Line 3: | Line 3: | ||
| issue date = 12/09/2014 | | issue date = 12/09/2014 | ||
| title = December 2014 Seismic Study Update Letter | | title = December 2014 Seismic Study Update Letter | ||
| author name = Post J | | author name = Post J, Repka D | ||
| author affiliation = Pacific Gas & Electric Co, Winston & Strawn, LLP | | author affiliation = Pacific Gas & Electric Co, Winston & Strawn, LLP | ||
| addressee name = Arnold G | | addressee name = Arnold G, Ryerson P, Trikouros N | ||
| addressee affiliation = NRC/ASLBP | | addressee affiliation = NRC/ASLBP | ||
| docket = 05000275, 05000323 | | docket = 05000275, 05000323 | ||
Line 16: | Line 16: | ||
=Text= | =Text= | ||
{{#Wiki_filter:December 9, 2014 by Electronic Information Exchange Administrative Judge Paul S. Ryerson Administrative Judge Nicholas G. Trikouros Administrative Judge Gary S. Arnold Atomic Safety and Licensing Board Panel | {{#Wiki_filter:December 9, 2014 by Electronic Information Exchange Administrative Judge Paul S. Ryerson Administrative Judge Nicholas G. Trikouros Administrative Judge Gary S. Arnold Atomic Safety and Licensing Board Panel U.S. Nuclear Regulatory Commission Two White Flint North 11545 Rockville Pike Mail Stop: T-3F23 Rockville, MD 20852 In the Matter of PACIFIC GAS AND ELECTRIC COMPANY (Diablo Canyon Power Plant, Units 1 and 2) | ||
Docket Nos. 50-275-LR and 50-323-LR RE: Status Report | |||
U.S. Nuclear Regulatory Commission Two White Flint North | |||
11545 Rockville Pike Mail Stop: T-3F23 | |||
Rockville, MD | |||
Docket Nos. 50-275-LR and 50-323-LR RE: | |||
==Dear Administrative Judges:== | ==Dear Administrative Judges:== | ||
As directed by the Licensing Board Order of June 7, 2011, Pacific Gas and Electric Company (PG&E) hereby provides its monthly report specifying its current best estimate of the dates on which it expects to complete milestones related to the coastal zone consistency certification associated with NRC license renewal for DCPP. PG&E issued the final seismic report in September 2014. PG&E plans to submit updates to the technical and environmental reports supporting DCPP license renewal in December 2014. PG&E will inform the NRC of the timing of any updated coastal consistency review filings as soon as possible. | |||
PG&E will continue to provide specific dates in the monthly reports to the extent practicable, recognizing that these dates may be modified as more accurate information becomes available. | PG&E will continue to provide specific dates in the monthly reports to the extent practicable, recognizing that these dates may be modified as more accurate information becomes available. | ||
cc: | Executed in accord with 10 CFR 2.304(d), | ||
/s/ signed electronically by Jennifer K. Post Attorney Pacific Gas and Electric Company 77 Beale St., B30A San Francisco, CA 94105 (415) 973-9809 jklm@pge.com | |||
/s/ signed electronically by David A. Repka Winston & Strawn LLP 1700 K Street, NW Washington, DC 20006 (202) 282-5726 drepka@winston.com cc: Docket No. 50-275, OL-DPR-80 Docket No. 50-323, OL-DPR-82 Service List (via Electronic Information Exchange) | |||
Pacific Gas and Electric Company Updated Best Estimate | Pacific Gas and Electric Company Updated Best Estimate Schedule for Seismic Studies Description of Activity Current Estimate Final Seismic Report Issued September 10, 2014(a) | ||
Response to NRC Request for Additional December 2014(b) | |||
Information for Safety and Environmental Reviews CZMA or Coastal Consistency File Coastal Development Permit TBD Coastal Consistency Issued TBD (a) | |||
Note: - Actual Date Completed (b) | |||
- Reference PG&E Letter DCL-14-043, dated June 4, 2014}} |
Latest revision as of 18:40, 31 October 2019
ML14343A987 | |
Person / Time | |
---|---|
Site: | Diablo Canyon |
Issue date: | 12/09/2014 |
From: | Post J, Repka D Pacific Gas & Electric Co, Winston & Strawn, LLP |
To: | Gary Arnold, Paul Ryerson, Nicholas Trikouros Atomic Safety and Licensing Board Panel |
SECY RAS | |
References | |
50-275-LR, 50-323-LR, ASLBP 10-900-01-LR-BD01, RAS 26997 | |
Download: ML14343A987 (3) | |
Text
December 9, 2014 by Electronic Information Exchange Administrative Judge Paul S. Ryerson Administrative Judge Nicholas G. Trikouros Administrative Judge Gary S. Arnold Atomic Safety and Licensing Board Panel U.S. Nuclear Regulatory Commission Two White Flint North 11545 Rockville Pike Mail Stop: T-3F23 Rockville, MD 20852 In the Matter of PACIFIC GAS AND ELECTRIC COMPANY (Diablo Canyon Power Plant, Units 1 and 2)
Docket Nos. 50-275-LR and 50-323-LR RE: Status Report
Dear Administrative Judges:
As directed by the Licensing Board Order of June 7, 2011, Pacific Gas and Electric Company (PG&E) hereby provides its monthly report specifying its current best estimate of the dates on which it expects to complete milestones related to the coastal zone consistency certification associated with NRC license renewal for DCPP. PG&E issued the final seismic report in September 2014. PG&E plans to submit updates to the technical and environmental reports supporting DCPP license renewal in December 2014. PG&E will inform the NRC of the timing of any updated coastal consistency review filings as soon as possible.
PG&E will continue to provide specific dates in the monthly reports to the extent practicable, recognizing that these dates may be modified as more accurate information becomes available.
Executed in accord with 10 CFR 2.304(d),
/s/ signed electronically by Jennifer K. Post Attorney Pacific Gas and Electric Company 77 Beale St., B30A San Francisco, CA 94105 (415) 973-9809 jklm@pge.com
/s/ signed electronically by David A. Repka Winston & Strawn LLP 1700 K Street, NW Washington, DC 20006 (202) 282-5726 drepka@winston.com cc: Docket No. 50-275, OL-DPR-80 Docket No. 50-323, OL-DPR-82 Service List (via Electronic Information Exchange)
Pacific Gas and Electric Company Updated Best Estimate Schedule for Seismic Studies Description of Activity Current Estimate Final Seismic Report Issued September 10, 2014(a)
Response to NRC Request for Additional December 2014(b)
Information for Safety and Environmental Reviews CZMA or Coastal Consistency File Coastal Development Permit TBD Coastal Consistency Issued TBD (a)
Note: - Actual Date Completed (b)