ML13199A441: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:UFUNIVERSITY of College of Engineering UF Training Reactor Facility 202 Nuclear Sciences Center PO Box 118300 Gainesville, FL 32611-8300 352-294-2104 bsheawufl.edu July 10, 2013 ATTN: Document Control Desk 10 CFR 50.54(p)U.S. Nuclear Regulatory Commission UFTR Operating License R-56, Docket 50-83 Washington, D.C. 20555-0001
{{#Wiki_filter:UFUNIVERSITY               of College of Engineering                                             202 Nuclear Sciences Center UF Training Reactor Facility                                       PO Box 118300 Gainesville, FL 32611-8300 352-294-2104 bsheawufl.edu July 10, 2013 ATTN: Document Control Desk                                                     10 CFR 50.54(p)
U.S. Nuclear Regulatory Commission             UFTR Operating License R-56, Docket 50-83 Washington, D.C. 20555-0001


==Subject:==
==Subject:==
Security Plan Change Performed Under 10 CFR 50.54(p)The UFTR has replaced a wooden door with a metal door. No loss of safeguards effectiveness results from the replacement.
Security Plan Change Performed Under 10 CFR 50.54(p)
The UFTR has replaced a wooden door with a metal door. No loss of safeguards effectiveness results from the replacement.
This submittal has been reviewed and approved by UFTR management and by the Executive Committee of the Reactor Safety Review Subcommittee.
This submittal has been reviewed and approved by UFTR management and by the Executive Committee of the Reactor Safety Review Subcommittee.
Please let us know if you need further information.
Please let us know if you need further information.
I declare under penalty of perjury that the foregoing is true and correct to my knowledge.
I declare under penalty of perjury that the foregoing is true and correct to my knowledge.
Executed on July 10, 2013.Brian Shea Reactor Manager BS/djc cc: Dean -College of Engineering Reactor Safety Review Subcommittee UFTR Facility Director UFTR Reactor Manager UFTR Licensing Engineer NRC Project Manager The Foundation for The Gator Nation A J An Equal Opportunity Institution}}
Executed on July 10, 2013.
Brian Shea Reactor Manager BS/djc cc:     Dean - College of Engineering Reactor Safety Review Subcommittee UFTR Facility Director UFTR Reactor Manager UFTR Licensing Engineer NRC Project Manager The Foundationfor The Gator Nation An Equal Opportunity Institution A J}}

Latest revision as of 16:50, 4 November 2019

Univ. of Florida, Security Plan Change Performed Under 10 CFR 50.54(p)
ML13199A441
Person / Time
Site: 05000083
Issue date: 07/10/2013
From: Shea B
Univ Of Florida, Gainesville
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML13199A441 (1)


Text

UFUNIVERSITY of College of Engineering 202 Nuclear Sciences Center UF Training Reactor Facility PO Box 118300 Gainesville, FL 32611-8300 352-294-2104 bsheawufl.edu July 10, 2013 ATTN: Document Control Desk 10 CFR 50.54(p)

U.S. Nuclear Regulatory Commission UFTR Operating License R-56, Docket 50-83 Washington, D.C. 20555-0001

Subject:

Security Plan Change Performed Under 10 CFR 50.54(p)

The UFTR has replaced a wooden door with a metal door. No loss of safeguards effectiveness results from the replacement.

This submittal has been reviewed and approved by UFTR management and by the Executive Committee of the Reactor Safety Review Subcommittee.

Please let us know if you need further information.

I declare under penalty of perjury that the foregoing is true and correct to my knowledge.

Executed on July 10, 2013.

Brian Shea Reactor Manager BS/djc cc: Dean - College of Engineering Reactor Safety Review Subcommittee UFTR Facility Director UFTR Reactor Manager UFTR Licensing Engineer NRC Project Manager The Foundationfor The Gator Nation An Equal Opportunity Institution A J