M. Dougherty 2 The submission of the LTP occurs towards the end of a nuclear power plants decommissioning process. The stated objective of the ZS LTP is to demonstrate to the NRC that ZS will successfully reduce the level of residual radioactivity to levels that will permit the release of the ZNPS site for unrestricted use and therefore allow for the termination of the NRC licenses (except for the ZNPS ISFSI, which is described below). The NRCs radiological criteria to release a site for unrestricted use is described in the NRCs regulation at 10 CFR 20.1402. ZS has indicated that upon license termination, it will transfer ownership and control of the ZNPS site (including the ZNPS ISFSI) to Exelon Nuclear Generation, LLC (Exelon).

Proposed Undertaking ZS submitted the LTP in accordance with NRC regulation 10 CFR 50.82(a)(9). The NRC, when it approves an LTP, is approving the following: (a) the adequacy of the licensees decommissioning funding plan to assure that sufficient funding is available to complete the remaining radiological remediation activities; (b) the radiation-release criteria for license termination; and (c) the adequacy of the design of the final site survey to verify that the radiological release criteria have been met. The final status survey is the radiological survey performed after an area has been fully characterized, remediation has been completed, and the area is ready to be released. In accordance with NRC regulation, 10 CFR 50.82(a)(11), the NRC shall terminate the ZNPS reactor operating licenses (except for the ZNPS ISFSI) upon ZS demonstration, through its final site radiation survey, that it has met the radiological release criteria of 10 CFR 20.1402.

Although 10 CFR 50.82(a)(9) requires the licensee to identify remaining dismantlement activities in its LTP, the NRCs regulatory purpose in approving the LTP is limited to the concerns described in the previous paragraph. The identification of the remaining dismantlement activities are for the purpose of ensuring that the licensee will have adequate funds to reduce the residual radioactivity to the required levels. In order for the NRC to approve the LTP, ZS must show how it will demonstrate, in a final site survey, the residual radioactivity remaining at the licensed site is within the 10 CFR 20.1402 regulatory limits.

ZNPS ISFSI The ZNPS ISFSI will remain under NRCs regulatory jurisdiction and is not part of this undertaking. The ZNPS 10 CFR Part 50 operating licenses will remain in effect for the ZNPS ISFSI only. If the LTP is approved, and if ZS demonstrates that it has met the 10 CFR 20.1402 regulatory criteria, the ZNPS licenses will be considered terminated in all other aspects. The ZNPS ISFSI is, and will continue to be, governed by the NRCs general license regulations for ISFSIs at Subpart K of 10 CFR Part 72. ZS will remain responsible for complying with the Subpart K regulations until the planned transfer of ownership to Exelon. At that point Exelon will assume responsibility for complying with the Subpart K regulations. The ZNPS ISFSI will remain in operation indefinitely, until such time as a deep geologic repository becomes available to accept spent fuel or other spent fuel disposal arrangements are made. The ZNPS ISFSI is enclosed by a separate security fence within the larger fenced 87-acre area. The ZNPS ISFSI is excluded from the Area of Potential Effects, which is described below.

M. Dougherty 3 Definition of Area of Potential Effects The ZNPS site is approximately 331 acres (all owner controlled). The NRC considers the direct Area of Potential Effects (APE) to be the approximate 87-acre, fence-enclosed site that includes all of the major buildings of the ZNPS, including Units 1 and 2. Virtually all NRC licensed activities occurred within the direct APE. The NRC anticipates that most radiological remediation activities will occur within the direct APE. The NRC considers the remaining 244 acres to be an indirect APE.

The direct APE is zoned for industrial use in accordance with The City of Zion, Illinois, Comprehensive Plan 2010. In addition to Units 1 and 2, other major buildings and facilities include the turbine building, containment buildings, the spent fuel building, which are in the process of being decommissioned and dismantled. The switchyard, ZNPS ISFSI, parking areas, rail lines, and haul paths are to remain in-place at license termination. The direct APE will continue to be an industrial-zoned property for the foreseeable future. The ZNPS ISFSI is located within the direct APE but is excluded, as it will remain under NRC license and thus, under NRCs regulatory jurisdiction. The indirect APE (244-acre parcel) consists mostly of open land. Other than radiological surveys, which may include small-scale soil sampling, no radiological remediation activities are expected to occur in the indirect APE.

Illinois Historic Preservation Agency Determination of No Historic Properties Affected By letter dated August 24, 2015, the NRC initiated consultation with the Illinois Historic Preservation Agency (IHPA) in accordance with Section 106 of the National Historic Preservation Act (NHPA). In a letter dated September 16, 2015, the IHPA determined that no historic properties are affected by the proposed undertaking and as such, the IHPA concluded that it had no objection to the proposed undertaking being approved by the NRC. IHPA has assigned Log #017022414 to this matter.

The NRC concurs with the IHPA determination that no historic properties are affected. Please advise us if there are traditional cultural properties of interest to your tribe in the APEs. Please note that a traditional cultural property may, or may not, meet the definition of historic property, as that term is defined in 36 CFR 800.16(l). If your Tribe determines there are traditional cultural properties within the APE that it wants to bring to the attention of the NRC, please complete the Tribal Response Form (Enclosure 2), and return it to the NRC within 30 days of receipt of this letter.

If you have concerns about the confidentiality of information that you may submit, we are available to discuss such concerns and will take all measures, as prescribed by applicable law, to protect the confidentiality of such information. Please note that, according to NRC policy, correspondence provided to the NRC, including those provided by e-mail, may be made publicly available. Therefore, the NRC recommends that the Tribe avoid including any information in its submission that your Tribal officials do not want to be publicly disclosed (e.g., personal e-mail addresses or other personal contact information). If your Tribal officials do not wish for their personal e-mail addresses to be made public, please use an alternate e-mail address when corresponding with the NRC.

M. Dougherty 4 For additional information regarding the proposed action, ZSs license amendment application is publicly available from the NRC's Agency Wide Documents Access and Management System (ADAMS), which can be accessed online at: http://www.nrc.gov/reading-rm/adams.html. The ADAMS accession number for ZSs application is ML15005A336.

If you have any questions or comments on the proposed ZNPS LTP Project, or need any additional information regarding ZSs license amendment application, please contact Mr. John Hickman by telephone at (301) 415-3017 or via email at: John.HickmanNMSS@nrc.gov. For information about the NHPA Section 106 process for this project, please contact Ms. Jessie Muir-Quintero by telephone at (301) 415-7476, or via email at: Jessie.Muir-Quintero@nrc.gov.

Sincerely,

/RA/

Craig G. Erlanger, Acting Director Division of Fuel Cycle Safety, Safeguards, and Environmental Review Office of Nuclear Material Safety and Safeguards Docket Nos.: 50-295 50-304

Enclosures:

1. Map of ZNPS Location
2. Tribal Response Form cc w/o encls.:

Mr. Gerard Van Noordennen, ZS Mr. Edmore Green Sac and Fox Nation of Missouri

M. Dougherty 4 For additional information regarding the proposed action, ZSs license amendment application is publicly available from the NRC's Agency Wide Documents Access and Management System (ADAMS), which can be accessed online at: http://www.nrc.gov/reading-rm/adams.html. The ADAMS accession number for ZSs application is ML15005A336.

If you have any questions or comments on the proposed ZNPS LTP Project, or need any additional information regarding ZSs license amendment application, please contact Mr. John Hickman by telephone at (301) 415-3017 or via email at: John.HickmanNMSS@nrc.gov. For information about the NHPA Section 106 process for this project, please contact Ms. Jessie Muir-Quintero by telephone at (301) 415-7476, or via email at: Jessie.Muir-Quintero@nrc.gov.

Sincerely,

/RA/

Craig G. Erlanger, Acting Director Division of Fuel Cycle Safety, Safeguards, and Environmental Review Office of Nuclear Material Safety and Safeguards Docket Nos.: 50-295 50-304

Enclosures:

1. Map of ZNPS Location
2. Tribal Response Form cc w/o encls.:

Mr. Gerard Van Noordennen, ZS Mr. Edmore Green Sac and Fox Nation of Missouri DISTRIBUTION:

APersinko BWatson ML15203A207 OFC FCSE/ERB FCSE/ERB DUWP/RDB NAME ABjornsen AWalker-Smith JHickman DATE 12/03/15 12/02/15 12/11/15 OFC OGC FCSE/ERB NMSS/FCSE NAME APessin LChang CErlanger DATE 02/05/16 via email 1/6/16 02/02/16 OFFICIAL RECORD COPY

February 2, 2016 Mr. Michael Dougherty, Chairperson Sac and Fox Nation of Missouri 305 N. Main Street Reserve, KS 66434

SUBJECT:

NATIONAL HISTORIC PRESERVATION ACT, SECTION 106 - NOTIFICATION OF ACCEPTANCE OF AMENDMENT APPLICATION FOR LICENSE TERMINATION PLAN FOR THE ZION NUCLEAR POWER STATION

Dear Chairperson Dougherty:

On December 19, 2014, the U.S. Nuclear Regulatory Commission (NRC) received an application for a license amendment request from Zion Solutions, LLC (ZS). ZS is the owner of the Zion Nuclear Power Station (ZNPS), which is a shut-down nuclear power reactor facility located near Zion, Illinois (Lake County) on the western shore of Lake Michigan. ZS holds NRC operating licenses for ZNPS Units 1 and 2, which are the two reactor units at the site. The ZS license amendment application requests the NRCs approval of a license termination plan (LTP) for ZNPS Units 1 and 2.

The ZNPS site is approximately 40 miles north of Chicago, Illinois and 42 miles south of Milwaukee, Wisconsin (Enclosure 1 is a map that shows the general location for the ZNPS site).

The ZNPS site is approximately 331 acres, including an approximate 87-acre, fence-enclosed area, in which both Units 1 and 2 and the ZNPS Independent Spent Fuel Storage Installation (ISFSI) are located.

Under the Atomic Energy Act of 1954, as amended, the NRC issued operating licenses for both Units 1 and 2 in 1973 (License No. DPR-39, Docket No. 50-295 for Unit 1, and License No.

DPR-48, Docket No. 50-304 for Unit 2). Specifically, the NRC issued the operating licenses for ZNPS Units 1 and 2 under its regulations at Title 10 of the Code of Federal Regulations (10 CFR) Part 50. Both units generated electricity for portions of northern Illinois and southern Wisconsin for over 20 years. Unit 1 ceased operation in 1997 and Unit 2 ceased operation in 1996. ZS is completing the decommissioning of both units. All spent fuel has been removed from the ZNPS spent fuel pool and ZS completed the final transfer in January 2015. ZS now stores the spent fuel assemblies in large steel cylinder-encased, pre-cast concrete casks located at the ZNPS ISFSI, which is located in the southwest portion of the ZNPS site. Spent fuel that has been removed from a reactors spent fuel pool is typically stored in casks at a nuclear power plants ISFSI.

M. Dougherty 2 The submission of the LTP occurs towards the end of a nuclear power plants decommissioning process. The stated objective of the ZS LTP is to demonstrate to the NRC that ZS will successfully reduce the level of residual radioactivity to levels that will permit the release of the ZNPS site for unrestricted use and therefore allow for the termination of the NRC licenses (except for the ZNPS ISFSI, which is described below). The NRCs radiological criteria to release a site for unrestricted use is described in the NRCs regulation at 10 CFR 20.1402. ZS has indicated that upon license termination, it will transfer ownership and control of the ZNPS site (including the ZNPS ISFSI) to Exelon Nuclear Generation, LLC (Exelon).

Proposed Undertaking ZS submitted the LTP in accordance with NRC regulation 10 CFR 50.82(a)(9). The NRC, when it approves an LTP, is approving the following: (a) the adequacy of the licensees decommissioning funding plan to assure that sufficient funding is available to complete the remaining radiological remediation activities; (b) the radiation-release criteria for license termination; and (c) the adequacy of the design of the final site survey to verify that the radiological release criteria have been met. The final status survey is the radiological survey performed after an area has been fully characterized, remediation has been completed, and the area is ready to be released. In accordance with NRC regulation, 10 CFR 50.82(a)(11), the NRC shall terminate the ZNPS reactor operating licenses (except for the ZNPS ISFSI) upon ZS demonstration, through its final site radiation survey, that it has met the radiological release criteria of 10 CFR 20.1402.

Although 10 CFR 50.82(a)(9) requires the licensee to identify remaining dismantlement activities in its LTP, the NRCs regulatory purpose in approving the LTP is limited to the concerns described in the previous paragraph. The identification of the remaining dismantlement activities are for the purpose of ensuring that the licensee will have adequate funds to reduce the residual radioactivity to the required levels. In order for the NRC to approve the LTP, ZS must show how it will demonstrate, in a final site survey, the residual radioactivity remaining at the licensed site is within the 10 CFR 20.1402 regulatory limits.

ZNPS ISFSI The ZNPS ISFSI will remain under NRCs regulatory jurisdiction and is not part of this undertaking. The ZNPS 10 CFR Part 50 operating licenses will remain in effect for the ZNPS ISFSI only. If the LTP is approved, and if ZS demonstrates that it has met the 10 CFR 20.1402 regulatory criteria, the ZNPS licenses will be considered terminated in all other aspects. The ZNPS ISFSI is, and will continue to be, governed by the NRCs general license regulations for ISFSIs at Subpart K of 10 CFR Part 72. ZS will remain responsible for complying with the Subpart K regulations until the planned transfer of ownership to Exelon. At that point Exelon will assume responsibility for complying with the Subpart K regulations. The ZNPS ISFSI will remain in operation indefinitely, until such time as a deep geologic repository becomes available to accept spent fuel or other spent fuel disposal arrangements are made. The ZNPS ISFSI is enclosed by a separate security fence within the larger fenced 87-acre area. The ZNPS ISFSI is excluded from the Area of Potential Effects, which is described below.

M. Dougherty 3 Definition of Area of Potential Effects The ZNPS site is approximately 331 acres (all owner controlled). The NRC considers the direct Area of Potential Effects (APE) to be the approximate 87-acre, fence-enclosed site that includes all of the major buildings of the ZNPS, including Units 1 and 2. Virtually all NRC licensed activities occurred within the direct APE. The NRC anticipates that most radiological remediation activities will occur within the direct APE. The NRC considers the remaining 244 acres to be an indirect APE.

The direct APE is zoned for industrial use in accordance with The City of Zion, Illinois, Comprehensive Plan 2010. In addition to Units 1 and 2, other major buildings and facilities include the turbine building, containment buildings, the spent fuel building, which are in the process of being decommissioned and dismantled. The switchyard, ZNPS ISFSI, parking areas, rail lines, and haul paths are to remain in-place at license termination. The direct APE will continue to be an industrial-zoned property for the foreseeable future. The ZNPS ISFSI is located within the direct APE but is excluded, as it will remain under NRC license and thus, under NRCs regulatory jurisdiction. The indirect APE (244-acre parcel) consists mostly of open land. Other than radiological surveys, which may include small-scale soil sampling, no radiological remediation activities are expected to occur in the indirect APE.

Illinois Historic Preservation Agency Determination of No Historic Properties Affected By letter dated August 24, 2015, the NRC initiated consultation with the Illinois Historic Preservation Agency (IHPA) in accordance with Section 106 of the National Historic Preservation Act (NHPA). In a letter dated September 16, 2015, the IHPA determined that no historic properties are affected by the proposed undertaking and as such, the IHPA concluded that it had no objection to the proposed undertaking being approved by the NRC. IHPA has assigned Log #017022414 to this matter.

The NRC concurs with the IHPA determination that no historic properties are affected. Please advise us if there are traditional cultural properties of interest to your tribe in the APEs. Please note that a traditional cultural property may, or may not, meet the definition of historic property, as that term is defined in 36 CFR 800.16(l). If your Tribe determines there are traditional cultural properties within the APE that it wants to bring to the attention of the NRC, please complete the Tribal Response Form (Enclosure 2), and return it to the NRC within 30 days of receipt of this letter.

If you have concerns about the confidentiality of information that you may submit, we are available to discuss such concerns and will take all measures, as prescribed by applicable law, to protect the confidentiality of such information. Please note that, according to NRC policy, correspondence provided to the NRC, including those provided by e-mail, may be made publicly available. Therefore, the NRC recommends that the Tribe avoid including any information in its submission that your Tribal officials do not want to be publicly disclosed (e.g., personal e-mail addresses or other personal contact information). If your Tribal officials do not wish for their personal e-mail addresses to be made public, please use an alternate e-mail address when corresponding with the NRC.

M. Dougherty 4 For additional information regarding the proposed action, ZSs license amendment application is publicly available from the NRC's Agency Wide Documents Access and Management System (ADAMS), which can be accessed online at: http://www.nrc.gov/reading-rm/adams.html. The ADAMS accession number for ZSs application is ML15005A336.

If you have any questions or comments on the proposed ZNPS LTP Project, or need any additional information regarding ZSs license amendment application, please contact Mr. John Hickman by telephone at (301) 415-3017 or via email at: John.HickmanNMSS@nrc.gov. For information about the NHPA Section 106 process for this project, please contact Ms. Jessie Muir-Quintero by telephone at (301) 415-7476, or via email at: Jessie.Muir-Quintero@nrc.gov.

Sincerely,

/RA/

Craig G. Erlanger, Acting Director Division of Fuel Cycle Safety, Safeguards, and Environmental Review Office of Nuclear Material Safety and Safeguards Docket Nos.: 50-295 50-304

Enclosures:

1. Map of ZNPS Location
2. Tribal Response Form cc w/o encls.:

Mr. Gerard Van Noordennen, ZS Mr. Edmore Green Sac and Fox Nation of Missouri

M. Dougherty 4 For additional information regarding the proposed action, ZSs license amendment application is publicly available from the NRC's Agency Wide Documents Access and Management System (ADAMS), which can be accessed online at: http://www.nrc.gov/reading-rm/adams.html. The ADAMS accession number for ZSs application is ML15005A336.

If you have any questions or comments on the proposed ZNPS LTP Project, or need any additional information regarding ZSs license amendment application, please contact Mr. John Hickman by telephone at (301) 415-3017 or via email at: John.HickmanNMSS@nrc.gov. For information about the NHPA Section 106 process for this project, please contact Ms. Jessie Muir-Quintero by telephone at (301) 415-7476, or via email at: Jessie.Muir-Quintero@nrc.gov.

Sincerely,

/RA/

Craig G. Erlanger, Acting Director Division of Fuel Cycle Safety, Safeguards, and Environmental Review Office of Nuclear Material Safety and Safeguards Docket Nos.: 50-295 50-304

Enclosures:

1. Map of ZNPS Location
2. Tribal Response Form cc w/o encls.:

Mr. Gerard Van Noordennen, ZS Mr. Edmore Green Sac and Fox Nation of Missouri DISTRIBUTION:

APersinko BWatson ML15203A207 OFC FCSE/ERB FCSE/ERB DUWP/RDB NAME ABjornsen AWalker-Smith JHickman DATE 12/03/15 12/02/15 12/11/15 OFC OGC FCSE/ERB NMSS/FCSE NAME APessin LChang CErlanger DATE 02/05/16 via email 1/6/16 02/02/16 OFFICIAL RECORD COPY