Line 2: Line 2:
| number = ML15331A160
| number = ML15331A160
| issue date = 12/22/2011
| issue date = 12/22/2011
| title = OFFICIAL EXHIBIT - NYS000459-00-BD01 - IR 05000271-11-011; 10/17/2011 - 12/11/2011; Vermont Yankee Nuclear Power Station; Review of License Renewal Activities
| title = Official Exhibit - NYS000459-00-BD01 - IR 05000271-11-011; 10/17/2011 - 12/11/2011; Vermont Yankee Nuclear Power Station; Review of License Renewal Activities.
| author name = Conte R J
| author name = Conte R
| author affiliation = NRC/RGN-III/DRS/EB1
| author affiliation = NRC/RGN-III/DRS/EB1
| addressee name = Wamser C
| addressee name = Wamser C
Line 19: Line 19:


=Text=
=Text=
{{#Wiki_filter: December 22, 20lLMr. Christopher WamserEntergy Nuclear Operations, Inc.Vermont Yankee Nuclear power Station185 Old Ferry RoadP.O. Box 500Brattleboro, VT 05302-0500
{{#Wiki_filter:United States Nuclear Regulatory Commission Official Hearing Exhibit In the Matter of:  Entergy Nuclear Operations, Inc.


SUBJECT: VERMONT YANKEE NUCLEAR POWER STATION - NRC INTEGRATEDINSPECTION REPORT 0500027 1 t2ol 1 01 1
(Indian Point Nuclear Generating Units 2 and 3)
NYS000459 ASLBP #: 07-858-03-LR-BD01    Submitted: November 9, 2012 Docket #: 05000247 l 05000286 Exhibit #: NYS000459-00-BD01  Identified: 11/5/2015 Admitted: 11/5/2015  Withdrawn:
Rejected:  Stricken:
Other:
UNITED STATES NUCLEAR REGULATORY COMMISSION
 
==REGION I==
475 ALLENDALE ROAD KING OF PRUSSIA, PA 19406-1415 December 22, 20lL Mr. Christopher Wamser Entergy Nuclear Operations, Inc.
 
Vermont Yankee Nuclear power Station 185 Old Ferry Road P.O. Box 500 Brattleboro, VT 05302-0500 SUBJECT: VERMONT YANKEE NUCLEAR   POWER STATION INSPECTION REPORT 0500027
        - NRC INTEGRATED 1 t2ol 1 01 1


==Dear Mr. Wamser:==
==Dear Mr. Wamser:==
on october 20,2011, the U.S. NuclearRegulatory Commission (NRC) completed an inspectionat the Vermont Yankee Nuclear Power Staiion. the enctosed report documbnts the results ofthe inspection, which were discussed on october 20, and December z 2011, wrth you and othermembers of your staff.This inspection was an examination of activities under your renewed operating license related tothe completion of commitments made during the renewed lic"nre apptication f,rocess andcompliance with the conditions of your licenie. Under the renewed operating license, entry intothe period of extended opelations is planned for March 22,2012. Th; inap;tion was directedtoward those activities and facilities accessible during the refueling outate. -witnin these areas,the inspection involved examination of selected proc6dur"s and representative records,observations of activities, and interviews with personnel.on the basis of the samples selected for review, there were no findings identified during thisinspection' We plan to continue to review Commitment Nos. 6, 12,aid 2s, along with yourprocess for commitment change management during future planned license renewal teaminspections, prior to March 22.20112. tn accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and itsenclosure will be available electronically for public inspection in the NRC Public DocumentRoom or from the Publicly Available Records (PARS) component of NRC's document systemAgencywide Document Access and Management System (ADAMS). ADAMS is accessible fromthe NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic ReadingRoom).
on october 20,2011, the U.S. NuclearRegulatory Commission (NRC) completed an inspection at the Vermont Yankee Nuclear Power Staiion. the enctosed report documbnts the results of the inspection, which were discussed on october 20, and December z 2011, wrth you and other members of your staff.
 
This inspection was an examination of activities under your renewed operating license related to the completion of commitments made during the renewed lic"nre apptication f,rocess and compliance with the conditions of your licenie. Under the renewed operating license, entry into the period of extended opelations is planned for March 22,2012. Th; inap;tion-witninwas directed toward those activities and facilities accessible during the refueling outate. these areas, the inspection involved examination of selected proc6dur"s and representative records, observations of activities, and interviews with personnel.


Sincerely,/Z,tr*J>MRichard J. Conte, ChiefEngineering Branch 1Division of Reactor SafetyDocket No. 50-271License No. DPR-28
on the basis of the samples selected for review, there were no findings identified during this inspection' We plan to continue to review Commitment Nos. 6, 12,aid 2s, along with your process for commitment change management during future planned license renewal team inspections, prior to March 22.20112. tn accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system Agencywide Document Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).


===Enclosure:===
Sincerely,
NRC lnspection Report 0500027 1 1201 101 1cc w/enclosure: Distribution via ListServ
/Z,tr*J>M Richard J. Conte, Chief Engineering Branch 1 Division of Reactor Safety Docket No. 50-271 License No. DPR-28 Enclosure:
NRC lnspection Report 0500027 1 1201 101 1 cc w/enclosure: Distribution via ListServ
}}
}}

Latest revision as of 05:05, 31 October 2019

Official Exhibit - NYS000459-00-BD01 - IR 05000271-11-011; 10/17/2011 - 12/11/2011; Vermont Yankee Nuclear Power Station; Review of License Renewal Activities.
ML15331A160
Person / Time
Site: Indian Point, Vermont Yankee  Entergy icon.png
Issue date: 12/22/2011
From: Conte R
NRC/RGN-III/DRS/EB1
To: Wamser C
Entergy Nuclear Operations
SECY RAS
References
RAS 23737, 50-247-LR, 50-286-LR, ASLBP 07-858-03-LR-BD01 IR-11-011
Download: ML15331A160 (12)


Text

United States Nuclear Regulatory Commission Official Hearing Exhibit In the Matter of: Entergy Nuclear Operations, Inc.

(Indian Point Nuclear Generating Units 2 and 3)

NYS000459 ASLBP #: 07-858-03-LR-BD01 Submitted: November 9, 2012 Docket #: 05000247 l 05000286 Exhibit #: NYS000459-00-BD01 Identified: 11/5/2015 Admitted: 11/5/2015 Withdrawn:

Rejected: Stricken:

Other:

UNITED STATES NUCLEAR REGULATORY COMMISSION

REGION I

475 ALLENDALE ROAD KING OF PRUSSIA, PA 19406-1415 December 22, 20lL Mr. Christopher Wamser Entergy Nuclear Operations, Inc.

Vermont Yankee Nuclear power Station 185 Old Ferry Road P.O. Box 500 Brattleboro, VT 05302-0500 SUBJECT: VERMONT YANKEE NUCLEAR POWER STATION INSPECTION REPORT 0500027

- NRC INTEGRATED 1 t2ol 1 01 1

Dear Mr. Wamser:

on october 20,2011, the U.S. NuclearRegulatory Commission (NRC) completed an inspection at the Vermont Yankee Nuclear Power Staiion. the enctosed report documbnts the results of the inspection, which were discussed on october 20, and December z 2011, wrth you and other members of your staff.

This inspection was an examination of activities under your renewed operating license related to the completion of commitments made during the renewed lic"nre apptication f,rocess and compliance with the conditions of your licenie. Under the renewed operating license, entry into the period of extended opelations is planned for March 22,2012. Th; inap;tion-witninwas directed toward those activities and facilities accessible during the refueling outate. these areas, the inspection involved examination of selected proc6dur"s and representative records, observations of activities, and interviews with personnel.

on the basis of the samples selected for review, there were no findings identified during this inspection' We plan to continue to review Commitment Nos. 6, 12,aid 2s, along with your process for commitment change management during future planned license renewal team inspections, prior to March 22.20112. tn accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system Agencywide Document Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/Z,tr*J>M Richard J. Conte, Chief Engineering Branch 1 Division of Reactor Safety Docket No. 50-271 License No. DPR-28 Enclosure:

NRC lnspection Report 0500027 1 1201 101 1 cc w/enclosure: Distribution via ListServ