ML13122A143: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
(2 intermediate revisions by the same user not shown)
Line 3: Line 3:
| issue date = 04/29/2013
| issue date = 04/29/2013
| title = 2012 Point Beach Nuclear Plant Initial License Examination Additional Outline Submittal Forms - Es - 301 - 1
| title = 2012 Point Beach Nuclear Plant Initial License Examination Additional Outline Submittal Forms - Es - 301 - 1
| author name = Zoia C D
| author name = Zoia C
| author affiliation = NRC/RGN-III/DRS/OLB
| author affiliation = NRC/RGN-III/DRS/OLB
| addressee name =  
| addressee name =  
Line 14: Line 14:
| page count = 2
| page count = 2
}}
}}
=Text=
{{#Wiki_filter:2012 POINT BEACH NUCLEAR PLANT INITIAL LICENSE EXAMINATION ADDITIONAL OUTLINE SUBMITTAL FORMS- ES-301-1
ES-301                              Administrative Topics Outline                                Form ES-301-1 Facility: Point Beach U1/U2                                          Date of Examination: Dec 3, 2012 Examination Level: RO IZI          SRO    0                          Operating Test Number: 2012301 Administrative Topic            Type                      Describe activity to be performed (see Note)                Code*
R,D        Perform Shutdown Margin Calculation Conduct of Operations 2.1.25 (3.9/4.2) Ability to interpret reference materials, such as graphs, curves, tables, etc.
Conduct a Control Board Walk-down for Shift S,M        Turnover Conduct of Operations 2.1.3 (3.7/3.9) Knowledge of shift or short-term relief turnover practices Equipment Control                    S,D        Perform Containment Isolation Valve test 2.2.12 (3. 7/4.1) Knowledge of surveillance procedures Radiation Control N/A Operate Technical Support Center Ventilation System Emergency R,D,P        2.4.35 (3.8/4.0) Knowledge oflocal auxiliary operator tasks Procedures/Plan                                  during an emergency and the resultant operational effects.
(2009 Exam)
NOTE: All items (5 total) are required for SROs. RO applicants require only 4 items unless they are retaking only the administrative topics, when all 5 are required.
*Type Codes & Criteria:            (C)ontrol room, (S)imulator, or Class(R)oom (D)irect from bank (S 3 for ROs;::; 4 for SROs & RO retakes)
(N)ew or (M)odified from bank (;:: 1)
(P)revious 2 exams (S 1; randomly selected)}}

Latest revision as of 18:58, 4 November 2019

2012 Point Beach Nuclear Plant Initial License Examination Additional Outline Submittal Forms - Es - 301 - 1
ML13122A143
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 04/29/2013
From: Chuck Zoia
NRC/RGN-III/DRS/OLB
To:
Shared Package
ML13120A406 List:
References
Download: ML13122A143 (2)


Text

2012 POINT BEACH NUCLEAR PLANT INITIAL LICENSE EXAMINATION ADDITIONAL OUTLINE SUBMITTAL FORMS- ES-301-1

ES-301 Administrative Topics Outline Form ES-301-1 Facility: Point Beach U1/U2 Date of Examination: Dec 3, 2012 Examination Level: RO IZI SRO 0 Operating Test Number: 2012301 Administrative Topic Type Describe activity to be performed (see Note) Code*

R,D Perform Shutdown Margin Calculation Conduct of Operations 2.1.25 (3.9/4.2) Ability to interpret reference materials, such as graphs, curves, tables, etc.

Conduct a Control Board Walk-down for Shift S,M Turnover Conduct of Operations 2.1.3 (3.7/3.9) Knowledge of shift or short-term relief turnover practices Equipment Control S,D Perform Containment Isolation Valve test 2.2.12 (3. 7/4.1) Knowledge of surveillance procedures Radiation Control N/A Operate Technical Support Center Ventilation System Emergency R,D,P 2.4.35 (3.8/4.0) Knowledge oflocal auxiliary operator tasks Procedures/Plan during an emergency and the resultant operational effects.

(2009 Exam)

NOTE: All items (5 total) are required for SROs. RO applicants require only 4 items unless they are retaking only the administrative topics, when all 5 are required.

  • Type Codes & Criteria: (C)ontrol room, (S)imulator, or Class(R)oom (D)irect from bank (S 3 for ROs;::; 4 for SROs & RO retakes)

(N)ew or (M)odified from bank (;:: 1)

(P)revious 2 exams (S 1; randomly selected)