ML15314A111: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(2 intermediate revisions by the same user not shown)
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:Clinton Power Station 8401 Power Road Clinton, IL 61727 U-604195 January 21, 2015 Regional Administrator Region Ill U. S. Nuclear Regulatory Commission 2443 Warrenville Road, Suite 210 Lisle, Illinois 60532-4352 Clinton Power Station, Unit 1 Facility Operating License No. NPF-62 NRC Docket No. 50-461 Exelon Generation 10 CFR 55.40
{{#Wiki_filter:Exelon Generation Clinton Power Station 8401 Power Road Clinton, IL 61727 U-604195                                                                             10 CFR 55.40 January 21, 2015 Regional Administrator Region Ill U. S. Nuclear Regulatory Commission 2443 Warrenville Road, Suite 210 Lisle , Illinois 60532-4352 Clinton Power Station, Unit 1 Facility Operating License No. NPF-62 NRC Docket No. 50-461


==Subject:==
==Subject:==
Clinton Power Station Submittal of Integrated Initial License Training Examination Materials Enclosed are the examination materials which Exelon Generating Company, LLC (EGC), is submitting in support of the Initial License Examination scheduled for the weeks of March 16, 2015 and March 23, 2015 at Clinton Power Station.
Clinton Power Station Submittal of Integrated Initial License Training Examination Materials Enclosed are the examination materials which Exelon Generating Company, LLC (EGC), is submitting in support of the Initial License Examination scheduled for the weeks of March 16, 2015 and March 23, 2015 at Clinton Power Station.
This submittal includes the Senior Reactor Operator and Reactor Operator Written Examinations
This submittal includes the Senior Reactor Operator and Reactor Operator Written Examinations, Job Performance Measures, and Integrated Plant Operation Scenario Guides.
, Job Performance Measures, and Integrated Plant Operation Scenario Guides. These examination materials have been developed in accordance with NUREG-1021
These examination materials have been developed in accordance with NUREG-1021 ,
, "Operating Licensing Examination Standards
"Operating Licensing Examination Standards", Revision 9, Supplement 1. Please note that reference materials are attached to each individual examination question or item.
", Revision 9, Supplement  
Some minor modifications have been made to the Integrated Examination Outline with regard to the operational scenarios in order to improve balance and content. These changes improve exam ination quality and are in compliance with NUREG-1021 .
: 1. Please note that reference materials are attached to each individual examination question or item. Some minor modifications have been made to the Integrated Examination Outline with regard to the operational scenarios in order to improve balance and content.
In accordance with NUREG-1021 , Section ES-201 , "Initial Operator Licensing Examination Process", please ensure that these materials are withheld from public disclosure until after the examinations are complete.
These changes improve examination quality and are in compliance with NUREG-1021
. In accordance with NUREG-1021
, Section ES-201, "Initial Operator Licensing Examination Process", please ensure that these materials are withheld from public disclosure until after the examinations are complete.
There are no regulatory commitments contained in this letter.
There are no regulatory commitments contained in this letter.
U-604195 Page 2 Should you have any questions related to this information
 
, please contact Mr. Christopher Dunn, Site Training Director, at (217) 937-4000. ,\ lJ\ ___, Site Vice President Clinton Power Station DRA/cas Attachments (hand delivered to NRC Region Ill Chief Examiner):
U-604195 Page 2 Should you have any questions related to this information, please contact Mr. Christopher Dunn, Site Training Director, at (217) 937-4000.
Respec~ully,
,\ lJ\ ___,
~~k ~~~ mer Site Vice President Clinton Power Station DRA/cas Attachments (hand delivered to NRC Region Ill Chief Examiner):
* RO/SRO Composite Examination with references attached
* RO/SRO Composite Examination with references attached
* Control Room Systems and Facility Walk-Through Job Performance Measures with references attached
* Control Room Systems and Facility Walk-Through Job Performance Measures with references attached
* Administrative Topic Job Performance Measures with references attached
* Administrative Topic Job Performance Measures with references attached
* Integrated Plant Operation Scenario Guides
* Integrated Plant Operation Scenario Guides
* Completed Checklists
* Completed Checklists:
: o Operating Test Quality Checklist (Form ES-301-3) o Simulator Scenario Quality Checklist (Form ES-301-4) o Transient and Event Checklist (Form ES-301-5) o Competencies Checklist (Form ES-301-6) o Written Exam Quality Checklist (Form 401-6) o Examination Security Agreement (Form ES-201-3) o Record of Rejected K/As (Form ES-401-4) cc: Chief, NRC Operator Licensing Branch (without Attachments)
o Operating Test Quality Checklist (Form ES-301-3) o Simulator Scenario Quality Checklist (Form ES-301-4) o Transient and Event Checklist (Form ES-301-5) o Competencies Checklist (Form ES-301-6) o Written Exam Quality Checklist (Form 401-6) o Examination Security Agreement (Form ES-201-3) o Record of Rejected K/As (Form ES-401-4) cc:         Chief, NRC Operator Licensing Branch (without Attachments)
NRC Senior Resident Inspector  
NRC Senior Resident Inspector - Clinton Power Station (without Attachments)
-Clinton Power Station (without Attachments)
NRC Document Control Desk (without attachments)
NRC Document Control Desk (without attachments)
Clinton Power Station 8401 Power Road Clinton, IL 61727 U-604195 January 21, 2015 Regional Administrator Region Ill U. S. Nuclear Regulatory Commission 2443 Warrenville Road, Suite 210 Lisle, Illinois 60532-4352 Clinton Power Station, Unit 1 Facility Operating License No. NPF-62 NRC Docket No. 50-461 Exelon Generation 10 CFR 55.40
 
Exelon Generation Clinton Power Station 8401 Power Road Clinton, IL 61727 U-604195                                                                             10 CFR 55.40 January 21, 2015 Regional Administrator Region Ill U. S. Nuclear Regulatory Commission 2443 Warrenville Road, Suite 210 Lisle , Illinois 60532-4352 Clinton Power Station, Unit 1 Facility Operating License No. NPF-62 NRC Docket No. 50-461


==Subject:==
==Subject:==
Clinton Power Station Submittal of Integrated Initial License Training Examination Materials Enclosed are the examination materials which Exelon Generating Company, LLC (EGC), is submitting in support of the Initial License Examination scheduled for the weeks of March 16, 2015 and March 23, 2015 at Clinton Power Station.
Clinton Power Station Submittal of Integrated Initial License Training Examination Materials Enclosed are the examination materials which Exelon Generating Company, LLC (EGC), is submitting in support of the Initial License Examination scheduled for the weeks of March 16, 2015 and March 23, 2015 at Clinton Power Station.
This submittal includes the Senior Reactor Operator and Reactor Operator Written Examinations
This submittal includes the Senior Reactor Operator and Reactor Operator Written Examinations, Job Performance Measures, and Integrated Plant Operation Scenario Guides.
, Job Performance Measures, and Integrated Plant Operation Scenario Guides. These examination materials have been developed in accordance with NUREG-1021
These examination materials have been developed in accordance with NUREG-1021 ,
, "Operating Licensing Examination Standards
"Operating Licensing Examination Standards", Revision 9, Supplement 1. Please note that reference materials are attached to each individual examination question or item.
", Revision 9, Supplement  
Some minor modifications have been made to the Integrated Examination Outline with regard to the operational scenarios in order to improve balance and content. These changes improve exam ination quality and are in compliance with NUREG-1021 .
: 1. Please note that reference materials are attached to each individual examination question or item. Some minor modifications have been made to the Integrated Examination Outline with regard to the operational scenarios in order to improve balance and content.
In accordance with NUREG-1021 , Section ES-201 , "Initial Operator Licensing Examination Process", please ensure that these materials are withheld from public disclosure until after the examinations are complete.
These changes improve examination quality and are in compliance with NUREG-1021
. In accordance with NUREG-1021
, Section ES-201, "Initial Operator Licensing Examination Process", please ensure that these materials are withheld from public disclosure until after the examinations are complete.
There are no regulatory commitments contained in this letter.
There are no regulatory commitments contained in this letter.
U-604195 Page 2 Should you have any questions related to this information
 
, please contact Mr. Christopher Dunn, Site Training Director, at (217) 937-4000. ,\ lJ\ ___, Site Vice President Clinton Power Station DRA/cas Attachments (hand delivered to NRC Region Ill Chief Examiner):
U-604195 Page 2 Should you have any questions related to this information, please contact Mr. Christopher Dunn, Site Training Director, at (217) 937-4000.
Respec~ully,
,\ lJ\ ___,
~~k ~~~ mer Site Vice President Clinton Power Station DRA/cas Attachments (hand delivered to NRC Region Ill Chief Examiner):
* RO/SRO Composite Examination with references attached
* RO/SRO Composite Examination with references attached
* Control Room Systems and Facility Walk-Through Job Performance Measures with references attached
* Control Room Systems and Facility Walk-Through Job Performance Measures with references attached
* Administrative Topic Job Performance Measures with references attached
* Administrative Topic Job Performance Measures with references attached
* Integrated Plant Operation Scenario Guides
* Integrated Plant Operation Scenario Guides
* Completed Checklists
* Completed Checklists:
: o Operating Test Quality Checklist (Form ES-301-3) o Simulator Scenario Quality Checklist (Form ES-301-4) o Transient and Event Checklist (Form ES-301-5) o Competencies Checklist (Form ES-301-6) o Written Exam Quality Checklist (Form 401-6) o Examination Security Agreement (Form ES-201-3) o Record of Rejected K/As (Form ES-401-4) cc: Chief, NRC Operator Licensing Branch (without Attachments)
o Operating Test Quality Checklist (Form ES-301-3) o Simulator Scenario Quality Checklist (Form ES-301-4) o Transient and Event Checklist (Form ES-301-5) o Competencies Checklist (Form ES-301-6) o Written Exam Quality Checklist (Form 401-6) o Examination Security Agreement (Form ES-201-3) o Record of Rejected K/As (Form ES-401-4) cc:         Chief, NRC Operator Licensing Branch (without Attachments)
NRC Senior Resident Inspector  
NRC Senior Resident Inspector - Clinton Power Station (without Attachments)
-Clinton Power Station (without Attachments)
NRC Document Control Desk (without attachments)}}
NRC Document Control Desk (without attachments)}}

Latest revision as of 05:46, 31 October 2019

2015 Clinton Power Station Initial License Examination Proposed Submittal Letter
ML15314A111
Person / Time
Site: Clinton Constellation icon.png
Issue date: 11/10/2015
From:
NRC/RGN-III
To:
Exelon Generation Co
Zoia, C D
Shared Package
ML15124A055 List:
References
Download: ML15314A111 (2)


Text

Exelon Generation Clinton Power Station 8401 Power Road Clinton, IL 61727 U-604195 10 CFR 55.40 January 21, 2015 Regional Administrator Region Ill U. S. Nuclear Regulatory Commission 2443 Warrenville Road, Suite 210 Lisle , Illinois 60532-4352 Clinton Power Station, Unit 1 Facility Operating License No. NPF-62 NRC Docket No. 50-461

Subject:

Clinton Power Station Submittal of Integrated Initial License Training Examination Materials Enclosed are the examination materials which Exelon Generating Company, LLC (EGC), is submitting in support of the Initial License Examination scheduled for the weeks of March 16, 2015 and March 23, 2015 at Clinton Power Station.

This submittal includes the Senior Reactor Operator and Reactor Operator Written Examinations, Job Performance Measures, and Integrated Plant Operation Scenario Guides.

These examination materials have been developed in accordance with NUREG-1021 ,

"Operating Licensing Examination Standards", Revision 9, Supplement 1. Please note that reference materials are attached to each individual examination question or item.

Some minor modifications have been made to the Integrated Examination Outline with regard to the operational scenarios in order to improve balance and content. These changes improve exam ination quality and are in compliance with NUREG-1021 .

In accordance with NUREG-1021 , Section ES-201 , "Initial Operator Licensing Examination Process", please ensure that these materials are withheld from public disclosure until after the examinations are complete.

There are no regulatory commitments contained in this letter.

U-604195 Page 2 Should you have any questions related to this information, please contact Mr. Christopher Dunn, Site Training Director, at (217) 937-4000.

Respec~ully,

,\ lJ\ ___,

~~k ~~~ mer Site Vice President Clinton Power Station DRA/cas Attachments (hand delivered to NRC Region Ill Chief Examiner):

  • RO/SRO Composite Examination with references attached
  • Integrated Plant Operation Scenario Guides
  • Completed Checklists:

o Operating Test Quality Checklist (Form ES-301-3) o Simulator Scenario Quality Checklist (Form ES-301-4) o Transient and Event Checklist (Form ES-301-5) o Competencies Checklist (Form ES-301-6) o Written Exam Quality Checklist (Form 401-6) o Examination Security Agreement (Form ES-201-3) o Record of Rejected K/As (Form ES-401-4) cc: Chief, NRC Operator Licensing Branch (without Attachments)

NRC Senior Resident Inspector - Clinton Power Station (without Attachments)

NRC Document Control Desk (without attachments)

Exelon Generation Clinton Power Station 8401 Power Road Clinton, IL 61727 U-604195 10 CFR 55.40 January 21, 2015 Regional Administrator Region Ill U. S. Nuclear Regulatory Commission 2443 Warrenville Road, Suite 210 Lisle , Illinois 60532-4352 Clinton Power Station, Unit 1 Facility Operating License No. NPF-62 NRC Docket No. 50-461

Subject:

Clinton Power Station Submittal of Integrated Initial License Training Examination Materials Enclosed are the examination materials which Exelon Generating Company, LLC (EGC), is submitting in support of the Initial License Examination scheduled for the weeks of March 16, 2015 and March 23, 2015 at Clinton Power Station.

This submittal includes the Senior Reactor Operator and Reactor Operator Written Examinations, Job Performance Measures, and Integrated Plant Operation Scenario Guides.

These examination materials have been developed in accordance with NUREG-1021 ,

"Operating Licensing Examination Standards", Revision 9, Supplement 1. Please note that reference materials are attached to each individual examination question or item.

Some minor modifications have been made to the Integrated Examination Outline with regard to the operational scenarios in order to improve balance and content. These changes improve exam ination quality and are in compliance with NUREG-1021 .

In accordance with NUREG-1021 , Section ES-201 , "Initial Operator Licensing Examination Process", please ensure that these materials are withheld from public disclosure until after the examinations are complete.

There are no regulatory commitments contained in this letter.

U-604195 Page 2 Should you have any questions related to this information, please contact Mr. Christopher Dunn, Site Training Director, at (217) 937-4000.

Respec~ully,

,\ lJ\ ___,

~~k ~~~ mer Site Vice President Clinton Power Station DRA/cas Attachments (hand delivered to NRC Region Ill Chief Examiner):

  • RO/SRO Composite Examination with references attached
  • Integrated Plant Operation Scenario Guides
  • Completed Checklists:

o Operating Test Quality Checklist (Form ES-301-3) o Simulator Scenario Quality Checklist (Form ES-301-4) o Transient and Event Checklist (Form ES-301-5) o Competencies Checklist (Form ES-301-6) o Written Exam Quality Checklist (Form 401-6) o Examination Security Agreement (Form ES-201-3) o Record of Rejected K/As (Form ES-401-4) cc: Chief, NRC Operator Licensing Branch (without Attachments)

NRC Senior Resident Inspector - Clinton Power Station (without Attachments)

NRC Document Control Desk (without attachments)