Line 2: Line 2:
| number = ML13105A175
| number = ML13105A175
| issue date = 04/26/2013
| issue date = 04/26/2013
| title = Vermont Yankee Nuclear Power Station - Issuance of Amendment No. 257 Request to Revise Requirement of the Recirculation Pump Discharge Bypass Valves (TAC No. ME8467)
| title = Issuance of Amendment No. 257 Request to Revise Requirement of the Recirculation Pump Discharge Bypass Valves
| author name = Guzman R V
| author name = Guzman R
| author affiliation = NRC/NRR/DORL/LPLI-1
| author affiliation = NRC/NRR/DORL/LPLI-1
| addressee name =  
| addressee name =  
Line 9: Line 9:
| docket = 05000271
| docket = 05000271
| license number = DPR-028
| license number = DPR-028
| contact person = Guzman R V
| contact person = Guzman R
| case reference number = TAC ME8467
| case reference number = TAC ME8467
| document type = Letter, Safety Evaluation, License-Operating (New/Renewal/Amendments) DKT 50
| document type = Letter, Safety Evaluation, License-Operating (New/Renewal/Amendments) DKT 50
| page count = 11
| page count = 11
| project = TAC:ME8467
| stage = Approval
}}
}}
=Text=
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 April 26, 2013 Site Vice President Entergy Nuclear Operations, Inc.
Vermont Yankee Nuclear Power Station P.O. Box 250 Governor Hunt Road Vernon, VT 05354
==SUBJECT:==
VERMONT YANKEE NUCLEAR POWER STATION - ISSUANCE OF AMENDMENT TO RENEWED FACILITY OPERATING LICENSE RE:
RECIRCULATION SYSTEM DISCHARGE BYPASS VALVE CHANGE (TAC NO. ME8437)
==Dear Sir or Madam:==
The Nuclear Regulatory Commission (NRC) has issued the enclosed Amendment No. 257 to Renewed Facility Operating License No. DPR-28 for the Vermont Yankee Nuclear Power Station (VYNPS), in response to your application dated April 17, 2012.
The licensee's application for the proposed amendment revised the VYNPS Technical Specification (TS) 3.5.A.5 and TS 4.5.A.5 to change the normal position of the recirculation pump discharge bypass valves from "open" to "closed"; therefore, the valves' safety function to close in support of accident mitigation is eliminated. The amendment also revised the TSs to require the valves to remain closed and their position to be verified once per operating cycle.
A copy of the related Safety Evaluation is enclosed. A Notice of Issuance will be included in the Commission's biweekly Federal Register notice.
Sincerely, Richard V. Guzman, Senior Project Manager Plant Licensing Branch 1-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-271
==Enclosures:==
: 1. Amendment No. 257 to License No. DPR-28
: 2. Safety Evaluation cc w/encls: Distribution via Listserv
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 ENTERGY NUCLEAR VERMONT YANKEE, LLC AND ENTERGY NUCLEAR OPERATIONS, INC.
DOCKET NO. 50-271 VERMONT YANKEE NUCLEAR POWER STATION AMENDMENT TO RENEWED FACILITY OPERATING LICENSE Amendment No. 257 Renewed License No. DPR-28
: 1. The Nuclear Regulatory Commission (the Commission) has found that:
A. The application for amendment filed by Entergy Nuclear Vermont Yankee, LLC and Entergy Nuclear Operations, Inc. (the licensee) dated April 17, 2012, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I; B. The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C. There is reasonable assurance: (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D. The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E. The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
Enclosure 1
                                                -2
: 2. Accordingly, the license is amended as indicated in the attachment to this license amendment, and paragraph 3.B of the Renewed Facility Operating License No. DPR-28 is hereby amended to read as follows:
(B)    Technical Specifications The Technical Specifications contained in Appendix A, as revised through Amendment No. 257, are hereby incorporated in the license. The licensee shall operate the facility in accordance with the Technical Specifications.
: 3. This license amendment is effective as of its date of issuance and shall be implemented within 60 days.
FOR THE NUCLEAR REGULATORY COMMISSION Sean C. Meighan, Acting Chief Plant Licensing Branch 1-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation
==Attachment:==
Changes to the License and Technical Specifications Date of Issuance: Apr; 1 26, 2013
ATTACHMENT TO LICENSE AMENDMENT NO. 257 RENEWED FACILITY OPERATING LICENSE NO. DPR-28 DOCKET NO. 50-271 Replace the following page of the Renewed Facility Operating License with the attached revised page. The revised page is identified by amendment number and contains marginal lines indicating the areas of change.
Remove Page                              Insert Page 3                                        3 Replace the following page of Appendix A, Technical Specifications, with the attached revised page. The revised page is identified by amendment number and contains marginal lines indicating the areas of change.
Remove Page                              Insert Page 102                                      102
                                              -3 D. Entergy Nuclear Operations, Inc., pursuant to the Act and 10 CFR Parts 30, 40 and 70, to receive, possess, and use in amounts as required any Byproduct, source, or special nuclear material without restriction to chemical or physical form, for sample analysis or instrument calibration or associated with radioactive apparatus or components.
E. Entergy Nuclear Operations, Inc., pursuant to the Act and 10 CFR Parts 30 and 70, to possess, but not to separate, such byproduct and special nuclear material as may be produced by operation of the facility.
: 3. This renewed license shall be deemed to contain and is subject to the conditions specified in the following Commission regulations: 10 CFR Part 20, Section 30.34 of 10 CFR Part 30, Section 40.41 of 10 CFR Part 40, Section 50.54 and 50.59 of 10 CFR Part 50, and Section 70.32 of 10 CFR Part 70; and is subject to all applicable provisions of the Act and to the rules, regulations, and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified below:
A. Maximum Power Level Entergy Nuclear Operations, Inc. is authorized to operate the facility at reactor core power levels not to exceed 1912 megawatts thermal in accordance with the Technical Specifications (Appendix A) appended hereto.
B. Technical Specifications The Technical Specifications contained in Appendix A, as revised through Amendment No. 257 are hereby incorporated in the license. Entergy Nuclear Operations, Inc. shall operate the facility in accordance with the Technical Specifications.
C. Reports Entergy Nuclear Operations, Inc. shall make reports in accordance with the requirements of the Technical Specifications.
D. This paragraph deleted by Amendment No. 226.
E. Environmental Conditions Pursuant to the Initial Decision of the presiding Atomic Safety and Licensing Board issued February 27, 1973, the following conditions for the protection of the environment are incorporated herein:
: 1. This paragraph deleted by Amendment No. 206, October 22, 2001.
: 2. This paragraph deleted by Amendment 131,10107/91.
Renewed Facility Operating License No. DPR-28                          Amendment No.    ~, 257
VYNPS 3.5  LIMITING CONDITION FOR                      4.5 SURVEILLANCE REQUIREMENT A.l.l recir"culation pump                  5. Operability testing of discharge valves shall                            recirculation pump be operable or closed                            discharge valves shall and all recirculation                            be in accordance with pump discharge bypass                                  fication 4.6.E.
valves shall be closed                                recirculation pump prior to reactor                                discharge bypass valves startup.                                        shall be verified closed once per operating
: 6. If the requirements of                          cycle.
Specifications 3.S.A cannot be met, an orderly shutdown of the reactor shall be initiated and the reactor shall be in a cold shutdown" condition within 24 hours.
B. Containment Spray cooling Capability                                  B. Containment Spray cooling Capability
: 1. Both containment cooling spray loops are required                  1. Surveillance of the to be operable when the                          drywell spray loops reactor water                                    shall be performed as temperature is greater                            follows. An air test than 212°F except that a                          shall be performed on Containment Cooling                              the drywell spray Subsystem may be                                  headers and nozzles inoperable for thirty                            following maintenance days.                                            that could result in nozzle blockage.
: 2. If this requirement cannot be met, an                          2. Deleted.
orderly shutdown shall be initiated and the reactor shall be in the cold shutdown condition within 24 hours.
Amendment No. t i , ~, H4, -+/--Hl-, ~, i2-{}9-, *M, ff4, ti-S-,257                  102
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION RELATED TO AMENDMENT NO. 2S7 TO RENEWED FACILITY OPERATING LICENSE NO. DPR-28 ENTERGY NUCLEAR VERMONT YANKEE, LLC AND ENTERGY NUCLEAR OPERATIONS, INC.
VERMONT YANKEE NUCLEAR POWER STATION DOCKET NO. SO-271
==1.0      INTRODUCTION==
By letter dated April 17, 2012 (Agencywide Documents Access and Management System Accession No. ML12110A414) Entergy Nuclear Operations, Inc. (Entergy, the licensee) submitted a license amendment request (LAR) for changes to the Vermont Yankee Nuclear Power Station (VYNPS) Technical Specifications (TSs).
The proposed change would revise TSs 3.S.AS and 4.S.AS to change the requirements for the recirculation pump discharge bypass valves. The proposed requirements will be that they are closed prior to reactor startup and that they are verified closed once per operating cycle.
The licensee discovered issues with the "An recirculation pump discharge bypass valve when they performed valve testing. The licensee evaluated dose and technical aspects of repairing the valve and decided to change the valve's normal position from open to closed. The licensee then declared the discharge bypass valve inoperable and closed it along with the "B" valve as the current TS allows.
==2.0      REGULATORY EVALUATION==
The regulatory requirements and guidance which the NRC staff considered in assessing the proposed TS change are as follows:
Section 182a of the Atomic Energy Act requires applicants for nuclear power plant operating licenses to include TSs as part of the license. In Title 10 of the Code of Federal Regulations (10 CFR), Part SO, Section SO.36, "Technical Specifications," the Commission established its regulatory requirements related to the content of TSs. Pursuant to 10 CFR SO.36(c), TSs are required to include items in the following categories: (1) safety limits, limiting safety system settings and control settings, (2) limiting conditions for operation (LCOs), (3) Surveillance Requirements (SRs), (4) design features, (S) administrative controls, (6) decommissioning, (7) initial notification, and (8) written reports.
Enclosure 2
                                                    -2 As stated in 10 CFR SO.36(c)(2)(i), the "Limiting conditions for operation are the lowest functional capability or performance levels of equipment required for safe operation of the facility. When a limiting condition for operation of a nuclear reactor is not met, the licensee shall shut down the reactor or follow any remedial action permitted by the technical specification ..." Criterion 3 of 10 CFR SO.36(c)(2)(ii) requires an LCO to be established for a structure, system, or component that is part of the primary success path and which functions or actuates to mitigate a design-basis accident or transient that either assumes the failure of or presents a challenge to the integrity of a fission product barrier.
==3.0      TECHNICAL EVALUATION==
3.1      Licensee's Proposed Change TS 3.S.A.S currently reads:
All recirculation pump discharge valves and bypass valves shall be operable or closed prior to the reactor startup.
The proposed TS 3.S.A.S would read:
All recirculation pump discharge valves shall be operable or closed and all recirculation pump discharge bypass valves shall be closed prior to reactor startup.
TS 4.S.A.S currently reads:
Operability testing of recirculation pump discharge valves and bypass valves shall be in accordance with Specification 4.6.E.
The proposed TS 4.S.A.S would read:
Operability testing of recirculation pump discharge valves shall be in accordance with Specification 4.6.E. The recirculation pump discharge bypass valves shall be verified closed once per operating cycle.
3.2      Background As stated in the licensee's LAR:
The reactor recirculation system consists of two recirculation pump loops external to the reactor vessel which provide the driving flow of water to the reactor vessel jet pumps. Each external loop consists of a downcomer, a motor-operated pump suction valve, a high capacity motor-driven pump. a motor-operated discharge valve with a motor-operated discharge bypass valve, a discharge riser containing a venture-type flow meter nozzle and a ring header which supplies five jet pump risers each with two jet pumps (for a total of ten per loop).
The water pumped through the external loops becomes the driving force for twenty jet pumps located in the reactor vessel annulus between the vessel wall and the core shroud. The water in the reactor annulus becomes the driven flow
                                                    -3 of the jet pumps which is accelerated by and mixed with the driving flow. The two flows are discharged below the core and provide core coolant flow up through the cooling channels.
An increase in recirculation flow temporarily reduces the steam void volume in the core by removing the steam at a faster rate and replacing it with water. Since voids act as negative reactivity, this increase in removal rate adds positive reactivity to the core, which in turn causes reactor power level to increase. The increased steam generation rate increases the steam void volume in the core with a subsequent negative reactivity effect, and thereby, a new higher power level is established. When recirculation flow is reduced, the power level is reduced in a similar manner, i.e., by the formation of voids.
3.3    NRC Staff Evaluation The licensee's Updated Final Safety Analysis Report (UFSAR) in section 4.3.4, currently states, There is a 4-inch bypass line around each pump discharge gate valve in the recirculation loop. The bypass discharge gate valve is maintained in the closed position. The bypass line is used to preheat an idle loop by reverse flow prior to returning a pump to service by keeping the discharge valve partially open. The pump is started at slow speed with the main discharge valve closed. The discharge valve is jogged open with the nuclear system at full pressure.
(Reference 4.3.7.7) Pump speed cannot be increased until after the main valve has been opened.
The licensee's engineering change provides for the discharge bypass valve to remain closed.
The discharge valve would then be jogged open during the recirculation system startup. When the pump starts, the inactive loop discharge valve would be jogged open while the discharge bypass valve would remain closed.
The safety function of the recirculation discharge bypass valves and discharge valves are also explained in the licensee's UFSAR. The valves are required to be closed to support Low Pressure Coolant Injection (LPCI) following a Loss of Coolant Accident (LOCA). For the startup of a cold loop, the licensee provided reference to General Electric (GE) safety analysis. The analysis concluded that operating the recirculation system with the discharge bypass valve open has a negligible effect on the primary coolant system flow. They also concluded that the position of the discharge bypass valve does not affect core characteristics such as void fraction.
The change would have the startup of a cold loop occur with the discharge bypass valve closed as opposed to open in the current assumptions. The licensee stated that the GE analysis showed that the TS change would not affect the current safety analysis. The NRC staff reviewed the conclusions and found them to be acceptable and that no change in the safety analysis occurs.
                                                      -4 The NRC staff reviewed the proposed change to TS 3.S.A.S to leave the recirculation pump discharge bypass valve closed as well as the proposed change to TS 4.S.A.S to verify that it is closed once per operating cycle. The NRC staff has concluded that the proposed TS changes will not affect the current accident analysis. The valve has a safety related function to close during accident scenarios that include LPCI operation following a LOCA. Placing the valves into the closed position and taking steps to ensure that they remain closed puts the valve in a position that satisfies their safety related function. Therefore, the NRC staff finds the proposed changes to be acceptable and that the current accident analysis remains valid.
==3.3      NRC Staff Conclusion==
The NRC staff has reviewed the proposed TS changes to TSs 3.S.A.S and 4.S.A.S regarding changing the requirement of the recirculation pump discharge bypass valves from "operable or closed prior to reactor startup" to "closed prior to reactor startup." The NRC staff concludes that the recirculation pump discharge bypass valves remaining closed put the valves into their safety related position. Operation in this position would allow the plant to continue to operate in a safe configuration and meet its current accident analysis. Therefore, the NRC staff has concluded that the proposed TS changes are acceptable.
==4.0      STATE CONSULTATION==
In accordance with the Commission's regulations, the Vermont State official was notified of the proposed issuance of the amendment. The State official had no comments.
S.O      ENVIRONMENTAL CONSIDERATION The amendment changes a requirement with respect to installation or use of a facility component located within the restricted area as defined in 10 CFR Part 20. The NRC staff has determined that the amendment involves no significant increase in amounts, and no significant change in the types of any effluents that may be released offsite, and that there is no significant increase in individual or cumulative occupational radiation exposure. The Commission has previously issued a proposed finding that the amendment involves no significant hazards consideration, and there has been no public comment on such finding (77 FR 601S0). Accordingly, the amendment meets the eligibility criteria for categorical exclusion set forth in 10 CFR S1.22(c)(9). Pursuant to 10 CFR S1.22(b), no environmental impact statement or environmental assessment need be prepared in connection with the issuance of the amendment.
==6.0      CONCLUSION==
The Commission has concluded, based on the considerations discussed above, that: (1) there is reasonable assurance that the health and safety of the public will not be endangered by operation in the proposed manner; (2) there is reasonable assurance that such activities will be conducted in compliance with the Commission's regulations; and (3) the issuance of the amendment will not be inimical to the common defense and security or to the health and safety of the public.
Principal Contributor: J. Miller, NRR/DSS/SRXB Date: April 26, 2013
April 26, 2013 Vice President, Operations Entergy Nuclear Operations, Inc.
Vermont Yankee Nuclear Power Station P.O. Box 250 Governor Hunt Road Vernon, VT 05354 SUB~IECT:        VERMONT YANKEE NUCLEAR POWER STATION - ISSUANCE OF AMENDMENT TO RENEWED FACILITY OPERATING LICENSE RE:
RECIRCULATION SYSTEM DISCHARGE BYPASS VALVE CHANGE (TAC NO. ME8437)
The Nuclear Regulatory Commission (NRC) has issued the enclosed Amendment No. 257 to Renewed Facility Operating License No. DPR-28 for the Vermont Yankee Nuclear Power Station (VYNPS), in response to your application dated April 17, 2012.
The licensee's application for the proposed amendment revised the VYNPS Technical Specification (TS) 3.5.A.5 and TS 4.5.A.5 to change the normal position of the recirculation pump discharge bypass valves from "open" to "closed"; therefore, the valves' safety function to close in support of accident mitigation is eliminated. The amendment also revised the TSs to require the valves to remain closed and their position to be verified once per operating cycle.
A copy of the related Safety Evaluation is enclosed. A Notice of Issuance will be included in the Commission's biweekly Federal Register notice.
Sincerely, Ira!
Richard V. Guzman, Senior Project Manager Plant Licensing Branch 1-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-271
==Enclosures:==
: 1. Amendment No. 257 to License No. DPR-28
: 2. Safety Evaluation cc w/encls: Distribution via Listserv DISTRIBUTION:
PUBLIC                            RidsRgn1 MailCenter                  RidsNrrDorlLpl1-1 Resource RidsNrrLAKGoldstein              RidsNrrDssSrxb Resource              RidsNrrDorlDpr Resource J. Miller, NRR                    RidsNrrDssStsb Resource              RidsNrrPMVermontYankeeResource RidsAcrsAcnw_MailCenter Resource Accession No.: ML13105A175              *SE nput via memo. No substantial changes made. NRR-106 OFFICE      LPL1-1/PM      LPL1-1/LA    SRXB/BC          STSB/BC      OGC            LPL1-1/BC(A)
KGoldstein    CJackson*                                    SMeighan NAME        RGuzman                                      RElliott    DCylkowski (DPickett for) 4/17/13 DATE        4/17/13                      3/7/13          4/24/13      4/22/13        4/26/13 4/26/13 OFFICIAL RECORD COPY}}

Latest revision as of 19:37, 4 November 2019

Issuance of Amendment No. 257 Request to Revise Requirement of the Recirculation Pump Discharge Bypass Valves
ML13105A175
Person / Time
Site: Vermont Yankee File:NorthStar Vermont Yankee icon.png
Issue date: 04/26/2013
From: Richard Guzman
Plant Licensing Branch 1
To:
Entergy Nuclear Operations
Guzman R
References
TAC ME8467
Download: ML13105A175 (11)


Text

{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 April 26, 2013 Site Vice President Entergy Nuclear Operations, Inc. Vermont Yankee Nuclear Power Station P.O. Box 250 Governor Hunt Road Vernon, VT 05354

SUBJECT:

VERMONT YANKEE NUCLEAR POWER STATION - ISSUANCE OF AMENDMENT TO RENEWED FACILITY OPERATING LICENSE RE: RECIRCULATION SYSTEM DISCHARGE BYPASS VALVE CHANGE (TAC NO. ME8437)

Dear Sir or Madam:

The Nuclear Regulatory Commission (NRC) has issued the enclosed Amendment No. 257 to Renewed Facility Operating License No. DPR-28 for the Vermont Yankee Nuclear Power Station (VYNPS), in response to your application dated April 17, 2012. The licensee's application for the proposed amendment revised the VYNPS Technical Specification (TS) 3.5.A.5 and TS 4.5.A.5 to change the normal position of the recirculation pump discharge bypass valves from "open" to "closed"; therefore, the valves' safety function to close in support of accident mitigation is eliminated. The amendment also revised the TSs to require the valves to remain closed and their position to be verified once per operating cycle. A copy of the related Safety Evaluation is enclosed. A Notice of Issuance will be included in the Commission's biweekly Federal Register notice. Sincerely, Richard V. Guzman, Senior Project Manager Plant Licensing Branch 1-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-271

Enclosures:

1. Amendment No. 257 to License No. DPR-28
2. Safety Evaluation cc w/encls: Distribution via Listserv

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 ENTERGY NUCLEAR VERMONT YANKEE, LLC AND ENTERGY NUCLEAR OPERATIONS, INC. DOCKET NO. 50-271 VERMONT YANKEE NUCLEAR POWER STATION AMENDMENT TO RENEWED FACILITY OPERATING LICENSE Amendment No. 257 Renewed License No. DPR-28

1. The Nuclear Regulatory Commission (the Commission) has found that:

A. The application for amendment filed by Entergy Nuclear Vermont Yankee, LLC and Entergy Nuclear Operations, Inc. (the licensee) dated April 17, 2012, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I; B. The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C. There is reasonable assurance: (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D. The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E. The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied. Enclosure 1

                                               -2
2. Accordingly, the license is amended as indicated in the attachment to this license amendment, and paragraph 3.B of the Renewed Facility Operating License No. DPR-28 is hereby amended to read as follows:

(B) Technical Specifications The Technical Specifications contained in Appendix A, as revised through Amendment No. 257, are hereby incorporated in the license. The licensee shall operate the facility in accordance with the Technical Specifications.

3. This license amendment is effective as of its date of issuance and shall be implemented within 60 days.

FOR THE NUCLEAR REGULATORY COMMISSION Sean C. Meighan, Acting Chief Plant Licensing Branch 1-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation

Attachment:

Changes to the License and Technical Specifications Date of Issuance: Apr; 1 26, 2013

ATTACHMENT TO LICENSE AMENDMENT NO. 257 RENEWED FACILITY OPERATING LICENSE NO. DPR-28 DOCKET NO. 50-271 Replace the following page of the Renewed Facility Operating License with the attached revised page. The revised page is identified by amendment number and contains marginal lines indicating the areas of change. Remove Page Insert Page 3 3 Replace the following page of Appendix A, Technical Specifications, with the attached revised page. The revised page is identified by amendment number and contains marginal lines indicating the areas of change. Remove Page Insert Page 102 102

                                             -3 D. Entergy Nuclear Operations, Inc., pursuant to the Act and 10 CFR Parts 30, 40 and 70, to receive, possess, and use in amounts as required any Byproduct, source, or special nuclear material without restriction to chemical or physical form, for sample analysis or instrument calibration or associated with radioactive apparatus or components.

E. Entergy Nuclear Operations, Inc., pursuant to the Act and 10 CFR Parts 30 and 70, to possess, but not to separate, such byproduct and special nuclear material as may be produced by operation of the facility.

3. This renewed license shall be deemed to contain and is subject to the conditions specified in the following Commission regulations: 10 CFR Part 20, Section 30.34 of 10 CFR Part 30, Section 40.41 of 10 CFR Part 40, Section 50.54 and 50.59 of 10 CFR Part 50, and Section 70.32 of 10 CFR Part 70; and is subject to all applicable provisions of the Act and to the rules, regulations, and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified below:

A. Maximum Power Level Entergy Nuclear Operations, Inc. is authorized to operate the facility at reactor core power levels not to exceed 1912 megawatts thermal in accordance with the Technical Specifications (Appendix A) appended hereto. B. Technical Specifications The Technical Specifications contained in Appendix A, as revised through Amendment No. 257 are hereby incorporated in the license. Entergy Nuclear Operations, Inc. shall operate the facility in accordance with the Technical Specifications. C. Reports Entergy Nuclear Operations, Inc. shall make reports in accordance with the requirements of the Technical Specifications. D. This paragraph deleted by Amendment No. 226. E. Environmental Conditions Pursuant to the Initial Decision of the presiding Atomic Safety and Licensing Board issued February 27, 1973, the following conditions for the protection of the environment are incorporated herein:

1. This paragraph deleted by Amendment No. 206, October 22, 2001.
2. This paragraph deleted by Amendment 131,10107/91.

Renewed Facility Operating License No. DPR-28 Amendment No. ~, 257

VYNPS 3.5 LIMITING CONDITION FOR 4.5 SURVEILLANCE REQUIREMENT A.l.l recir"culation pump 5. Operability testing of discharge valves shall recirculation pump be operable or closed discharge valves shall and all recirculation be in accordance with pump discharge bypass fication 4.6.E. valves shall be closed recirculation pump prior to reactor discharge bypass valves startup. shall be verified closed once per operating

6. If the requirements of cycle.

Specifications 3.S.A cannot be met, an orderly shutdown of the reactor shall be initiated and the reactor shall be in a cold shutdown" condition within 24 hours. B. Containment Spray cooling Capability B. Containment Spray cooling Capability

1. Both containment cooling spray loops are required 1. Surveillance of the to be operable when the drywell spray loops reactor water shall be performed as temperature is greater follows. An air test than 212°F except that a shall be performed on Containment Cooling the drywell spray Subsystem may be headers and nozzles inoperable for thirty following maintenance days. that could result in nozzle blockage.
2. If this requirement cannot be met, an 2. Deleted.

orderly shutdown shall be initiated and the reactor shall be in the cold shutdown condition within 24 hours. Amendment No. t i , ~, H4, -+/--Hl-, ~, i2-{}9-, *M, ff4, ti-S-,257 102

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION RELATED TO AMENDMENT NO. 2S7 TO RENEWED FACILITY OPERATING LICENSE NO. DPR-28 ENTERGY NUCLEAR VERMONT YANKEE, LLC AND ENTERGY NUCLEAR OPERATIONS, INC. VERMONT YANKEE NUCLEAR POWER STATION DOCKET NO. SO-271

1.0 INTRODUCTION

By letter dated April 17, 2012 (Agencywide Documents Access and Management System Accession No. ML12110A414) Entergy Nuclear Operations, Inc. (Entergy, the licensee) submitted a license amendment request (LAR) for changes to the Vermont Yankee Nuclear Power Station (VYNPS) Technical Specifications (TSs). The proposed change would revise TSs 3.S.AS and 4.S.AS to change the requirements for the recirculation pump discharge bypass valves. The proposed requirements will be that they are closed prior to reactor startup and that they are verified closed once per operating cycle. The licensee discovered issues with the "An recirculation pump discharge bypass valve when they performed valve testing. The licensee evaluated dose and technical aspects of repairing the valve and decided to change the valve's normal position from open to closed. The licensee then declared the discharge bypass valve inoperable and closed it along with the "B" valve as the current TS allows.

2.0 REGULATORY EVALUATION

The regulatory requirements and guidance which the NRC staff considered in assessing the proposed TS change are as follows: Section 182a of the Atomic Energy Act requires applicants for nuclear power plant operating licenses to include TSs as part of the license. In Title 10 of the Code of Federal Regulations (10 CFR), Part SO, Section SO.36, "Technical Specifications," the Commission established its regulatory requirements related to the content of TSs. Pursuant to 10 CFR SO.36(c), TSs are required to include items in the following categories: (1) safety limits, limiting safety system settings and control settings, (2) limiting conditions for operation (LCOs), (3) Surveillance Requirements (SRs), (4) design features, (S) administrative controls, (6) decommissioning, (7) initial notification, and (8) written reports. Enclosure 2

                                                   -2 As stated in 10 CFR SO.36(c)(2)(i), the "Limiting conditions for operation are the lowest functional capability or performance levels of equipment required for safe operation of the facility. When a limiting condition for operation of a nuclear reactor is not met, the licensee shall shut down the reactor or follow any remedial action permitted by the technical specification ..." Criterion 3 of 10 CFR SO.36(c)(2)(ii) requires an LCO to be established for a structure, system, or component that is part of the primary success path and which functions or actuates to mitigate a design-basis accident or transient that either assumes the failure of or presents a challenge to the integrity of a fission product barrier.

3.0 TECHNICAL EVALUATION

3.1 Licensee's Proposed Change TS 3.S.A.S currently reads: All recirculation pump discharge valves and bypass valves shall be operable or closed prior to the reactor startup. The proposed TS 3.S.A.S would read: All recirculation pump discharge valves shall be operable or closed and all recirculation pump discharge bypass valves shall be closed prior to reactor startup. TS 4.S.A.S currently reads: Operability testing of recirculation pump discharge valves and bypass valves shall be in accordance with Specification 4.6.E. The proposed TS 4.S.A.S would read: Operability testing of recirculation pump discharge valves shall be in accordance with Specification 4.6.E. The recirculation pump discharge bypass valves shall be verified closed once per operating cycle. 3.2 Background As stated in the licensee's LAR: The reactor recirculation system consists of two recirculation pump loops external to the reactor vessel which provide the driving flow of water to the reactor vessel jet pumps. Each external loop consists of a downcomer, a motor-operated pump suction valve, a high capacity motor-driven pump. a motor-operated discharge valve with a motor-operated discharge bypass valve, a discharge riser containing a venture-type flow meter nozzle and a ring header which supplies five jet pump risers each with two jet pumps (for a total of ten per loop). The water pumped through the external loops becomes the driving force for twenty jet pumps located in the reactor vessel annulus between the vessel wall and the core shroud. The water in the reactor annulus becomes the driven flow

                                                   -3 of the jet pumps which is accelerated by and mixed with the driving flow. The two flows are discharged below the core and provide core coolant flow up through the cooling channels.

An increase in recirculation flow temporarily reduces the steam void volume in the core by removing the steam at a faster rate and replacing it with water. Since voids act as negative reactivity, this increase in removal rate adds positive reactivity to the core, which in turn causes reactor power level to increase. The increased steam generation rate increases the steam void volume in the core with a subsequent negative reactivity effect, and thereby, a new higher power level is established. When recirculation flow is reduced, the power level is reduced in a similar manner, i.e., by the formation of voids. 3.3 NRC Staff Evaluation The licensee's Updated Final Safety Analysis Report (UFSAR) in section 4.3.4, currently states, There is a 4-inch bypass line around each pump discharge gate valve in the recirculation loop. The bypass discharge gate valve is maintained in the closed position. The bypass line is used to preheat an idle loop by reverse flow prior to returning a pump to service by keeping the discharge valve partially open. The pump is started at slow speed with the main discharge valve closed. The discharge valve is jogged open with the nuclear system at full pressure. (Reference 4.3.7.7) Pump speed cannot be increased until after the main valve has been opened. The licensee's engineering change provides for the discharge bypass valve to remain closed. The discharge valve would then be jogged open during the recirculation system startup. When the pump starts, the inactive loop discharge valve would be jogged open while the discharge bypass valve would remain closed. The safety function of the recirculation discharge bypass valves and discharge valves are also explained in the licensee's UFSAR. The valves are required to be closed to support Low Pressure Coolant Injection (LPCI) following a Loss of Coolant Accident (LOCA). For the startup of a cold loop, the licensee provided reference to General Electric (GE) safety analysis. The analysis concluded that operating the recirculation system with the discharge bypass valve open has a negligible effect on the primary coolant system flow. They also concluded that the position of the discharge bypass valve does not affect core characteristics such as void fraction. The change would have the startup of a cold loop occur with the discharge bypass valve closed as opposed to open in the current assumptions. The licensee stated that the GE analysis showed that the TS change would not affect the current safety analysis. The NRC staff reviewed the conclusions and found them to be acceptable and that no change in the safety analysis occurs.

                                                     -4 The NRC staff reviewed the proposed change to TS 3.S.A.S to leave the recirculation pump discharge bypass valve closed as well as the proposed change to TS 4.S.A.S to verify that it is closed once per operating cycle. The NRC staff has concluded that the proposed TS changes will not affect the current accident analysis. The valve has a safety related function to close during accident scenarios that include LPCI operation following a LOCA. Placing the valves into the closed position and taking steps to ensure that they remain closed puts the valve in a position that satisfies their safety related function. Therefore, the NRC staff finds the proposed changes to be acceptable and that the current accident analysis remains valid.

3.3 NRC Staff Conclusion

The NRC staff has reviewed the proposed TS changes to TSs 3.S.A.S and 4.S.A.S regarding changing the requirement of the recirculation pump discharge bypass valves from "operable or closed prior to reactor startup" to "closed prior to reactor startup." The NRC staff concludes that the recirculation pump discharge bypass valves remaining closed put the valves into their safety related position. Operation in this position would allow the plant to continue to operate in a safe configuration and meet its current accident analysis. Therefore, the NRC staff has concluded that the proposed TS changes are acceptable.

4.0 STATE CONSULTATION

In accordance with the Commission's regulations, the Vermont State official was notified of the proposed issuance of the amendment. The State official had no comments. S.O ENVIRONMENTAL CONSIDERATION The amendment changes a requirement with respect to installation or use of a facility component located within the restricted area as defined in 10 CFR Part 20. The NRC staff has determined that the amendment involves no significant increase in amounts, and no significant change in the types of any effluents that may be released offsite, and that there is no significant increase in individual or cumulative occupational radiation exposure. The Commission has previously issued a proposed finding that the amendment involves no significant hazards consideration, and there has been no public comment on such finding (77 FR 601S0). Accordingly, the amendment meets the eligibility criteria for categorical exclusion set forth in 10 CFR S1.22(c)(9). Pursuant to 10 CFR S1.22(b), no environmental impact statement or environmental assessment need be prepared in connection with the issuance of the amendment.

6.0 CONCLUSION

The Commission has concluded, based on the considerations discussed above, that: (1) there is reasonable assurance that the health and safety of the public will not be endangered by operation in the proposed manner; (2) there is reasonable assurance that such activities will be conducted in compliance with the Commission's regulations; and (3) the issuance of the amendment will not be inimical to the common defense and security or to the health and safety of the public. Principal Contributor: J. Miller, NRR/DSS/SRXB Date: April 26, 2013

April 26, 2013 Vice President, Operations Entergy Nuclear Operations, Inc. Vermont Yankee Nuclear Power Station P.O. Box 250 Governor Hunt Road Vernon, VT 05354 SUB~IECT: VERMONT YANKEE NUCLEAR POWER STATION - ISSUANCE OF AMENDMENT TO RENEWED FACILITY OPERATING LICENSE RE: RECIRCULATION SYSTEM DISCHARGE BYPASS VALVE CHANGE (TAC NO. ME8437) The Nuclear Regulatory Commission (NRC) has issued the enclosed Amendment No. 257 to Renewed Facility Operating License No. DPR-28 for the Vermont Yankee Nuclear Power Station (VYNPS), in response to your application dated April 17, 2012. The licensee's application for the proposed amendment revised the VYNPS Technical Specification (TS) 3.5.A.5 and TS 4.5.A.5 to change the normal position of the recirculation pump discharge bypass valves from "open" to "closed"; therefore, the valves' safety function to close in support of accident mitigation is eliminated. The amendment also revised the TSs to require the valves to remain closed and their position to be verified once per operating cycle. A copy of the related Safety Evaluation is enclosed. A Notice of Issuance will be included in the Commission's biweekly Federal Register notice. Sincerely, Ira! Richard V. Guzman, Senior Project Manager Plant Licensing Branch 1-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-271

Enclosures:

1. Amendment No. 257 to License No. DPR-28
2. Safety Evaluation cc w/encls: Distribution via Listserv DISTRIBUTION:

PUBLIC RidsRgn1 MailCenter RidsNrrDorlLpl1-1 Resource RidsNrrLAKGoldstein RidsNrrDssSrxb Resource RidsNrrDorlDpr Resource J. Miller, NRR RidsNrrDssStsb Resource RidsNrrPMVermontYankeeResource RidsAcrsAcnw_MailCenter Resource Accession No.: ML13105A175 *SE nput via memo. No substantial changes made. NRR-106 OFFICE LPL1-1/PM LPL1-1/LA SRXB/BC STSB/BC OGC LPL1-1/BC(A) KGoldstein CJackson* SMeighan NAME RGuzman RElliott DCylkowski (DPickett for) 4/17/13 DATE 4/17/13 3/7/13 4/24/13 4/22/13 4/26/13 4/26/13 OFFICIAL RECORD COPY}}