ML14343A987: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(3 intermediate revisions by the same user not shown)
Line 3: Line 3:
| issue date = 12/09/2014
| issue date = 12/09/2014
| title = December 2014 Seismic Study Update Letter
| title = December 2014 Seismic Study Update Letter
| author name = Post J K, Repka D A
| author name = Post J, Repka D
| author affiliation = Pacific Gas & Electric Co, Winston & Strawn, LLP
| author affiliation = Pacific Gas & Electric Co, Winston & Strawn, LLP
| addressee name = Arnold G S, Ryerson P S, Trikouros N G
| addressee name = Arnold G, Ryerson P, Trikouros N
| addressee affiliation = NRC/ASLBP
| addressee affiliation = NRC/ASLBP
| docket = 05000275, 05000323
| docket = 05000275, 05000323
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:December 9, 2014 by Electronic Information Exchange Administrative Judge Paul S. Ryerson Administrative Judge Nicholas G. Trikouros Administrative Judge Gary S. Arnold Atomic Safety and Licensing Board Panel U.S. Nuclear Regulatory Commission Two White Flint North 11545 Rockville Pike Mail Stop: T-3F23 Rockville, MD 20852 In the Matter of PACIFIC GAS AND ELECTRIC COMPANY (Diablo Canyon Power Plant, Units 1 and 2) Docket Nos. 50-275-LR and 50-323-LR RE: Status Report
{{#Wiki_filter:December 9, 2014 by Electronic Information Exchange Administrative Judge Paul S. Ryerson Administrative Judge Nicholas G. Trikouros Administrative Judge Gary S. Arnold Atomic Safety and Licensing Board Panel U.S. Nuclear Regulatory Commission Two White Flint North 11545 Rockville Pike Mail Stop: T-3F23 Rockville, MD 20852 In the Matter of PACIFIC GAS AND ELECTRIC COMPANY (Diablo Canyon Power Plant, Units 1 and 2)
Docket Nos. 50-275-LR and 50-323-LR RE: Status Report


==Dear Administrative Judges:==
==Dear Administrative Judges:==
As directed by the Licensing Board Order of June 7, 2011, Pacific Gas and Electric Company (PG&E) hereby provides its monthly report specifying its current best estimate of the dates on which it expects to complete milestones related to the coastal zone consistency certification associated with NRC license renewal for DCPP. PG&E issued the final seismic report in September 2014. PG&E plans to submit updates to the technical and environmental reports supporting DCPP license renewal in December 2014. PG&E will inform the NRC of the timing of any updated coastal consistency review filings as soon as possible.
As directed by the Licensing Board Order of June 7, 2011, Pacific Gas and Electric Company (PG&E) hereby provides its monthly report specifying its current best estimate of the dates on which it expects to complete milestones related to the coastal zone consistency certification associated with NRC license renewal for DCPP. PG&E issued the final seismic report in September 2014. PG&E plans to submit updates to the technical and environmental reports supporting DCPP license renewal in December 2014. PG&E will inform the NRC of the timing of any updated coastal consistency review filings as soon as possible.
PG&E will continue to provide specific dates in the monthly reports to the extent practicable, recognizing that these dates may be modified as more accurate information becomes available.
PG&E will continue to provide specific dates in the monthly reports to the extent practicable, recognizing that these dates may be modified as more accurate information becomes available.
Executed in accord with 10 CFR 2.304(d),     /s/ signed electronically by         Jennifer K. Post Attorney Pacific Gas and Electric Company 77 Beale St., B30A San Francisco, CA 94105 (415) 973-9809 jklm@pge.com       /s/ signed electronically by         David A. Repka Winston & Strawn LLP 1700 K Street, NW Washington, DC 20006 (202) 282-5726 drepka@winston.com cc: Docket No. 50-275, OL-DPR-80 Docket No. 50-323, OL-DPR-82 Service List (via Electronic Information Exchange)
 
Pacific Gas and Electric Company Updated Best Estimate Schedule for Seismic Studies Description of Activity Current Estimate Final Seismic Report Issued September 10, 2014(a) Response to NRC Request for Additional Information for Safety and Environmental Reviews December 2014(b) CZMA or Coastal Consistency File Coastal Development Permit TBD Coastal Consistency Issued TBD Note: (a) - Actual Date Completed   (b) - Reference PG&E Letter DCL-14-043, dated June 4, 2014}}
Executed in accord with 10 CFR 2.304(d),
                                            /s/ signed electronically by Jennifer K. Post Attorney Pacific Gas and Electric Company 77 Beale St., B30A San Francisco, CA 94105 (415) 973-9809 jklm@pge.com
                                            /s/ signed electronically by David A. Repka Winston & Strawn LLP 1700 K Street, NW Washington, DC 20006 (202) 282-5726 drepka@winston.com cc: Docket No. 50-275, OL-DPR-80 Docket No. 50-323, OL-DPR-82 Service List (via Electronic Information Exchange)
 
Pacific Gas and Electric Company Updated Best Estimate Schedule for Seismic Studies Description of Activity                   Current Estimate Final Seismic Report Issued                             September 10, 2014(a)
Response to NRC Request for Additional December 2014(b)
Information for Safety and Environmental Reviews CZMA or Coastal Consistency File Coastal Development Permit                                 TBD Coastal Consistency Issued                                       TBD (a)
Note:      - Actual Date Completed (b)
            - Reference PG&E Letter DCL-14-043, dated June 4, 2014}}

Latest revision as of 18:40, 31 October 2019

December 2014 Seismic Study Update Letter
ML14343A987
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 12/09/2014
From: Post J, Repka D
Pacific Gas & Electric Co, Winston & Strawn, LLP
To: Gary Arnold, Paul Ryerson, Nicholas Trikouros
Atomic Safety and Licensing Board Panel
SECY RAS
References
50-275-LR, 50-323-LR, ASLBP 10-900-01-LR-BD01, RAS 26997
Download: ML14343A987 (3)


Text

December 9, 2014 by Electronic Information Exchange Administrative Judge Paul S. Ryerson Administrative Judge Nicholas G. Trikouros Administrative Judge Gary S. Arnold Atomic Safety and Licensing Board Panel U.S. Nuclear Regulatory Commission Two White Flint North 11545 Rockville Pike Mail Stop: T-3F23 Rockville, MD 20852 In the Matter of PACIFIC GAS AND ELECTRIC COMPANY (Diablo Canyon Power Plant, Units 1 and 2)

Docket Nos. 50-275-LR and 50-323-LR RE: Status Report

Dear Administrative Judges:

As directed by the Licensing Board Order of June 7, 2011, Pacific Gas and Electric Company (PG&E) hereby provides its monthly report specifying its current best estimate of the dates on which it expects to complete milestones related to the coastal zone consistency certification associated with NRC license renewal for DCPP. PG&E issued the final seismic report in September 2014. PG&E plans to submit updates to the technical and environmental reports supporting DCPP license renewal in December 2014. PG&E will inform the NRC of the timing of any updated coastal consistency review filings as soon as possible.

PG&E will continue to provide specific dates in the monthly reports to the extent practicable, recognizing that these dates may be modified as more accurate information becomes available.

Executed in accord with 10 CFR 2.304(d),

/s/ signed electronically by Jennifer K. Post Attorney Pacific Gas and Electric Company 77 Beale St., B30A San Francisco, CA 94105 (415) 973-9809 jklm@pge.com

/s/ signed electronically by David A. Repka Winston & Strawn LLP 1700 K Street, NW Washington, DC 20006 (202) 282-5726 drepka@winston.com cc: Docket No. 50-275, OL-DPR-80 Docket No. 50-323, OL-DPR-82 Service List (via Electronic Information Exchange)

Pacific Gas and Electric Company Updated Best Estimate Schedule for Seismic Studies Description of Activity Current Estimate Final Seismic Report Issued September 10, 2014(a)

Response to NRC Request for Additional December 2014(b)

Information for Safety and Environmental Reviews CZMA or Coastal Consistency File Coastal Development Permit TBD Coastal Consistency Issued TBD (a)

Note: - Actual Date Completed (b)

- Reference PG&E Letter DCL-14-043, dated June 4, 2014