ML15155B411: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
(8 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML15155B411
| number = ML15155B411
| issue date = 06/03/2015
| issue date = 06/03/2015
| title = NRC E-mail to ACE Dated June 3, 2015 - Questions from the Limerick Aam On May, 21, 2015 - [Edats R1-2015-0195]
| title = NRC E-mail to ACE Dated June 3, 2015 - Questions from the Limerick Aam on May, 21, 2015 - (EDATS R1-2015-0195)
| author name = Bower F L
| author name = Bower F
| author affiliation = NRC/RGN-I/DRP/PB4
| author affiliation = NRC/RGN-I/DRP/PB4
| addressee name = Cuthbert L
| addressee name = Cuthbert L
Line 15: Line 15:
| page count = 1
| page count = 1
}}
}}
=Text=
{{#Wiki_filter:From:                        Bower, Fred Sent:                        Wednesday, June 03, 2015 5:00 PM To:                          ACEActivists@comcast.net Cc:                          Klukan, Brett; R1ALLEGATION RESOURCE; Ennis, Rick; Scott, Michael; Nieh, Ho; OPA1 RESOURCE; Bower, Fred; Screnci, Diane; Sheehan, Neil; Tifft, Doug; McNamara, Nancy; Broaddus, Doug; Barber, Scott; Jackson, Christopher; OPA1 RESOURCE
==Subject:==
ACE - Questions from the Limerick AAM on May, 21, 2015 - [EDATS R1-2015-0195]
The Alliance for a Clean Environment (ACE)
ACE - Questions from the Limerick AAM on May, 21, 2015 - [EDATS R1-2015-0195]
==Dear Dr. Cuthbert (ACE),==
On May 21, 2015, the U. S. Nuclear Regulatory Commission (NRC) conducted a public open house at the Limerick Township Municipal Building in Limerick, PA. The NRC conducted the Annual Assessment Meeting (AAM) open house to discuss its assessment of the safety performance at Limerick Generating Station (LGS) for 2014. A summary of this meeting can be located in ADAMS using accession number ML15147A615. Publically available ADAMS documents can be located by entering accession number (ML) into the search box in the upper right corner of our homepage at www.nrc.gov.
At this meeting, the Deputy Director of the Division of Reactor Projects in the Region I office of the NRC, Mr. Michael Scott, accepted the following three questions from you.
: 1. What is the highest burnup to which Limerick Generating Station (LGS) licensed to fuel and when did they get that level authorized?
: 2. Has spent fuel from other plants been shipped to LGS?
: 3. Where does low level radioactive waste from LGS go?
Mr. Scott has requested that I respond to ACE with answers to these questions.
Regarding the third question, I note in an email (ML14118A047) dated April 24, 2014, Region I has previously fully responded to this ACE question. I trust this is sufficiently responsive.
I have previously responded to several inquiries from ACE regarding high burnup nuclear fuel.
Regarding the above questions numbered 1 and 2, I have determined that both involve licensing information and require coordination with staff in the NRCs Office of Nuclear Reactor Regulation (NRR) in our Rockville, Maryland offices to develop a response. After coordination with NRRs project manager for LGS, we will respond to these two questions when we are able and likely within 30 - 60 days.
Sincerely,
Fred Bower USNRC Region I Branch Chief with Oversight Responsibility for Limerick, Peach Bottom and Susquehanna l 2100 Renaissance Boulevard, STE 100, King of Prussia, PA 19406 l l: (610) 337-5200 l}}

Latest revision as of 11:37, 31 October 2019

NRC E-mail to ACE Dated June 3, 2015 - Questions from the Limerick Aam on May, 21, 2015 - (EDATS R1-2015-0195)
ML15155B411
Person / Time
Site: Limerick  Constellation icon.png
Issue date: 06/03/2015
From: Fred Bower
Reactor Projects Region 1 Branch 4
To: Cuthbert L
Alliance For A Clean Environment
BOWER, FL
Shared Package
ML15146A181 List:
References
EDATS RI-2015-0195
Download: ML15155B411 (1)


Text

From: Bower, Fred Sent: Wednesday, June 03, 2015 5:00 PM To: ACEActivists@comcast.net Cc: Klukan, Brett; R1ALLEGATION RESOURCE; Ennis, Rick; Scott, Michael; Nieh, Ho; OPA1 RESOURCE; Bower, Fred; Screnci, Diane; Sheehan, Neil; Tifft, Doug; McNamara, Nancy; Broaddus, Doug; Barber, Scott; Jackson, Christopher; OPA1 RESOURCE

Subject:

ACE - Questions from the Limerick AAM on May, 21, 2015 - [EDATS R1-2015-0195]

The Alliance for a Clean Environment (ACE)

ACE - Questions from the Limerick AAM on May, 21, 2015 - [EDATS R1-2015-0195]

Dear Dr. Cuthbert (ACE),

On May 21, 2015, the U. S. Nuclear Regulatory Commission (NRC) conducted a public open house at the Limerick Township Municipal Building in Limerick, PA. The NRC conducted the Annual Assessment Meeting (AAM) open house to discuss its assessment of the safety performance at Limerick Generating Station (LGS) for 2014. A summary of this meeting can be located in ADAMS using accession number ML15147A615. Publically available ADAMS documents can be located by entering accession number (ML) into the search box in the upper right corner of our homepage at www.nrc.gov.

At this meeting, the Deputy Director of the Division of Reactor Projects in the Region I office of the NRC, Mr. Michael Scott, accepted the following three questions from you.

1. What is the highest burnup to which Limerick Generating Station (LGS) licensed to fuel and when did they get that level authorized?
2. Has spent fuel from other plants been shipped to LGS?
3. Where does low level radioactive waste from LGS go?

Mr. Scott has requested that I respond to ACE with answers to these questions.

Regarding the third question, I note in an email (ML14118A047) dated April 24, 2014, Region I has previously fully responded to this ACE question. I trust this is sufficiently responsive.

I have previously responded to several inquiries from ACE regarding high burnup nuclear fuel.

Regarding the above questions numbered 1 and 2, I have determined that both involve licensing information and require coordination with staff in the NRCs Office of Nuclear Reactor Regulation (NRR) in our Rockville, Maryland offices to develop a response. After coordination with NRRs project manager for LGS, we will respond to these two questions when we are able and likely within 30 - 60 days.

Sincerely,

Fred Bower USNRC Region I Branch Chief with Oversight Responsibility for Limerick, Peach Bottom and Susquehanna l 2100 Renaissance Boulevard, STE 100, King of Prussia, PA 19406 l l: (610) 337-5200 l