| | title = OFFICIAL EXHIBIT - NYS000459-00-BD01 - IR 05000271-11-011; 10/17/2011 - 12/11/2011; Vermont Yankee Nuclear Power Station; Review of License Renewal Activities | | | title = Official Exhibit - NYS000459-00-BD01 - IR 05000271-11-011; 10/17/2011 - 12/11/2011; Vermont Yankee Nuclear Power Station; Review of License Renewal Activities. |
| | author name = Conte R J | | | author name = Conte R |
| | author affiliation = NRC/RGN-III/DRS/EB1 | | | author affiliation = NRC/RGN-III/DRS/EB1 |
| | addressee name = Wamser C | | | addressee name = Wamser C |
Line 19: |
Line 19: |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter: December 22, 20lLMr. Christopher WamserEntergy Nuclear Operations, Inc.Vermont Yankee Nuclear power Station185 Old Ferry RoadP.O. Box 500Brattleboro, VT 05302-0500 | | {{#Wiki_filter:United States Nuclear Regulatory Commission Official Hearing Exhibit In the Matter of: Entergy Nuclear Operations, Inc. |
|
| |
|
| SUBJECT: VERMONT YANKEE NUCLEAR POWER STATION - NRC INTEGRATEDINSPECTION REPORT 0500027 1 t2ol 1 01 1 | | (Indian Point Nuclear Generating Units 2 and 3) |
| | NYS000459 ASLBP #: 07-858-03-LR-BD01 Submitted: November 9, 2012 Docket #: 05000247 l 05000286 Exhibit #: NYS000459-00-BD01 Identified: 11/5/2015 Admitted: 11/5/2015 Withdrawn: |
| | Rejected: Stricken: |
| | Other: |
| | UNITED STATES NUCLEAR REGULATORY COMMISSION |
| | |
| | ==REGION I== |
| | 475 ALLENDALE ROAD KING OF PRUSSIA, PA 19406-1415 December 22, 20lL Mr. Christopher Wamser Entergy Nuclear Operations, Inc. |
| | |
| | Vermont Yankee Nuclear power Station 185 Old Ferry Road P.O. Box 500 Brattleboro, VT 05302-0500 SUBJECT: VERMONT YANKEE NUCLEAR POWER STATION INSPECTION REPORT 0500027 |
| | - NRC INTEGRATED 1 t2ol 1 01 1 |
|
| |
|
| ==Dear Mr. Wamser:== | | ==Dear Mr. Wamser:== |
| on october 20,2011, the U.S. NuclearRegulatory Commission (NRC) completed an inspectionat the Vermont Yankee Nuclear Power Staiion. the enctosed report documbnts the results ofthe inspection, which were discussed on october 20, and December z 2011, wrth you and othermembers of your staff.This inspection was an examination of activities under your renewed operating license related tothe completion of commitments made during the renewed lic"nre apptication f,rocess andcompliance with the conditions of your licenie. Under the renewed operating license, entry intothe period of extended opelations is planned for March 22,2012. Th; inap;tion was directedtoward those activities and facilities accessible during the refueling outate. -witnin these areas,the inspection involved examination of selected proc6dur"s and representative records,observations of activities, and interviews with personnel.on the basis of the samples selected for review, there were no findings identified during thisinspection' We plan to continue to review Commitment Nos. 6, 12,aid 2s, along with yourprocess for commitment change management during future planned license renewal teaminspections, prior to March 22.20112. tn accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and itsenclosure will be available electronically for public inspection in the NRC Public DocumentRoom or from the Publicly Available Records (PARS) component of NRC's document systemAgencywide Document Access and Management System (ADAMS). ADAMS is accessible fromthe NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic ReadingRoom). | | on october 20,2011, the U.S. NuclearRegulatory Commission (NRC) completed an inspection at the Vermont Yankee Nuclear Power Staiion. the enctosed report documbnts the results of the inspection, which were discussed on october 20, and December z 2011, wrth you and other members of your staff. |
| | |
| | This inspection was an examination of activities under your renewed operating license related to the completion of commitments made during the renewed lic"nre apptication f,rocess and compliance with the conditions of your licenie. Under the renewed operating license, entry into the period of extended opelations is planned for March 22,2012. Th; inap;tion-witninwas directed toward those activities and facilities accessible during the refueling outate. these areas, the inspection involved examination of selected proc6dur"s and representative records, observations of activities, and interviews with personnel. |
|
| |
|
| Sincerely,/Z,tr*J>MRichard J. Conte, ChiefEngineering Branch 1Division of Reactor SafetyDocket No. 50-271License No. DPR-28
| | on the basis of the samples selected for review, there were no findings identified during this inspection' We plan to continue to review Commitment Nos. 6, 12,aid 2s, along with your process for commitment change management during future planned license renewal team inspections, prior to March 22.20112. tn accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system Agencywide Document Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). |
|
| |
|
| ===Enclosure:===
| | Sincerely, |
| NRC lnspection Report 0500027 1 1201 101 1cc w/enclosure: Distribution via ListServ | | /Z,tr*J>M Richard J. Conte, Chief Engineering Branch 1 Division of Reactor Safety Docket No. 50-271 License No. DPR-28 Enclosure: |
| | NRC lnspection Report 0500027 1 1201 101 1 cc w/enclosure: Distribution via ListServ |
| }} | | }} |
|
---|
Category:Legal-Exhibit
MONTHYEARML15337A3522015-11-17017 November 2015 Official Exhibit - NYS000582-00-BD01 - Diagram of Strength Vs Amplitude by Dr. Richard T. Lahey ML15337A3372015-11-11011 November 2015 Official Exhibit - ENTR00726-00-BD01 - Track 2 Hearing Exhibit List ML15337A3322015-11-0505 November 2015 Official Exhibit - ENT000726-00-BD01 - Entergy Track 2 Hearing Exhibit List ML15337A3352015-11-0505 November 2015 Official Exhibit - RIVR14001-00-BD01 - Riverkeeper Tailored Track 2 Exhibit List ML15337A3362015-11-0505 November 2015 Official Exhibit - NRCR10001-00-BD01 - NRC Staff Track 2 Exhibit List ML15337A3332015-11-0404 November 2015 Official Exhibit - NYSR25001-00-BD01 - NYS Revised Tailored Exhibits List Relevant to Track 2 Contentions ML15337A3312015-11-0303 November 2015 Official Exhibit - NRC000230-00-BD01 - Corrections to Prefiled Testimony NRC000168 and NRC000197 ML15337A3262015-10-29029 October 2015 Official Exhibit - ENT000722-00-BD01 - Supplemental Testimony of Entergy Witnesses Nelson Azevedo, Timothy Griesbach & Randy Lott ML15337A3292015-10-29029 October 2015 Official Exhibit - ENTR16001-00-BD01 - Entergy Revised Exhibit List ML15337A3242015-09-23023 September 2015 Official Exhibit - NYS000576-00-BD01 - Pre-Filed Supplemental Testimony of Richard T. Lahey Re Contentions NYS-25, NYS-26B/RK-TC-1B & NYS-38/RK-TC-5 ML15337A2822015-09-0909 September 2015 Official Exhibit - NYS000566-00-BD01 - Figure 1 for Supplemental Reply Testimony of Dr. Richard T. Lahey ML15337A2832015-09-0909 September 2015 Official Exhibit - NYS000563-00-BD01 - Pressurized Water Reactor (PWR) Systems, USNRC Technical Training Center, Reactor Concepts Manual, Pages 4-1 to 4-28 ML15337A2932015-09-0909 September 2015 Official Exhibit - NYS000567-PUB-00-BD01 - Pre-filed Supplemental Reply Testimony of Richard T. Lahey, Jr. in Support of Contention NYS-25 (Public, Redacted) (September 9, 2015) ML15337A2942015-09-0909 September 2015 Official Exhibit - NYS000568-PUB-00-BD01 - Supplemental Reply Statement of Position of the State of New York in Support of Contention NYS-25 (Public, Redacted) (September 9, 2015) ML15337A2952015-09-0909 September 2015 Official Exhibit - NYS000569-PUB-00-BD01 - Pre-filed Supplemental Reply Testimony of Richard T. Lahey, Jr. in Support of Contention NYS-26B/RK-TC-1B (Public, Redacted) (September 9, 2015) ML15337A2962015-09-0909 September 2015 Official Exhibit - NYS000570-PUB-00-BD01 - Supplemental Reply Statement of Position of the State of New York and Riverkeeper, Inc. in Support of Contention NYS-26B/RK-TC-1B (Public, Redacted) (September 9, 2015) ML15337A2972015-09-0909 September 2015 Official Exhibit - RIV000164-00-BD01 - NUREG-1740, ACRS, Voltage-Based Alternative Repair Criteria: a Report to the Advisory Committee on Reactor Safeguards by the Ad Hoc Subcommittee on a Differing Professional Opinion (2001) ML15337A3042015-09-0909 September 2015 Official Exhibit - NYS000571-PUB-00-BD01 - Pre-filed Supplemental Reply Testimony of David J. Duquette in Support of Contention NYS-38/RK-TC-5 (Public, Redacted) (September 9, 2015) ML15337A3062015-09-0909 September 2015 Official Exhibit - NYS000572-PUB-00-BD01 - Pre-filed Supplemental Reply Testimony of Richard T. Lahey, Jr. in Support of Contention NYS-38/RK-TC-5 (Public, Redacted) (September 9, 2015) ML15337A3072015-09-0909 September 2015 Official Exhibit - NYS000573-PUB-00-BD01 - Supplemental Reply Statement of Position of the State of New York and Riverkeeper, Inc. in Support of Contention NYS-38/RK-TC-5 (Public, Redacted) (September 9, 2015) ML15337A3142015-09-0404 September 2015 Official Exhibit - ENTR00615-PUB-00-BD01 - Entergy'S Statement of Position Re Contention NYS-25 (Embrittlement) - Redacted ML15337A2452015-08-10010 August 2015 Official Exhibit - NRC000227-00-BD01 - Gary Stevens Statement of Professional Qualifications ML15337A2442015-08-10010 August 2015 Official Exhibit - NRCR00161-00-BD01 - NRC Staff Testimony of Dr. Allen L. Hiser and Mr. Kenneth J. Karwoski Concerning Portions of State of New York and Riverkeeper, Inc. Joint Contention NYS-38/RK-TC5 (Revised) ML15337A2412015-08-10010 August 2015 Official Exhibit - NRCR00147-00-BD01 - NRC Staff'S Revised Statement of Position on State of New York and Riverkeeper'S Joint Contention NYS-38/RK-TC5 (Revised) ML15337A2592015-08-10010 August 2015 Official Exhibit - NRC000224-00-BD01 - IP3 FSAR Rev. 04 Chapter 16 ML15337A2602015-08-10010 August 2015 Official Exhibit - NRC000226-00-BD01 - Jeffrey C. Poehler Statement of Professional Qualifications ML15337A2622015-08-10010 August 2015 Official Exhibit - NRC000228-00-BD01 - Indian Point Unit 2 Technical Specifications 3.1.4 ML15337A2632015-08-10010 August 2015 Official Exhibit - NRC000229-00-BD01 - Indian Point, Unit 3 Technical Specifications 3.1.4 ML15337A2642015-08-10010 August 2015 Official Exhibit - NRC000196-PUB-00-BD01 - NRC Staff'S Initial Statement of Position on Contention NYS-25 (Reactor Vessel Internals) ML15337A2652015-08-10010 August 2015 Official Exhibit - NRC000197-PUB-00-BD01 - NRC Staff Testimony of Dr. Allen Hiser, Jeffrey Poehler, and Gary Stevens on NYS-25 and NYS-38/RK-TC-5 ML15335A3052015-08-10010 August 2015 Official Exhibit - NRCR20101-00-BD01 - NRC Staff'S Revised Statement of Position Regarding NYS 26B/RK-TC-1B ML15335A3022015-08-10010 August 2015 Official Exhibit - NRC000207-00-BD01 - Regulatory Information Conference Presentation Slides, Recent Materials Inspections of PWR Reactor Internals (Mar. 2015) ML15337A2692015-08-10010 August 2015 Official Exhibit - NRC000169-00-BD01 - NRC000169 - Indian Point, Unit 2 Technical Specifications (Excerpt) ML15337A2712015-08-10010 August 2015 Official Exhibit - NRC000223-00-BD01 - IP3 FSAR Rev. 04 Chapter 14 (2011) ML15337A2782015-08-10010 August 2015 Official Exhibit - NRC000168-PUB-00-BD01 - NRC Staff Testimony of Dr. Allen Hiser, Dr. Ching Ng, Mr. Gary Stevens, P.E., and Mr. on Yee, Concerning Contentions NYS-26B/RK-TC-1B and NYS-38/RK-TC-5 ML15335A3012015-08-10010 August 2015 Official Exhibit - NRC000206-00-BD01 - Indian Point, Unit 2, Updated Final Safety Analysis Report (Ufsar), Rev. 25, Chapter 14 - Safety Analysis (2014) ML15335A3002015-08-10010 August 2015 Official Exhibit - NRC000205-00-BD01 - Indian Point, Unit 2, Updated Final Safety Analysis Report (Ufsar), Rev. 25, Chapter 3 - Reactor (2014) ML15337A3162015-08-10010 August 2015 Official Exhibit - ENT000616-PUB-00-BD01 - Testimony of Entergy Witnesses Nelson F. Azevedo, Robert J. Dolansky, Alan B. Cox, Jack R. Strosnider, Timothy J. Griesbach, Randy G. Lott, and Mark A. Gray Regarding Contention NYS-25 (Embrittleme ML15337A3172015-08-10010 August 2015 Official Exhibit - ENT000678-PUB-00-BD01 - NL-07-140, Letter from F. Dacimo, Entergy, to NRC Document Control Desk, ?Reply to Request for Additional Information Regarding License Renewal Application? (Nov. 28, 2007)Redacted ML15337A3182015-08-10010 August 2015 Official Exhibit - ENT000679-PUB-00-BD01 - Redacted Revised Testimony of Entergy Witnesses Nelson F. Azevedo, Alan B. Cox, Jack R. Strosnider, Randy G. Lott, Mark A. Gray, and Barry M. Gordon Regarding Contention NYS-26B/RK-TC-1B (Metal Fat ML15337A3192015-08-10010 August 2015 Official Exhibit - ENT000698-PUB-00-BD01 - Entergy'S Revised Statement of Position Regarding Contention NYS-38/RK-TC-5(Safety Commitments) (Aug. 10, 2015)Redacted ML15337A3202015-08-10010 August 2015 Official Exhibit - ENT000699-PUB-00-BD01 - Redacted Revised Testimony of Entergy Witnesses Nelson Azevedo, Robert Dolansky, Alan Cox, Jack Strosnider, Timothy Griesbach, Barry Gordon, Randy Lott, and Mark Gray Regarding Contention NYS-38/RK ML15335A2932015-08-10010 August 2015 Official Exhibit - NRCR00104-00-BD01 - on Yee Statement of Professional Qualifications (Revised) ML15334A2342015-08-10010 August 2015 Official Exhibit - ENT000624-00-BD01 - Letter from N. Salgado to Vice Pres., Operations, Entergy Nuclear Operations, Inc., IP Nuclear Generating Unit No. 2 - Relief from the Examination Area for Reactor Vessel Head Penetration . . . ML15334A2842015-08-10010 August 2015 Official Exhibit - ENT000687-00-BD01 - NRC, Safety Evaluation Report, Topical Report on ASME Section III Piping and Component Fatigue Analysis Utilizing the Westems Computer Code (WCAP-17577, Revision 2) (Undated) ML15334A2822015-08-10010 August 2015 Official Exhibit - ENT000680-00-BD01 - Curriculum Vitae of Barry M. Gordon ML15334A2632015-08-10010 August 2015 Official Exhibit - ENT000648-00-BD01 - M. Mitchell, Chief, Vessels and Internals Integrity Branch, Response to Non-Concurrence Regarding Safety Evaluation for Topical Report MRP-227 Pressurized Water Reactor Internals Inspection and Evaluat ML15334A2442015-08-10010 August 2015 Official Exhibit - ENT000641-00-BD01 - Final License Renewal Interim Staff Guidance LR-ISG-2011-04, Updated Aging Management Criteria for Reactor Vessel Internal Components for Pressurized Water Reactors (May 28, 2013) ML15334A2402015-08-10010 August 2015 Official Exhibit - ENT000637-00-BD01 - NUREG-1874, Recommended Screening Limits for Pressurized Thermal Shock (PTS) (March 2010) ML15334A2362015-08-10010 August 2015 Official Exhibit - ENT000625-00-BD01 - Letter from N. Salgado to Vice President, Operations, Entergy Nuclear Operations, Inc., IP Nuclear Generating Unit No. 3 Relief Requests RR-3-45 and RR-3-46 for Reactor Vessel Head Penetrations Examina 2015-09-09
[Table view] |
Text
United States Nuclear Regulatory Commission Official Hearing Exhibit In the Matter of: Entergy Nuclear Operations, Inc.
(Indian Point Nuclear Generating Units 2 and 3)
NYS000459 ASLBP #: 07-858-03-LR-BD01 Submitted: November 9, 2012 Docket #: 05000247 l 05000286 Exhibit #: NYS000459-00-BD01 Identified: 11/5/2015 Admitted: 11/5/2015 Withdrawn:
Rejected: Stricken:
Other:
UNITED STATES NUCLEAR REGULATORY COMMISSION
REGION I
475 ALLENDALE ROAD KING OF PRUSSIA, PA 19406-1415 December 22, 20lL Mr. Christopher Wamser Entergy Nuclear Operations, Inc.
Vermont Yankee Nuclear power Station 185 Old Ferry Road P.O. Box 500 Brattleboro, VT 05302-0500 SUBJECT: VERMONT YANKEE NUCLEAR POWER STATION INSPECTION REPORT 0500027
- NRC INTEGRATED 1 t2ol 1 01 1
Dear Mr. Wamser:
on october 20,2011, the U.S. NuclearRegulatory Commission (NRC) completed an inspection at the Vermont Yankee Nuclear Power Staiion. the enctosed report documbnts the results of the inspection, which were discussed on october 20, and December z 2011, wrth you and other members of your staff.
This inspection was an examination of activities under your renewed operating license related to the completion of commitments made during the renewed lic"nre apptication f,rocess and compliance with the conditions of your licenie. Under the renewed operating license, entry into the period of extended opelations is planned for March 22,2012. Th; inap;tion-witninwas directed toward those activities and facilities accessible during the refueling outate. these areas, the inspection involved examination of selected proc6dur"s and representative records, observations of activities, and interviews with personnel.
on the basis of the samples selected for review, there were no findings identified during this inspection' We plan to continue to review Commitment Nos. 6, 12,aid 2s, along with your process for commitment change management during future planned license renewal team inspections, prior to March 22.20112. tn accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system Agencywide Document Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,
/Z,tr*J>M Richard J. Conte, Chief Engineering Branch 1 Division of Reactor Safety Docket No. 50-271 License No. DPR-28 Enclosure: