ML14272A465: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(2 intermediate revisions by the same user not shown)
Line 9: Line 9:
| docket = 05000361, 05000362
| docket = 05000361, 05000362
| license number = NPF-010, NPF-015
| license number = NPF-010, NPF-015
| contact person = Wengert T J
| contact person = Wengert T
| document type = Meeting Briefing Package/Handouts, Slides and Viewgraphs
| document type = Meeting Briefing Package/Handouts, Slides and Viewgraphs
| page count = 5
| page count = 5
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:SONGS DECOMMISSIONING   CONTROL ROOM / COMMAND CENTER FUNCTION OPTIONS September 24, 2014 Meeting Agenda Topic Time Introduction 12:00 pm SONGS Decommissioning Plan/Schedule 12:10 pm Relocation of Main Control Room / Command Center Functions 12:20 pm NRC Feedback/Discussion on Command Center Option 1:10 pm Path Forward 1:30 pm Security Discussion (Closed Meeting) 1:35 pm Summary/Actions/Conclusion 1:55 pm 2 Security Discussion 3 Control Room Functional Requirement Comparisons 4 Design Requirement Operating Plant Proposed Decommissioning Security - Access Protected Area/Vital Area Access Controls Protected Area - Bullet Resistance 10 CFR 73.55 (protects plant safety controls) Not required (no plant controls in control room) - Cyber Security 10 CFR 73.54 (as functions require) 10 CFR 73.54 (as functions require)
{{#Wiki_filter:SONGS DECOMMISSIONING CONTROL ROOM / COMMAND CENTER FUNCTION OPTIONS September 24, 2014
 
Meeting Agenda Topic                                             Time Introduction                                     12:00 pm SONGS Decommissioning Plan/Schedule             12:10 pm Relocation of Main Control Room / Command Center 12:20 pm Functions NRC Feedback/Discussion on Command Center 1:10 pm Option Path Forward                                     1:30 pm Security Discussion (Closed Meeting)             1:35 pm Summary/Actions/Conclusion                       1:55 pm 2
 
Security Discussion 3
 
Control Room Functional Requirement Comparisons Design Requirement Operating Plant             Proposed Decommissioning Security
  - Access           Protected Area/Vital Area    Protected Area Access Controls
  - Bullet Resistance 10 CFR 73.55 (protects plant Not required (no plant safety controls)            controls in control room)
  - Cyber Security   10 CFR 73.54 (as functions   10 CFR 73.54 (as require)                    functions require) 4
 
Summary Actions/Conclusions 5}}
Summary Actions/Conclusions 5}}

Latest revision as of 00:53, 4 November 2019

SONGS Public Meeting Slides (Non-Public Portion) - Public Meeting September 24, 2014
ML14272A465
Person / Time
Site: San Onofre  Southern California Edison icon.png
Issue date: 09/24/2014
From:
Southern California Edison Co
To:
Office of Nuclear Reactor Regulation
Wengert T
References
Download: ML14272A465 (5)


Text

SONGS DECOMMISSIONING CONTROL ROOM / COMMAND CENTER FUNCTION OPTIONS September 24, 2014

Meeting Agenda Topic Time Introduction 12:00 pm SONGS Decommissioning Plan/Schedule 12:10 pm Relocation of Main Control Room / Command Center 12:20 pm Functions NRC Feedback/Discussion on Command Center 1:10 pm Option Path Forward 1:30 pm Security Discussion (Closed Meeting) 1:35 pm Summary/Actions/Conclusion 1:55 pm 2

Security Discussion 3

Control Room Functional Requirement Comparisons Design Requirement Operating Plant Proposed Decommissioning Security

- Access Protected Area/Vital Area Protected Area Access Controls

- Bullet Resistance 10 CFR 73.55 (protects plant Not required (no plant safety controls) controls in control room)

- Cyber Security 10 CFR 73.54 (as functions 10 CFR 73.54 (as require) functions require) 4

Summary Actions/Conclusions 5