| issue date = 04/03/2013 | | issue date = 04/03/2013 | ||
| title = IR 05000424-13-007 and 05000425-13-007, on 07/15-19, 07/29 -008/02, 08/12-16/2013, Notification of Vogtle Electric Generating Plant - Component Design Bases Inspection | | title = IR 05000424-13-007 and 05000425-13-007, on 07/15-19, 07/29 -008/02, 08/12-16/2013, Notification of Vogtle Electric Generating Plant - Component Design Bases Inspection | ||
| author name = Nease R | | author name = Nease R | ||
| author affiliation = NRC/RGN-II/DRS/EB1 | | author affiliation = NRC/RGN-II/DRS/EB1 | ||
| addressee name = Tynan T | | addressee name = Tynan T | ||
| addressee affiliation = Southern Nuclear Operating Co, Inc | | addressee affiliation = Southern Nuclear Operating Co, Inc | ||
| docket = 05000424, 05000425 | | docket = 05000424, 05000425 | ||
Line 14: | Line 14: | ||
| page count = 10 | | page count = 10 | ||
}} | }} | ||
See also: [[ | See also: [[see also::IR 05000424/2013007]] | ||
=Text= | =Text= | ||
{{#Wiki_filter: | {{#Wiki_filter:UNITED STATES | ||
Mr. Tom E. Tynan | NUCLEAR REGULATORY COMMISSION | ||
Vice President | REGION II | ||
Southern Nuclear Operating Company, Inc. | 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 | ||
Vogtle Electric Generating Plant 7821 River Road Waynesboro, GA 30830 | ATLANTA, GEORGIA 30303-1257 | ||
April 3, 2013 | |||
SUBJECT: NOTIFICATION OF VOGTLE ELECTRIC GENERATING PLANT - COMPONENT DESIGN BASES INSPECTION - NRC INSPECTION REPORT 05000424/2013007 AND 05000425/2013007 | Mr. Tom E. Tynan | ||
Dear Mr. Tynan: | Vice President | ||
Southern Nuclear Operating Company, Inc. | |||
The purpose of this letter is to notify you that the U.S. Nuclear Regulatory Commission (NRC) | Vogtle Electric Generating Plant | ||
Region II staff will conduct a component design bases inspection (CDBI) at your Vogtle Electric Generating Plant during the weeks of July 15 - 19, July 29 - August 2, and August 12 - 16, 2013. | 7821 River Road | ||
inspection procedure, Procedure 71111.21, | Waynesboro, GA 30830 | ||
August 14, 2012. | SUBJECT: NOTIFICATION OF VOGTLE ELECTRIC GENERATING PLANT - | ||
as designed and to support proper system operation. | COMPONENT DESIGN BASES INSPECTION - NRC INSPECTION REPORT | ||
of selected operator actions, operating experience, and modifications. | 05000424/2013007 AND 05000425/2013007 | ||
Dear Mr. Tynan: | |||
onsite inspection. | The purpose of this letter is to notify you that the U.S. Nuclear Regulatory Commission (NRC) | ||
Region II staff will conduct a component design bases inspection (CDBI) at your Vogtle Electric | |||
risk-significant components and operator actions. | Generating Plant during the weeks of July 15 - 19, July 29 - August 2, and August 12 - 16, | ||
support the inspection will also be identified. | 2013. The inspection team will be led by Geoffrey Ottenberg, a Senior Reactor Inspector from | ||
the NRC's Region II Office. This inspection will be conducted in accordance with the baseline | |||
The Enclosure lists documents that will be needed prior to the information-gathering visit. | inspection procedure, Procedure 71111.21, Component Design Bases Inspection, issued | ||
August 14, 2012. | |||
The inspection will evaluate the capability of risk significant / low margin components to function | |||
as designed and to support proper system operation. The inspection will also include a review | |||
of selected operator actions, operating experience, and modifications. | |||
During a telephone conversation on March 28, 2013, Mr. Ottenberg confirmed with George | |||
Gunn of your staff, arrangements for an information-gathering site visit and the three-week | |||
onsite inspection. The schedule is as follows: | |||
* Information-gathering visit: Week of June 24 - 28, 2013 | |||
* Onsite weeks: July 15 - 19, July 29 - August 2, and August 12 - 16, 2013 | |||
The purpose of the information-gathering visit is to meet with members of your staff to identify | |||
risk-significant components and operator actions. Information and documentation needed to | |||
support the inspection will also be identified. Mr. George Macdonald, a Region II Senior | |||
Reactor Analyst, will support Mr. Ottenberg during the information-gathering visit to review | |||
probabilistic risk assessment data and identify risk significant components, which will be | |||
examined during the inspection. | |||
The Enclosure lists documents that will be needed prior to the information-gathering visit. | |||
Please provide the referenced information to the Region II office by June 10, 2013. The | |||
inspectors will try to minimize your administrative burden by specifically identifying only those | |||
documents required for inspection preparation. | |||
T. Tynan 2 | |||
Additional documents will be requested during the information-gathering visit. The additional | |||
information will need to be made available to the team in the Region II office prior to the | |||
inspection teams preparation week of July 8, 2013. Mr. Ottenberg will also discuss the | |||
following inspection support administrative details: (1) availability of knowledgeable plant | |||
engineering and licensing personnel to serve as points of contact during the inspection, (2) | |||
method of tracking inspector requests during the inspection, (3) licensee computer access, (4) | |||
working space, (5) arrangements for site access, and (6) other applicable information. | |||
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its | |||
Enclosure will be available electronically for public inspection in the NRC Public Document | |||
Room or from the Publicly Available Records (PARS) component of NRCs Agencywide | |||
Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC | |||
Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). | |||
Thank you for your cooperation in this matter. If you have any questions regarding the | |||
information requested or the inspection, please contact Mr. Ottenberg at 404-997-4658 or me at | |||
404-997-4530. | |||
Sincerely, | |||
/RA/ | |||
Rebecca L. Nease, Chief | |||
Engineering Branch 1 | |||
Division of Reactor Safety | |||
Docket Nos. 50-424, 50-425 | |||
License Nos. NPF-68, NPF-81 | |||
Enclosure: | |||
Information Request for Vogtle Electric | |||
Generating Plant - Component Design | |||
Bases Inspection | |||
cc: (See page 3) | |||
_________________________ GX SUNSI REVIEW COMPLETE G FORM 665 ATTACHED | |||
OFFICE RII: DRS RII: DRS | |||
SIGNATURE RA RA | |||
NAME Ottenberg Nease | |||
DATE 4/3/2012 4/3/2013 4/ /2013 4/ /2013 4/ /2013 4/ /2013 4/ /2013 | |||
E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO | |||
T. Tynan 3 | |||
cc: Leigh Perry | |||
C. Russ Dedrickson SVP & General Counsel-Ops & SNC | |||
Fleet Support Supervisor Southern Nuclear Operating Company, Inc. | |||
Southern Nuclear Operating Company, Inc. Electronic Mail Distribution | |||
Electronic Mail Distribution | |||
T. E. Tynan | |||
S. Kuczynski Site Vice President | |||
Chairman, President and CEO Vogtle Electric Generating Plant | |||
Southern Nuclear Operating Company, Inc. Southern Nuclear Operating Company, Inc. | |||
Electronic Mail Distribution Electronic Mail Distribution | |||
Todd L. Youngblood C. R. Pierce | |||
Vice President Nuclear Licensing Director | |||
Fleet Oversight Southern Nuclear Operating Company, Inc. | |||
Southern Nuclear Operating Company, Inc. Electronic Mail Distribution | |||
Electronic Mail Distribution | |||
B. D. McKinney, Jr. | |||
W. L. Bargeron Regulatory Response Manager | |||
Plant Manager Southern Nuclear Operating Company, Inc. | |||
Vogtle Electric Generating Plant Electronic Mail Distribution | |||
Southern Nuclear Operating Company, Inc. | |||
Electronic Mail Distribution D. W. Daughhetee | |||
Licensing Engineer | |||
D. G. Bost Southern Nuclear Operating Company, Inc. | |||
Chief Nuclear Officer Electronic Mail Distribution | |||
Southern Nuclear Operating Company, Inc. | |||
Electronic Mail Distribution Bradley J. Adams | |||
Vice President | |||
N. J. Stringfellow Fleet Operations Support | |||
Licensing Manager Southern Nuclear Operating Company, Inc. | |||
Southern Nuclear Operating Company, Inc. Electronic Mail Distribution | |||
Electronic Mail Distribution | |||
T. D. Honeycutt | |||
Paula Marino Regulatory Response Supervisor | |||
Vice President Southern Nuclear Operating Company, Inc. | |||
Engineering Electronic Mail Distribution | |||
Southern Nuclear Operating Company, Inc. | |||
Electronic Mail Distribution L. P. Hill | |||
Licensing Supervisor | |||
T. A. Lynch Southern Nuclear Operating Company, Inc. | |||
Vice President Electronic Mail Distribution | |||
Joseph M. Farley Nuclear Plant | |||
Southern Nuclear Operating Company, Inc. L. L. Crumpton | |||
Electronic Mail Distribution Administrative Assistant, Sr. | |||
Southern Nuclear Operating Company, Inc. | |||
Dennis R. Madison Electronic Mail Distribution | |||
Vice President | |||
Edwin I. Hatch Nuclear Plant | |||
Southern Nuclear Operating Company, Inc. (cc contd - See page 3) | |||
Electronic Mail Distribution | |||
T. Tynan 4 | |||
(cc contd) Richard Haynes | |||
Hickox, T. Mark Director, Division of Waste Management | |||
Vogtle Electric Generating Plant Bureau of Land and Waste Management | |||
Electronic Mail Distribution S.C. Department of Health and | |||
Environmental Control | |||
Mark Rauckhorst 2600 Bull Street | |||
Site Vice President Columbia, SC 29201 | |||
Vogtle Units 3 and 4 | |||
Southern Nuclear Operating Company Lee Foley | |||
Electronic Mail Distribution Manager of Contracts Generation | |||
Oglethorpe Power Corporation | |||
S. C. Swanson Electronic Mail Distribution | |||
Site Support Manager | |||
Vogtle Electric Generating Plant Mark Williams | |||
Electronic Mail Distribution Commissioner | |||
Georgia Department of Natural Resources | |||
Senior Resident Inspector Electronic Mail Distribution | |||
U.S. Nuclear Regulatory Commission | |||
Vogtle Electric Generating Plant Chuck Mueller | |||
U.S. NRC Manager | |||
7821 River Road Policy and Radiation Program | |||
Waynesboro, GA 30830 Georgia Department of Natural Resources | |||
Electronic Mail Distribution | |||
Arthur H. Domby, Esq. | |||
Troutman Sanders Cynthia A. Sanders | |||
Electronic Mail Distribution Radioactive Materials Program Manager | |||
Environmental Protection Division | |||
Jerry Ranalli Georgia Department of Natural Resources | |||
Municipal Electric Authority of Georgia Electronic Mail Distribution | |||
Power | |||
Electronic Mail Distribution James C. Hardeman | |||
Environmental Radiation Program Manager | |||
Sandra Threatt, Manager Environmental Protection Division | |||
Nuclear Response and Emergency Georgia Department of Natural Resources | |||
Environmental Surveillance Electronic Mail Distribution | |||
Bureau of Land and Waste Management | |||
Department of Health and Environmental Mr. Steven M. Jackson | |||
Control Senior Engineer - Power Supply | |||
Electronic Mail Distribution Municipal Electric Authority of Georgia | |||
Electronic Mail Distribution | |||
Division of Radiological Health | |||
TN Dept. of Environment & Conservation Reece McAlister | |||
401 Church Street Executive Secretary | |||
Nashville, TN 37243-1532 Georgia Public Service Commission | |||
Electronic Mail Distribution | |||
Office of the Attorney General | |||
40 Capitol Square, SW | |||
Atlanta, GA 30334 | |||
(cc contd - See page 4) | |||
T. Tynan 5 | |||
(cc contd) | |||
Office of the County Commissioner | |||
Burke County Commission | |||
Electronic Mail Distribution | |||
Director | |||
Consumers' Utility Counsel Division | |||
Governor's Office of Consumer Affairs | |||
2 M. L. King, Jr. Drive | |||
Plaza Level East; Suite 356 | |||
Atlanta, GA 30334-4600 | |||
Amy Whaley | |||
Resident Manager | |||
Electronic Mail Distribution | |||
Letter to Tom E. Tynan from Rebecca L. Nease dated April 3, 2013 | |||
SUBJECT: NOTIFICATION OF VOGTLE ELECTRIC GENERATING PLANT - | |||
COMPONENT DESIGN BASES INSPECTION - NRC INSPECTION REPORT | |||
05000424/2013007 AND 05000425/2013007 | |||
DISTRIBUTION: | |||
RIDSNRRDIRS | |||
PUBLIC | |||
RidsNrrPMVogtle Resource | |||
INFORMATION REQUEST FOR VOGTLE ELECTRIC GENERATING PLANT | |||
COMPONENT DESIGN BASES INSPECTION | |||
Please provide the information electronically in .pdf files, Excel, or other searchable format on | |||
CDROM. (or FTP site, SharePoint, etc.) The CDROM (or website) should be indexed and | |||
hyperlinked to facilitate ease of use. | |||
1. From your most-recent probabilistic safety analysis (PSA) excluding external events and | |||
fires: | |||
a. Two risk rankings of components from your site-specific probabilistic safety | |||
analysis (PSA): one sorted by Risk Achievement Worth (RAW), and the other | |||
sorted by Birnbaum Importance | |||
b. A list of the top 500 cutsets | |||
2. From your most-recent probabilistic safety analysis (PSA) including external events and | |||
fires: | |||
a. Two risk rankings of components from your site-specific probabilistic safety | |||
analysis (PSA): one sorted by Risk Achievement Worth (RAW), and the other | |||
sorted by Birnbaum Importance | |||
b. A list of the top 500 cutsets | |||
3. Risk ranking of operator actions from your site-specific PSA sorted by RAW. Provide | |||
human reliability worksheets for these items. | |||
4. List of time critical operator actions with a brief description of each action. | |||
5. List of Emergency and Abnormal Operating Procedures revised (significant) since June 14, | |||
2010, with a brief description of each revision. | |||
6. List of components with low design margins (i.e., pumps closest to the design limit for flow | |||
or pressure, diesel generator close to design-required output, heat exchangers close to | |||
rated design heat removal, and MOV risk-margin rankings, etc.), and associated | |||
evaluations or calculations. | |||
7. List of station operating experience evaluations/reviews performed, and documented in the | |||
stations corrective action program, for industry events and safety related equipment | |||
failures/vulnerabilities [as communicated by NRC Generic Communications, Industry | |||
Communications, 10 CFR Part 21 Notifications, etc.] since June 14, 2010. | |||
8. List and brief description of safety related SSC design modifications implemented since | |||
June 14, 2010. | |||
9. List and brief description of common-cause component failures that have occurred since | |||
June 14, 2010. | |||
Enclosure | |||
2 | |||
10. List and brief description of operability evaluations completed since June 14, 2010. | |||
11. List of equipment on the sites Station Equipment Reliability Issues List, including a | |||
description of the reason(s) why each component is on that list, and summaries (if | |||
available) of your plans to address the issue(s). | |||
12. List and brief description of equipment currently in degraded or nonconforming status as | |||
described in RIS 05-020. | |||
13. List and reason for equipment classified in maintenance rule (a)(1) status since | |||
June 14, 2010, to present. | |||
14. Copies of System Descriptions (or the like design basis documents) for Safety-Related | |||
Systems. | |||
15. Copy of UFSAR(s). | |||
16. Copy of Technical Specification(s). | |||
17. Copy of Technical Specifications Bases. | |||
18. Copy of Technical Requirements Manual(s). | |||
19. List and brief description of Root Cause Evaluations that have been performed since June | |||
14, 2010. | |||
20. In-service Testing Program Procedure(s). | |||
21. Corrective Action Program Procedure(s). | |||
22. One line diagram of electrical plant. (Electronic and full size - hard copy week of June 24, | |||
2013) | |||
23. Index and legend for electrical plant one-line diagrams. | |||
24. Primary AC calculation(s) for safety-related buses. | |||
25. Primary DC calculation(s) for safety-related buses. | |||
26. PI&Ds for Safety-Related systems. (Electronic and 1/2 size - hard copy week of June 24, | |||
2013) | |||
27. Index and Legend for PI&Ds. | |||
28. Copy of Operability determination procedure(s). | |||
30. Copies of condition reports associated with findings from previous CDBI. (If applicable) | |||
Enclosure | |||
3 | |||
31. Index (procedure number, titles, and current revision) of station Emergency Operating | |||
Procedures (EOPs), Abnormal Operating Procedures (AOPs), and Annunciator Response | |||
Procedures (ARPs). | |||
32. Copy of any self-assessments performed in preparation for this inspection. | |||
33. List of any condition reports generated in preparation for this inspection. | |||
34. Copies of condition reports generated from previous CDBI (2010). | |||
35. Contact information for a person to discuss PRA information prior to and during the | |||
information-gathering trip. (Name, title, phone number, and e-mail address) | |||
Enclosure | |||
}} | }} |
Latest revision as of 19:55, 4 November 2019
ML13094A213 | |
Person / Time | |
---|---|
Site: | Vogtle |
Issue date: | 04/03/2013 |
From: | Nease R NRC/RGN-II/DRS/EB1 |
To: | Tynan T Southern Nuclear Operating Co |
References | |
IR-13-007 | |
Download: ML13094A213 (10) | |
See also: IR 05000424/2013007
Text
UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION II
245 PEACHTREE CENTER AVENUE NE, SUITE 1200
ATLANTA, GEORGIA 30303-1257
April 3, 2013
Mr. Tom E. Tynan
Vice President
Southern Nuclear Operating Company, Inc.
Vogtle Electric Generating Plant
7821 River Road
Waynesboro, GA 30830
SUBJECT: NOTIFICATION OF VOGTLE ELECTRIC GENERATING PLANT -
COMPONENT DESIGN BASES INSPECTION - NRC INSPECTION REPORT
05000424/2013007 AND 05000425/2013007
Dear Mr. Tynan:
The purpose of this letter is to notify you that the U.S. Nuclear Regulatory Commission (NRC)
Region II staff will conduct a component design bases inspection (CDBI) at your Vogtle Electric
Generating Plant during the weeks of July 15 - 19, July 29 - August 2, and August 12 - 16,
2013. The inspection team will be led by Geoffrey Ottenberg, a Senior Reactor Inspector from
the NRC's Region II Office. This inspection will be conducted in accordance with the baseline
inspection procedure, Procedure 71111.21, Component Design Bases Inspection, issued
August 14, 2012.
The inspection will evaluate the capability of risk significant / low margin components to function
as designed and to support proper system operation. The inspection will also include a review
of selected operator actions, operating experience, and modifications.
During a telephone conversation on March 28, 2013, Mr. Ottenberg confirmed with George
Gunn of your staff, arrangements for an information-gathering site visit and the three-week
onsite inspection. The schedule is as follows:
- Information-gathering visit: Week of June 24 - 28, 2013
- Onsite weeks: July 15 - 19, July 29 - August 2, and August 12 - 16, 2013
The purpose of the information-gathering visit is to meet with members of your staff to identify
risk-significant components and operator actions. Information and documentation needed to
support the inspection will also be identified. Mr. George Macdonald, a Region II Senior
Reactor Analyst, will support Mr. Ottenberg during the information-gathering visit to review
probabilistic risk assessment data and identify risk significant components, which will be
examined during the inspection.
The Enclosure lists documents that will be needed prior to the information-gathering visit.
Please provide the referenced information to the Region II office by June 10, 2013. The
inspectors will try to minimize your administrative burden by specifically identifying only those
documents required for inspection preparation.
T. Tynan 2
Additional documents will be requested during the information-gathering visit. The additional
information will need to be made available to the team in the Region II office prior to the
inspection teams preparation week of July 8, 2013. Mr. Ottenberg will also discuss the
following inspection support administrative details: (1) availability of knowledgeable plant
engineering and licensing personnel to serve as points of contact during the inspection, (2)
method of tracking inspector requests during the inspection, (3) licensee computer access, (4)
working space, (5) arrangements for site access, and (6) other applicable information.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its
Enclosure will be available electronically for public inspection in the NRC Public Document
Room or from the Publicly Available Records (PARS) component of NRCs Agencywide
Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC
Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Thank you for your cooperation in this matter. If you have any questions regarding the
information requested or the inspection, please contact Mr. Ottenberg at 404-997-4658 or me at
404-997-4530.
Sincerely,
/RA/
Rebecca L. Nease, Chief
Engineering Branch 1
Division of Reactor Safety
Docket Nos. 50-424, 50-425
Enclosure:
Information Request for Vogtle Electric
Generating Plant - Component Design
Bases Inspection
cc: (See page 3)
_________________________ GX SUNSI REVIEW COMPLETE G FORM 665 ATTACHED
NAME Ottenberg Nease
DATE 4/3/2012 4/3/2013 4/ /2013 4/ /2013 4/ /2013 4/ /2013 4/ /2013
E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO
T. Tynan 3
cc: Leigh Perry
C. Russ Dedrickson SVP & General Counsel-Ops & SNC
Fleet Support Supervisor Southern Nuclear Operating Company, Inc.
Southern Nuclear Operating Company, Inc. Electronic Mail Distribution
Electronic Mail Distribution
T. E. Tynan
S. Kuczynski Site Vice President
Chairman, President and CEO Vogtle Electric Generating Plant
Southern Nuclear Operating Company, Inc. Southern Nuclear Operating Company, Inc.
Electronic Mail Distribution Electronic Mail Distribution
Todd L. Youngblood C. R. Pierce
Vice President Nuclear Licensing Director
Fleet Oversight Southern Nuclear Operating Company, Inc.
Southern Nuclear Operating Company, Inc. Electronic Mail Distribution
Electronic Mail Distribution
B. D. McKinney, Jr.
W. L. Bargeron Regulatory Response Manager
Plant Manager Southern Nuclear Operating Company, Inc.
Vogtle Electric Generating Plant Electronic Mail Distribution
Southern Nuclear Operating Company, Inc.
Electronic Mail Distribution D. W. Daughhetee
Licensing Engineer
D. G. Bost Southern Nuclear Operating Company, Inc.
Chief Nuclear Officer Electronic Mail Distribution
Southern Nuclear Operating Company, Inc.
Electronic Mail Distribution Bradley J. Adams
Vice President
N. J. Stringfellow Fleet Operations Support
Licensing Manager Southern Nuclear Operating Company, Inc.
Southern Nuclear Operating Company, Inc. Electronic Mail Distribution
Electronic Mail Distribution
T. D. Honeycutt
Paula Marino Regulatory Response Supervisor
Vice President Southern Nuclear Operating Company, Inc.
Engineering Electronic Mail Distribution
Southern Nuclear Operating Company, Inc.
Electronic Mail Distribution L. P. Hill
Licensing Supervisor
T. A. Lynch Southern Nuclear Operating Company, Inc.
Vice President Electronic Mail Distribution
Joseph M. Farley Nuclear Plant
Southern Nuclear Operating Company, Inc. L. L. Crumpton
Electronic Mail Distribution Administrative Assistant, Sr.
Southern Nuclear Operating Company, Inc.
Dennis R. Madison Electronic Mail Distribution
Vice President
Edwin I. Hatch Nuclear Plant
Southern Nuclear Operating Company, Inc. (cc contd - See page 3)
Electronic Mail Distribution
T. Tynan 4
(cc contd) Richard Haynes
Hickox, T. Mark Director, Division of Waste Management
Vogtle Electric Generating Plant Bureau of Land and Waste Management
Electronic Mail Distribution S.C. Department of Health and
Environmental Control
Mark Rauckhorst 2600 Bull Street
Site Vice President Columbia, SC 29201
Vogtle Units 3 and 4
Southern Nuclear Operating Company Lee Foley
Electronic Mail Distribution Manager of Contracts Generation
Oglethorpe Power Corporation
S. C. Swanson Electronic Mail Distribution
Site Support Manager
Vogtle Electric Generating Plant Mark Williams
Electronic Mail Distribution Commissioner
Georgia Department of Natural Resources
Senior Resident Inspector Electronic Mail Distribution
U.S. Nuclear Regulatory Commission
Vogtle Electric Generating Plant Chuck Mueller
U.S. NRC Manager
7821 River Road Policy and Radiation Program
Waynesboro, GA 30830 Georgia Department of Natural Resources
Electronic Mail Distribution
Arthur H. Domby, Esq.
Troutman Sanders Cynthia A. Sanders
Electronic Mail Distribution Radioactive Materials Program Manager
Environmental Protection Division
Jerry Ranalli Georgia Department of Natural Resources
Municipal Electric Authority of Georgia Electronic Mail Distribution
Power
Electronic Mail Distribution James C. Hardeman
Environmental Radiation Program Manager
Sandra Threatt, Manager Environmental Protection Division
Nuclear Response and Emergency Georgia Department of Natural Resources
Environmental Surveillance Electronic Mail Distribution
Bureau of Land and Waste Management
Department of Health and Environmental Mr. Steven M. Jackson
Control Senior Engineer - Power Supply
Electronic Mail Distribution Municipal Electric Authority of Georgia
Electronic Mail Distribution
Division of Radiological Health
TN Dept. of Environment & Conservation Reece McAlister
401 Church Street Executive Secretary
Nashville, TN 37243-1532 Georgia Public Service Commission
Electronic Mail Distribution
Office of the Attorney General
40 Capitol Square, SW
Atlanta, GA 30334
(cc contd - See page 4)
T. Tynan 5
(cc contd)
Office of the County Commissioner
Burke County Commission
Electronic Mail Distribution
Director
Consumers' Utility Counsel Division
Governor's Office of Consumer Affairs
2 M. L. King, Jr. Drive
Plaza Level East; Suite 356
Atlanta, GA 30334-4600
Amy Whaley
Resident Manager
Electronic Mail Distribution
Letter to Tom E. Tynan from Rebecca L. Nease dated April 3, 2013
SUBJECT: NOTIFICATION OF VOGTLE ELECTRIC GENERATING PLANT -
COMPONENT DESIGN BASES INSPECTION - NRC INSPECTION REPORT
05000424/2013007 AND 05000425/2013007
DISTRIBUTION:
RIDSNRRDIRS
PUBLIC
RidsNrrPMVogtle Resource
INFORMATION REQUEST FOR VOGTLE ELECTRIC GENERATING PLANT
COMPONENT DESIGN BASES INSPECTION
Please provide the information electronically in .pdf files, Excel, or other searchable format on
CDROM. (or FTP site, SharePoint, etc.) The CDROM (or website) should be indexed and
hyperlinked to facilitate ease of use.
1. From your most-recent probabilistic safety analysis (PSA) excluding external events and
fires:
a. Two risk rankings of components from your site-specific probabilistic safety
analysis (PSA): one sorted by Risk Achievement Worth (RAW), and the other
sorted by Birnbaum Importance
b. A list of the top 500 cutsets
2. From your most-recent probabilistic safety analysis (PSA) including external events and
fires:
a. Two risk rankings of components from your site-specific probabilistic safety
analysis (PSA): one sorted by Risk Achievement Worth (RAW), and the other
sorted by Birnbaum Importance
b. A list of the top 500 cutsets
3. Risk ranking of operator actions from your site-specific PSA sorted by RAW. Provide
human reliability worksheets for these items.
4. List of time critical operator actions with a brief description of each action.
5. List of Emergency and Abnormal Operating Procedures revised (significant) since June 14,
2010, with a brief description of each revision.
6. List of components with low design margins (i.e., pumps closest to the design limit for flow
or pressure, diesel generator close to design-required output, heat exchangers close to
rated design heat removal, and MOV risk-margin rankings, etc.), and associated
evaluations or calculations.
7. List of station operating experience evaluations/reviews performed, and documented in the
stations corrective action program, for industry events and safety related equipment
failures/vulnerabilities [as communicated by NRC Generic Communications, Industry
Communications, 10 CFR Part 21 Notifications, etc.] since June 14, 2010.
8. List and brief description of safety related SSC design modifications implemented since
June 14, 2010.
9. List and brief description of common-cause component failures that have occurred since
June 14, 2010.
Enclosure
2
10. List and brief description of operability evaluations completed since June 14, 2010.
11. List of equipment on the sites Station Equipment Reliability Issues List, including a
description of the reason(s) why each component is on that list, and summaries (if
available) of your plans to address the issue(s).
12. List and brief description of equipment currently in degraded or nonconforming status as
described in RIS 05-020.
13. List and reason for equipment classified in maintenance rule (a)(1) status since
June 14, 2010, to present.
14. Copies of System Descriptions (or the like design basis documents) for Safety-Related
Systems.
15. Copy of UFSAR(s).
16. Copy of Technical Specification(s).
17. Copy of Technical Specifications Bases.
18. Copy of Technical Requirements Manual(s).
19. List and brief description of Root Cause Evaluations that have been performed since June
14, 2010.
20. In-service Testing Program Procedure(s).
21. Corrective Action Program Procedure(s).
22. One line diagram of electrical plant. (Electronic and full size - hard copy week of June 24,
2013)
23. Index and legend for electrical plant one-line diagrams.
24. Primary AC calculation(s) for safety-related buses.
25. Primary DC calculation(s) for safety-related buses.
26. PI&Ds for Safety-Related systems. (Electronic and 1/2 size - hard copy week of June 24,
2013)
27. Index and Legend for PI&Ds.
28. Copy of Operability determination procedure(s).
30. Copies of condition reports associated with findings from previous CDBI. (If applicable)
Enclosure
3
31. Index (procedure number, titles, and current revision) of station Emergency Operating
Procedures (EOPs), Abnormal Operating Procedures (AOPs), and Annunciator Response
Procedures (ARPs).
32. Copy of any self-assessments performed in preparation for this inspection.
33. List of any condition reports generated in preparation for this inspection.
34. Copies of condition reports generated from previous CDBI (2010).
35. Contact information for a person to discuss PRA information prior to and during the
information-gathering trip. (Name, title, phone number, and e-mail address)
Enclosure