ML16033A471: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(2 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML16033A471
| number = ML16033A471
| issue date = 01/22/2016
| issue date = 01/22/2016
| title = Millstone, Unit 2 - Inservice Inspection Program, Owner'S Activity Report, Refueling Outage 23
| title = Inservice Inspection Program, Owner'S Activity Report, Refueling Outage 23
| author name = Stanley B L
| author name = Stanley B
| author affiliation = Dominion Nuclear Connecticut, Inc
| author affiliation = Dominion Nuclear Connecticut, Inc
| addressee name =  
| addressee name =  
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:~Dominion Dominion Nuclear Connecticut, Inc.Rope Ferry Rd., Waterford, CT 06385 Mailing Address: P.O. Box 128 Waterford, CT 06385 dora. corn JAN 2 2 2015 U.S. Nuclear Regulatory Commission Attention:
{{#Wiki_filter:Dominion Nuclear Connecticut, Inc.                             ~Dominion Rope Ferry Rd., Waterford, CT 06385 Mailing Address: P.O. Box 128 Waterford, CT 06385 dora. corn JAN 2 2 2015 U.S. Nuclear Regulatory Commission                         Serial No.      16-005 Attention: Document Control Desk                           NSS&L/MLC       R0 Washington, DC 20555                                        Docket No.     50-336 License No. DPR-65 DOMINION NUCLEAR CONNECTICUT. INC.
Document Control Desk Washington, DC 20555 Serial No.NSS&L/MLC Docket No.License No.16-005 R0 50-336 DPR-65 DOMINION NUCLEAR CONNECTICUT.
MILLSTONE POWER STATION UNIT 2 INSERVICE INSPECTION PROGRAM - OWNER'S ACTIVITY REPORT, REFUELING OUTAGE 23 Dominion Nuclear Connecticut, Inc. hereby submits the American Society of Mechanical Engineers (AS ME), Section XI, Form OAR-I, Owner's Activity Report for the period from May 19, 2014 through Refueling Outage 23, completed on November 7, 2015, for Millstone Power Station Unit 2. The enclosure is in accordance with the requirements of ASME Code Case N-532-4.
INC.MILLSTONE POWER STATION UNIT 2 INSERVICE INSPECTION PROGRAM -OWNER'S ACTIVITY REPORT, REFUELING OUTAGE 23 Dominion Nuclear Connecticut, Inc. hereby submits the American Society of Mechanical Engineers (AS ME), Section XI, Form OAR-I, Owner's Activity Report for the period from May 19, 2014 through Refueling Outage 23, completed on November 7, 2015, for Millstone Power Station Unit 2. The enclosure is in accordance with the requirements of ASME Code Case N-532-4.If you have any questions or require additional information, please contact Mr. Thomas Cleary at (860) 444-4377.Sincerely, B. L. Stanley Director, Nuclear Station Safety and Licensing  
If you have any questions or require additional information, please contact Mr. Thomas Cleary at (860) 444-4377.
Sincerely, B. L. Stanley Director, Nuclear Station Safety and Licensing


==Enclosure:==
==Enclosure:==
: 1. Millstone Power Station Unit 2, Owner's Activity Report -Refueling Outage 23 Commitments made in this letter: None.
: 1. Millstone Power Station Unit 2, Owner's Activity Report - Refueling Outage 23 Commitments made in this letter: None.
Serial No. 16-005 Owner's Activity Report, 2R23 Docket No. 50-336 Page 2 of 2 cc: U.S. Nuclear Regulatory Commission Region I 2100 Renaissance Blvd Suite 100 King of Prussia, PA 19406-2713 R. V. Guzman NRC Senior Project Manager U.S. Nuclear Regulatory Commission, Mail Stop 08 C2 One White Flint North 11555 Rockville Pike Rockville, MD 20852-2738 NRC Senior Resident Inspector Millstone Power Station Serial No.Docket No.16-005 50-336 ENCLOSURE1I INSERVICE INSPECTION PROGRAM -OWNER'S ACTIVITY REPORT REFUELING OUTAGE 23 MILLSTONE POWER STATION UNIT 2 DOMINION NUCLEAR CONNECTICUT, INC.
 
MILLSTONE POWER STATION UNIT NO. 2 OWNER'S ACTIVITY REPORT REFUELING OUTAGE 23 Revision 0 Contents: OAR-i Renort Number: MP2-2R23 Table 1: Items with Flaws or Relevant Conditions That Required Evaluation for Continued Service.Table 2: Abstract of Repairs/Replacement Activities Required for Continued Service Prepared By: Reviewed By: Reviewed By:/ IS Owner Independent Review Date: e' a 6, Date: eo,2, Authorized Nuec1ir Inserviee .Inspector n~ni Form OAR-I Owner's Activity Report A 1 !-5[I k [ S1';i Report Number:_MP2-2R23 Plant Millstone Nuclear Power Station. Rope Ferry Road, Waterford, Connecticut 06385 Unit No. 2 (if applicable)
Serial No. 16-005 Owner's Activity Report, 2R23 Docket No. 50-336 Page 2 of 2 cc: U.S. Nuclear Regulatory Commission Region I 2100 Renaissance Blvd Suite 100 King of Prussia, PA 19406-2713 R. V. Guzman NRC Senior Project Manager U.S. Nuclear Regulatory Commission, Mail Stop 08 C2 One White Flint North 11555 Rockville Pike Rockville, MD 20852-2738 NRC Senior Resident Inspector Millstone Power Station
Current inspection interval 4th Current inspection period 2nd Commercial service date 12126/1975 Refueling outage no. 23 (1 st, 2 nd, 3rd, 4 tf, other)(1st, 2nd, 3rd)Edition and Addenda of Section Xl applicable to the inspection plans 2004 Edition. No Addenda Date and revision of inspection plans 06/15/i5 Revision 3. Chancqe 3-008 Edition and Addenda of Section XI applicable to repair/replacement activities, if different than the inspection plans N/A Code Cases used: N-460, N-532-4, N-566-2. N-722-1. N-770-1 (if applicable)
 
CERTIFICATE OF CONFORMANCE I certify that (a) the statements made in this report are correct; (b) the examinations and tests meet the Inspection Plan as required by the ASME Code, Section Xl; and (c) the repair/replacement activities and evaluations supporting the completion of 2R23 conform to the requirements of Section XI.(refueling outage number)Signed k~
Serial No. 16-005 Docket No. 50-336 ENCLOSURE1I INSERVICE INSPECTION PROGRAM - OWNER'S ACTIVITY REPORT REFUELING OUTAGE 23 MILLSTONE POWER STATION UNIT 2 DOMINION NUCLEAR CONNECTICUT, INC.
SI Proaram O~wner Date 01/05/2016 SOwner or ..-......-  
 
.....CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Connecticut and employed by The Hartford Steam Boiler Inspection and Insurance Company of Connecticut of Hartford.
MILLSTONE POWER STATION UNIT NO. 2 OWNER'S ACTIVITY REPORT REFUELING OUTAGE 23 Revision 0 Contents:
Connecticut have inspected the items described in this Owner's Activity Report, and state that, to the best of my knowledge and belief, the Owner has performed all activities represented by this report in accordance with the requirements of Section XI.By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the repair/replacement activities and evaluation described in this report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.
OAR-i Renort Number: MP2-2R23 Table 1: Items with Flaws or Relevant Conditions That Required Evaluation for Continued Service.
A4,, 6"r/R/- ,, z-- c'_:, Inspect s' e "National Bo'ard, State, Province and Endorsements Date 6O/.//. £Z-O/,,
Table 2: Abstract of Repairs/Replacement Activities Required for Continued Service Prepared By:       / IS Progr* Owner                     Date: e' a     6, Reviewed By:                                              Date: eo,2, Independent Review Reviewed By:
m~nksn~Form OAR-I Owner's Activity Report A --II .6~ S Table I Items with Flaws or Relevant Conditions That Required Evaluation for Continued Service Examination Item Description Evaluation Description Category and Item Number F-A / F1 .30G Pipe Support 405633 Anchor bolt thread engagement evaluated by Engineering as acceptable for continued service as documented in UIR MP2-15-001.
Authorized Nuec1ir Inserviee .Inspector
F-A/ F1.20C Pipe Support 401021 Support spring load setting evaluated by Engineering as acceptable for continued service as documented in UIR MP2-15-002.F-A / Fl1.20B Pipe Support 401022 Support spring load setting evaluated by Engineering as acceptable for continued service as documented in UIR MP2-15-003.F-A / FlI.30A Pipe Support 405875 Corrosion evaluated by Engineering as acceptable for continued service as documented in UIR MP2-15-004.
 
F-A/ F F.20A Pipe Support 402116 Skewed base plate bolting evaluated by Engineering as acceptable for continued service as documented in UIR MP2-15-005.F-A / FI .40F Pipe Support Grout and coating degradation at support CAR-X-35A-1-S-B base evaluated by Engineering as acceptable for continued service as documented in UIR MP2-15-006.
Form OAR-I Owner's Activity Report n~ni                        A             -i.[*:,:1i  1     ,*_-' k    !-5[I                                       [ S1';i Report Number:_            MP2-2R23 Plant                     Millstone Nuclear Power Station.                     Rope Ferry Road, Waterford, Connecticut 06385 Unit No.       2                         Commercial service date                      12126/1975             Refueling outage no. 23 (if applicable)
F-A/ F1.20C Pipe Support 312009 Support spring load selling evaluated by Engineering as acceptable for continued service as documented in UIR MP2-15-007.F-A/ Fl.20A Pipe Support 310021 Support strut barrel thread engagement evaluated by Engineering as acceptable for continued service. Support adjusted to restore to original design condition as documented in UIR MP2-15-008.
Current inspection interval        4th
C-H / C7.10 Valve 2-SI-470 Evidence of leakage at bolted connection evaluated in accordance with ASME Code Case N-566-2 as acceptable for continued service as documented in ETE MP-2015-1103 C-H / C7.10 Valve 2-SI-411 Evidence of leakage at bolted connection evaluated in accordance with ASME Code Case N-566-2 as acceptable for continued service as documented in ETE MP-201 5-1103 Form OAR-I Owner's Activity Report Table 1 Items with Flaws or Relevant Conditions That Required Evaluation for Continued Service Examination Item Description Evaluation Description Category and Item Number C-H / C7.10 Pump 2-SI-P41B Suction Evidence of leakage at bolted connection Flange evaluated in accordance with ASME Code Case N-566-2 as acceptable for continued service as documented in ETE MP-2015-1 103 C-H I C7.10 .Valve 2-SI-460 Evidence of leakage at bolted connection evaluated in accordance with ASME Code Case N-566-2 as acceptable for continued service as documented in ETE MP-2015-1153  
( 1 st, 2 nd, 3rd, 4 tf,   other)
.......Form OAR-I Owner's Activity Report Table 2 Abstract of RepairlReplacement Activities Required for Continued Service Code Class Item Description Description of Work Date RepairlReplacement Completed Plan Number Replace section of Feedwater piping on line 2 Pipe ~~~~~ 18"-EBB-6.
Current inspection period          2nd (1st, 2nd, 3rd)
Note: This 0/821 30721 Pipe Spool activity was performed 0/821 30721 during previous outage 2R22. Ref. CR1010609.
Edition and Addenda of Section Xl applicable to the inspection plans                               2004 Edition. No Addenda Date and revision of inspection plans                 06/15/i5 Revision 3. Chancqe 3-008 Edition and Addenda of Section XI applicable to repair/replacement activities, if different than the inspection plans N/A Code Cases used:           N-460, N-532-4, N-566-2. N-722-1. N-770-1 (if applicable)
__________
CERTIFICATE OF CONFORMANCE I certify that (a) the statements made in this report are correct; (b) the examinations and tests meet the Inspection Plan as required by the ASME Code, Section Xl; and (c) the repair/replacement activities and evaluations supporting the completion of               2R23                             conform to the requirements of Section XI.
Replace section of 3Pipe Spool Service Water piping on 01/25/2015 53102808407
(refueling outage number)
_____________  
Signed     k~                               *."**;*"7**,_.                  SI Proaram O~wner Date 01/05/2016 SOwner or Owner's*Designee*ftle"                        ..-......-           .....
~~~line 3"-HUD-32____________
CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of             Connecticut                         and employed by The Hartford Steam Boiler Inspection and Insurance Company of Connecticut of Hartford. Connecticut have inspected the items described in this Owner's Activity Report, and state that, to the best of my knowledge and belief, the Owner has performed all activities represented by this report in accordance with the requirements of Section XI.
Replace pressure 3Valve retaining parts of Service 08/05/2015 53102864670
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the repair/replacement activities and evaluation described in this report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.
____________  
                  ,,--*.**"*Z,"
~~Water valve 2-SW-i178B
                        *.*--*fCommissions                                          A4,, **              6"r/R/-        ,,  z--  c'_:,
___________
Inspect     s'*ignatu e "National                                                               Bo'ard, State, Province and Endorsements Date 6O/.//.         £Z-O/,,
Replace section of 3Pipe Spool Service Water piping on 08/07/2015 53102865581
 
__________
Form OAR-I Owner's Activity Report m~nksn~
_____________
A         -       -       II                               .6~     S Table I Items with Flaws or Relevant Conditions That Required Evaluation for Continued Service Examination                 Item Description               Evaluation Description Category and Item Number F-A / F1 .30G         Pipe Support 405633         Anchor bolt thread engagement evaluated by Engineering as acceptable for continued service as documented in UIR MP2-15-001.
line 2-1/2"-HUD-1 12 Replace section of 3Pipe Spool Service Water piping on 10/17/2015 53102867864
F-A/ F1.20C           Pipe Support 401021         Support spring load setting evaluated by Engineering as acceptable for continued service as documented in UIR MP2                                                           002.
__________
F-A / Fl1.20B         Pipe Support 401022         Support spring load setting evaluated by Engineering as acceptable for continued service as documented in UIR MP2                                                           003.
_____________
F-A / FlI.30A         Pipe Support 405875         Corrosion evaluated by Engineering as acceptable for continued service as documented in UIR MP2-15-004.
line 2-1/2"-HUD-1 12 Replace section of 2Pipe Spool Feedwater piping on line 10/29/2015 53102801958 18"-EBD-8 at valve 2-FW-5B Replace section of 2Pipe Spool Feedwater piping on line 10/30/20 15 53102885893 1 8"-EBB-6 at valve________2-FW-5A Replace section of 2 Pipe Spool ~~Feedwater piping on line 1/021 30842 Pipe spool 18"-EBB-6 inside 1/021 30842 containment  
F F-A/ F.20A             Pipe Support 402116         Skewed base plate bolting evaluated by Engineering as acceptable for continued service as documented in UIR MP2                                                           005.
~Dominion Dominion Nuclear Connecticut, Inc.Rope Ferry Rd., Waterford, CT 06385 Mailing Address: P.O. Box 128 Waterford, CT 06385 dora. corn JAN 2 2 2015 U.S. Nuclear Regulatory Commission Attention:
F-A / FI .40F         Pipe Support               Grout and coating degradation at support CAR-X-35A-1-S-B             base evaluated by Engineering as acceptable for continued service as documented in UIR MP2-15-006.
Document Control Desk Washington, DC 20555 Serial No.NSS&L/MLC Docket No.License No.16-005 R0 50-336 DPR-65 DOMINION NUCLEAR CONNECTICUT.
F-A/ F1.20C           Pipe Support 312009         Support spring load selling evaluated by Engineering as acceptable for continued service as documented in UIR MP2                                                           007.
INC.MILLSTONE POWER STATION UNIT 2 INSERVICE INSPECTION PROGRAM -OWNER'S ACTIVITY REPORT, REFUELING OUTAGE 23 Dominion Nuclear Connecticut, Inc. hereby submits the American Society of Mechanical Engineers (AS ME), Section XI, Form OAR-I, Owner's Activity Report for the period from May 19, 2014 through Refueling Outage 23, completed on November 7, 2015, for Millstone Power Station Unit 2. The enclosure is in accordance with the requirements of ASME Code Case N-532-4.If you have any questions or require additional information, please contact Mr. Thomas Cleary at (860) 444-4377.Sincerely, B. L. Stanley Director, Nuclear Station Safety and Licensing  
F-A/ Fl.20A           Pipe Support 310021         Support strut barrel thread engagement evaluated by Engineering as acceptable for continued service. Support adjusted to restore to original design condition as documented in UIR MP2-15-008.
C-H / C7.10           Valve 2-SI-470             Evidence of leakage at bolted connection evaluated in accordance with ASME Code Case N-566-2 as acceptable for continued service as documented in ETE MP-2015-1103 C-H / C7.10           Valve 2-SI-411             Evidence of leakage at bolted connection evaluated in accordance with ASME Code Case N-566-2 as acceptable for continued service as documented in ETE MP-201 5-1103
 
In,*ioo,          Form OAR-I Owner's Activity Report Table 1 Items with Flaws or Relevant Conditions That Required Evaluation for Continued Service Examination                 Item Description             Evaluation Description Category and Item Number C-H / C7.10             Pump 2-SI-P41B Suction     Evidence of leakage at bolted connection Flange                     evaluated in accordance with ASME Code Case N-566-2 as acceptable for continued service as documented in ETE MP-2015-1 103 C-H I C7.10           .Valve 2-SI-460             Evidence of leakage at bolted connection evaluated in accordance with ASME Code Case N-566-2 as acceptable for continued service as documented in ETE MP-2015-1153
 
                  .......               Form OAR-I Owner's Activity Report Table 2 Abstract of RepairlReplacement Activities Required for Continued Service Code Class       Item Description           Description of Work             Date       RepairlReplacement Completed             Plan Number Replace section of Feedwater piping on line 2                 ~~~~~
Pipe Pipe Spool        18"-EBB-6.       Note: This activity was performed      0/821 0/821                   30721 30721 during previous outage 2R22. Ref. CR1010609.                   __________
Replace section of 3Pipe                     Spool       Service Water piping on     01/25/2015             53102808407
_____________                               ~~~line 3"-HUD-32____________
Replace pressure 3Valve                               retaining parts of Service   08/05/2015             53102864670
____________                         ~~Water valve 2-SW-i178B                   ___________
Replace section of 3Pipe                     Spool       Service Water piping on     08/07/2015             53102865581
_______________________                  line 2-1/2"-HUD-1 12 Replace section of 3Pipe                     Spool       Service Water piping on     10/17/2015             53102867864
__________ _____________               line 2-1/2"-HUD-1 12 Replace section of 2Pipe                     Spool       Feedwater piping on line     10/29/2015             53102801958 18"-EBD-8 at valve 2-FW-5B Replace section of 2Pipe                     Spool       Feedwater piping on line     10/30/20 15           53102885893 18"-EBB-6 at valve
________2-FW-5A Replace section of 2         Pipe Spool         ~~Feedwater piping on line     1/021                   30842 Pipe spool       18"-EBB-6 inside       1/021                   30842 containment
 
Dominion Nuclear Connecticut, Inc.                             ~Dominion Rope Ferry Rd., Waterford, CT 06385 Mailing Address: P.O. Box 128 Waterford, CT 06385 dora. corn JAN 2 2 2015 U.S. Nuclear Regulatory Commission                         Serial No.      16-005 Attention: Document Control Desk                           NSS&L/MLC       R0 Washington, DC 20555                                        Docket No.     50-336 License No. DPR-65 DOMINION NUCLEAR CONNECTICUT. INC.
MILLSTONE POWER STATION UNIT 2 INSERVICE INSPECTION PROGRAM - OWNER'S ACTIVITY REPORT, REFUELING OUTAGE 23 Dominion Nuclear Connecticut, Inc. hereby submits the American Society of Mechanical Engineers (AS ME), Section XI, Form OAR-I, Owner's Activity Report for the period from May 19, 2014 through Refueling Outage 23, completed on November 7, 2015, for Millstone Power Station Unit 2. The enclosure is in accordance with the requirements of ASME Code Case N-532-4.
If you have any questions or require additional information, please contact Mr. Thomas Cleary at (860) 444-4377.
Sincerely, B. L. Stanley Director, Nuclear Station Safety and Licensing


==Enclosure:==
==Enclosure:==
: 1. Millstone Power Station Unit 2, Owner's Activity Report -Refueling Outage 23 Commitments made in this letter: None.
: 1. Millstone Power Station Unit 2, Owner's Activity Report - Refueling Outage 23 Commitments made in this letter: None.
Serial No. 16-005 Owner's Activity Report, 2R23 Docket No. 50-336 Page 2 of 2 cc: U.S. Nuclear Regulatory Commission Region I 2100 Renaissance Blvd Suite 100 King of Prussia, PA 19406-2713 R. V. Guzman NRC Senior Project Manager U.S. Nuclear Regulatory Commission, Mail Stop 08 C2 One White Flint North 11555 Rockville Pike Rockville, MD 20852-2738 NRC Senior Resident Inspector Millstone Power Station Serial No.Docket No.16-005 50-336 ENCLOSURE1I INSERVICE INSPECTION PROGRAM -OWNER'S ACTIVITY REPORT REFUELING OUTAGE 23 MILLSTONE POWER STATION UNIT 2 DOMINION NUCLEAR CONNECTICUT, INC.
 
MILLSTONE POWER STATION UNIT NO. 2 OWNER'S ACTIVITY REPORT REFUELING OUTAGE 23 Revision 0 Contents: OAR-i Renort Number: MP2-2R23 Table 1: Items with Flaws or Relevant Conditions That Required Evaluation for Continued Service.Table 2: Abstract of Repairs/Replacement Activities Required for Continued Service Prepared By: Reviewed By: Reviewed By:/ IS Owner Independent Review Date: e' a 6, Date: eo,2, Authorized Nuec1ir Inserviee .Inspector n~ni Form OAR-I Owner's Activity Report A 1 !-5[I k [ S1';i Report Number:_MP2-2R23 Plant Millstone Nuclear Power Station. Rope Ferry Road, Waterford, Connecticut 06385 Unit No. 2 (if applicable)
Serial No. 16-005 Owner's Activity Report, 2R23 Docket No. 50-336 Page 2 of 2 cc: U.S. Nuclear Regulatory Commission Region I 2100 Renaissance Blvd Suite 100 King of Prussia, PA 19406-2713 R. V. Guzman NRC Senior Project Manager U.S. Nuclear Regulatory Commission, Mail Stop 08 C2 One White Flint North 11555 Rockville Pike Rockville, MD 20852-2738 NRC Senior Resident Inspector Millstone Power Station
Current inspection interval 4th Current inspection period 2nd Commercial service date 12126/1975 Refueling outage no. 23 (1 st, 2 nd, 3rd, 4 tf, other)(1st, 2nd, 3rd)Edition and Addenda of Section Xl applicable to the inspection plans 2004 Edition. No Addenda Date and revision of inspection plans 06/15/i5 Revision 3. Chancqe 3-008 Edition and Addenda of Section XI applicable to repair/replacement activities, if different than the inspection plans N/A Code Cases used: N-460, N-532-4, N-566-2. N-722-1. N-770-1 (if applicable)
 
CERTIFICATE OF CONFORMANCE I certify that (a) the statements made in this report are correct; (b) the examinations and tests meet the Inspection Plan as required by the ASME Code, Section Xl; and (c) the repair/replacement activities and evaluations supporting the completion of 2R23 conform to the requirements of Section XI.(refueling outage number)Signed k~
Serial No. 16-005 Docket No. 50-336 ENCLOSURE1I INSERVICE INSPECTION PROGRAM - OWNER'S ACTIVITY REPORT REFUELING OUTAGE 23 MILLSTONE POWER STATION UNIT 2 DOMINION NUCLEAR CONNECTICUT, INC.
SI Proaram O~wner Date 01/05/2016 SOwner or ..-......-  
 
.....CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Connecticut and employed by The Hartford Steam Boiler Inspection and Insurance Company of Connecticut of Hartford.
MILLSTONE POWER STATION UNIT NO. 2 OWNER'S ACTIVITY REPORT REFUELING OUTAGE 23 Revision 0 Contents:
Connecticut have inspected the items described in this Owner's Activity Report, and state that, to the best of my knowledge and belief, the Owner has performed all activities represented by this report in accordance with the requirements of Section XI.By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the repair/replacement activities and evaluation described in this report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.
OAR-i Renort Number: MP2-2R23 Table 1: Items with Flaws or Relevant Conditions That Required Evaluation for Continued Service.
A4,, 6"r/R/- ,, z-- c'_:, Inspect s' e "National Bo'ard, State, Province and Endorsements Date 6O/.//. £Z-O/,,
Table 2: Abstract of Repairs/Replacement Activities Required for Continued Service Prepared By:       / IS Progr* Owner                     Date: e' a     6, Reviewed By:                                              Date: eo,2, Independent Review Reviewed By:
m~nksn~Form OAR-I Owner's Activity Report A --II .6~ S Table I Items with Flaws or Relevant Conditions That Required Evaluation for Continued Service Examination Item Description Evaluation Description Category and Item Number F-A / F1 .30G Pipe Support 405633 Anchor bolt thread engagement evaluated by Engineering as acceptable for continued service as documented in UIR MP2-15-001.
Authorized Nuec1ir Inserviee .Inspector
F-A/ F1.20C Pipe Support 401021 Support spring load setting evaluated by Engineering as acceptable for continued service as documented in UIR MP2-15-002.F-A / Fl1.20B Pipe Support 401022 Support spring load setting evaluated by Engineering as acceptable for continued service as documented in UIR MP2-15-003.F-A / FlI.30A Pipe Support 405875 Corrosion evaluated by Engineering as acceptable for continued service as documented in UIR MP2-15-004.
 
F-A/ F F.20A Pipe Support 402116 Skewed base plate bolting evaluated by Engineering as acceptable for continued service as documented in UIR MP2-15-005.F-A / FI .40F Pipe Support Grout and coating degradation at support CAR-X-35A-1-S-B base evaluated by Engineering as acceptable for continued service as documented in UIR MP2-15-006.
Form OAR-I Owner's Activity Report n~ni                        A             -i.[*:,:1i  1     ,*_-' k    !-5[I                                       [ S1';i Report Number:_            MP2-2R23 Plant                     Millstone Nuclear Power Station.                     Rope Ferry Road, Waterford, Connecticut 06385 Unit No.       2                         Commercial service date                     12126/1975             Refueling outage no. 23 (if applicable)
F-A/ F1.20C Pipe Support 312009 Support spring load selling evaluated by Engineering as acceptable for continued service as documented in UIR MP2-15-007.F-A/ Fl.20A Pipe Support 310021 Support strut barrel thread engagement evaluated by Engineering as acceptable for continued service. Support adjusted to restore to original design condition as documented in UIR MP2-15-008.
Current inspection interval        4th
C-H / C7.10 Valve 2-SI-470 Evidence of leakage at bolted connection evaluated in accordance with ASME Code Case N-566-2 as acceptable for continued service as documented in ETE MP-2015-1103 C-H / C7.10 Valve 2-SI-411 Evidence of leakage at bolted connection evaluated in accordance with ASME Code Case N-566-2 as acceptable for continued service as documented in ETE MP-201 5-1103 Form OAR-I Owner's Activity Report Table 1 Items with Flaws or Relevant Conditions That Required Evaluation for Continued Service Examination Item Description Evaluation Description Category and Item Number C-H / C7.10 Pump 2-SI-P41B Suction Evidence of leakage at bolted connection Flange evaluated in accordance with ASME Code Case N-566-2 as acceptable for continued service as documented in ETE MP-2015-1 103 C-H I C7.10 .Valve 2-SI-460 Evidence of leakage at bolted connection evaluated in accordance with ASME Code Case N-566-2 as acceptable for continued service as documented in ETE MP-2015-1153  
( 1 st, 2 nd, 3rd, 4 tf,   other)
.......Form OAR-I Owner's Activity Report Table 2 Abstract of RepairlReplacement Activities Required for Continued Service Code Class Item Description Description of Work Date RepairlReplacement Completed Plan Number Replace section of Feedwater piping on line 2 Pipe ~~~~~ 18"-EBB-6.
Current inspection period          2nd (1st, 2nd, 3rd)
Note: This 0/821 30721 Pipe Spool activity was performed 0/821 30721 during previous outage 2R22. Ref. CR1010609.
Edition and Addenda of Section Xl applicable to the inspection plans                               2004 Edition. No Addenda Date and revision of inspection plans                 06/15/i5 Revision 3. Chancqe 3-008 Edition and Addenda of Section XI applicable to repair/replacement activities, if different than the inspection plans N/A Code Cases used:           N-460, N-532-4, N-566-2. N-722-1. N-770-1 (if applicable)
__________
CERTIFICATE OF CONFORMANCE I certify that (a) the statements made in this report are correct; (b) the examinations and tests meet the Inspection Plan as required by the ASME Code, Section Xl; and (c) the repair/replacement activities and evaluations supporting the completion of               2R23                             conform to the requirements of Section XI.
Replace section of 3Pipe Spool Service Water piping on 01/25/2015 53102808407
(refueling outage number)
_____________  
Signed     k~                               *."**;*"7**,_.                  SI Proaram O~wner Date 01/05/2016 SOwner or Owner's*Designee*ftle"                        ..-......-           .....
~~~line 3"-HUD-32____________
CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of             Connecticut                         and employed by The Hartford Steam Boiler Inspection and Insurance Company of Connecticut of Hartford. Connecticut have inspected the items described in this Owner's Activity Report, and state that, to the best of my knowledge and belief, the Owner has performed all activities represented by this report in accordance with the requirements of Section XI.
Replace pressure 3Valve retaining parts of Service 08/05/2015 53102864670
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the repair/replacement activities and evaluation described in this report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.
____________  
                  ,,--*.**"*Z,"
~~Water valve 2-SW-i178B
                        *.*--*fCommissions                                          A4,, **              6"r/R/-         ,,   z-- c'_:,
___________
Inspect     s'*ignatu e "National                                                               Bo'ard, State, Province and Endorsements Date 6O/.//.         £Z-O/,,
Replace section of 3Pipe Spool Service Water piping on 08/07/2015 53102865581
 
__________
Form OAR-I Owner's Activity Report m~nksn~
_____________
A         -       -       II                               .6~     S Table I Items with Flaws or Relevant Conditions That Required Evaluation for Continued Service Examination                 Item Description               Evaluation Description Category and Item Number F-A / F1 .30G         Pipe Support 405633         Anchor bolt thread engagement evaluated by Engineering as acceptable for continued service as documented in UIR MP2-15-001.
line 2-1/2"-HUD-1 12 Replace section of 3Pipe Spool Service Water piping on 10/17/2015 53102867864
F-A/ F1.20C           Pipe Support 401021         Support spring load setting evaluated by Engineering as acceptable for continued service as documented in UIR MP2                                                           002.
__________
F-A / Fl1.20B         Pipe Support 401022         Support spring load setting evaluated by Engineering as acceptable for continued service as documented in UIR MP2                                                           003.
_____________
F-A / FlI.30A         Pipe Support 405875         Corrosion evaluated by Engineering as acceptable for continued service as documented in UIR MP2-15-004.
line 2-1/2"-HUD-1 12 Replace section of 2Pipe Spool Feedwater piping on line 10/29/2015 53102801958 18"-EBD-8 at valve 2-FW-5B Replace section of 2Pipe Spool Feedwater piping on line 10/30/20 15 53102885893 1 8"-EBB-6 at valve________2-FW-5A Replace section of 2 Pipe Spool ~~Feedwater piping on line 1/021 30842 Pipe spool 18"-EBB-6 inside 1/021 30842 containment}}
F F-A/ F.20A             Pipe Support 402116         Skewed base plate bolting evaluated by Engineering as acceptable for continued service as documented in UIR MP2                                                           005.
F-A / FI .40F         Pipe Support               Grout and coating degradation at support CAR-X-35A-1-S-B             base evaluated by Engineering as acceptable for continued service as documented in UIR MP2-15-006.
F-A/ F1.20C           Pipe Support 312009         Support spring load selling evaluated by Engineering as acceptable for continued service as documented in UIR MP2                                                           007.
F-A/ Fl.20A           Pipe Support 310021         Support strut barrel thread engagement evaluated by Engineering as acceptable for continued service. Support adjusted to restore to original design condition as documented in UIR MP2-15-008.
C-H / C7.10           Valve 2-SI-470             Evidence of leakage at bolted connection evaluated in accordance with ASME Code Case N-566-2 as acceptable for continued service as documented in ETE MP-2015-1103 C-H / C7.10           Valve 2-SI-411             Evidence of leakage at bolted connection evaluated in accordance with ASME Code Case N-566-2 as acceptable for continued service as documented in ETE MP-201 5-1103
 
In,*ioo,          Form OAR-I Owner's Activity Report Table 1 Items with Flaws or Relevant Conditions That Required Evaluation for Continued Service Examination                 Item Description             Evaluation Description Category and Item Number C-H / C7.10             Pump 2-SI-P41B Suction     Evidence of leakage at bolted connection Flange                     evaluated in accordance with ASME Code Case N-566-2 as acceptable for continued service as documented in ETE MP-2015-1 103 C-H I C7.10           .Valve 2-SI-460             Evidence of leakage at bolted connection evaluated in accordance with ASME Code Case N-566-2 as acceptable for continued service as documented in ETE MP-2015-1153
 
                  .......               Form OAR-I Owner's Activity Report Table 2 Abstract of RepairlReplacement Activities Required for Continued Service Code Class       Item Description           Description of Work             Date       RepairlReplacement Completed             Plan Number Replace section of Feedwater piping on line 2                 ~~~~~
Pipe Pipe Spool        18"-EBB-6.       Note: This activity was performed      0/821 0/821                   30721 30721 during previous outage 2R22. Ref. CR1010609.                   __________
Replace section of 3Pipe                     Spool       Service Water piping on     01/25/2015             53102808407
_____________                               ~~~line 3"-HUD-32____________
Replace pressure 3Valve                               retaining parts of Service   08/05/2015             53102864670
____________                         ~~Water valve 2-SW-i178B                   ___________
Replace section of 3Pipe                     Spool       Service Water piping on     08/07/2015             53102865581
_______________________                  line 2-1/2"-HUD-1 12 Replace section of 3Pipe                     Spool       Service Water piping on     10/17/2015             53102867864
__________ _____________               line 2-1/2"-HUD-1 12 Replace section of 2Pipe                     Spool       Feedwater piping on line     10/29/2015             53102801958 18"-EBD-8 at valve 2-FW-5B Replace section of 2Pipe                     Spool       Feedwater piping on line     10/30/20 15           53102885893 18"-EBB-6 at valve
________2-FW-5A Replace section of 2         Pipe Spool         ~~Feedwater piping on line     1/021                   30842 Pipe spool       18"-EBB-6 inside       1/021                   30842 containment}}

Latest revision as of 02:12, 31 October 2019

Inservice Inspection Program, Owner'S Activity Report, Refueling Outage 23
ML16033A471
Person / Time
Site: Millstone Dominion icon.png
Issue date: 01/22/2016
From: Stanley B
Dominion Nuclear Connecticut
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
16-005
Download: ML16033A471 (8)


Text

Dominion Nuclear Connecticut, Inc. ~Dominion Rope Ferry Rd., Waterford, CT 06385 Mailing Address: P.O. Box 128 Waterford, CT 06385 dora. corn JAN 2 2 2015 U.S. Nuclear Regulatory Commission Serial No.16-005 Attention: Document Control Desk NSS&L/MLC R0 Washington, DC 20555 Docket No. 50-336 License No. DPR-65 DOMINION NUCLEAR CONNECTICUT. INC.

MILLSTONE POWER STATION UNIT 2 INSERVICE INSPECTION PROGRAM - OWNER'S ACTIVITY REPORT, REFUELING OUTAGE 23 Dominion Nuclear Connecticut, Inc. hereby submits the American Society of Mechanical Engineers (AS ME),Section XI, Form OAR-I, Owner's Activity Report for the period from May 19, 2014 through Refueling Outage 23, completed on November 7, 2015, for Millstone Power Station Unit 2. The enclosure is in accordance with the requirements of ASME Code Case N-532-4.

If you have any questions or require additional information, please contact Mr. Thomas Cleary at (860) 444-4377.

Sincerely, B. L. Stanley Director, Nuclear Station Safety and Licensing

Enclosure:

1. Millstone Power Station Unit 2, Owner's Activity Report - Refueling Outage 23 Commitments made in this letter: None.

Serial No.16-005 Owner's Activity Report, 2R23 Docket No. 50-336 Page 2 of 2 cc: U.S. Nuclear Regulatory Commission Region I 2100 Renaissance Blvd Suite 100 King of Prussia, PA 19406-2713 R. V. Guzman NRC Senior Project Manager U.S. Nuclear Regulatory Commission, Mail Stop 08 C2 One White Flint North 11555 Rockville Pike Rockville, MD 20852-2738 NRC Senior Resident Inspector Millstone Power Station

Serial No.16-005 Docket No. 50-336 ENCLOSURE1I INSERVICE INSPECTION PROGRAM - OWNER'S ACTIVITY REPORT REFUELING OUTAGE 23 MILLSTONE POWER STATION UNIT 2 DOMINION NUCLEAR CONNECTICUT, INC.

MILLSTONE POWER STATION UNIT NO. 2 OWNER'S ACTIVITY REPORT REFUELING OUTAGE 23 Revision 0 Contents:

OAR-i Renort Number: MP2-2R23 Table 1: Items with Flaws or Relevant Conditions That Required Evaluation for Continued Service.

Table 2: Abstract of Repairs/Replacement Activities Required for Continued Service Prepared By: / IS Progr* Owner Date: e' a 6, Reviewed By: Date: eo,2, Independent Review Reviewed By:

Authorized Nuec1ir Inserviee .Inspector

Form OAR-I Owner's Activity Report n~ni A -i.[*:,:1i 1 ,*_-' k  !-5[I [ S1';i Report Number:_ MP2-2R23 Plant Millstone Nuclear Power Station. Rope Ferry Road, Waterford, Connecticut 06385 Unit No. 2 Commercial service date 12126/1975 Refueling outage no. 23 (if applicable)

Current inspection interval 4th

( 1 st, 2 nd, 3rd, 4 tf, other)

Current inspection period 2nd (1st, 2nd, 3rd)

Edition and Addenda of Section Xl applicable to the inspection plans 2004 Edition. No Addenda Date and revision of inspection plans 06/15/i5 Revision 3. Chancqe 3-008 Edition and Addenda of Section XI applicable to repair/replacement activities, if different than the inspection plans N/A Code Cases used: N-460, N-532-4, N-566-2. N-722-1. N-770-1 (if applicable)

CERTIFICATE OF CONFORMANCE I certify that (a) the statements made in this report are correct; (b) the examinations and tests meet the Inspection Plan as required by the ASME Code, Section Xl; and (c) the repair/replacement activities and evaluations supporting the completion of 2R23 conform to the requirements of Section XI.

(refueling outage number)

Signed k~ *."**;*"7**,_. SI Proaram O~wner Date 01/05/2016 SOwner or Owner's*Designee*ftle" ..-......- .....

CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Connecticut and employed by The Hartford Steam Boiler Inspection and Insurance Company of Connecticut of Hartford. Connecticut have inspected the items described in this Owner's Activity Report, and state that, to the best of my knowledge and belief, the Owner has performed all activities represented by this report in accordance with the requirements of Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the repair/replacement activities and evaluation described in this report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

,,--*.**"*Z,"

  • .*--*fCommissions A4,, ** 6"r/R/- ,, z-- c'_:,

Inspect s'*ignatu e "National Bo'ard, State, Province and Endorsements Date 6O/.//. £Z-O/,,

Form OAR-I Owner's Activity Report m~nksn~

A - - II .6~ S Table I Items with Flaws or Relevant Conditions That Required Evaluation for Continued Service Examination Item Description Evaluation Description Category and Item Number F-A / F1 .30G Pipe Support 405633 Anchor bolt thread engagement evaluated by Engineering as acceptable for continued service as documented in UIR MP2-15-001.

F-A/ F1.20C Pipe Support 401021 Support spring load setting evaluated by Engineering as acceptable for continued service as documented in UIR MP2 002.

F-A / Fl1.20B Pipe Support 401022 Support spring load setting evaluated by Engineering as acceptable for continued service as documented in UIR MP2 003.

F-A / FlI.30A Pipe Support 405875 Corrosion evaluated by Engineering as acceptable for continued service as documented in UIR MP2-15-004.

F F-A/ F.20A Pipe Support 402116 Skewed base plate bolting evaluated by Engineering as acceptable for continued service as documented in UIR MP2 005.

F-A / FI .40F Pipe Support Grout and coating degradation at support CAR-X-35A-1-S-B base evaluated by Engineering as acceptable for continued service as documented in UIR MP2-15-006.

F-A/ F1.20C Pipe Support 312009 Support spring load selling evaluated by Engineering as acceptable for continued service as documented in UIR MP2 007.

F-A/ Fl.20A Pipe Support 310021 Support strut barrel thread engagement evaluated by Engineering as acceptable for continued service. Support adjusted to restore to original design condition as documented in UIR MP2-15-008.

C-H / C7.10 Valve 2-SI-470 Evidence of leakage at bolted connection evaluated in accordance with ASME Code Case N-566-2 as acceptable for continued service as documented in ETE MP-2015-1103 C-H / C7.10 Valve 2-SI-411 Evidence of leakage at bolted connection evaluated in accordance with ASME Code Case N-566-2 as acceptable for continued service as documented in ETE MP-201 5-1103

In,*ioo, Form OAR-I Owner's Activity Report Table 1 Items with Flaws or Relevant Conditions That Required Evaluation for Continued Service Examination Item Description Evaluation Description Category and Item Number C-H / C7.10 Pump 2-SI-P41B Suction Evidence of leakage at bolted connection Flange evaluated in accordance with ASME Code Case N-566-2 as acceptable for continued service as documented in ETE MP-2015-1 103 C-H I C7.10 .Valve 2-SI-460 Evidence of leakage at bolted connection evaluated in accordance with ASME Code Case N-566-2 as acceptable for continued service as documented in ETE MP-2015-1153

....... Form OAR-I Owner's Activity Report Table 2 Abstract of RepairlReplacement Activities Required for Continued Service Code Class Item Description Description of Work Date RepairlReplacement Completed Plan Number Replace section of Feedwater piping on line 2 ~~~~~

Pipe Pipe Spool 18"-EBB-6. Note: This activity was performed 0/821 0/821 30721 30721 during previous outage 2R22. Ref. CR1010609. __________

Replace section of 3Pipe Spool Service Water piping on 01/25/2015 53102808407

_____________ ~~~line 3"-HUD-32____________

Replace pressure 3Valve retaining parts of Service 08/05/2015 53102864670

____________ ~~Water valve 2-SW-i178B ___________

Replace section of 3Pipe Spool Service Water piping on 08/07/2015 53102865581

_______________________ line 2-1/2"-HUD-1 12 Replace section of 3Pipe Spool Service Water piping on 10/17/2015 53102867864

__________ _____________ line 2-1/2"-HUD-1 12 Replace section of 2Pipe Spool Feedwater piping on line 10/29/2015 53102801958 18"-EBD-8 at valve 2-FW-5B Replace section of 2Pipe Spool Feedwater piping on line 10/30/20 15 53102885893 18"-EBB-6 at valve

________2-FW-5A Replace section of 2 Pipe Spool ~~Feedwater piping on line 1/021 30842 Pipe spool 18"-EBB-6 inside 1/021 30842 containment

Dominion Nuclear Connecticut, Inc. ~Dominion Rope Ferry Rd., Waterford, CT 06385 Mailing Address: P.O. Box 128 Waterford, CT 06385 dora. corn JAN 2 2 2015 U.S. Nuclear Regulatory Commission Serial No.16-005 Attention: Document Control Desk NSS&L/MLC R0 Washington, DC 20555 Docket No. 50-336 License No. DPR-65 DOMINION NUCLEAR CONNECTICUT. INC.

MILLSTONE POWER STATION UNIT 2 INSERVICE INSPECTION PROGRAM - OWNER'S ACTIVITY REPORT, REFUELING OUTAGE 23 Dominion Nuclear Connecticut, Inc. hereby submits the American Society of Mechanical Engineers (AS ME),Section XI, Form OAR-I, Owner's Activity Report for the period from May 19, 2014 through Refueling Outage 23, completed on November 7, 2015, for Millstone Power Station Unit 2. The enclosure is in accordance with the requirements of ASME Code Case N-532-4.

If you have any questions or require additional information, please contact Mr. Thomas Cleary at (860) 444-4377.

Sincerely, B. L. Stanley Director, Nuclear Station Safety and Licensing

Enclosure:

1. Millstone Power Station Unit 2, Owner's Activity Report - Refueling Outage 23 Commitments made in this letter: None.

Serial No.16-005 Owner's Activity Report, 2R23 Docket No. 50-336 Page 2 of 2 cc: U.S. Nuclear Regulatory Commission Region I 2100 Renaissance Blvd Suite 100 King of Prussia, PA 19406-2713 R. V. Guzman NRC Senior Project Manager U.S. Nuclear Regulatory Commission, Mail Stop 08 C2 One White Flint North 11555 Rockville Pike Rockville, MD 20852-2738 NRC Senior Resident Inspector Millstone Power Station

Serial No.16-005 Docket No. 50-336 ENCLOSURE1I INSERVICE INSPECTION PROGRAM - OWNER'S ACTIVITY REPORT REFUELING OUTAGE 23 MILLSTONE POWER STATION UNIT 2 DOMINION NUCLEAR CONNECTICUT, INC.

MILLSTONE POWER STATION UNIT NO. 2 OWNER'S ACTIVITY REPORT REFUELING OUTAGE 23 Revision 0 Contents:

OAR-i Renort Number: MP2-2R23 Table 1: Items with Flaws or Relevant Conditions That Required Evaluation for Continued Service.

Table 2: Abstract of Repairs/Replacement Activities Required for Continued Service Prepared By: / IS Progr* Owner Date: e' a 6, Reviewed By: Date: eo,2, Independent Review Reviewed By:

Authorized Nuec1ir Inserviee .Inspector

Form OAR-I Owner's Activity Report n~ni A -i.[*:,:1i 1 ,*_-' k  !-5[I [ S1';i Report Number:_ MP2-2R23 Plant Millstone Nuclear Power Station. Rope Ferry Road, Waterford, Connecticut 06385 Unit No. 2 Commercial service date 12126/1975 Refueling outage no. 23 (if applicable)

Current inspection interval 4th

( 1 st, 2 nd, 3rd, 4 tf, other)

Current inspection period 2nd (1st, 2nd, 3rd)

Edition and Addenda of Section Xl applicable to the inspection plans 2004 Edition. No Addenda Date and revision of inspection plans 06/15/i5 Revision 3. Chancqe 3-008 Edition and Addenda of Section XI applicable to repair/replacement activities, if different than the inspection plans N/A Code Cases used: N-460, N-532-4, N-566-2. N-722-1. N-770-1 (if applicable)

CERTIFICATE OF CONFORMANCE I certify that (a) the statements made in this report are correct; (b) the examinations and tests meet the Inspection Plan as required by the ASME Code, Section Xl; and (c) the repair/replacement activities and evaluations supporting the completion of 2R23 conform to the requirements of Section XI.

(refueling outage number)

Signed k~ *."**;*"7**,_. SI Proaram O~wner Date 01/05/2016 SOwner or Owner's*Designee*ftle" ..-......- .....

CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Connecticut and employed by The Hartford Steam Boiler Inspection and Insurance Company of Connecticut of Hartford. Connecticut have inspected the items described in this Owner's Activity Report, and state that, to the best of my knowledge and belief, the Owner has performed all activities represented by this report in accordance with the requirements of Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the repair/replacement activities and evaluation described in this report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

,,--*.**"*Z,"

  • .*--*fCommissions A4,, ** 6"r/R/- ,, z-- c'_:,

Inspect s'*ignatu e "National Bo'ard, State, Province and Endorsements Date 6O/.//. £Z-O/,,

Form OAR-I Owner's Activity Report m~nksn~

A - - II .6~ S Table I Items with Flaws or Relevant Conditions That Required Evaluation for Continued Service Examination Item Description Evaluation Description Category and Item Number F-A / F1 .30G Pipe Support 405633 Anchor bolt thread engagement evaluated by Engineering as acceptable for continued service as documented in UIR MP2-15-001.

F-A/ F1.20C Pipe Support 401021 Support spring load setting evaluated by Engineering as acceptable for continued service as documented in UIR MP2 002.

F-A / Fl1.20B Pipe Support 401022 Support spring load setting evaluated by Engineering as acceptable for continued service as documented in UIR MP2 003.

F-A / FlI.30A Pipe Support 405875 Corrosion evaluated by Engineering as acceptable for continued service as documented in UIR MP2-15-004.

F F-A/ F.20A Pipe Support 402116 Skewed base plate bolting evaluated by Engineering as acceptable for continued service as documented in UIR MP2 005.

F-A / FI .40F Pipe Support Grout and coating degradation at support CAR-X-35A-1-S-B base evaluated by Engineering as acceptable for continued service as documented in UIR MP2-15-006.

F-A/ F1.20C Pipe Support 312009 Support spring load selling evaluated by Engineering as acceptable for continued service as documented in UIR MP2 007.

F-A/ Fl.20A Pipe Support 310021 Support strut barrel thread engagement evaluated by Engineering as acceptable for continued service. Support adjusted to restore to original design condition as documented in UIR MP2-15-008.

C-H / C7.10 Valve 2-SI-470 Evidence of leakage at bolted connection evaluated in accordance with ASME Code Case N-566-2 as acceptable for continued service as documented in ETE MP-2015-1103 C-H / C7.10 Valve 2-SI-411 Evidence of leakage at bolted connection evaluated in accordance with ASME Code Case N-566-2 as acceptable for continued service as documented in ETE MP-201 5-1103

In,*ioo, Form OAR-I Owner's Activity Report Table 1 Items with Flaws or Relevant Conditions That Required Evaluation for Continued Service Examination Item Description Evaluation Description Category and Item Number C-H / C7.10 Pump 2-SI-P41B Suction Evidence of leakage at bolted connection Flange evaluated in accordance with ASME Code Case N-566-2 as acceptable for continued service as documented in ETE MP-2015-1 103 C-H I C7.10 .Valve 2-SI-460 Evidence of leakage at bolted connection evaluated in accordance with ASME Code Case N-566-2 as acceptable for continued service as documented in ETE MP-2015-1153

....... Form OAR-I Owner's Activity Report Table 2 Abstract of RepairlReplacement Activities Required for Continued Service Code Class Item Description Description of Work Date RepairlReplacement Completed Plan Number Replace section of Feedwater piping on line 2 ~~~~~

Pipe Pipe Spool 18"-EBB-6. Note: This activity was performed 0/821 0/821 30721 30721 during previous outage 2R22. Ref. CR1010609. __________

Replace section of 3Pipe Spool Service Water piping on 01/25/2015 53102808407

_____________ ~~~line 3"-HUD-32____________

Replace pressure 3Valve retaining parts of Service 08/05/2015 53102864670

____________ ~~Water valve 2-SW-i178B ___________

Replace section of 3Pipe Spool Service Water piping on 08/07/2015 53102865581

_______________________ line 2-1/2"-HUD-1 12 Replace section of 3Pipe Spool Service Water piping on 10/17/2015 53102867864

__________ _____________ line 2-1/2"-HUD-1 12 Replace section of 2Pipe Spool Feedwater piping on line 10/29/2015 53102801958 18"-EBD-8 at valve 2-FW-5B Replace section of 2Pipe Spool Feedwater piping on line 10/30/20 15 53102885893 18"-EBB-6 at valve

________2-FW-5A Replace section of 2 Pipe Spool ~~Feedwater piping on line 1/021 30842 Pipe spool 18"-EBB-6 inside 1/021 30842 containment