ML15083A059: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(One intermediate revision by the same user not shown)
Line 3: Line 3:
| issue date = 03/06/2015
| issue date = 03/06/2015
| title = 2015 Point Beach Nuclear Plant Initial License Examination Form ES-201-1
| title = 2015 Point Beach Nuclear Plant Initial License Examination Form ES-201-1
| author name = McNeil D R
| author name = Mcneil D
| author affiliation = NRC/RGN-III/DRS/OLB
| author affiliation = NRC/RGN-III/DRS/OLB
| addressee name =  
| addressee name =  
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:ES-201, Rev. 9 Examination Preparation Checklist Form ES-201-1   Facility:
{{#Wiki_filter:ES-201, Rev. 9                           Examination Preparation Checklist                           Form ES-201-1 Facility:   Point Beach Nuclear Power Plant                                 Date of Examination: 03/04/2015 Developed by: Written - Facility                   NRC       // Operating - Facility         NRC     n/a Chief Target Task Description (Reference)                               Examiner=s Date*
Point Beach Nuclear Power Plant Date of Examination:
Initials
0 3/04/20 1 5  Developed by: Written  
    -180         1. Examination administration date confirmed (C.1.a; C.2.a and b)                         dm
- Facility       NRC     //   Operating  
    -120         2. NRC examiners and facility contact assigned (C.1.d; C.2.e)                             dm
- Facility      NRC    n/a Target Date* Task Description (Reference)
    -120         3. Facility contact briefed on security and other requirements (C.2.c)                   dm
Chief Examiner=s Initials -180 1. Examination administration date confirmed (C.1.a; C.2.a and b) dm -120 2. NRC examiners and facility contact assigned (C.1.d; C.2.e) dm -120 3. Facility contact briefed on security and other requirements (C.2.c) dm -120 4. Corporate notification letter sent (C.2.d) dm [-90] [5. Reference material due (C.1.e; C.3.c; Attachment 2)]
    -120         4. Corporate notification letter sent (C.2.d)                                             dm
dm  {-75} 6. Integrated examination outline(s) due, including Forms ES
[-90]         [5. Reference material due (C.1.e; C.3.c; Attachment 2)]                                   dm
-201-2, ES-201-3, ES-301-1, ES-301-2, ES-301-5, ES-D-1's, ES-401-1/2, ES-401-3, and ES-401-4, as applicable (C.1.e and f; C.3.d) dm  {-70} {7. Examination outline(s) reviewed by NRC and feedback provided to facility licensee (C.2.h; C.3.e)}
: 6. Integrated examination outline(s) due, including Forms ES-201-2, ES-201-
dm  {-45} 8. Proposed examinations (including written, walk
{-75}              3, ES-301-1, ES-301-2, ES-301-5, ES-D-1's, ES-401-1/2, ES-401-3, and                   dm ES-401-4, as applicable (C.1.e and f; C.3.d)
-through JPMs, and scenarios, as applicable), supporting documentation (including Forms ES-301-3, ES-301-4, ES-301-5, ES-301-6, and ES-401-6, and any Form ES-201-3 updates), and reference materials due (C.1.e, f, g and h; C.3.d) dm  -30 9. Preliminary license applications (NRC Form 398s) due (C.1.l; C.2.g; ES-202) dm  -14 10. Final license applications due and Form ES
{7. Examination outline(s) reviewed by NRC and feedback provided to facility
-201-4 prepared (C.1.l; C.2.i; ES-202) dm  -14 11. Examination approved by NRC supervisor for facility licensee review (C.2.h; C.3.f) dm  -14 12. Examinations reviewed with facility licensee (C.1.j; C.2.f and h; C.3.g) dm -7 13. Written examinations and operating tests approved by NRC supervisor (C.2.i; C.3.h) dm  -7 14. Final applications reviewed; 1 or 2 (if >10) applications audited to confirm qualifications / eligibility; and examination approval and waiver letters sent (C.2.i; Attachment 4; ES
{-70}                                                                                                    dm licensee (C.2.h; C.3.e)}
-202, C.2.e; ES
: 8. Proposed examinations (including written, walk-through JPMs, and scenarios, as applicable), supporting documentation (including Forms
-204) dm  -7 15. Proctoring/written exam administration guidelines reviewed with facility licensee (C.3.k) dm  -7 16. Approved scenarios, job performance measures, and questions distributed to NRC examiners (C.3.i) dm
{-45}                                                                                                    dm ES-301-3, ES-301-4, ES-301-5, ES-301-6, and ES-401-6, and any Form ES-201-3 updates), and reference materials due (C.1.e, f, g and h; C.3.d)
* Target dates are generally based on facility-prepared examinations and are keyed to the examination date identified in the corporate notification letter. They are for planning purposes and may be adjusted on a case
: 9. Preliminary license applications (NRC Form 398s) due (C.1.l; C.2.g;
-by-case basis in coordination with the facility licensee.
    -30                                                                                                      dm ES-202)
: 10. Final license applications due and Form ES-201-4 prepared (C.1.l; C.2.i;
    -14                                                                                                      dm ES-202)
: 11. Examination approved by NRC supervisor for facility licensee review
    -14                                                                                                      dm (C.2.h; C.3.f)
    -14         12. Examinations reviewed with facility licensee (C.1.j; C.2.f and h; C.3.g)               dm
: 13. Written examinations and operating tests approved by NRC supervisor
      -7                                                                                                      dm (C.2.i; C.3.h)
: 14. Final applications reviewed; 1 or 2 (if >10) applications audited to confirm
      -7              qualifications / eligibility; and examination approval and waiver letters sent         dm (C.2.i; Attachment 4; ES-202, C.2.e; ES-204)
: 15. Proctoring/written exam administration guidelines reviewed
      -7                                                                                                      dm with facility licensee (C.3.k)
: 16. Approved scenarios, job performance measures, and questions
      -7                                                                                                      dm distributed to NRC examiners (C.3.i)
* Target dates are generally based on facility-prepared examinations and are keyed to the examination date identified in the corporate notification letter. They are for planning purposes and may be adjusted on a case-by-case basis in coordination with the facility licensee.
[Applies only] {Does not apply} to examinations prepared by the NRC.}}
[Applies only] {Does not apply} to examinations prepared by the NRC.}}

Latest revision as of 14:02, 31 October 2019

2015 Point Beach Nuclear Plant Initial License Examination Form ES-201-1
ML15083A059
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 03/06/2015
From: Mcneil D
NRC/RGN-III/DRS/OLB
To:
Florida Power & Light Energy Point Beach
References
Download: ML15083A059 (1)


Text

ES-201, Rev. 9 Examination Preparation Checklist Form ES-201-1 Facility: Point Beach Nuclear Power Plant Date of Examination: 03/04/2015 Developed by: Written - Facility NRC // Operating - Facility NRC n/a Chief Target Task Description (Reference) Examiner=s Date*

Initials

-180 1. Examination administration date confirmed (C.1.a; C.2.a and b) dm

-120 2. NRC examiners and facility contact assigned (C.1.d; C.2.e) dm

-120 3. Facility contact briefed on security and other requirements (C.2.c) dm

-120 4. Corporate notification letter sent (C.2.d) dm

[-90] [5. Reference material due (C.1.e; C.3.c; Attachment 2)] dm

6. Integrated examination outline(s) due, including Forms ES-201-2, ES-201-

{-75} 3, ES-301-1, ES-301-2, ES-301-5, ES-D-1's, ES-401-1/2, ES-401-3, and dm ES-401-4, as applicable (C.1.e and f; C.3.d)

{7. Examination outline(s) reviewed by NRC and feedback provided to facility

{-70} dm licensee (C.2.h; C.3.e)}

8. Proposed examinations (including written, walk-through JPMs, and scenarios, as applicable), supporting documentation (including Forms

{-45} dm ES-301-3, ES-301-4, ES-301-5, ES-301-6, and ES-401-6, and any Form ES-201-3 updates), and reference materials due (C.1.e, f, g and h; C.3.d)

9. Preliminary license applications (NRC Form 398s) due (C.1.l; C.2.g;

-30 dm ES-202)

10. Final license applications due and Form ES-201-4 prepared (C.1.l; C.2.i;

-14 dm ES-202)

11. Examination approved by NRC supervisor for facility licensee review

-14 dm (C.2.h; C.3.f)

-14 12. Examinations reviewed with facility licensee (C.1.j; C.2.f and h; C.3.g) dm

13. Written examinations and operating tests approved by NRC supervisor

-7 dm (C.2.i; C.3.h)

14. Final applications reviewed; 1 or 2 (if >10) applications audited to confirm

-7 qualifications / eligibility; and examination approval and waiver letters sent dm (C.2.i; Attachment 4; ES-202, C.2.e; ES-204)

15. Proctoring/written exam administration guidelines reviewed

-7 dm with facility licensee (C.3.k)

16. Approved scenarios, job performance measures, and questions

-7 dm distributed to NRC examiners (C.3.i)

  • Target dates are generally based on facility-prepared examinations and are keyed to the examination date identified in the corporate notification letter. They are for planning purposes and may be adjusted on a case-by-case basis in coordination with the facility licensee.

[Applies only] {Does not apply} to examinations prepared by the NRC.