Line 3: Line 3:
| issue date = 09/15/2014
| issue date = 09/15/2014
| title = NRC Staff September 2014 Hearing File Update Letter
| title = NRC Staff September 2014 Hearing File Update Letter
| author name = Kanatas C E
| author name = Kanatas C
| author affiliation = NRC/OGC
| author affiliation = NRC/OGC
| addressee name = Abramson P B, Karlin A S, Trikouros N G
| addressee name = Abramson P, Karlin A, Trikouros N
| addressee affiliation = NRC/ASLBP
| addressee affiliation = NRC/ASLBP
| docket = 05000275, 05000323
| docket = 05000275, 05000323
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:September 15, 2014   Administrative Judge Alex S. Karlin, Chair Atomic Safety and Licensing Board Panel Mail Stop - T-3 F23 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Administrative Judge Paul B. Abramson Atomic Safety and Licensing Board Panel Mail Stop - T-3 F23 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Administrative Judge Nicholas G. Trikouros Atomic Safety and Licensing Board Panel Mail Stop - T-3 F23 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001  
{{#Wiki_filter:September 15, 2014 Administrative Judge                                Administrative Judge Alex S. Karlin, Chair                               Paul B. Abramson Atomic Safety and Licensing Board Panel             Atomic Safety and Licensing Board Panel Mail Stop - T-3 F23                                  Mail Stop - T-3 F23 U.S. Nuclear Regulatory Commission                   U.S. Nuclear Regulatory Commission Washington, DC 20555-0001                           Washington, DC 20555-0001 Administrative Judge Nicholas G. Trikouros Atomic Safety and Licensing Board Panel Mail Stop - T-3 F23 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 In the Matter of Pacific Gas and Electric Company (Diablo Canyon Nuclear Power Plant, Units 1 and 2)
Docket Nos. 50-275-LR and 50-323-LR


In the Matter of Pacific Gas and Electric Company (Diablo Canyon Nuclear Power Plant, Units 1 and 2) Docket Nos. 50-275-LR and 50-323-LR 
==Dear Administrative Judges:==


==Dear Administrative Judges:==
In accordance with the Boards November 19, 2012 Revised Scheduling Order and Section 2.1203 and Section 2.336, the NRC staff is providing notice that it has updated the hearing file for this proceeding and has made it available to the parties. For any member of the public that wishes to inspect the hearing file, the Staff has created a separate folder in the agencys Electronic Hearing Docket (EHD) associated with this proceeding entitled Diablo Canyon Hearing File, and if any documents are produced for this period, the updated documents, along with an index listing the documents, will be published in that folder.
In accordance with the Board's November 19, 2 012 Revised Scheduling Order and Section 2.1203 and Section 2.336, the NRC staff is providing notice that it has updated the hearing file for this proceeding and has made it available to the parties. For any member of the public that wishes to inspect the hearing file, the Staff has created a separate folder in the agency's Electronic Hearing Docket (EHD) associated with this proceeding entitled "Diablo Canyon Hearing File," and if any documents are produced for this period, the updated documents, along with an index listing the documents, will be published in that folder. Respectfully Submitted,   Signed (electronically) by   Catherine E. Kanatas Counsel for NRC Staff U.S. Nuclear Regulatory Commission Office of the General Counsel Mail Stop - O-15D21 Washington, DC 20555 Telephone: (301) 415-2321 E-mail: catherine.kanatas@nrc.gov Date of signature: September 15, 2014 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION  BEFORE THE ATOMIC SAFETY AND LICENSING BOARD    In the Matter of ) ) PACIFIC GAS AND ELECTRIC COMPANY ) 50-275-LR/ 50-3523-LR ) (Diablo Canyon Nuclear Power Plant, ) Units 1 and 2) ) 
Respectfully Submitted, Signed (electronically) by Catherine E. Kanatas Counsel for NRC Staff U.S. Nuclear Regulatory Commission Office of the General Counsel Mail Stop - O-15D21 Washington, DC 20555 Telephone: (301) 415-2321 E-mail: catherine.kanatas@nrc.gov Date of signature: September 15, 2014


CERTIFICATE OF SERVICE Pursuant to 10 C.F.R. § 2.305 (revised) I hereby certify that copies of the foregoing "SEPTEMBER 2014 HEARING FILE UPDATE LETTER," dated September 15, 2014, have been served upon the Electronic Information Exchange, the NRC's E-filing System, in the above captioned proceeding, this 15th day of September, 2014. /Signed (electronically) by/ Catherine E. Kanatas Counsel for NRC Staff U.S. Nuclear Regulatory Commission Office of the General Counsel Mail Stop - O-15D21 Washington, DC 20555 Telephone: (301) 415-2321 E-mail: catherine.kanatas@nrc.gov Date of signature: September 15, 2014}}
UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of                                    )
                                                    )
PACIFIC GAS AND ELECTRIC COMPANY                    )        50-275-LR/ 50-3523-LR
                                                    )
(Diablo Canyon Nuclear Power Plant,                )
Units 1 and 2)                                      )
CERTIFICATE OF SERVICE Pursuant to 10 C.F.R. § 2.305 (revised) I hereby certify that copies of the foregoing SEPTEMBER 2014 HEARING FILE UPDATE LETTER, dated September 15, 2014, have been served upon the Electronic Information Exchange, the NRCs E-filing System, in the above captioned proceeding, this 15th day of September, 2014.
                                                    /Signed (electronically) by/
Catherine E. Kanatas Counsel for NRC Staff U.S. Nuclear Regulatory Commission Office of the General Counsel Mail Stop - O-15D21 Washington, DC 20555 Telephone: (301) 415-2321 E-mail: catherine.kanatas@nrc.gov Date of signature: September 15, 2014}}

Latest revision as of 00:20, 4 November 2019

NRC Staff September 2014 Hearing File Update Letter
ML14258B119
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 09/15/2014
From: Catherine Kanatas
NRC/OGC
To: Abramson P, Karlin A, Nicholas Trikouros
Atomic Safety and Licensing Board Panel
SECY RAS
References
50-275-LR, 50-323-LR, ASLBP 10-900-01-LR-BD01, RAS 26494
Download: ML14258B119 (2)


Text

September 15, 2014 Administrative Judge Administrative Judge Alex S. Karlin, Chair Paul B. Abramson Atomic Safety and Licensing Board Panel Atomic Safety and Licensing Board Panel Mail Stop - T-3 F23 Mail Stop - T-3 F23 U.S. Nuclear Regulatory Commission U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Washington, DC 20555-0001 Administrative Judge Nicholas G. Trikouros Atomic Safety and Licensing Board Panel Mail Stop - T-3 F23 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 In the Matter of Pacific Gas and Electric Company (Diablo Canyon Nuclear Power Plant, Units 1 and 2)

Docket Nos. 50-275-LR and 50-323-LR

Dear Administrative Judges:

In accordance with the Boards November 19, 2012 Revised Scheduling Order and Section 2.1203 and Section 2.336, the NRC staff is providing notice that it has updated the hearing file for this proceeding and has made it available to the parties. For any member of the public that wishes to inspect the hearing file, the Staff has created a separate folder in the agencys Electronic Hearing Docket (EHD) associated with this proceeding entitled Diablo Canyon Hearing File, and if any documents are produced for this period, the updated documents, along with an index listing the documents, will be published in that folder.

Respectfully Submitted, Signed (electronically) by Catherine E. Kanatas Counsel for NRC Staff U.S. Nuclear Regulatory Commission Office of the General Counsel Mail Stop - O-15D21 Washington, DC 20555 Telephone: (301) 415-2321 E-mail: catherine.kanatas@nrc.gov Date of signature: September 15, 2014

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of )

)

PACIFIC GAS AND ELECTRIC COMPANY ) 50-275-LR/ 50-3523-LR

)

(Diablo Canyon Nuclear Power Plant, )

Units 1 and 2) )

CERTIFICATE OF SERVICE Pursuant to 10 C.F.R. § 2.305 (revised) I hereby certify that copies of the foregoing SEPTEMBER 2014 HEARING FILE UPDATE LETTER, dated September 15, 2014, have been served upon the Electronic Information Exchange, the NRCs E-filing System, in the above captioned proceeding, this 15th day of September, 2014.

/Signed (electronically) by/

Catherine E. Kanatas Counsel for NRC Staff U.S. Nuclear Regulatory Commission Office of the General Counsel Mail Stop - O-15D21 Washington, DC 20555 Telephone: (301) 415-2321 E-mail: catherine.kanatas@nrc.gov Date of signature: September 15, 2014