| title = IR 05000387/2015404 05000388/2015404; 11/16/2015 to 11/20/2015; Susquehanna Steam Electric Station, Units 1 and 2; Physical Protection of Category 1 and 2 Material - Letter Only | | title = IR 05000387/2015404 05000388/2015404; 11/16/2015 to 11/20/2015; Susquehanna Steam Electric Station, Units 1 and 2; Physical Protection of Category 1 and 2 Material - Letter Only | ||
| author name = | | author name = Mckinley R | ||
| author affiliation = NRC/RGN-I/DRS/PSB1 | | author affiliation = NRC/RGN-I/DRS/PSB1 | ||
| addressee name = Rausch T | | addressee name = Rausch T | ||
| addressee affiliation = Susquehanna Nuclear, LLC | | addressee affiliation = Susquehanna Nuclear, LLC | ||
| docket = 05000387, 05000388 | | docket = 05000387, 05000388 | ||
Line 18: | Line 18: | ||
=Text= | =Text= | ||
{{#Wiki_filter: | {{#Wiki_filter:ember 14, 2015 | ||
SUBJECT: SUSQUEHANNA STEAM ELECTRIC STATION, UNITS 1 AND 2 - SECURITY INSPECTION REPORT | ==SUBJECT:== | ||
SUSQUEHANNA STEAM ELECTRIC STATION, UNITS 1 AND 2 - SECURITY INSPECTION REPORT 05000387/2015404 AND 05000388/2015404 | |||
==Dear Mr. Rausch:== | ==Dear Mr. Rausch:== | ||
On November 20, 2015, the U.S. Nuclear Regulatory Commission (NRC) completed a security inspection at your Susquehanna Steam Electric Station, Units 1 and 2. On November 20, 2015, the NRC inspectors discussed the results of this inspection with Mr. Jon Franke | On November 20, 2015, the U.S. Nuclear Regulatory Commission (NRC) completed a security inspection at your Susquehanna Steam Electric Station, Units 1 and 2. On November 20, 2015, the NRC inspectors discussed the results of this inspection with Mr. Jon Franke, Site Vice President, and other members of your staff. Inspectors documented the results of this inspection in the enclosed inspection report. | ||
, Site Vice President , and other members of your staff. Inspectors documented the results of this inspection in the enclosed inspection report. | |||
NRC inspectors documented one finding of very low security significance in this report. | NRC inspectors documented one finding of very low security significance in this report. This finding involved a violation of NRC requirements. The NRC is treating this violation as a non-cited violation (NCV) consistent with Section 2.3.2.a of the Enforcement Policy. If you contest this violation or its significance, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington DC 20555 0001; with copies to the Regional Administrator, Region I; the Director, Office of Enforcement, U.S. Nuclear Regulatory Commission, Washington, DC 20555 0001; and the NRC resident inspector at the Susquehanna Steam Electric Station. | ||
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) Part 2.390, Public Inspections, Exemptions, Requests for Withholding, of the NRC's Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Document Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, the material enclosed herewith contains Security-Related Information in accordance with 10 CFR §2.390(d)(1) and its disclosure to unauthorized individuals could present a security vulnerability. Therefore, the material in the enclosure will not be made available electronically for public inspection in the NRC Public Document Room or from the NRC's ADAMS. | |||
of the NRC's | |||
a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Document Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading | |||
-rm/adams.html (the Public Electronic Reading Room). | |||
Enclosure contains Sensitive Unclassified Non-Safeguards Information. When separated from enclosure, the transmittal document is decontrolled. If you choose to provide a response and Security-Related Information is necessary to provide an acceptable response, please mark your entire response Security-Related Information - | |||
-Related Information in accordance with 10 CFR §2.390(d)(1) and | Withhold From Public Disclosure Under 10 CFR §2.390 in accordance with 10 CFR | ||
§2.390(d)(1) and follow the instructions for withholding in 10 CFR §2.390(b)(1). In accordance with 10 CFR §2.390(b) (1)(ii), the NRC is waiving the affidavit requirements for your response. | |||
Sincerely, | |||
/RA/ | |||
Raymond R. McKinley, Chief Plant Support Branch 1 Division of Reactor Safety Docket Nos. 50-387, 50-388 License Nos. NPF-14, NPF-22 Nonpublic Enclosure: | |||
Inspection Report 05000387/2015404, 05000388/2015404 w/Attachment: Supplemental Information (OUO-SRI) | |||
cc w/o encl; w/o OUO-SRI: Distribution via ListServ cc w/encl; w/OUO-SRI: | |||
BMartonick, Manager, Nuclear Security DAllard, Director, PA DEP ML15350A297 (Cover letter) | |||
ADAMS ACCESSION NUMBER: ML15350A307 (Cover letter w/enclosure) | |||
Cover Letter: Non-Sensitive Publicly Available SUNSI Review Sensitive Non-Publicly Available Cover Letter w/ Enclosure: Non-Sensitive Publicly Available SUNSI Review Sensitive Non-Publicly Available OFFICE RI/DRS RI/DRS RI/DRP RI/DRS NAME CGraves DCaron DSchroeder RMcKinley DATE 12/8/2015 12/8/2015 12/10/2015 12/14/2015 Letter to Timothy Rausch from Raymond McKinley SUBJECT: SUSQUEHANNA STEAM ELECTRIC STATION, UNITS 1 AND 2 - SECURITY INSPECTION REPORT 05000387/2015404 AND 05000388/2015404 Distribution w/o encl; w/o OUO - SRI: (via E-Mail) | |||
DDorman, RA DLew, DRA MScott, DRP JColaccino, DRP RLorson, DRS GSuber, DRS DSchroeder, DRP SBarber, DRP ATurilin, DRP PMeier, DRP JGreives, DRP, SRI TDaun, DRP, RI AGould, DRP, AA JJessie, RI, OEDO RidsNrrPMSusquehanna Resource RidsNrrDorlLpl1-2 Resource ROPreports Resource Distribution w/encl; w/OUO- SRI: (via E-Mail) | |||
50-387, 50-388 License Nos. | D. Caron, DRS R. McKinley, DRS D. Schroeder, DRP J. Greives, DRP, SRI T. Daun, DRP, RI N. Simonian, NSIR E. Wharton, NSIR C. Johnson, NSIR R. Albert, NSIR NOSB B. Desai, DRS, RII S. Orth, DRS, RIII M. Haire, DRS, RIV | ||
NPF-14, NPF-22 Nonpublic | |||
Inspection Report | |||
Supplemental Information ( | |||
-SRI: Distribution via ListServ cc w/encl; w/OUO | |||
-SRI: | |||
ML15350A297 (Cover letter) | |||
ADAMS ACCESSION NUMBER: | |||
ML15350A307 (Cover letter w/enclosure) | |||
Cover Letter | |||
: | |||
SUBJECT: SUSQUEHANNA STEAM ELECTRIC STATION, UNITS 1 AND 2 - SECURITY INSPECTION REPORT | |||
-2 Resource ROPreports Resource Distribution w/encl; w/OUO- SRI: (via E-Mail) D. Caron, DRS R. McKinley, DRS D. Schroeder, DRP J. | |||
}} | }} |
Latest revision as of 03:13, 31 October 2019
ML15350A297 | |
Person / Time | |
---|---|
Site: | Susquehanna |
Issue date: | 12/14/2015 |
From: | Raymond Mckinley Plant Support Branch 1 |
To: | Rausch T Susquehanna |
References | |
IR 2015404 | |
Download: ML15350A297 (4) | |
Text
ember 14, 2015
SUBJECT:
SUSQUEHANNA STEAM ELECTRIC STATION, UNITS 1 AND 2 - SECURITY INSPECTION REPORT 05000387/2015404 AND 05000388/2015404
Dear Mr. Rausch:
On November 20, 2015, the U.S. Nuclear Regulatory Commission (NRC) completed a security inspection at your Susquehanna Steam Electric Station, Units 1 and 2. On November 20, 2015, the NRC inspectors discussed the results of this inspection with Mr. Jon Franke, Site Vice President, and other members of your staff. Inspectors documented the results of this inspection in the enclosed inspection report.
NRC inspectors documented one finding of very low security significance in this report. This finding involved a violation of NRC requirements. The NRC is treating this violation as a non-cited violation (NCV) consistent with Section 2.3.2.a of the Enforcement Policy. If you contest this violation or its significance, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington DC 20555 0001; with copies to the Regional Administrator, Region I; the Director, Office of Enforcement, U.S. Nuclear Regulatory Commission, Washington, DC 20555 0001; and the NRC resident inspector at the Susquehanna Steam Electric Station.
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) Part 2.390, Public Inspections, Exemptions, Requests for Withholding, of the NRC's Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Document Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, the material enclosed herewith contains Security-Related Information in accordance with 10 CFR §2.390(d)(1) and its disclosure to unauthorized individuals could present a security vulnerability. Therefore, the material in the enclosure will not be made available electronically for public inspection in the NRC Public Document Room or from the NRC's ADAMS.
Enclosure contains Sensitive Unclassified Non-Safeguards Information. When separated from enclosure, the transmittal document is decontrolled. If you choose to provide a response and Security-Related Information is necessary to provide an acceptable response, please mark your entire response Security-Related Information -
Withhold From Public Disclosure Under 10 CFR §2.390 in accordance with 10 CFR
§2.390(d)(1) and follow the instructions for withholding in 10 CFR §2.390(b)(1). In accordance with 10 CFR §2.390(b) (1)(ii), the NRC is waiving the affidavit requirements for your response.
Sincerely,
/RA/
Raymond R. McKinley, Chief Plant Support Branch 1 Division of Reactor Safety Docket Nos. 50-387, 50-388 License Nos. NPF-14, NPF-22 Nonpublic Enclosure:
Inspection Report 05000387/2015404, 05000388/2015404 w/Attachment: Supplemental Information (OUO-SRI)
cc w/o encl; w/o OUO-SRI: Distribution via ListServ cc w/encl; w/OUO-SRI:
BMartonick, Manager, Nuclear Security DAllard, Director, PA DEP ML15350A297 (Cover letter)
ADAMS ACCESSION NUMBER: ML15350A307 (Cover letter w/enclosure)
Cover Letter: Non-Sensitive Publicly Available SUNSI Review Sensitive Non-Publicly Available Cover Letter w/ Enclosure: Non-Sensitive Publicly Available SUNSI Review Sensitive Non-Publicly Available OFFICE RI/DRS RI/DRS RI/DRP RI/DRS NAME CGraves DCaron DSchroeder RMcKinley DATE 12/8/2015 12/8/2015 12/10/2015 12/14/2015 Letter to Timothy Rausch from Raymond McKinley SUBJECT: SUSQUEHANNA STEAM ELECTRIC STATION, UNITS 1 AND 2 - SECURITY INSPECTION REPORT 05000387/2015404 AND 05000388/2015404 Distribution w/o encl; w/o OUO - SRI: (via E-Mail)
DDorman, RA DLew, DRA MScott, DRP JColaccino, DRP RLorson, DRS GSuber, DRS DSchroeder, DRP SBarber, DRP ATurilin, DRP PMeier, DRP JGreives, DRP, SRI TDaun, DRP, RI AGould, DRP, AA JJessie, RI, OEDO RidsNrrPMSusquehanna Resource RidsNrrDorlLpl1-2 Resource ROPreports Resource Distribution w/encl; w/OUO- SRI: (via E-Mail)
D. Caron, DRS R. McKinley, DRS D. Schroeder, DRP J. Greives, DRP, SRI T. Daun, DRP, RI N. Simonian, NSIR E. Wharton, NSIR C. Johnson, NSIR R. Albert, NSIR NOSB B. Desai, DRS, RII S. Orth, DRS, RIII M. Haire, DRS, RIV