{{#Wiki_filter:UNITED NUCLEAR REGULATORY WASHINGTON, D.C. 20555*0001 May 23,2013 Mr. Chris Costanzo Vice President Nine Mile Point Nine Mile Point Nuclear Station, LLC P. O. Box 63 Lycoming, NY 13093 NINE MILE POINT NUCLEAR STATION, UNIT NO.2 -REQUEST FOR WITHHOLDING INFORMATION FROM PUBLIC DISCLOSURE RE: SUBMITTAL OF EVALUATION TO ESTABLISH INSPECTION INTERVALS FOR ..lET PUMP HOLDDOWN BEAMS FABRICATED FROM MODIFIED ALLOY 718 MATERIAL (TAC NO. ME7800)  
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555*0001 May 23,2013 Mr. Chris Costanzo Vice President Nine Mile Point Nine Mile Point Nuclear Station, LLC P. O. Box 63 Lycoming, NY 13093 SUB,JECT:      NINE MILE POINT NUCLEAR STATION, UNIT NO.2 - REQUEST FOR WITHHOLDING INFORMATION FROM PUBLIC DISCLOSURE RE: SUBMITTAL OF EVALUATION TO ESTABLISH INSPECTION INTERVALS FOR ..lET PUMP HOLDDOWN BEAMS FABRICATED FROM MODIFIED ALLOY 718 MATERIAL (TAC NO. ME7800)


==Dear Mr. Costanzo:==
==Dear Mr. Costanzo:==


By letter dated March 11, 2013 (Agencywide Documents Access and Management System (ADAMS) Package Accession No. ML130780404), you submitted affidavit dated February 28, 2013, executed by James A. Gresham, Manager, Regulatory Compliance, Nuclear Services, Westinghouse Electric Company, LLC (Westinghouse), 1000 Westinghouse Drive, Cranberry Township, PA16066, USA. By letter dated May 3,2013 (ADAMS Accession No. ML13130A158), you submitted a supplemented affidavit, which included the same affidavit as before, and additionally provided the misSing page with the information that was not included in the affidavit as required by 10 CFR 2.390. The supplemented affidavit requested that the information contained in the following document be withheld from public disclosure pursuant to Title 10 of the Code of Federal Regulations (10 CFR), Part 2, Section 2.390(a)(4):
By letter dated March 11, 2013 (Agencywide Documents Access and Management System (ADAMS) Package Accession No. ML130780404), you submitted affidavit dated February 28, 2013, executed by James A. Gresham, Manager, Regulatory Compliance, Nuclear Services, Westinghouse Electric Company, LLC (Westinghouse), 1000 Westinghouse Drive, Cranberry Township, PA16066, USA. By letter dated May 3,2013 (ADAMS Accession No.
CENG Letter to NRC, "Nine Mile Point Nuclear Station, Unit No.2, Docket No. 50-410, Submittal of Evaluation to Establish Inspection Intervals for Jet Pump Holddown Beams Fabricated from Modified Alloy 718 Material, March 11, 2013, Attachment 4, "Westinghouse Engineering Report XGEN-2012-25-P, Revision 1, Technical Basis for the Inspection Frequency of the Modified Alloy 718 Jet Pump Beam (Proprietary)" (ADAMS Accession No. ML13078A325) (Affidavit dated February 28, 2013). The affidavit stated that the submitted information should be considered exempt from mandatory public disclosure for the following reasons: 4(ii) (a) The information reveals the distinguishing aspects of a process (or component, structure, tool, method, etc.) where prevention of its use by any of Westinghouse's competitors without license from Westinghouse constitutes a competitive economic advantage over other companies.
ML13130A158), you submitted a supplemented affidavit, which included the same affidavit as before, and additionally provided the misSing page with the information that was not included in the affidavit as required by 10 CFR 2.390. The supplemented affidavit requested that the information contained in the following document be withheld from public disclosure pursuant to Title 10 of the Code of Federal Regulations (10 CFR), Part 2, Section 2.390(a)(4):
4(ii) (c) It consists of supporting data, including test data, relative to a process (or component, structure, tool, method, etc.), the application of which data secures a competitive economic advantage, e.g., by optimization or improved marketability.
CENG Letter to NRC, "Nine Mile Point Nuclear Station, Unit No.2, Docket No.
C. Costanzo -We have reviewed your application and the material in accordance with the requirements 10 CFR 2.390 and, on the basis of the statements in the affidavit, have determined that submitted information sought to be withheld contains proprietary commercial information should be withheld from public Therefore, the submitted information marked as proprietary, will be withheld from disclosure pursuant to 10 CFR 2.390(b)(5) and Section 103(b) of the Atomic Energy Act 1954, as Withholding from public inspection shall not affect the right, if any, of persons properly directly concerned to inspect the documents.
50-410, Submittal of Evaluation to Establish Inspection Intervals for Jet Pump Holddown Beams Fabricated from Modified Alloy 718 Material, March 11, 2013, Attachment 4, "Westinghouse Engineering Report XGEN-2012-25-P, Revision 1, Technical Basis for the Inspection Frequency of the Modified Alloy 718 Jet Pump Beam (Proprietary)" (ADAMS Accession No. ML13078A325) (Affidavit dated February 28, 2013).
If the need arises, we may send copies of information to our consultants working in this area. We will, of course, ensure that consultants have signed the appropriate agreements for handling proprietary If the basis for withholding this information from public inspection should change in the such that the information could then be made available for public inspection, you promptly notify the Nuclear Regulatory Commission (NRC). You also should understand the NRC may have cause to review this determination in the future, for example, if the scope a Freedom of Information Act request includes your information.
The affidavit stated that the submitted information should be considered exempt from mandatory public disclosure for the following reasons:
In all review situations, if NRC makes a determination adverse to the above, you will be notified in advance of any Nonproprietary copy of CENG document, (Attachment 2 ADAMS Accession ML13078A323), has been placed in the NRC's Public Document Room and added to ADAMS Public Electronic Reading If you have any questions regarding this matter, I may be reached at Sincerely, Bhalchandra Vaidya, Project Manager Plant Licensing Branch 1-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-410 cc: James A Gresham, Regulatory Compliance, Nuclear Westinghouse Electric Company, LLC 1000 Westinghouse Cranberry TownShip, PA16066, Additional Distribution via C. Costanzo -We have reviewed your application and the material in accordance with the requirements 10 CFR 2.390 and, on the basis of the statements in the affidavit, have determined that submitted information sought to be withheld contains proprietary commercial information should be withheld from public Therefore, the submitted information marked as proprietary, will be withheld from disclosure pursuant to 10 CFR 2.390(b)(5) and Section 103(b) of the Atomic Energy Act 1954, as Withholding from public inspection shall not affect the right, if any, of persons properly directly concerned to inspect the documents.
4(ii)   (a)     The information reveals the distinguishing aspects of a process (or component, structure, tool, method, etc.) where prevention of its use by any of Westinghouse's competitors without license from Westinghouse constitutes a competitive economic advantage over other companies.
If the need arises, we may send copies of information to our conSUltants working in this area. We will. of course, ensure that consultants have signed the appropriate agreements for handling proprietary If the basis for withholding this information from public inspection should change in the such that the information could then be made available for public inspection, you promptly notify the Nuclear Regulatory Commission (NRC). You also should understand the NRC may have cause to review this determination in the future, for example, if the scope a Freedom of Information Act request includes your information.
4(ii)   (c)     It consists of supporting data, including test data, relative to a process (or component, structure, tool, method, etc.), the application of which data secures a competitive economic advantage, e.g., by optimization or improved marketability.
In all review situations, if NRC makes a determination adverse to the above, you will be notified in advance of any Nonproprietary copy of CENG document, (Attachment 2 ADAMS Accession ML13078A323), has been placed in the NRC's Public Document Room and added to ADAMS Public Electronic Reading If you have any questions regarding this matter, I may be reached at Sincerely, Ira! Bhalchandra Vaidya, Project Manager Plant Licensing Branch 1-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-410 cc: James A. Gresham, Regulatory Compliance, Nuclear Westinghouse Electric Company, LLC 1000 Westinghouse Cranberry Township, PA 16066, Additional Distribution via DISTRIBUTION:
 
PUBLIC LPLI-1 R/F RidsNrrDorlLPL 1-1 RidsNrrLAKGoldstein RidsNrrPMNineMilePoint RidsNrrDeEvib RidsOgcRp RidsRgn1 MailCenter RidsAcrsAcnw_MailCTR PPurtscher, NRR/DE/EVIB ADAMS Accession No.: ML13101A274 OFFICE NRR/DORULPL 1-1\PM NRR/DORULPL 1-1\ NAME BVaid a DATE 05113/13 C NRRlDORULPL 1-1/BC SMei han 05123113}}
C. Costanzo                                   - 2 We have reviewed your application and the material in accordance with the requirements of 10 CFR 2.390 and, on the basis of the statements in the affidavit, have determined that the submitted information sought to be withheld contains proprietary commercial information and should be withheld from public disclosure.
Therefore, the submitted information marked as proprietary, will be withheld from public disclosure pursuant to 10 CFR 2.390(b)(5) and Section 103(b) of the Atomic Energy Act of 1954, as amended.
Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the documents. If the need arises, we may send copies of this information to our consultants working in this area. We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information.
If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the Nuclear Regulatory Commission (NRC). You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information. In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure.
Nonproprietary copy of CENG document, (Attachment 2 ADAMS Accession No.
ML13078A323), has been placed in the NRC's Public Document Room and added to the ADAMS Public Electronic Reading Room.
If you have any questions regarding this matter, I may be reached at 301-415-3308.
Sincerely,
                                                ~
Bhalchandra Vaidya, Project Manager Plant Licensing Branch 1-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-410 cc:
James A Gresham, Manager, Regulatory Compliance, Nuclear Services, Westinghouse Electric Company, LLC (Westinghouse),
1000 Westinghouse Drive, Cranberry TownShip, PA16066, USA Additional Distribution via Listserv
 
C. Costanzo                                 - 2 We have reviewed your application and the material in accordance with the requirements of 10 CFR 2.390 and, on the basis of the statements in the affidavit, have determined that the submitted information sought to be withheld contains proprietary commercial information and should be withheld from public disclosure.
Therefore, the submitted information marked as proprietary, will be withheld from public disclosure pursuant to 10 CFR 2.390(b)(5) and Section 103(b) of the Atomic Energy Act of 1954, as amended.
Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the documents. If the need arises, we may send copies of this information to our conSUltants working in this area. We will. of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information.
If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the Nuclear Regulatory Commission (NRC). You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information. In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure.
Nonproprietary copy of CENG document, (Attachment 2 ADAMS Accession No.
ML13078A323), has been placed in the NRC's Public Document Room and added to the ADAMS Public Electronic Reading Room.
If you have any questions regarding this matter, I may be reached at 301-415-3308.
Sincerely, Ira!
Bhalchandra Vaidya, Project Manager Plant Licensing Branch 1-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-410 cc:
James A. Gresham, Manager, Regulatory Compliance, Nuclear Services, Westinghouse Electric Company, LLC (Westinghouse),
1000 Westinghouse Drive, Cranberry Township, PA 16066, USA Additional Distribution via Listserv DISTRIBUTION:
PUBLIC                   LPLI-1 R/F                   RidsNrrDorlLPL1-1     RidsNrrLAKGoldstein RidsNrrPMNineMilePoint   RidsNrrDeEvib                 RidsOgcRp             RidsRgn1 MailCenter RidsAcrsAcnw_MailCTR     PPurtscher, NRR/DE/EVIB ADAMS Accession No.: ML13101A274 OFFICE       NRR/DORULPL1-1\PM       NRR/DORULPL1-1\                    C      NRRlDORULPL1-1/BC NAME         BVaid a                                                           SMei han DATE         05113/13                                                           05123113}}

Revision as of 20:40, 4 November 2019

Request for Withholding Information from Public Disclosure Submittal of Evaluation to Establish Inspection Intervals for Jet Pump Holddown Beams Fabricated from Modified Alloy 718 Material
ML13101A274
Person / Time
Site: Nine Mile Point Constellation icon.png
Issue date: 05/23/2013
From: Bhalchandra Vaidya
Plant Licensing Branch 1
To: Costanzo C
Nine Mile Point
Vaidya B, NRR/DORL/LPL1-1, 415-3308
References
TAC ME7800
Download: ML13101A274 (3)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555*0001 May 23,2013 Mr. Chris Costanzo Vice President Nine Mile Point Nine Mile Point Nuclear Station, LLC P. O. Box 63 Lycoming, NY 13093 SUB,JECT: NINE MILE POINT NUCLEAR STATION, UNIT NO.2 - REQUEST FOR WITHHOLDING INFORMATION FROM PUBLIC DISCLOSURE RE: SUBMITTAL OF EVALUATION TO ESTABLISH INSPECTION INTERVALS FOR ..lET PUMP HOLDDOWN BEAMS FABRICATED FROM MODIFIED ALLOY 718 MATERIAL (TAC NO. ME7800)

Dear Mr. Costanzo:

By letter dated March 11, 2013 (Agencywide Documents Access and Management System (ADAMS) Package Accession No. ML130780404), you submitted affidavit dated February 28, 2013, executed by James A. Gresham, Manager, Regulatory Compliance, Nuclear Services, Westinghouse Electric Company, LLC (Westinghouse), 1000 Westinghouse Drive, Cranberry Township, PA16066, USA. By letter dated May 3,2013 (ADAMS Accession No.

ML13130A158), you submitted a supplemented affidavit, which included the same affidavit as before, and additionally provided the misSing page with the information that was not included in the affidavit as required by 10 CFR 2.390. The supplemented affidavit requested that the information contained in the following document be withheld from public disclosure pursuant to Title 10 of the Code of Federal Regulations (10 CFR), Part 2, Section 2.390(a)(4):

CENG Letter to NRC, "Nine Mile Point Nuclear Station, Unit No.2, Docket No.

50-410, Submittal of Evaluation to Establish Inspection Intervals for Jet Pump Holddown Beams Fabricated from Modified Alloy 718 Material, March 11, 2013, Attachment 4, "Westinghouse Engineering Report XGEN-2012-25-P, Revision 1, Technical Basis for the Inspection Frequency of the Modified Alloy 718 Jet Pump Beam (Proprietary)" (ADAMS Accession No. ML13078A325) (Affidavit dated February 28, 2013).

The affidavit stated that the submitted information should be considered exempt from mandatory public disclosure for the following reasons:

4(ii) (a) The information reveals the distinguishing aspects of a process (or component, structure, tool, method, etc.) where prevention of its use by any of Westinghouse's competitors without license from Westinghouse constitutes a competitive economic advantage over other companies.

4(ii) (c) It consists of supporting data, including test data, relative to a process (or component, structure, tool, method, etc.), the application of which data secures a competitive economic advantage, e.g., by optimization or improved marketability.

C. Costanzo - 2 We have reviewed your application and the material in accordance with the requirements of 10 CFR 2.390 and, on the basis of the statements in the affidavit, have determined that the submitted information sought to be withheld contains proprietary commercial information and should be withheld from public disclosure.

Therefore, the submitted information marked as proprietary, will be withheld from public disclosure pursuant to 10 CFR 2.390(b)(5) and Section 103(b) of the Atomic Energy Act of 1954, as amended.

Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the documents. If the need arises, we may send copies of this information to our consultants working in this area. We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information.

If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the Nuclear Regulatory Commission (NRC). You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information. In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure.

Nonproprietary copy of CENG document, (Attachment 2 ADAMS Accession No.

ML13078A323), has been placed in the NRC's Public Document Room and added to the ADAMS Public Electronic Reading Room.

If you have any questions regarding this matter, I may be reached at 301-415-3308.

Sincerely,

~

Bhalchandra Vaidya, Project Manager Plant Licensing Branch 1-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-410 cc:

James A Gresham, Manager, Regulatory Compliance, Nuclear Services, Westinghouse Electric Company, LLC (Westinghouse),

1000 Westinghouse Drive, Cranberry TownShip, PA16066, USA Additional Distribution via Listserv

C. Costanzo - 2 We have reviewed your application and the material in accordance with the requirements of 10 CFR 2.390 and, on the basis of the statements in the affidavit, have determined that the submitted information sought to be withheld contains proprietary commercial information and should be withheld from public disclosure.

Therefore, the submitted information marked as proprietary, will be withheld from public disclosure pursuant to 10 CFR 2.390(b)(5) and Section 103(b) of the Atomic Energy Act of 1954, as amended.

Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the documents. If the need arises, we may send copies of this information to our conSUltants working in this area. We will. of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information.

If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the Nuclear Regulatory Commission (NRC). You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information. In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure.

Nonproprietary copy of CENG document, (Attachment 2 ADAMS Accession No.

ML13078A323), has been placed in the NRC's Public Document Room and added to the ADAMS Public Electronic Reading Room.

If you have any questions regarding this matter, I may be reached at 301-415-3308.

Sincerely, Ira!

Bhalchandra Vaidya, Project Manager Plant Licensing Branch 1-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-410 cc:

James A. Gresham, Manager, Regulatory Compliance, Nuclear Services, Westinghouse Electric Company, LLC (Westinghouse),

1000 Westinghouse Drive, Cranberry Township, PA 16066, USA Additional Distribution via Listserv DISTRIBUTION:

PUBLIC LPLI-1 R/F RidsNrrDorlLPL1-1 RidsNrrLAKGoldstein RidsNrrPMNineMilePoint RidsNrrDeEvib RidsOgcRp RidsRgn1 MailCenter RidsAcrsAcnw_MailCTR PPurtscher, NRR/DE/EVIB ADAMS Accession No.: ML13101A274 OFFICE NRR/DORULPL1-1\PM NRR/DORULPL1-1\ C NRRlDORULPL1-1/BC NAME BVaid a SMei han DATE 05113/13 05123113