{{#Wiki_filter:July 11, 2013   In the Matter of PACIFIC GAS AND ELECTRIC COMPANY (Diablo Canyon Power Plant, Units 1 and 2)
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, DC 20555 - 0001 July 11, 2013 Administrative Judge                                Administrative Judge Alex S. Karlin, Chair                              Paul B. Abramson Atomic Safety and Licensing Board Panel            Atomic Safety and Licensing Board Panel Mail Stop: T-3F23                                  Mail Stop: T-3F23 Washington, DC 20555-001                            Washington, DC 20555-0001 Administrative Judge Nicholas G. Trikouros Atomic Safety and Licensing Board Panel Mail Stop: T-3F23 Washington, DC 20555-0001 In the Matter of PACIFIC GAS AND ELECTRIC COMPANY (Diablo Canyon Power Plant, Units 1 and 2)
Docket Nos. 50
Docket Nos. 50-275-LR and 50-323-LR
-275-LR and 50-323-LR    


==Dear Administrative Judges:==
==Dear Administrative Judges:==


In accordance with the Board's November 19, 2012 Revised Scheduling Order and Section 2.1203 and Section 2.336, the NRC staff is providing notice that it has updated the hearing file for this proceeding and has made it available to the parties. For any member of the public that wishes to inspect the hearing file, the Staff has created a separate folder in the agency's Electronic Hearing Docket ("EHD") associated with this proceeding entitled "Diablo Hearing File," and if any documents are produced for this period, the updated documents, along with an index listing the documents, will be published in that folder.
In accordance with the Boards November 19, 2012 Revised Scheduling Order and Section 2.1203 and Section 2.336, the NRC staff is providing notice that it has updated the hearing file for this proceeding and has made it available to the parties. For any member of the public that wishes to inspect the hearing file, the Staff has created a separate folder in the agencys Electronic Hearing Docket (EHD) associated with this proceeding entitled Diablo Hearing File, and if any documents are produced for this period, the updated documents, along with an index listing the documents, will be published in that folder.
Respectfully submitted,         /signed (electronically) by/
Respectfully submitted,
Lloyd B. Subin Counsel for the NRC Staff U.S. Nuclear Regulatory Commission Mail Stop O
                                                      /signed (electronically) by/
-15 D21       Washington, DC 20555
Lloyd B. Subin Counsel for the NRC Staff U.S. Nuclear Regulatory Commission Mail Stop O-15 D21 Washington, DC 20555-0001 (301) 415-1988 Lloyd.Subin@nrc.gov
-0001       (301) 415-1 988        Lloyd.Subin@nrc.gov U N I T E D S T A T E S N U C L E A R R E G U L A T O R Y C O M M I S S I O NWASHINGTON, DC 20555 - 0001 Administrative Judge Alex S. Karlin, Chair Atomic Safety and Licensing Board Panel Mail Stop: T
-3F23 Washington, DC 20555-001  Administrative Judge Paul B. Abramson Atomic Safety and Licensing Board Panel Mail Stop: T
-3F23 Washington, DC 20555
-0001  Administrative Judge Nicholas G. Trikouros Atomic Safety and Licensing Board Panel Mail Stop: T
-3F23 Washington, DC 20555-0001 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of
        )            ) PACIFIC GAS AND ELECTRIC COMPANY
    )  Docket Nos. 50
-275-LR/ 50-323-LR      ) (Diablo Canyon Nuclear Power Plant,      ) ASLBP No. 10
-900-01-LR-BD01  Units 1 and 2)
    )                CERTIFICATE OF SERVICE


Pursuant to 10 C.F.R § 2.305 (revised), I hereby certify that copies of the foregoing NRC Staff letter dated July 11, 2013 , have been served upon the following by the Electronic Information Exchange , the NRC's E
UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of                                    )
-Filing System
                                                    )
, in the above captioned proceeding
PACIFIC GAS AND ELECTRIC COMPANY                    )        Docket Nos. 50-275-LR/ 50-323-LR
, this 1 1 t h day of Ju ly 2013:
                                                    )
Administrative Judge Alex S. Karlin, Chair Atomic Safety and Licensing Board Panel Mail Stop  
(Diablo Canyon Nuclear Power Plant,                )        ASLBP No. 10-900-01-LR-BD01 Units 1 and 2)                              )
- T-3 F23 U.S. Nuclear Regulatory Commission Washington, DC 20555
CERTIFICATE OF SERVICE Pursuant to 10 C.F.R § 2.305 (revised), I hereby certify that copies of the foregoing NRC Staff letter dated July 11, 2013, have been served upon the following by the Electronic Information Exchange, the NRCs E-Filing System, in the above captioned proceeding, this 11th day of July 2013:
-0001 E-mail: ask2@nrc.gov Administrative Judge Nicholas G. Trikouros Atomic Safety and Licensing Board Panel Mail Stop  
Administrative Judge                               Office of Commission Appellate Alex S. Karlin, Chair                                 Adjudication Atomic Safety and Licensing Board Panel             U.S. Nuclear Regulatory Commission Mail Stop - T-3 F23                                 Mail Stop - O-16G4 U.S. Nuclear Regulatory Commission                 Washington, DC 20555-0001 Washington, DC 20555-0001                           E-mail: ocaamail@nrc.gov E-mail: ask2@nrc.gov Administrative Judge                               Office of the Secretary Nicholas G. Trikouros                               Attn: Rulemakings and Adjudications Staff Atomic Safety and Licensing Board Panel             Mail Stop: O-16G4 Mail Stop - T-3 F23                                 U.S. Nuclear Regulatory Commission U.S. Nuclear Regulatory Commission                 Washington, DC 20555-0001 Washington, DC 20555-0001                           E-mail: HEARINGDOCKET@nrc.gov E-mail: ngt@nrc.gov Administrative Judge                                David A. Repka, Esq.
- T-3 F23 U.S. Nuclear Regulatory Commission Washington, DC 20555
Paul B. Abramson                                    Tyson Smith, Esq.
-0001 E-mail: ngt@nrc.gov Administrative Judge Paul B. Abramson Atomic Safety and Licensing Board Panel Mail Stop
Atomic Safety and Licensing Board Panel            Carlos Sisco Mail Stop - T-3 F23                                Winston & Strawn LLP U.S. Nuclear Regulatory Commission                  101 California Street Washington, DC 20555-0001                          San Francisco, CA 94111-5802 E-mail: pba@nrc.gov                                E-mail: drepka@winston.com trsmith@winston.com CSisco@winston.com
- T-3 F23 U.S. Nuclear Regulatory Commission Washington, DC 20555
-0001 E-mail: pba@nrc.gov      Office of Commission Appellate Adjudication U.S. Nuclear Regulatory Commission Mail Stop
- O-16G4 Washington, DC 20555
-0001 E-mail: ocaamail@nrc.gov Office of the Secretary Attn: Rulemakings and Adjudications Staff Mail Stop: O
-16G4 U.S. Nuclear Regulatory Commission Washington, DC 20555
-0001 E-mail: HEARINGDOCKET@nrc.gov David A. Repka, Esq.
Tyson Smith, Esq.
Carlos Sisco Winston & Strawn LLP 101 California Street San Francisco, CA 94111
-5802 E-mail: drepka@winston.com trsmith@winston.com CSisco@winston.co m
Jill ZamEk, Esq.
San Luis Obispo Mothers for Peace 1123 Flora Road Arroyo Grande, CA 93420 E-mail:  jzk@charter.net Diane Curran, Esq.
Harmon, Curran, Spielberg, and Eisenberg


1726 M Street NW Suite 600 Washington, DC 20036 E-mail: dcurran@harmoncurran.com
Jill ZamEk, Esq.                  Diane Curran, Esq.
 
San Luis Obispo Mothers for Peace Harmon, Curran, Spielberg, and Eisenberg 1123 Flora Road                  1726 M Street NW Arroyo Grande, CA 93420          Suite 600 E-mail: jzk@charter.net          Washington, DC 20036 E-mail: dcurran@harmoncurran.com
    /Signed (electronically) by/
                                  /Signed (electronically) by/
_______________________________
_______________________________
 
Lloyd B. Subin Counsel for NRC Staff U.S. Nuclear Regulatory Commission Office of the General Counsel Mail Stop - O-15D21 Washington, DC 20555 Telephone: (301) 415-1988 E-mail: Lloyd.Subin@nrc.gov Date of Signature: July 11, 2013}}
Lloyd B. Subin Counsel for NRC Staff U.S. Nuclear Regulatory Commission Office of the General Counsel Mail Stop  
- O-15D21 Washington, DC 20555 Telephone: (301) 415-1988 E-mail: Lloyd.Subin@nrc.gov Date of Signature: Ju ly 1 1, 2013}}

Revision as of 17:07, 4 November 2019

NRC Staff Hearing File Update in the Matter of Diablo Canyon, Units 1 and 2
ML13192A200
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 07/11/2013
From: Subin L
NRC/OGC
To: Abramson P, Karlin A, Nicholas Trikouros
Atomic Safety and Licensing Board Panel
SECY RAS
References
50-275-LR, 50-323-LR, ASLBP 10-900-01-LR-BD01, RAS 24806
Download: ML13192A200 (3)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, DC 20555 - 0001 July 11, 2013 Administrative Judge Administrative Judge Alex S. Karlin, Chair Paul B. Abramson Atomic Safety and Licensing Board Panel Atomic Safety and Licensing Board Panel Mail Stop: T-3F23 Mail Stop: T-3F23 Washington, DC 20555-001 Washington, DC 20555-0001 Administrative Judge Nicholas G. Trikouros Atomic Safety and Licensing Board Panel Mail Stop: T-3F23 Washington, DC 20555-0001 In the Matter of PACIFIC GAS AND ELECTRIC COMPANY (Diablo Canyon Power Plant, Units 1 and 2)

Docket Nos. 50-275-LR and 50-323-LR

Dear Administrative Judges:

In accordance with the Boards November 19, 2012 Revised Scheduling Order and Section 2.1203 and Section 2.336, the NRC staff is providing notice that it has updated the hearing file for this proceeding and has made it available to the parties. For any member of the public that wishes to inspect the hearing file, the Staff has created a separate folder in the agencys Electronic Hearing Docket (EHD) associated with this proceeding entitled Diablo Hearing File, and if any documents are produced for this period, the updated documents, along with an index listing the documents, will be published in that folder.

Respectfully submitted,

/signed (electronically) by/

Lloyd B. Subin Counsel for the NRC Staff U.S. Nuclear Regulatory Commission Mail Stop O-15 D21 Washington, DC 20555-0001 (301) 415-1988 Lloyd.Subin@nrc.gov

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of )

)

PACIFIC GAS AND ELECTRIC COMPANY ) Docket Nos. 50-275-LR/ 50-323-LR

)

(Diablo Canyon Nuclear Power Plant, ) ASLBP No. 10-900-01-LR-BD01 Units 1 and 2) )

CERTIFICATE OF SERVICE Pursuant to 10 C.F.R § 2.305 (revised), I hereby certify that copies of the foregoing NRC Staff letter dated July 11, 2013, have been served upon the following by the Electronic Information Exchange, the NRCs E-Filing System, in the above captioned proceeding, this 11th day of July 2013:

Administrative Judge Office of Commission Appellate Alex S. Karlin, Chair Adjudication Atomic Safety and Licensing Board Panel U.S. Nuclear Regulatory Commission Mail Stop - T-3 F23 Mail Stop - O-16G4 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Washington, DC 20555-0001 E-mail: ocaamail@nrc.gov E-mail: ask2@nrc.gov Administrative Judge Office of the Secretary Nicholas G. Trikouros Attn: Rulemakings and Adjudications Staff Atomic Safety and Licensing Board Panel Mail Stop: O-16G4 Mail Stop - T-3 F23 U.S. Nuclear Regulatory Commission U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Washington, DC 20555-0001 E-mail: HEARINGDOCKET@nrc.gov E-mail: ngt@nrc.gov Administrative Judge David A. Repka, Esq.

Paul B. Abramson Tyson Smith, Esq.

Atomic Safety and Licensing Board Panel Carlos Sisco Mail Stop - T-3 F23 Winston & Strawn LLP U.S. Nuclear Regulatory Commission 101 California Street Washington, DC 20555-0001 San Francisco, CA 94111-5802 E-mail: pba@nrc.gov E-mail: drepka@winston.com trsmith@winston.com CSisco@winston.com

Jill ZamEk, Esq. Diane Curran, Esq.

San Luis Obispo Mothers for Peace Harmon, Curran, Spielberg, and Eisenberg 1123 Flora Road 1726 M Street NW Arroyo Grande, CA 93420 Suite 600 E-mail: jzk@charter.net Washington, DC 20036 E-mail: dcurran@harmoncurran.com

/Signed (electronically) by/

_______________________________

Lloyd B. Subin Counsel for NRC Staff U.S. Nuclear Regulatory Commission Office of the General Counsel Mail Stop - O-15D21 Washington, DC 20555 Telephone: (301) 415-1988 E-mail: Lloyd.Subin@nrc.gov Date of Signature: July 11, 2013