ML13270A086: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(2 intermediate revisions by the same user not shown)
Line 12: Line 12:
| document type = Letter
| document type = Letter
| page count = 4
| page count = 4
| project =
| stage = Request
}}
}}


=Text=
=Text=
{{#Wiki_filter:REED COLLEGEREACTOR FAC I LITY3203 Southeast Woodstock Boulevard
{{#Wiki_filter:REED COLLEGE REACTOR FAC I LITY 3203 Southeast Woodstock Boulevard Portland, Oregon 97202-899 September 17, 2013 fehephone 503/777-7222 tax 503/777-7274 entail reaictor@reed.edu ATTN: Document Control Desk web U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 http://reactor.reed.edu Docket: 50-288 License No: R-112 Enclosed is the Response to the Request for Additional Information dated 8/27/2013.
: Portland, Oregon97202-899 September 17, 2013fehephone 503/777-7222 tax503/777-7274 entailreaictor@reed.edu webhttp://reactor.reed.edu ATTN: Document Control DeskU.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Docket: 50-288License No: R-112Enclosed is the Response to the Request for Additional Information dated8/27/2013.
Please contact me if you have any questions.
Please contact me if you have any questions.
I declare under penalty of perjury that the foregoing is true and correct.Executed on / /Melinda Krahenbuhl, Ph.D.Director, Reed Research Reactorrý") 0 Response to the Request for additional information issued August 27, 20131. In the current RRR TS 6.1.1, Figure 1, Administrative structure, the level 4includes only "Reactor Operators."
I declare under penalty of perjury that the foregoing is true and correct.
NUREG -1537, Part 1, Chapter 14, Section6.1.1, supports ANSI/ANS-15.1-2007, Section 6.1.1, which describes level 4staffing as "Operating staff, e.g., senior reactor operators, reactor operators, and trainees."
Executed on         /       /
Please indicate if senior reactor operators should be includedin level 4 or justify the current description.
Melinda Krahenbuhl, Ph.D.
ResponseIn section 6.1.2, "Senior Reactor Operators" is included in level 4. Forclarity and consistency with NUREG -1537, Part 1, Chapter 14, Section6.1.1, which supports ANSI/ANS-15.1-2007, Section 6.1.1, Figure 1will be changed.
Director, Reed Research Reactor rý")0
The proposed figure is attached.
 
In addition TS 6.1.2will be changed to the following:
Response to the Request for additional information issued August 27, 2013
: d. Operating Staff (level 4): Trainees, Reactor Operators and SeniorReactor Operators.
: 1. In the current RRR TS 6.1.1, Figure 1, Administrative structure, the level 4 includes only "Reactor Operators." NUREG -1537, Part 1, Chapter 14, Section 6.1.1, supports ANSI/ANS-15.1-2007, Section 6.1.1, which describes level 4 staffing as "Operating staff, e.g., senior reactor operators, reactor operators, and trainees." Please indicate if senior reactor operators should be included in level 4 or justify the current description.
The Operating Staff report to the ReactorOperations Manager and the Director, and are primarily involved inthe manipulation of reactor controls, monitoring of instrumentation, and operation and maintenance of reactor related equipment.
 
: 2. Your letter states the title Reactor Operations Manager has replaced the titleof Operations Supervisor in Technical Specifications."
===Response===
: a. Reed College TS 6.1.3(b)(3) lists "Operation Supervisor" as one of thereactor facility personnel or explain why the position should remain.b. Reed College TS 6.5(d) includes "Operations Supervisor  
In section 6.1.2, "Senior Reactor Operators" is included in level 4. For clarity and consistency with NUREG -1537, Part 1, Chapter 14, Section 6.1.1, which supports ANSI/ANS-15.1-2007, Section 6.1.1, Figure 1 will be changed. The proposed figure is attached. In addition TS 6.1.2 will be changed to the following:
" as on of thereactor facility personnel able to approve experiments.
: d. Operating Staff (level 4): Trainees, Reactor Operators and Senior Reactor Operators. The Operating Staff report to the Reactor Operations Manager and the Director, and are primarily involved in the manipulation of reactor controls, monitoring of instrumentation, and operation and maintenance of reactor related equipment.
Please explainif the statement should read "minor changes that do not alter theexperiment may be approved by the Reactor Operations Manager orDirector" or justify the current description.
: 2. Your letter states the title Reactor Operations Manager has replaced the title of Operations Supervisor in Technical Specifications."
Responsea. We will remove the Operations Supervisor from the list. TS6.1.3(b) will be changed to the following:
: a. Reed College TS 6.1.3(b)(3) lists "Operation Supervisor" as one of the reactor facility personnel or explain why the position should remain.
A list of reactor facility personnel by name and telephone numbershall be readily available in the control room for use by theoperator.
: b. Reed College TS 6.5(d) includes "Operations Supervisor " as on of the reactor facility personnel able to approve experiments. Please explain if the statement should read "minor changes that do not alter the experiment may be approved by the Reactor Operations Manager or Director" or justify the current description.
The list shall include:1. Reactor Director;
 
: 2. Reactor Operations Manager;3. Radiation Safety Officer; and4. At least one other person who is a licensed SRO.1  
===Response===
: b. Reed College will continue to have student supervisors.
: a. We will remove the Operations Supervisor from the list.           TS 6.1.3(b) will be changed to the following:
Thesestudent supervisors will be allowed to approve minor changes thatdo not significantly alter the experiment.
A list of reactor facility personnel by name and telephone number shall be readily available in the control room for use by the operator. The list shall include:
TS 6.5 (d) will bechanged to the following:
: 1. Reactor Director;
: d. Minor changes that do not significantly alter the experiment may be approved by a Supervisor, Reactor Operations Manager orDirector.
: 2. Reactor Operations Manager;
2 Figure 1: Administrative Structure
: 3. Radiation Safety Officer; and
--- -Communication Authority}}
: 4. At least one other person who is a licensed SRO.
1
: b. Reed College will continue to have student supervisors. These student supervisors will be allowed to approve minor changes that do not significantly alter the experiment. TS 6.5 (d) will be changed to the following:
: d. Minor changes that do not significantly alter the experiment may be approved by a Supervisor, Reactor Operations Manager or Director.
2
 
Figure 1: Administrative Structure
                                  --- - Communication Authority}}

Latest revision as of 13:07, 4 November 2019

Reed College - Response to the Request for Additional Information Dated 8/27/2013
ML13270A086
Person / Time
Site: Reed College
Issue date: 09/17/2013
From: Krahenbuhl M
Reed College
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML13270A086 (4)


Text

REED COLLEGE REACTOR FAC I LITY 3203 Southeast Woodstock Boulevard Portland, Oregon 97202-899 September 17, 2013 fehephone 503/777-7222 tax 503/777-7274 entail reaictor@reed.edu ATTN: Document Control Desk web U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 http://reactor.reed.edu Docket: 50-288 License No: R-112 Enclosed is the Response to the Request for Additional Information dated 8/27/2013.

Please contact me if you have any questions.

I declare under penalty of perjury that the foregoing is true and correct.

Executed on / /

Melinda Krahenbuhl, Ph.D.

Director, Reed Research Reactor rý")0

Response to the Request for additional information issued August 27, 2013

1. In the current RRR TS 6.1.1, Figure 1, Administrative structure, the level 4 includes only "Reactor Operators." NUREG -1537, Part 1, Chapter 14, Section 6.1.1, supports ANSI/ANS-15.1-2007, Section 6.1.1, which describes level 4 staffing as "Operating staff, e.g., senior reactor operators, reactor operators, and trainees." Please indicate if senior reactor operators should be included in level 4 or justify the current description.

Response

In section 6.1.2, "Senior Reactor Operators" is included in level 4. For clarity and consistency with NUREG -1537, Part 1, Chapter 14, Section 6.1.1, which supports ANSI/ANS-15.1-2007, Section 6.1.1, Figure 1 will be changed. The proposed figure is attached. In addition TS 6.1.2 will be changed to the following:

d. Operating Staff (level 4): Trainees, Reactor Operators and Senior Reactor Operators. The Operating Staff report to the Reactor Operations Manager and the Director, and are primarily involved in the manipulation of reactor controls, monitoring of instrumentation, and operation and maintenance of reactor related equipment.
2. Your letter states the title Reactor Operations Manager has replaced the title of Operations Supervisor in Technical Specifications."
a. Reed College TS 6.1.3(b)(3) lists "Operation Supervisor" as one of the reactor facility personnel or explain why the position should remain.
b. Reed College TS 6.5(d) includes "Operations Supervisor " as on of the reactor facility personnel able to approve experiments. Please explain if the statement should read "minor changes that do not alter the experiment may be approved by the Reactor Operations Manager or Director" or justify the current description.

Response

a. We will remove the Operations Supervisor from the list. TS 6.1.3(b) will be changed to the following:

A list of reactor facility personnel by name and telephone number shall be readily available in the control room for use by the operator. The list shall include:

1. Reactor Director;
2. Reactor Operations Manager;
3. Radiation Safety Officer; and
4. At least one other person who is a licensed SRO.

1

b. Reed College will continue to have student supervisors. These student supervisors will be allowed to approve minor changes that do not significantly alter the experiment. TS 6.5 (d) will be changed to the following:
d. Minor changes that do not significantly alter the experiment may be approved by a Supervisor, Reactor Operations Manager or Director.

2

Figure 1: Administrative Structure

--- - Communication Authority