|
|
(10 intermediate revisions by the same user not shown) |
Line 2: |
Line 2: |
| | number = ML15041A723 | | | number = ML15041A723 |
| | issue date = 02/19/2015 | | | issue date = 02/19/2015 |
| | title = Donald C. Cook Nuclear Plant, Unit 2, Correction of Technical Specification Typographical Error Incurred During License Amendment No. 304 (TAC No. MF5673) | | | title = Correction of Technical Specification Typographical Error Incurred During License Amendment No. 304 |
| | author name = Chawla M L | | | author name = Chawla M |
| | author affiliation = NRC/NRR/DORL/LPLIII-1 | | | author affiliation = NRC/NRR/DORL/LPLIII-1 |
| | addressee name = Weber L J | | | addressee name = Weber L |
| | addressee affiliation = Indiana Michigan Power Co | | | addressee affiliation = Indiana Michigan Power Co |
| | docket = 05000316 | | | docket = 05000316 |
| | license number = DPR-074 | | | license number = DPR-074 |
| | contact person = Chawla M L | | | contact person = Chawla M |
| | case reference number = TAC MF5673 | | | case reference number = TAC MF5673 |
| | document type = Letter | | | document type = Letter |
Line 18: |
Line 18: |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 Mr. Lawrence J. Weber Senior Vice President and Chief Nuclear Officer Indiana Michigan Power Company Nuclear Generation Group One Cook Place Bridgman, Ml 49106 February 19, 2015 SUBJECT: DONALD C. COOK NUCLEAR PLANT, UNIT 2 -CORRECTION OF TECHNICAL SPECIFICATION TYPOGRAPHICAL ERROR INCURRED DURING LICENSE AMENDMENT NO. 304 (TAC NO. MF5673) Dear Mr. Weber: By letter dated March 22, 2013 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML 13046A114), the U.S. Nuclear Regulatory Commission (NRC) issued Amendment Nos. 320 and 304 to Renewed Facility Operating License Nos. DPR-58 and DPR-74 for Donald C. Cook Nuclear Plant (CNP), Units 1 and 2. The amendments modified the technical specifications (TSs) to adopt Technical Specifications Task Force (TSTF) Change Traveler TSTF-510. On February 2, 2015, the NRC was notified by letter from Michael Scarpello, Regulatory Affairs Manager (ADAMS Accession No. ML 15035A065), that errors had been identified page 5.6-4 of the TSs for CNP Unit 2. Specifically, an extraneous reference was listed under section 5.6.5 CORE OPERATING LIMITS REPORT (COLR) (continued). Also, in Section 5.6.6 Post Accident Monitoring Report, "Condition B or G of LCO 3.3.3" was incorrectly written as "Condition B or H of LCO 3.3.3." Condition H of LCO 3.3.3 does not exist in the CNP Unit 2 TSs. Both errors were introduced during the issuance of License Amendment No. 304. The NRC staff has determined that these were inadvertent typographical errors and are entirely editorial in nature. The proposed corrections do not change any of the conclusions in the safety evaluation associated with Amendment No. 304 for CNP Unit 2, and do not affect the associated notice to the public. Please find enclosed the replacement page. | | {{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 February 19, 2015 Mr. Lawrence J. Weber Senior Vice President and Chief Nuclear Officer Indiana Michigan Power Company Nuclear Generation Group One Cook Place Bridgman, Ml 49106 |
| L. Weber -2 -If you have any questions regarding this matter, please contact me at (301) 415-8371. Docket No. 50-316 Enclosure: Sincerely, Mahesh L. Chawla, Project Manager Plant Licensing Branch 111-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Corrected Pages to License Amendment No. 304 cc w/encl: Distribution via ListServ ENCLOSURE DONALD C. COOK NUCLEAR PLANT, UNIT 2 DOCKET NO. 50-316 CORRECTED PAGES TO LICENSE AMENDMENT NO. 304 TECHNICAL SPECIFICATIONS PAGE 5.6-4 5.6 Reporting Requirements 5.6.5 CORE OPERATING LIMITS REPORT (COLR) (continued) Reporting Requirements 5.6 7. WCAP-13749-P-A, "Safety Evaluation Supporting the Conditional Exemption of the Most Negative EOL Moderator Temperature Coefficient Measurement," (Westinghouse Proprietary); and 8. WCAP-12610-P-A & CENPD-404-P-A, Addendum 1-A, "Optimized ZIRLOŽ," July 2006 (Westinghouse Proprietary) c. The core operating limits shall be determined such that all applicable limits (e.g., fuel thermal mechanical limits, core thermal hydraulic limits, Emergency Core Cooling Systems (ECCS) limits, nuclear limits such as SDM, transient analysis limits, and accident analysis limits) of the safety analysis are met. d. The COLR, including any midcycle revisions or supplements, shall be provided upon issuance for each reload cycle to the NRC. 5.6.6 Post Accident Monitoring Report When a report is required by Condition B or G of LCO 3.3.3, "Post Accident Monitoring {PAM} Instrumentation," a report shall be submitted within the following 14 days. The report shall outline the preplanned alternate method of monitoring, the cause of the inoperabi!ity, and the plans and schedule for restoring the instrumentation channels of the Function to OPERABLE status. 5.6.7 Steam Generator Tube Inspection Report A report shall be submitted within 180 days after the initial entry into MODE 4 following completion of an inspection performed in accordance with the Specification 5.5.7, Steam Generator (SG) Program. The report shall include: a. The scope of inspections perlormed on each SG, b. Degradation mechanisms found, c. Nondestructive examination techniques utilized for each degradation mechanism, d. Location, orientation (if linear), and measured sizes (if available) of service induced indications, e. Number of tubes plugged during the inspection outage for each degradation, f. The number and percentages of tubes plugged to date, and the effective plugging percentage in each generator, and Cook Nuclear Plant Unit 2 5.6-4 Amendment No. 2-99, :rnJ, 2+9, .200, Corrected by letter of 2119/15 L. Weber -2 -If you have any questions regarding this matter, please contact me at (301) 415-8371. Docket No. 50-316 Enclosure: Sincerely, IRA/ Mahesh L. Chawla, Project Manager Plant Licensing Branch 111-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Corrected Pages to License Amendment No. 304 cc w/encl: Distribution via ListServ DISTRIBUTION: PUBLIC LPL3-1 r/f RidsNrrDorllpl3-1 Resource RidsNrrPMDCCook Resource RidsNrrLAMHendersonResource RidsAcrsAcnw_MailCTRResource RidsRg n3MailCenterResou rce RecordsAmend Resource ADAMS Accession No.: ML 15041A723 OFFICE LPL3-1/PMiT LPL3-1/PM LPL3-1/LA DSS/STSB/BC NAME ADietrich MChawla MHenderson RElliott DATE 2/10/2015 02/11/2015 02/12/2015 2/19/2015 OFFICIAL RECORD COPY LPL3-1/BC LPL3-1/PM DPelton MChawla 02/19/2015 02/19/2015 | | |
| }} | | ==SUBJECT:== |
| | DONALD C. COOK NUCLEAR PLANT, UNIT 2 - CORRECTION OF TECHNICAL SPECIFICATION TYPOGRAPHICAL ERROR INCURRED DURING LICENSE AMENDMENT NO. 304 (TAC NO. MF5673) |
| | |
| | ==Dear Mr. Weber:== |
| | |
| | By letter dated March 22, 2013 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML13046A114), the U.S. Nuclear Regulatory Commission (NRC) issued Amendment Nos. 320 and 304 to Renewed Facility Operating License Nos. DPR-58 and DPR-74 for Donald C. Cook Nuclear Plant (CNP), Units 1 and 2. The amendments modified the technical specifications (TSs) to adopt Technical Specifications Task Force (TSTF) Change Traveler TSTF-510. |
| | On February 2, 2015, the NRC was notified by letter from Michael Scarpello, Regulatory Affairs Manager (ADAMS Accession No. ML15035A065), that errors had been identified page 5.6-4 of the TSs for CNP Unit 2. Specifically, an extraneous reference was listed under section 5.6.5 CORE OPERATING LIMITS REPORT (COLR) (continued). Also, in Section 5.6.6 Post Accident Monitoring Report, "Condition B or G of LCO 3.3.3" was incorrectly written as "Condition B or H of LCO 3.3.3." Condition H of LCO 3.3.3 does not exist in the CNP Unit 2 TSs. Both errors were introduced during the issuance of License Amendment No. 304. |
| | The NRC staff has determined that these were inadvertent typographical errors and are entirely editorial in nature. The proposed corrections do not change any of the conclusions in the safety evaluation associated with Amendment No. 304 for CNP Unit 2, and do not affect the associated notice to the public. Please find enclosed the replacement page. |
| | |
| | L. Weber If you have any questions regarding this matter, please contact me at (301) 415-8371. |
| | Sincerely, Mahesh L. Chawla, Project Manager Plant Licensing Branch 111-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-316 |
| | |
| | ==Enclosure:== |
| | |
| | Corrected Pages to License Amendment No. 304 cc w/encl: Distribution via ListServ |
| | |
| | ENCLOSURE DONALD C. COOK NUCLEAR PLANT, UNIT 2 DOCKET NO. 50-316 CORRECTED PAGES TO LICENSE AMENDMENT NO. 304 TECHNICAL SPECIFICATIONS PAGE 5.6-4 |
| | |
| | Reporting Requirements 5.6 5.6 Reporting Requirements 5.6.5 CORE OPERATING LIMITS REPORT (COLR) (continued) |
| | : 7. WCAP-13749-P-A, "Safety Evaluation Supporting the Conditional Exemption of the Most Negative EOL Moderator Temperature Coefficient Measurement," (Westinghouse Proprietary); and |
| | : 8. WCAP-12610-P-A & CENPD-404-P-A, Addendum 1-A, "Optimized ZIRLO'," July 2006 (Westinghouse Proprietary) |
| | : c. The core operating limits shall be determined such that all applicable limits (e.g., fuel thermal mechanical limits, core thermal hydraulic limits, Emergency Core Cooling Systems (ECCS) limits, nuclear limits such as SDM, transient analysis limits, and accident analysis limits) of the safety analysis are met. |
| | : d. The COLR, including any midcycle revisions or supplements, shall be provided upon issuance for each reload cycle to the NRC. |
| | 5.6.6 Post Accident Monitoring Report When a report is required by Condition B or G of LCO 3.3.3, "Post Accident Monitoring {PAM} Instrumentation," a report shall be submitted within the following 14 days. The report shall outline the preplanned alternate method of monitoring, the cause of the inoperabi!ity, and the plans and schedule for restoring the instrumentation channels of the Function to OPERABLE status. |
| | 5.6.7 Steam Generator Tube Inspection Report A report shall be submitted within 180 days after the initial entry into MODE 4 following completion of an inspection performed in accordance with the Specification 5.5.7, Steam Generator (SG) Program. The report shall include: |
| | : a. The scope of inspections perlormed on each SG, |
| | : b. Degradation mechanisms found, |
| | : c. Nondestructive examination techniques utilized for each degradation mechanism, |
| | : d. Location, orientation (if linear), and measured sizes (if available) of service induced indications, |
| | : e. Number of tubes plugged during the inspection outage for each degradation, |
| | : f. The number and percentages of tubes plugged to date, and the effective plugging percentage in each generator, and Cook Nuclear Plant Unit 2 5.6-4 Amendment No. 2-99, :rnJ, 2+9, .200, ~ |
| | JOO,~. Corrected by letter of 2119/15 |
| | |
| | ML15041A723 OFFICE LPL3-1/PMiT LPL3-1/PM LPL3-1/LA DSS/STSB/BC LPL3-1/BC LPL3-1/PM NAME ADietrich MChawla MHenderson RElliott DPelton MChawla DATE 2/10/2015 02/11/2015 02/12/2015 2/19/2015 02/19/2015 02/19/2015}} |
Letter Sequence Other |
---|
|
|
MONTHYEARML15041A7232015-02-19019 February 2015 Correction of Technical Specification Typographical Error Incurred During License Amendment No. 304 Project stage: Other 2015-02-19
[Table View] |
Similar Documents at Cook |
---|
Category:Letter
MONTHYEARIR 05000315/20240032024-10-31031 October 2024 Integrated Inspection Report 05000315/2024003 05000316/2024003 07200072/2024001 and Exercise of Enforcement Discretion AEP-NRC-2024-77, U2C28 Steam Generator Tube Inspection Report2024-10-21021 October 2024 U2C28 Steam Generator Tube Inspection Report AEP-NRC-2024-80, Independent Spent Fuel Storage Installation Registration of Dry Spent Fuel Storage Cask2024-10-15015 October 2024 Independent Spent Fuel Storage Installation Registration of Dry Spent Fuel Storage Cask AEP-NRC-2024-79, Unit 2, Independent Spent Fuel Storage Installation - Registration of Dry Spent Storage Cask2024-09-26026 September 2024 Unit 2, Independent Spent Fuel Storage Installation - Registration of Dry Spent Storage Cask AEP-NRC-2024-78, Reply to a Notice of Violation: EA-24-0472024-09-23023 September 2024 Reply to a Notice of Violation: EA-24-047 05000316/LER-2024-002-01, Manual Reactor Trip Following Rapid Downpower for Steam Leak2024-09-12012 September 2024 Manual Reactor Trip Following Rapid Downpower for Steam Leak IR 05000315/20244022024-09-10010 September 2024 Security Baseline Inspection Report 05000315/2024402 and 05000316/2024402, Independent Spent Fuel Storage Installation Security Inspection Report 07200072/2024401 AEP-NRC-2024-69, Core Operating Limits Report2024-09-0909 September 2024 Core Operating Limits Report IR 05000315/20243012024-09-0505 September 2024 NRC Initial License Examination Report 05000315/2024301 and 05000316/2024301 ML24225A0022024-09-0303 September 2024 Issuance of Amendment Nos. 363 and 344 Revising Technical Specifications Section 3.8.1, AC Sources-Operating, for a One-Time Extension of a Completion Time IR 05000315/20240112024-08-30030 August 2024 NRC Inspection Report 05000315/2024011 and 05000316/2024011 and Notice of Violation AEP-NRC-2024-76, Unit 2 - Supplement to License Amendment Request for One-Time Extension of Completion Time for Inoperable AC Source - Operating2024-08-28028 August 2024 Unit 2 - Supplement to License Amendment Request for One-Time Extension of Completion Time for Inoperable AC Source - Operating AEP-NRC-2024-51, Annual Report of Loss-Of-Coolant Accident Evaluation Model Changes2024-08-28028 August 2024 Annual Report of Loss-Of-Coolant Accident Evaluation Model Changes 05000316/LER-2024-003, Plant Shutdown Required by Technical Specifications Due to Reactor Coolant System Identified Leakage2024-08-22022 August 2024 Plant Shutdown Required by Technical Specifications Due to Reactor Coolant System Identified Leakage IR 05000315/20240052024-08-21021 August 2024 Updated Inspection Plan for Donald C. Cook Nuclear Plant, Units 1 and 2 (Report 05000315/2024005 and 05000316/2024005) AEP-NRC-2024-61, Unit 2 - Response to Request for Additional Information for Neutron Flux Instrumentation License Amendment Request2024-08-15015 August 2024 Unit 2 - Response to Request for Additional Information for Neutron Flux Instrumentation License Amendment Request ML24221A2702024-08-0808 August 2024 Unit 2 Independent Spent Fuel Storage Installation - Registration of Dry Spent Fuel Storage Cask AEP-NRC-2024-62, Unit 2, Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Cask2024-08-0707 August 2024 Unit 2, Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Cask ML24256A1482024-08-0202 August 2024 2024 Post Examination Submittal Letter AEP-NRC-2024-47, Form OAR-1, Owners Activity Report2024-07-30030 July 2024 Form OAR-1, Owners Activity Report ML24183A0162024-07-25025 July 2024 Review of Reactor Vessel Material Surveillance Program Capsule W Technical Report ML24169A2142024-07-25025 July 2024 Issuance of Amendment No. 362 Regarding Change to Technical Specification 3.4.12, Low Temperature Overpressure Protection System IR 05000315/20240022024-07-24024 July 2024 Integrated Inspection Report 05000315/2024002 and 05000316/2024002 05000316/LER-2024-002, Manual Reactor Trip Following Rapid Downpower for Steam Leak2024-07-15015 July 2024 Manual Reactor Trip Following Rapid Downpower for Steam Leak ML24197A1262024-07-15015 July 2024 Unit 2 - Request for Additional Information (RAI) for License Amendment Request for One-Time Extension of Completion Time for Inoperable AC Source - Operating ML24191A0692024-07-0909 July 2024 Operator Licensing Examination Approval - Donald C. Cook Nuclear Power Plant, July 2024 AEP-NRC-2024-56, Unit 2, Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Cask2024-07-0808 July 2024 Unit 2, Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Cask AEP-NRC-2024-48, Response to Request for Additional Information (RAI) for License Amendment Request for One-Time Extension of Completion Time for Inoperable AC Source - Operating2024-07-0202 July 2024 Response to Request for Additional Information (RAI) for License Amendment Request for One-Time Extension of Completion Time for Inoperable AC Source - Operating ML24176A1012024-06-21021 June 2024 57143-EN 57143 - Paragon Energy Solutions - Update 1 (Final) - 10CFR Part 21 Final Notification: P21-05242024-FN, Rev. 0 AEP-NRC-2024-45, Report Per Technical Specification 5.6.6 for Inoperability of Post Accident Monitoring Neutron Flux Monitoring2024-06-13013 June 2024 Report Per Technical Specification 5.6.6 for Inoperability of Post Accident Monitoring Neutron Flux Monitoring ML24163A0132024-06-12012 June 2024 Request for Information for the NRC Age-Related Degradation Inspection: Inspection Report 05000315/2024012 and 05000316/2024012 ML24159A2522024-05-30030 May 2024 10 CFR 50.71(e) Update and Related Site Change Reports AEP-NRC-2024-23, Core Operating Limits Report2024-05-23023 May 2024 Core Operating Limits Report ML24141A2162024-05-20020 May 2024 —Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection 05000316/LER-2024-001, Reactor Trip Due to Main Turbine Trip from a High-High Thrust Bearing Position Trip2024-05-20020 May 2024 Reactor Trip Due to Main Turbine Trip from a High-High Thrust Bearing Position Trip AEP-NRC-2024-40, Unit 2 - Supplement to License Amendment Request for One-Time Extension of Completion Time for Inoperable AC Source - Operating2024-05-16016 May 2024 Unit 2 - Supplement to License Amendment Request for One-Time Extension of Completion Time for Inoperable AC Source - Operating AEP-NRC-2024-41, Annual Radiological Environmental Operating Report2024-05-15015 May 2024 Annual Radiological Environmental Operating Report AEP-NRC-2024-26, Transmittal of Donald C. Cook Nuclear Plant, Emergency Plan Revision 492024-05-14014 May 2024 Transmittal of Donald C. Cook Nuclear Plant, Emergency Plan Revision 49 IR 05000315/20244012024-05-14014 May 2024 – Security Baseline Inspection Report 05000315/2024401 and 05000316/2024401 AEP-NRC-2024-07, Unit 2 - Transmittal of Report of Changes to the Emergency Plan2024-05-14014 May 2024 Unit 2 - Transmittal of Report of Changes to the Emergency Plan IR 05000315/20240012024-05-14014 May 2024 Integrated Inspection Report 05000315/2024001 and 05000316/2024001 ML24115A2152024-05-0707 May 2024 LTR: CNP Non-Acceptance with Opportunity TS 3-8-1 AEP-NRC-2024-24, Form OAR-1, Owners Activity Report2024-05-0707 May 2024 Form OAR-1, Owners Activity Report ML24256A1472024-05-0606 May 2024 DC Cook 2024 NRC Examination Submittal Letter: Submittal ML24116A0002024-05-0202 May 2024 – Regulatory Audit in Support of Review of the Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors AEP-NRC-2024-35, Response to NRC Regulatory Issue Summary 2024-01 Preparation and Scheduling of Operator Licensing Examinations2024-04-30030 April 2024 Response to NRC Regulatory Issue Summary 2024-01 Preparation and Scheduling of Operator Licensing Examinations AEP-NRC-2024-28, 2023 Annual Radioactive Effluent Release Report2024-04-29029 April 2024 2023 Annual Radioactive Effluent Release Report AEP-NRC-2024-31, Annual Report of Individual Monitoring2024-04-24024 April 2024 Annual Report of Individual Monitoring AEP-NRC-2024-29, (CNP) Unit 2 - Request for Relief Related to American Society of Mechanical Engineers (ASME) Code Case N-729-6 Supplemental Examination Requirements, ISIR-5-072024-04-0303 April 2024 (CNP) Unit 2 - Request for Relief Related to American Society of Mechanical Engineers (ASME) Code Case N-729-6 Supplemental Examination Requirements, ISIR-5-07 AEP-NRC-2024-02, Unit 2 License Amendment Request for One-Time Extension of Completion Time for Inoperable AC Source - Operating2024-04-0303 April 2024 Unit 2 License Amendment Request for One-Time Extension of Completion Time for Inoperable AC Source - Operating 2024-09-09
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 February 19, 2015 Mr. Lawrence J. Weber Senior Vice President and Chief Nuclear Officer Indiana Michigan Power Company Nuclear Generation Group One Cook Place Bridgman, Ml 49106
SUBJECT:
DONALD C. COOK NUCLEAR PLANT, UNIT 2 - CORRECTION OF TECHNICAL SPECIFICATION TYPOGRAPHICAL ERROR INCURRED DURING LICENSE AMENDMENT NO. 304 (TAC NO. MF5673)
Dear Mr. Weber:
By letter dated March 22, 2013 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML13046A114), the U.S. Nuclear Regulatory Commission (NRC) issued Amendment Nos. 320 and 304 to Renewed Facility Operating License Nos. DPR-58 and DPR-74 for Donald C. Cook Nuclear Plant (CNP), Units 1 and 2. The amendments modified the technical specifications (TSs) to adopt Technical Specifications Task Force (TSTF) Change Traveler TSTF-510.
On February 2, 2015, the NRC was notified by letter from Michael Scarpello, Regulatory Affairs Manager (ADAMS Accession No. ML15035A065), that errors had been identified page 5.6-4 of the TSs for CNP Unit 2. Specifically, an extraneous reference was listed under section 5.6.5 CORE OPERATING LIMITS REPORT (COLR) (continued). Also, in Section 5.6.6 Post Accident Monitoring Report, "Condition B or G of LCO 3.3.3" was incorrectly written as "Condition B or H of LCO 3.3.3." Condition H of LCO 3.3.3 does not exist in the CNP Unit 2 TSs. Both errors were introduced during the issuance of License Amendment No. 304.
The NRC staff has determined that these were inadvertent typographical errors and are entirely editorial in nature. The proposed corrections do not change any of the conclusions in the safety evaluation associated with Amendment No. 304 for CNP Unit 2, and do not affect the associated notice to the public. Please find enclosed the replacement page.
L. Weber If you have any questions regarding this matter, please contact me at (301) 415-8371.
Sincerely, Mahesh L. Chawla, Project Manager Plant Licensing Branch 111-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-316
Enclosure:
Corrected Pages to License Amendment No. 304 cc w/encl: Distribution via ListServ
ENCLOSURE DONALD C. COOK NUCLEAR PLANT, UNIT 2 DOCKET NO. 50-316 CORRECTED PAGES TO LICENSE AMENDMENT NO. 304 TECHNICAL SPECIFICATIONS PAGE 5.6-4
Reporting Requirements 5.6 5.6 Reporting Requirements 5.6.5 CORE OPERATING LIMITS REPORT (COLR) (continued)
- 7. WCAP-13749-P-A, "Safety Evaluation Supporting the Conditional Exemption of the Most Negative EOL Moderator Temperature Coefficient Measurement," (Westinghouse Proprietary); and
- 8. WCAP-12610-P-A & CENPD-404-P-A, Addendum 1-A, "Optimized ZIRLO'," July 2006 (Westinghouse Proprietary)
- c. The core operating limits shall be determined such that all applicable limits (e.g., fuel thermal mechanical limits, core thermal hydraulic limits, Emergency Core Cooling Systems (ECCS) limits, nuclear limits such as SDM, transient analysis limits, and accident analysis limits) of the safety analysis are met.
- d. The COLR, including any midcycle revisions or supplements, shall be provided upon issuance for each reload cycle to the NRC.
5.6.6 Post Accident Monitoring Report When a report is required by Condition B or G of LCO 3.3.3, "Post Accident Monitoring {PAM} Instrumentation," a report shall be submitted within the following 14 days. The report shall outline the preplanned alternate method of monitoring, the cause of the inoperabi!ity, and the plans and schedule for restoring the instrumentation channels of the Function to OPERABLE status.
5.6.7 Steam Generator Tube Inspection Report A report shall be submitted within 180 days after the initial entry into MODE 4 following completion of an inspection performed in accordance with the Specification 5.5.7, Steam Generator (SG) Program. The report shall include:
- a. The scope of inspections perlormed on each SG,
- b. Degradation mechanisms found,
- c. Nondestructive examination techniques utilized for each degradation mechanism,
- d. Location, orientation (if linear), and measured sizes (if available) of service induced indications,
- e. Number of tubes plugged during the inspection outage for each degradation,
- f. The number and percentages of tubes plugged to date, and the effective plugging percentage in each generator, and Cook Nuclear Plant Unit 2 5.6-4 Amendment No. 2-99, :rnJ, 2+9, .200, ~
JOO,~. Corrected by letter of 2119/15
ML15041A723 OFFICE LPL3-1/PMiT LPL3-1/PM LPL3-1/LA DSS/STSB/BC LPL3-1/BC LPL3-1/PM NAME ADietrich MChawla MHenderson RElliott DPelton MChawla DATE 2/10/2015 02/11/2015 02/12/2015 2/19/2015 02/19/2015 02/19/2015