ML16083A469: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(7 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML16083A469
| number = ML16083A469
| issue date = 11/30/2015
| issue date = 11/30/2015
| title = Pilgrim Nuclear Power Station - Redacted - Updated Final Safety Analysis Report (UFSAR) Part 5 - November 2015 (CAC No. MF7229)
| title = Redacted - Updated Final Safety Analysis Report (UFSAR) Part 5 - November 2015
| author name =  
| author name =  
| author affiliation = Entergy Nuclear Operations, Inc
| author affiliation = Entergy Nuclear Operations, Inc
Line 19: Line 19:


=Text=
=Text=
{{#Wiki_filter:  
{{#Wiki_filter:PNPS-FSAR


PNPS-FSAR  SUMMARY TABLE OF CONTENTS   Summ T of C-i Rev. 30  Nov. 2015 Section       Title                             Volume Section 1 Introduction and Summary 1 1.1 Project Identification 1 1.2 Definitions 1 1.3 Methods of Technical Presentation 1 1.4 Classification of BWR Systems, Criteria, 1 and Requirements for Safety Evaluation 1.5 Principal Design Criteria 1 1.6 Station Description 1 1.7 Comparison of Principal Design Characteristics 1 1.8 Summary of Radiation Effects 1 1.9 Station Management 1 1.10 Quality Assurance Program 1 1.11 Station Research, Development, and Further Information Requirements and Resolutions Summary 1 Section 2 Station Site and Environs 1 2.1 Introduction 1 2.2 Site Description 1 2.3 Meteorology 1 2.4 Hydrology 1 2.5 Geology and Seismology 1 2.6 Environs Radiation Surveillance Program 1 Section 3 Reactor 1 3.1 Summary Description 1 3.2 Fuel Mechanical Design 1 3.3 Reactor Vessel Internals Mechanical Design 1 3.4 Reactivity Control Mechanical Design 1 3.5 Control Rod Drive Housing Supports 1 3.6 Nuclear Design 1 3.7 Thermal and Hydraulic Design 1 3.8 Standby Liquid Control System 1 3.9 Recirculation Pump Trip, Alternate Rod Insertion, and Feedwater Pump Trip Systems 1 Section 4 Reactor Coolant System 2 4.1 Summary Description 2 4.2 Reactor Vessel and Appurtenances Mechanical Design 2 4.3 Recirculation System 2 4.4 Nuclear System Pressure Relief System 2 4.5 Main Steam Line Flow Restrictor 2 PNPS-FSAR  SUMMARY TABLE OF CONTENTS (Cont)    Summ T of C-ii Rev. 30 Nov. 2015Section Title                          Volume  4.6 Main Steam Line Isolation Valves  2 4.7 Reactor Core Isolation Cooling System 2 4.8 Residual Heat Removal System  2 4.9 Reactor Water Cleanup System  2 4.10 Nuclear System Leakage Rate Limits  2 4.11 Main Steam Lines and Feedwater Piping 2 Section 5 Containment  2  5.1 Summary Descriptions  2 5.2 Primary Containment System  2 5.3 Secondary Containment System  2 5.4 Control of Combustible Gas Concentrations  in Containment  2  Section 6 Core Standby Cooling Systems  2 6.1 Safety Objective  2 6.2 Safety Design Bases  2 6.3 Summary Description - Core Standby Cooling  Systems  2 6.4 Description  2 6.5 Safety Evaluation  2 6.6 Inspection and Testing  2 6.7 The Nuclear Safety Requirements  for Plant Operation  2 6.8 Current Technical Specifications  2 Section 7 Control and Instrumentation  3 7.1 Summary Description  3 7.2 Reactor Protection System  3 7.3 Primary Containment and Reactor Vessel  Isolation Control System 3 7.4 Core Standby Cooling Systems Control  and Instrumentation  3 7.5 Neutron Monitoring System  3 7.6 Refueling Interlocks  3 7.7 Reactor Manual Control System  3 7.8 Reactor Vessel Instrumentation  3 7.9 Recirculation Flow Control System  3 7.10 Feedwater Control System  3 7.11 Turbine Generator Control System  3 7.12 Process Radiation Monitoring  3 7.13 Area Radiation Monitoring System  3 7.14 Environs Radiation Monitors  3 7.15 Health Physics and Laboratory Analysis  Radiation Monitors  3 PNPS-FSAR  SUMMARY TABLE OF CONTENTS (Cont)    Summ T of C-iii Rev. 30  Nov. 2015 Section Title                            Volume  7.16 Process Computer System  3 7.17 Nuclear System Stability Analysis for  Initial Core  3 7.18 Reactor Building Isolation and  Control System  3 7.19 RHR Service Water System (SSW, RBCCW) 3 7.20 Equipment Area Cooling System  3 7.21 Meteorological Instrumentation  3  Section 8 Electrical Power System  4  8.1 Summary Description  4 8.2 Unit and Preferred AC Power Sources 4 8.3 Secondary AC Power Source  4 8.4 Auxiliary Power Distribution System 4 8.5 Standby AC Power Source  4 8.6 125 and 250 Volt DC Power Systems 4 8.7 24 Volt DC Power System  4 8.8 120 Volt AC Power Systems  4 8.9 Cable Installation Criteria  4 8.10 Blackout AC Power Source  4 Section 9 Radioactive Waste Systems  4 9.1 Summary Description  4 9.2 Liquid Radwaste System  4 9.3 Solid Radwaste System  4 9.4 Gaseous Radwaste System  4 9.5 Trash Compaction and Decontamination Facilities 4 Section 10 Auxiliary Systems  4 10.1 Summary Description  4 10.2 New Fuel Storage  4 10.3 Spent Fuel Storage  4 10.4 Fuel Pool Cooling and Cleanup System 4 10.5 Reactor Building Closed Cooling Water System 4 10.6 Turbine Building Closed Cooling Water System 4 10.7 Salt Service Water System  4 10.8 Fire Protection System  4 10.9 HVAC Systems  4 10.10 Makeup Water Treatment System  4 10.11 Instrument and Service Air Systems 4 10.12 Potable and Sanitary Water System 4 10.13 Equipment and Floor Drainage Systems 4 10.14 Process Sampling Systems  4 10.15 Communications Systems  4 10.16 Station Lighting System  4 10.17 Main Control Room Environmental Control System 4 10.18 Equipment Area Cooling System  4 10.19 Post Accident Sampling System  4 PNPS-FSAR  SUMMARY TABLE OF CONTENTS (Cont)    Summ T of C-iv Rev. 30  Nov. 2015  Section Title  Volume 10.20 Crack Arrest Verification System 4 10.21 Hydrogen Water Chemistry Extended Test System 4 10.22 Electrolytic Hydrogen Water Chemistry System 4 10.23 Mitigation Monitoring System 4 Section 11 Power Conversion Systems 4  11.1 Summary Description 4 11.2 Turbine-Generator 4 11.3 Main Condenser 4 11.4 Main Condenser Gas Removal and Turbine  Sealing Systems 4 11.5 Turbine Bypass System 4 11.6 Circulating Water System 4 11.7 Condensate Demineralizer System 4 11.8 Condensate and Feedwater System 4 11.9 Condensate Storage System 4  Section 12 Structures and Shielding 4 12.1 Summary Description 4 12.2 Structural Design 4 12.3 Shielding and Radiation Protection 4 12.4 Radioactive Materials Safety  4 Section 13 Conduct of Operations 5 13.1 Introduction and Summary 5 13.2 Organization and Responsibilities 5 13.3 Training 5 13.4 Preoperational Test Program 5 13.5 Reactor Startup and Power Test Program 5 13.6 Station Procedures 5 13.7 Records 5 13.8 Operational Review and Audits 5 Section 14  Station Safety Analysis 5 14.1 Introduction 5 14.2 Reactor Limits 5 14.3 Method of Approach 5 14.4 Abnormal Operational Transients 5 14.5 Postulated Design Basis Accidents 5 14.6 Special Events 5 14.7 References 5 PNPS-FSAR  SUMMARY TABLE OF CONTENTS (Cont)    Summ T of C-v Rev. 30  Nov. 2015  Section Title  Volume  Appendix A Pressure Integrity of Piping and Equipment  Pressure Parts 5 A.1 Scope  5 A.2 Classification of Piping and Equipment  Pressure Parts 5 A.3 Design Requirements  5 A.4 Materials  5 A.5 Fabrication and Installation Requirements 5 A.6 Testing and Inspection Requirements 5 A.7 Final Cleaning and Protection  5 A.8 F1, F2, F3, and F4 Fabrication and Erection  Schedule 5 A.9 M1, M2, and M3 Material Schedules  5 A.10 T1, T2, T3, T4, and T5 Inspection and  Testing Schedules 5 Appendix B Technical Specifications  5 B.1 Technical Specifications  5 B.2 Technical Specifications Relocated to the FSAR 5 B.3 Relocated Technical Specifications and Related 5  Bases  5 B.4 References  5 Appendix C Structural Loading Criteria  5 C.1 Scope  5 C.2 Concrete and Steel Structures  5 C.3 Components  5 Appendix D  Quality Assurance Program  5  D.1 General  5 D.2 Program Organization and Responsibility 5 D.3 Quality Surveillance and Auditing  5 D.4 Quality Controls and Assurance Measures 5 D.5 QC-QA Documentation and Records  5 D.6 Project Communications  5  Attachment D.I  General Electric Quality  System for BWR Nuclear Steam Supply Projects 5  Attachment D.II  Bechtel Quality Assurance Program,  Pilgrim Nuclear Power Station 5  Attachment D.III Site Handling and Storage of Nuclear  Steam Supply System Equipment, Pilgrim  Nuclear Power Station 5 PNPS-FSAR  SUMMARY TABLE OF CONTENTS (Cont)    Summ T of C-vi Rev. 30  Nov. 2015 Section Title  Volume  Appendix E Stack Release Limit Calculations for Pilgrim  Station Site 5 E.1 Analytical Model  5 E.2 Verification of Analytical Model  5 E.3 Stack Release Limit Calculations for Pilgrim  Station Site 5 E.4 Building Exhaust Vent Release  5 E.5 Summary  5 E.6 References  5 Appendix F Comparison of Pilgrim Nuclear  Power Station with the Proposed  General Design Criteria Published  by the AEC for Public Comment in  The Federal Register July 11, 1967  6 F.1 Summary Description  6 F.2 Criteria Conformance  6  Appendix G Station Nuclear Safety Operation  Analysis Supporting Nuclear  Safety Requirements for Plant  Operation  6  G.1 Analytical Objective  6 G.2 Bases for Selecting Operation Requirements for  Plant Operation  6 G.3 Bases for Selecting Surveillance Test  Frequencies for Nuclear Safety Systems  and Engineered Safeguards for Plant Operation 6 G.4 Method of Analysis  6 G.5 Analysis and Results  6 G.6 Conclusion  6 Appendix H Tornado Criteria for Nuclear Power Plants 6 H.0 Foreword  6 H.1 Introduction  6 H.2 Characteristics of Tornadoes  6 H.3 Tornado Probability  6 H.4 Wind Loading  6 H.5 Pressure Differential  6 H.6 Water Loss  6 H.7 Tornado Missiles  6 H.8 References  6 PNPS-FSAR  SUMMARY TABLE OF CONTENTS (Cont)    Summ T of C-vii Rev. 30  Nov. 2015 Appendix I Site Investigation of the Seabreezes 6  I.1 Introduction  6 I.2 Results and Conclusions  6  Section Title  Volume I.3 Discussion  6 I.4 Data and Calculations  6 I.5 References  6  Appendix J Station Research, Development, and    Further Information Requirements and  Resolution  6  J.1 Resolution of ACRS Concerns  6 J.2 Areas Specified in the ACRS Construction  Permit Letter for Pilgrim Nuclear Power  Station  6 J.3 Areas Specified in the AEC Staff    Construction Permit - Safety Evaluation  Report for Pilgrim Nuclear Power Station 6 J.4 Areas Specified in Recent, Related ACRS  Construction and Operating Permit Letters 6 J.5 Summary Conclusions  6 J.6 References  6 Appendix K Inservice Inspection Program  6 K.1 General  6 K.2 Inspection Program Development  6 K.3 Inspection Program Implementation  6 K.4 Reference Base Examinations  6 K.5 Documentation and Records  6 Appendix L  Containment Report  7 L.1 Introduction and Summary  7 L.2 Basis for Containment Design  7 L.3 Containment System Design  7 L.4 Initial Overload and Leakage Rate Test 7 L.5 Manufacturer's Data Report for Nuclear  Vessels  7 Appendix M Reactor Pressure Vessel Design Report 7 M.1 Introduction to the Report  7 M.2 Summary  7  Appendix N Emergency Plan  7 PNPS-FSAR  SUMMARY TABLE OF CONTENTS (Cont)    Summ T of C-viii Rev. 30  Nov. 2015 Section Title  Volume  Appendix O Analysis of the Consequences of  High Energy Piping Failures Outside  The Primary Containment  7 O.1 Introduction  7 O.2 Analysis Assumptions  7 O.3 Analysis Approach  7 O.4 Structural Loading Analytical Technique 7 O.5 Jet and Fluid Forces Analytical Techniques 7 O.6 Detailed System Analyses  7 O.7 Environmental Qualification of Electrical  Equipment  7 Appendix P Deleted  7 Appendix Q  Supplemental Reload Submittal  7 Q.1 Introduction  7 Appendix R Initial Core Station Safety Analysis 7  R.1 Introduction  7 R.2 Analyses of Abnormal Operational  Transients (Initial Core)  7 R.3 Analysis of Design Basis Accidents  (Initial Core)  7 R.4 Special Events (Initial Core)  7 R.5 Analytical Methods (Initial Core) 7 R.6 Evaluation Using Standard NRC  Approach (Initial Core)  7  Appendix S License Renewal Commitments  7 S.1 Supplement for Renewed Operating License 7 S.2 Aging Management programs and Activities 7  Transients (Initial Core)  7 S.3 Evaluation of Time-Limited Aging Analyses  7 S.4 References  7 PNPS-FSAR  LIST OF EFFECTIVE PAGES 
==SUMMARY==
**VOLUME 7**VOLUME 7**VOLUME 7**VOLUME 7**VOLUME 7**  Page, Table (T), or Revision      Figure (F)      Number    EP7 - 1 of 10 Rev. 30 - Nov. 2015 VOLUME 7 Summ T of C-i..........................................30 Summ T of C-ii.........................................30 Summ T of C-iii........................................30 Summ T of C-iv.........................................30 Summ T of C-v..........................................30 Summ T of C-vi.........................................30 Summ T of C-vii........................................30 Summ T of C-viii.......................................30 List of Effective Pages Vol. 7 (1 thru 10).............30  APPENDIX L L-i....................................................28 L-ii...................................................28 L-iii..................................................28 L-iv...................................................28 L-v....................................................28 L.1-1...................................................0 FL.1-1 Refer to C1A 1-8 ...............................17 L.2-1...................................................0 TL.2-1 (1 of 9)........................................25 TL.2-1 (2 of 9)........................................25 TL.2-1 (3 of 9)........................................25 TL.2-1 (4 of 9)........................................25 TL.2-1 (5 of 9)........................................25 TL.2-1 (6 of 9)........................................25 TL.2-1 (7 of 9)........................................25 TL.2-1 (8 of 9)........................................25 TL.2-1 (9 of 9)........................................25 FL.2-1 Refer to C1A 2-11 ..............................17 FL.2-2 Refer to C1A 3-5 ...............................17 FL.2-3 Refer to C1A 4-8 ...............................17 FL.2-4 Refer to C1A 5-11 ..............................17 FL.2-5 Refer to C1A 6-8 ...............................17 FL.2-6 Refer to C1A 7-6 ...............................17 FL.2-7 Refer to C1A 8-7 ...............................17 FL.2-8 Refer to C1A 9-7 ...............................17 FL.2-9 Refer to C1A 10-4 ..............................17 FL.2-10 Refer to C1A 12-5 .............................17 FL.2-11 Refer to C1A 13-4 .............................17 PNPS-FSAR  LIST OF EFFECTIVE PAGES 
TABLE OF CONTENTS Section   Title                                               Volume Section 1 Introduction and Summary                               1 1.1       Project Identification                                 1 1.2       Definitions                                           1 1.3       Methods of Technical Presentation                     1 1.4       Classification of BWR Systems, Criteria,               1 and Requirements for Safety Evaluation 1.5       Principal Design Criteria                             1 1.6       Station Description                                   1 1.7       Comparison of Principal Design Characteristics                                       1 1.8       Summary of Radiation Effects                           1 1.9       Station Management                                     1 1.10     Quality Assurance Program                             1 1.11     Station Research, Development, and Further Information Requirements and Resolutions Summary       1 Section 2 Station Site and Environs                             1 2.1       Introduction                                           1 2.2       Site Description                                       1 2.3       Meteorology                                           1 2.4       Hydrology                                             1 2.5       Geology and Seismology                                 1 2.6       Environs Radiation Surveillance Program               1 Section 3 Reactor                                               1 3.1       Summary Description                                   1 3.2       Fuel Mechanical Design                                 1 3.3       Reactor Vessel Internals Mechanical Design             1 3.4       Reactivity Control Mechanical Design                   1 3.5       Control Rod Drive Housing Supports                     1 3.6       Nuclear Design                                         1 3.7       Thermal and Hydraulic Design                           1 3.8       Standby Liquid Control System                         1 3.9       Recirculation Pump Trip, Alternate Rod Insertion, and Feedwater Pump Trip Systems                       1 Section 4 Reactor Coolant System                                 2 4.1       Summary Description                                   2 4.2       Reactor Vessel and Appurtenances Mechanical Design                                                 2 4.3       Recirculation System                                   2 4.4       Nuclear System Pressure Relief System                 2 4.5       Main Steam Line Flow Restrictor                       2 Summ T of C-i        Rev. 30 - Nov. 2015
**VOLUME 7**VOLUME 7**VOLUME 7**VOLUME 7**VOLUME 7**  Page, Table (T), or Revision      Figure (F)      Number    EP7 - 2 of 10 Rev. 30 - Nov. 2015 FL 12 Refer to C1A 14-4 .............................17 FL.2-13 Refer to C1A 15-6 .............................17 FL.2-14 Refer to C1A 16-4 .............................17 FL.2-15 Refer to C1A 17-5 .............................17 FL.2-16 Refer to C1A 19-10 ............................17 FL.2-17 Refer to C1A 20-7 .............................17 FL.2-18 Refer to C1A 21-5 .............................17 FL.2-19 Refer to C1A 50-5 .............................17 FL.2-20 Refer to C1A 51-7 .............................17 FL.2-21 Refer to C1A 52-5 .............................17 FL.2-22 Refer to C1A 58-4 .............................17 FL.2-23 Refer to C1A 62-4 .............................17 FL.2-24 Refer to C1A 100-3 ............................17 FL.2-25 Refer to C1A 185 ..............................17 L.3-1 Pages (1-13).....................................28 TL.3-1 (1 of 1)........................................28 TL.3-2 (1 of 1).........................................9 TL.3-3 (1 of 2)........................................11 TL.3-3 (2 of 2)........................................11 TL.3-4 (1 of 1).........................................5 TL.3-5 (1 of 1).........................................0 TL.3-6 (1 of 1).........................................0 TL.3-7 (1 of 1).........................................0 TL.3-8 (1 of 2).........................................1 TL.3-8 (2 of 2).........................................1 TL.3-9 (1 of 1).........................................2 TL.3-10 (1 of 1)........................................0 TL.3-11 (1 of 1).......................................21 TL.3-12 (1 of 1).......................................21 FL.3-1 (1 of 1).........................................0 FL.3-2 (1 of 1).........................................0 L.4-1...................................................0 L.5-1 (Form N-1)........................................0 L.5-2 (Form N-1)........................................0 L.5-3 (Form N-2)........................................0 L.5-4 (Form N-2)........................................0 PNPS-FSAR  LIST OF EFFECTIVE PAGES 
**VOLUME 7**VOLUME 7**VOLUME 7**VOLUME 7**VOLUME 7**  Page, Table (T), or Revision      Figure (F)      Number    EP7 - 3 of 10 Rev. 30 - Nov. 2015 APPENDIX M M-i....................................................29 M-ii...................................................29  M.1-1..................................................29 M.1-2..................................................29 FM.1-1 Refer to 1979-216-6 (C.E.)......................17 FM.1-2 Refer to 1979-185-3 (C.E.)......................17  M.2-1..................................................25 M.2-2..................................................25  APPENDIX N N.1-1...................................................9  APPENDIX O O-i....................................................11 O-ii...................................................11 O-iii...................................................9 O-iv....................................................5 O-v.....................................................5 O-vi....................................................5 O.1-1..................................................15 O.2-1..................................................15 O.2-1a.................................................15 O.2-2...................................................5 O.2-3...................................................5 TO.2-1 (1 of 1).........................................5 FO.2-1 (1 of 1).........................................5 FO.2-2 (1 of 1).........................................5 O.3-1...................................................9 PNPS-FSAR  LIST OF EFFECTIVE PAGES 
**VOLUME 7**VOLUME 7**VOLUME 7**VOLUME 7**VOLUME 7**  Page, Table (T), or Revision      Figure (F)      Number    EP7 - 4 of 10 Rev. 30 - Nov. 2015 O.4-1...................................................5 O.4-2...................................................5 O.4-3...................................................5 O.4-4...................................................5 O.4-5...................................................5 O.4-6...................................................5 O.4-7...................................................5 O.4-8...................................................5 O.4-9...................................................5 O.4-10..................................................5 O.4-11..................................................5 O.4-12..................................................5 O.4-13..................................................5 O.4-14..................................................5 O.4-15..................................................5 O.4-16..................................................5 O.4-17..................................................5 O.4-18..................................................5 O.4-19..................................................5 O.4-20..................................................5 O.4-21..................................................5 O.4-22..................................................5 TO.4-1 (1 of 1).........................................5 TO.4-2 (1 of 1).........................................5 TO.4-3 (1 of 2).........................................5 TO.4-3 (2 of 2).........................................5 TO.4-4 (1 of 1).........................................5 FO.4-1 (1 of 1).........................................5 FO.4-2 (1 of 1).........................................5 FO.4-3 (1 of 1).........................................5 FO.4-4 (1 of 1).........................................5 FO.4-5 (1 of 1).........................................5 FO.4-6 (1 of 1).........................................5 FO.4-7 (1 of 1).........................................5 O.5-1...................................................5 O.5-2...................................................5 O.5-3...................................................5 O.5-4...................................................5 O.5-5...................................................5 O.5-6...................................................5 O.5-7...................................................5 O.5-8...................................................5 O.5-9...................................................5 PNPS-FSAR  LIST OF EFFECTIVE PAGES 
**VOLUME 7**VOLUME 7**VOLUME 7**VOLUME 7**VOLUME 7**  Page, Table (T), or Revision      Figure (F)      Number    EP7 - 5 of 10 Rev. 30 - Nov. 2015 FO.5-1 (1 of 1).........................................5 FO.5-2 (1 of 1).........................................5 FO.5-3 (1 of 1).........................................5 FO.5-4 (1 of 1).........................................5  O.6-1...................................................9 O.6-2...................................................9 O.6-3..................................................16 O.6-4..................................................16 O.6-5..................................................16 O.6-6..................................................22 O.6-6a.................................................22 O.6-7..................................................15 O.6-8..................................................15 O.6-9..................................................15  TO.6-1 (1 of 3).........................................5 TO.6-1 (2 of 3).........................................5 TO.6-1 (3 of 3)........................................13 TO.6-2 (1 of 1)........................................23 TO.6-3 (1 of 5).........................................5 TO.6-3 (2 of 5).........................................5 TO.6-3 (3 of 5).........................................5 TO.6-3 (4 of 5).........................................9 TO.6-3 (5 of 5)........................................13 FO.6-1 (1 of 1).........................................5 FO.6-2 (1 of 1).........................................5 FO.6-3 (1 of 1).........................................5 FO.6-4 (1 of 1).........................................5 FO.6-5 (1 of 1).........................................5 FO.6-6 (1 of 1).........................................5 FO.6-7 (1 of 1).........................................5 FO.6-8 (1 of 1).........................................5 FO.6-9 (1 of 1).........................................5 FO.6-10 (1 of 1)........................................5 FO.6-11 (1 of 1)........................................5 FO.6-12 (1 of 1)........................................5 FO.6-13 (1 of 1)........................................5 FO.6-14 (1 of 1)........................................5 FO.6-15 (1 of 1)........................................5 FO.6-16 (1 of 1)........................................5 FO.6-17 (1 of 1)........................................5 PNPS-FSAR  LIST OF EFFECTIVE PAGES 
**VOLUME 7**VOLUME 7**VOLUME 7**VOLUME 7**VOLUME 7**  Page, Table (T), or Revision      Figure (F)      Number    EP7 - 6 of 10 Rev. 30 - Nov. 2015 FO.6-18 (1 of 1)........................................5 FO.6-19 (1 of 1)........................................5 FO.6-20 (1 of 1)........................................5 FO.6-21 (1 of 1)........................................5 FO.6-22 (1 of 1).......................................15 FO.6-23 (1 of 1)........................................5 FO.6-24 (1 of 1).......................................15 FO.6-25 (1 of 1)........................................5 FO.6-26 (1 of 1)........................................5 FO.6-27 (1 of 1)........................................5 O.7-1...................................................9  APPENDIX P  P.1-1  (Deleted).......................................15  APPENDIX Q Q-i....................................................30 Q-ii...................................................30 Q-iii..................................................30 Q.1 Pages 1-4..........................................30  APPENDIX R R-i....................................................23 R-ii...................................................23 R-iii..................................................23 R-iv...................................................23 R-v....................................................23 R-vi...................................................23 R-vii..................................................23 R-viii.................................................23 R.1-1...................................................6 R.2-1...................................................6 R.2-2...................................................6 R.2-3..................................................19 R.2-4..................................................19 R.2-4a.................................................19 R.2-5...................................................6 R.2-6...................................................6 PNPS-FSAR  LIST OF EFFECTIVE PAGES 
**VOLUME 7**VOLUME 7**VOLUME 7**VOLUME 7**VOLUME 7**  Page, Table (T), or Revision      Figure (F)      Number    EP7 - 7 of 10 Rev. 30 - Nov. 2015 R.2-7...................................................6 R.2-8...................................................6 R.2-9...................................................6 R.2-10..................................................6 R.2-11..................................................6 R.2-12..................................................6 R.2-13..................................................6 R.2-14.................................................23 R.2-15..................................................6 R.2-16.................................................13 R.2-17..................................................6 R.2-18..................................................6 R.2-19..................................................6 R.2-20..................................................6  FR.2-1 (1 of 1).........................................6 FR.2-2 (1 of 1).........................................6 FR.2-3 (1 of 1).........................................6 FR.2-4 (1 of 1).........................................6 FR.2-5 (1 of 2).........................................6 FR.2-5 (2 of 2).........................................6 FR.2-6 (1 of 1).........................................6 FR.2-7 (1 of 1).........................................6 FR.2-8 (1 of 1).........................................6 FR.2-9 (1 of 1).........................................6 FR.2-10 (1 of 1)........................................6 FR.2-11 (1 of 1)........................................6 FR.2-12 (1 of 1)........................................6 FR.2-13 (1 of 2)........................................6 FR.2-13 (2 of 2)........................................6 FR.2-14 (1 of 2)........................................6 FR.2-14 (2 of 2)........................................6 FR.2-15 (1 of 2)........................................6 FR.2-15 (2 of 2)........................................6 FR.2-16 (1 of 2)........................................6 FR.2-16 (2 of 2)........................................6 FR.2-17 (1 of 2)........................................6 FR.2-17 (2 of 2)........................................6 FR.2-18 (1 of 1)........................................6 FR.2-19 (1 of 1)........................................6 FR.2-20 (1 of 1)........................................6 FR.2-21 (1 of 1)........................................6 FR.2-22 (1 of 1)........................................6 FR.2-23 (1 of 1)........................................6 FR.2-24 (1 of 1)........................................6 FR.2-25 (1 of 1)........................................6 PNPS-FSAR  LIST OF EFFECTIVE PAGES 
**VOLUME 7**VOLUME 7**VOLUME 7**VOLUME 7**VOLUME 7**  Page, Table (T), or Revision      Figure (F)      Number    EP7 - 8 of 10 Rev. 30 - Nov. 2015 R.3-1..................................................16 R.3-2..................................................16 R.3-3..................................................23 R.3-4..................................................23 R.3-5...................................................6 R.3-6...................................................6 R.3-7...................................................6 R.3-8...................................................6 R.3-9..................................................23 R.3-10..................................................6 R.3-11.................................................23 R.3-12.................................................23 R.3-13.................................................23 R.3-14..................................................6 R.3-15..................................................6 R.3-16..................................................6 R.3-17..................................................6 R.3-18..................................................6 R.3-19..................................................6 R.3-20..................................................9 R.3-21.................................................23 R.3-22.................................................17 R.3-23.................................................23 R.3-24..................................................6 R.3-25..................................................6 R.3-26..................................................6 TR.3-1 (1 of 1)........................................16 TR.3-2 (1 of 1).........................................9 TR.3-3 (1 of 1).........................................9 TR.3-4 (1 of 1)........................................16 TR.3-5 (1 of 1)........................................16 TR.3-6 (1 of 1).........................................9 TR.3-7 (1 of 1).........................................9 TR.3-8 (1 of 1)........................................16 TR.3-9 (1 of 1)........................................23 TR.3-10 (1 of 1)........................................9 TR.3-11 (1 of 1)........................................6 FR.3-1 (1 of 1).........................................6 FR.3-2 (1 of 1).........................................6 FR.3-3 (1 of 1).........................................6 FR.3-4 (1 of 1).........................................6 FR.3-5 (1 of 1).........................................6 FR.3-6 (1 of 1).........................................6 FR.3-7 (1 of 1).........................................6 FR.3-8 (1 of 1).........................................6 PNPS-FSAR  LIST OF EFFECTIVE PAGES 
**VOLUME 7**VOLUME 7**VOLUME 7**VOLUME 7**VOLUME 7**  Page, Table (T), or Revision      Figure (F)      Number    EP7 - 9 of 10 Rev. 30 - Nov. 2015 R.4-1...................................................6 R.5-1..................................................23 R.5-2...................................................6 R.5-3...................................................6 R.5-4...................................................6 R.5-5...................................................6 R.5-6...................................................6 R.5-7..................................................23 R.5-8...................................................6 R.5-9...................................................6 R.5-10.................................................24 R.5-11..................................................6 R.5-12..................................................6 R.5-13..................................................6 R.5-14..................................................6 R.5-15..................................................6 R.5-16..................................................6 R.5-17..................................................6 R.5-18..................................................6 R.5-19.................................................23 R.5-20..................................................6 R.5-21..................................................6 R.5-22..................................................6 R.5-23..................................................6 R.5-24.................................................24 R.5-25..................................................6 R.5-26.................................................23 R.5-27.................................................23 R.5-28.................................................23 R.5-29..................................................6 R.5-30..................................................6 R.5-31..................................................6 R.5-32..................................................6 R.5-33..................................................6 R.5-34.................................................24 R.5-35..................................................6 R.5-36..................................................6 TR.5-1 (1 of 1).........................................9 TR.5-2 (1 of 1).........................................9 TR.5-3 (1 of 1).........................................9 TR.5-4 (1 of 1).........................................9 TR.5-5 (1 of 1).........................................9 TR.5-6 (1 of 1).........................................9 PNPS-FSAR  LIST OF EFFECTIVE PAGES 
**VOLUME 7**VOLUME 7**VOLUME 7**VOLUME 7**VOLUME 7**  Page, Table (T), or Revision      Figure (F)      Number    EP7 - 10 of 10 Rev. 30 - Nov. 2015 TR.5-7 (1 of 1).........................................9 TR.5-8 (1 of 1).........................................9 FR.5-1 (1 of 1).........................................6 R.6-1...................................................6 R.6-2..................................................16 R.6-3..................................................10 R.6-4...................................................6 R.6-5..................................................21 R.6-6..................................................23 R.6-6a.................................................21 R.6-7...................................................6 R.6-8..................................................24 R.6-9..................................................24 R.6-10..................................................6 R.6-11..................................................6  TR.6-1 (1 of 1).........................................9 TR.6-2 (1 of 1).........................................9 TR.6-3 (1 of 1)........................................10 TR.6-4 (1 of 1)........................................23 TR.6-5 (1 of 1)........................................23 TR.6-6 (1 of 1)........................................23 TR.6-7 (1 of 1).........................................9 TR.6-8 (1 of 1).........................................9 TR.6-9 (1 of 1)........................................24 TR.6-10 (1 of 2)........................................6 TR.6-10 (2 of 2)........................................6 TR.6-11 (1 of 2)........................................6 TR.6-11 (2 of 2)........................................6 TR.6-12 (1 of 1)........................................9 TR.6-13 (1 of 1)........................................9 FR.6-1 (1 of 1).........................................6 FR.6-2 (1 of 1).........................................6  APPENDIX S  S-i....................................................30 S-ii...................................................30 S.1 Page 1-1...........................................29  S.2 Pages 1-23.........................................30 S.3 Pages 1-10.........................................29 S.4 Pages 1-3..........................................29 


}}
PNPS-FSAR
 
==SUMMARY==
TABLE OF CONTENTS (Cont)
Section  Title                                          Volume 4.6      Main Steam Line Isolation Valves                  2 4.7      Reactor Core Isolation Cooling System            2 4.8      Residual Heat Removal System                      2 4.9      Reactor Water Cleanup System                      2 4.10      Nuclear System Leakage Rate Limits                2 4.11      Main Steam Lines and Feedwater Piping            2 Section 5 Containment                                      2 5.1      Summary Descriptions                              2 5.2      Primary Containment System                        2 5.3      Secondary Containment System                      2 5.4      Control of Combustible Gas Concentrations in Containment                                    2 Section 6 Core Standby Cooling Systems                      2 6.1      Safety Objective                                  2 6.2      Safety Design Bases                              2 6.3      Summary Description - Core Standby Cooling Systems                                          2 6.4      Description                                      2 6.5      Safety Evaluation                                2 6.6      Inspection and Testing                            2 6.7      The Nuclear Safety Requirements for Plant Operation                              2 6.8      Current Technical Specifications                  2 Section 7 Control and Instrumentation                      3 7.1      Summary Description                              3 7.2      Reactor Protection System                        3 7.3      Primary Containment and Reactor Vessel Isolation Control System                          3 7.4      Core Standby Cooling Systems Control and Instrumentation                              3 7.5      Neutron Monitoring System                        3 7.6      Refueling Interlocks                              3 7.7      Reactor Manual Control System                    3 7.8      Reactor Vessel Instrumentation                    3 7.9      Recirculation Flow Control System                3 7.10      Feedwater Control System                          3 7.11      Turbine Generator Control System                  3 7.12      Process Radiation Monitoring                      3 7.13      Area Radiation Monitoring System                  3 7.14      Environs Radiation Monitors                      3 7.15      Health Physics and Laboratory Analysis Radiation Monitors                                3 Summ T of C-ii        Rev. 30 - Nov. 2015
 
PNPS-FSAR
 
==SUMMARY==
TABLE OF CONTENTS (Cont)
Section    Title                                          Volume 7.16      Process Computer System                            3 7.17      Nuclear System Stability Analysis for Initial Core                                      3 7.18      Reactor Building Isolation and Control System                                    3 7.19      RHR Service Water System (SSW, RBCCW)              3 7.20      Equipment Area Cooling System                      3 7.21      Meteorological Instrumentation                    3 Section 8  Electrical Power System                            4 8.1        Summary Description                                4 8.2        Unit and Preferred AC Power Sources                4 8.3        Secondary AC Power Source                          4 8.4        Auxiliary Power Distribution System                4 8.5        Standby AC Power Source                            4 8.6        125 and 250 Volt DC Power Systems                  4 8.7        24 Volt DC Power System                            4 8.8        120 Volt AC Power Systems                          4 8.9        Cable Installation Criteria                        4 8.10      Blackout AC Power Source                          4 Section 9  Radioactive Waste Systems                          4 9.1        Summary Description                                4 9.2        Liquid Radwaste System                            4 9.3        Solid Radwaste System                              4 9.4        Gaseous Radwaste System                            4 9.5        Trash Compaction and Decontamination Facilities    4 Section 10 Auxiliary Systems                                  4 10.1      Summary Description                                4 10.2      New Fuel Storage                                  4 10.3      Spent Fuel Storage                                4 10.4      Fuel Pool Cooling and Cleanup System              4 10.5      Reactor Building Closed Cooling Water System      4 10.6      Turbine Building Closed Cooling Water System      4 10.7      Salt Service Water System                          4 10.8      Fire Protection System                            4 10.9      HVAC Systems                                      4 10.10      Makeup Water Treatment System                      4 10.11      Instrument and Service Air Systems                4 10.12      Potable and Sanitary Water System                  4 10.13      Equipment and Floor Drainage Systems              4 10.14      Process Sampling Systems                          4 10.15      Communications Systems                            4 10.16      Station Lighting System                            4 10.17      Main Control Room Environmental Control System    4 10.18      Equipment Area Cooling System                      4 10.19      Post Accident Sampling System                      4 Summ T of C-iii      Rev. 30 - Nov. 2015
 
PNPS-FSAR
 
==SUMMARY==
TABLE OF CONTENTS (Cont)
Section    Title                                              Volume 10.20      Crack Arrest Verification System                      4 10.21      Hydrogen Water Chemistry Extended Test System        4 10.22      Electrolytic Hydrogen Water Chemistry System          4 10.23      Mitigation Monitoring System                          4 Section 11 Power Conversion Systems                              4 11.1      Summary Description                                  4 11.2      Turbine-Generator                                    4 11.3      Main Condenser                                        4 11.4      Main Condenser Gas Removal and Turbine Sealing Systems                                      4 11.5      Turbine Bypass System                                4 11.6      Circulating Water System                              4 11.7      Condensate Demineralizer System                      4 11.8      Condensate and Feedwater System                      4 11.9      Condensate Storage System                            4 Section 12 Structures and Shielding                              4 12.1      Summary Description                                  4 12.2      Structural Design                                    4 12.3      Shielding and Radiation Protection                    4 12.4      Radioactive Materials Safety                          4 Section 13 Conduct of Operations                                5 13.1      Introduction and Summary                              5 13.2      Organization and Responsibilities                    5 13.3      Training                                              5 13.4      Preoperational Test Program                          5 13.5      Reactor Startup and Power Test Program                5 13.6      Station Procedures                                    5 13.7      Records                                              5 13.8      Operational Review and Audits                        5 Section 14 Station Safety Analysis                              5 14.1      Introduction                                          5 14.2      Reactor Limits                                        5 14.3      Method of Approach                                    5 14.4      Abnormal Operational Transients                      5 14.5      Postulated Design Basis Accidents                    5 14.6      Special Events                                        5 14.7      References                                            5 Summ T of C-iv        Rev. 30 - Nov. 2015
 
PNPS-FSAR
 
==SUMMARY==
TABLE OF CONTENTS (Cont)
Section    Title                                            Volume Appendix A Pressure Integrity of Piping and Equipment Pressure Parts                                    5 A.1        Scope                                              5 A.2        Classification of Piping and Equipment Pressure Parts                                    5 A.3        Design Requirements                                5 A.4        Materials                                          5 A.5        Fabrication and Installation Requirements          5 A.6        Testing and Inspection Requirements                5 A.7        Final Cleaning and Protection                      5 A.8        F1, F2, F3, and F4 Fabrication and Erection Schedule                                          5 A.9        M1, M2, and M3 Material Schedules                  5 A.10      T1, T2, T3, T4, and T5 Inspection and Testing Schedules                                  5 Appendix B Technical Specifications                          5 B.1        Technical Specifications                          5 B.2        Technical Specifications Relocated to the FSAR    5 B.3        Relocated Technical Specifications and Related    5 Bases                                              5 B.4        References                                        5 Appendix C Structural Loading Criteria                        5 C.1        Scope                                              5 C.2        Concrete and Steel Structures                      5 C.3        Components                                        5 Appendix D Quality Assurance Program                          5 D.1        General                                            5 D.2        Program Organization and Responsibility            5 D.3        Quality Surveillance and Auditing                  5 D.4        Quality Controls and Assurance Measures            5 D.5        QC-QA Documentation and Records                    5 D.6        Project Communications                            5 Attachment D.I  General Electric Quality System for BWR Nuclear Steam Supply Projects      5 Attachment D.II Bechtel Quality Assurance Program, Pilgrim Nuclear Power Station                      5 Attachment D.III Site Handling and Storage of Nuclear Steam Supply System Equipment, Pilgrim Nuclear Power Station                              5 Summ T of C-v        Rev. 30 - Nov. 2015
 
PNPS-FSAR
 
==SUMMARY==
TABLE OF CONTENTS (Cont)
Section    Title                                          Volume Appendix E Stack Release Limit Calculations for Pilgrim Station Site                                      5 E.1        Analytical Model                                  5 E.2        Verification of Analytical Model                  5 E.3        Stack Release Limit Calculations for Pilgrim Station Site                                      5 E.4        Building Exhaust Vent Release                    5 E.5        Summary                                          5 E.6        References                                        5 Appendix F Comparison of Pilgrim Nuclear Power Station with the Proposed General Design Criteria Published by the AEC for Public Comment in The Federal Register July 11, 1967                6 F.1        Summary Description                              6 F.2        Criteria Conformance                              6 Appendix G Station Nuclear Safety Operation Analysis Supporting Nuclear Safety Requirements for Plant Operation                                        6 G.1        Analytical Objective                              6 G.2        Bases for Selecting Operation Requirements for Plant Operation                                  6 G.3        Bases for Selecting Surveillance Test Frequencies for Nuclear Safety Systems and Engineered Safeguards for Plant Operation    6 G.4        Method of Analysis                                6 G.5        Analysis and Results                              6 G.6        Conclusion                                        6 Appendix H Tornado Criteria for Nuclear Power Plants        6 H.0        Foreword                                          6 H.1        Introduction                                      6 H.2        Characteristics of Tornadoes                      6 H.3        Tornado Probability                              6 H.4        Wind Loading                                      6 H.5        Pressure Differential                            6 H.6        Water Loss                                        6 H.7        Tornado Missiles                                  6 H.8        References                                        6 Summ T of C-vi        Rev. 30 - Nov. 2015
 
PNPS-FSAR
 
==SUMMARY==
TABLE OF CONTENTS (Cont)
Appendix I Site Investigation of the Seabreezes              6 I.1        Introduction                                      6 I.2        Results and Conclusions                            6 Section    Title                                            Volume I.3        Discussion                                        6 I.4        Data and Calculations                              6 I.5        References                                        6 Appendix J Station Research, Development, and Further Information Requirements and Resolution                                        6 J.1        Resolution of ACRS Concerns                        6 J.2        Areas Specified in the ACRS Construction Permit Letter for Pilgrim Nuclear Power Station                                            6 J.3        Areas Specified in the AEC Staff Construction Permit - Safety Evaluation Report for Pilgrim Nuclear Power Station          6 J.4        Areas Specified in Recent, Related ACRS Construction and Operating Permit Letters          6 J.5        Summary Conclusions                                6 J.6        References                                        6 Appendix K Inservice Inspection Program                      6 K.1        General                                            6 K.2        Inspection Program Development                    6 K.3        Inspection Program Implementation                  6 K.4        Reference Base Examinations                        6 K.5        Documentation and Records                          6 Appendix L Containment Report                                7 L.1        Introduction and Summary                          7 L.2        Basis for Containment Design                      7 L.3        Containment System Design                          7 L.4        Initial Overload and Leakage Rate Test            7 L.5        Manufacturer's Data Report for Nuclear Vessels                                            7 Appendix M Reactor Pressure Vessel Design Report              7 M.1        Introduction to the Report                        7 M.2        Summary                                            7 Appendix N Emergency Plan                                    7 Summ T of C-vii      Rev. 30 - Nov. 2015
 
PNPS-FSAR
 
==SUMMARY==
TABLE OF CONTENTS (Cont)
Section    Title                                        Volume Appendix O Analysis of the Consequences of High Energy Piping Failures Outside The Primary Containment                          7 O.1        Introduction                                    7 O.2        Analysis Assumptions                            7 O.3        Analysis Approach                                7 O.4        Structural Loading Analytical Technique          7 O.5        Jet and Fluid Forces Analytical Techniques      7 O.6        Detailed System Analyses                        7 O.7        Environmental Qualification of Electrical Equipment                                        7 Appendix P Deleted                                          7 Appendix Q Supplemental Reload Submittal                    7 Q.1        Introduction                                    7 Appendix R Initial Core Station Safety Analysis            7 R.1        Introduction                                    7 R.2        Analyses of Abnormal Operational Transients (Initial Core)                        7 R.3        Analysis of Design Basis Accidents (Initial Core)                                  7 R.4        Special Events (Initial Core)                    7 R.5        Analytical Methods (Initial Core)                7 R.6        Evaluation Using Standard NRC Approach (Initial Core)                          7 Appendix S License Renewal Commitments                      7 S.1        Supplement for Renewed Operating License        7 S.2        Aging Management programs and Activities        7 Transients (Initial Core)                        7 S.3        Evaluation of Time-Limited Aging Analyses        7 S.4        References                                      7 Summ T of C-viii    Rev. 30 - Nov. 2015
 
PNPS-FSAR LIST OF EFFECTIVE PAGES
**VOLUME 7**VOLUME 7**VOLUME 7**VOLUME 7**VOLUME 7**
Page, Table (T), or                                  Revision Figure (F)                                      Number VOLUME 7 Summ T of C-i..........................................30 Summ T of C-ii.........................................30 Summ T of C-iii........................................30 Summ T of C-iv.........................................30 Summ T of C-v..........................................30 Summ T of C-vi.........................................30 Summ T of C-vii........................................30 Summ T of C-viii.......................................30 List of Effective Pages Vol. 7 (1 thru 10).............30 APPENDIX L L-i....................................................28 L-ii...................................................28 L-iii..................................................28 L-iv...................................................28 L-v....................................................28 L.1-1...................................................0 FL.1-1 Refer to C1A 1-8 ...............................17 L.2-1...................................................0 TL.2-1 (1 of 9)........................................25 TL.2-1 (2 of 9)........................................25 TL.2-1 (3 of 9)........................................25 TL.2-1 (4 of 9)........................................25 TL.2-1 (5 of 9)........................................25 TL.2-1 (6 of 9)........................................25 TL.2-1 (7 of 9)........................................25 TL.2-1 (8 of 9)........................................25 TL.2-1 (9 of 9)........................................25 FL.2-1 Refer to C1A 2-11 ..............................17 FL.2-2 Refer to C1A 3-5 ...............................17 FL.2-3 Refer to C1A 4-8 ...............................17 FL.2-4 Refer to C1A 5-11 ..............................17 FL.2-5 Refer to C1A 6-8 ...............................17 FL.2-6 Refer to C1A 7-6 ...............................17 FL.2-7 Refer to C1A 8-7 ...............................17 FL.2-8 Refer to C1A 9-7 ...............................17 FL.2-9 Refer to C1A 10-4 ..............................17 FL.2-10 Refer to C1A 12-5 .............................17 FL.2-11 Refer to C1A 13-4 .............................17 EP7 - 1 of 10            Rev. 30 - Nov. 2015
 
PNPS-FSAR LIST OF EFFECTIVE PAGES
**VOLUME 7**VOLUME 7**VOLUME 7**VOLUME 7**VOLUME 7**
Page, Table (T), or                                  Revision Figure (F)                                      Number FL-2-12 Refer to C1A 14-4 .............................17 FL.2-13 Refer to C1A 15-6 .............................17 FL.2-14 Refer to C1A 16-4 .............................17 FL.2-15 Refer to C1A 17-5 .............................17 FL.2-16 Refer to C1A 19-10 ............................17 FL.2-17 Refer to C1A 20-7 .............................17 FL.2-18 Refer to C1A 21-5 .............................17 FL.2-19 Refer to C1A 50-5 .............................17 FL.2-20 Refer to C1A 51-7 .............................17 FL.2-21 Refer to C1A 52-5 .............................17 FL.2-22 Refer to C1A 58-4 .............................17 FL.2-23 Refer to C1A 62-4 .............................17 FL.2-24 Refer to C1A 100-3 ............................17 FL.2-25 Refer to C1A 185 ..............................17 L.3-1 Pages (1-13).....................................28 TL.3-1 (1 of 1)........................................28 TL.3-2 (1 of 1).........................................9 TL.3-3 (1 of 2)........................................11 TL.3-3 (2 of 2)........................................11 TL.3-4 (1 of 1).........................................5 TL.3-5 (1 of 1).........................................0 TL.3-6 (1 of 1).........................................0 TL.3-7 (1 of 1).........................................0 TL.3-8 (1 of 2).........................................1 TL.3-8 (2 of 2).........................................1 TL.3-9 (1 of 1).........................................2 TL.3-10 (1 of 1)........................................0 TL.3-11 (1 of 1).......................................21 TL.3-12 (1 of 1).......................................21 FL.3-1 (1 of 1).........................................0 FL.3-2 (1 of 1).........................................0 L.4-1...................................................0 L.5-1 (Form N-1)........................................0 L.5-2 (Form N-1)........................................0 L.5-3 (Form N-2)........................................0 L.5-4 (Form N-2)........................................0 EP7 - 2 of 10            Rev. 30 - Nov. 2015
 
PNPS-FSAR LIST OF EFFECTIVE PAGES
**VOLUME 7**VOLUME 7**VOLUME 7**VOLUME 7**VOLUME 7**
Page, Table (T), or                                  Revision Figure (F)                                      Number APPENDIX M M-i....................................................29 M-ii...................................................29 M.1-1..................................................29 M.1-2..................................................29 FM.1-1 Refer to 1979-216-6 (C.E.)......................17 FM.1-2 Refer to 1979-185-3 (C.E.)......................17 M.2-1..................................................25 M.2-2..................................................25 APPENDIX N N.1-1...................................................9 APPENDIX O O-i....................................................11 O-ii...................................................11 O-iii...................................................9 O-iv....................................................5 O-v.....................................................5 O-vi....................................................5 O.1-1..................................................15 O.2-1..................................................15 O.2-1a.................................................15 O.2-2...................................................5 O.2-3...................................................5 TO.2-1 (1 of 1).........................................5 FO.2-1 (1 of 1).........................................5 FO.2-2 (1 of 1).........................................5 O.3-1...................................................9 EP7 - 3 of 10            Rev. 30 - Nov. 2015
 
PNPS-FSAR LIST OF EFFECTIVE PAGES
**VOLUME 7**VOLUME 7**VOLUME 7**VOLUME 7**VOLUME 7**
Page, Table (T), or                                  Revision Figure (F)                                      Number O.4-1...................................................5 O.4-2...................................................5 O.4-3...................................................5 O.4-4...................................................5 O.4-5...................................................5 O.4-6...................................................5 O.4-7...................................................5 O.4-8...................................................5 O.4-9...................................................5 O.4-10..................................................5 O.4-11..................................................5 O.4-12..................................................5 O.4-13..................................................5 O.4-14..................................................5 O.4-15..................................................5 O.4-16..................................................5 O.4-17..................................................5 O.4-18..................................................5 O.4-19..................................................5 O.4-20..................................................5 O.4-21..................................................5 O.4-22..................................................5 TO.4-1 (1 of 1).........................................5 TO.4-2 (1 of 1).........................................5 TO.4-3 (1 of 2).........................................5 TO.4-3 (2 of 2).........................................5 TO.4-4 (1 of 1).........................................5 FO.4-1 (1 of 1).........................................5 FO.4-2 (1 of 1).........................................5 FO.4-3 (1 of 1).........................................5 FO.4-4 (1 of 1).........................................5 FO.4-5 (1 of 1).........................................5 FO.4-6 (1 of 1).........................................5 FO.4-7 (1 of 1).........................................5 O.5-1...................................................5 O.5-2...................................................5 O.5-3...................................................5 O.5-4...................................................5 O.5-5...................................................5 O.5-6...................................................5 O.5-7...................................................5 O.5-8...................................................5 O.5-9...................................................5 EP7 - 4 of 10            Rev. 30 - Nov. 2015
 
PNPS-FSAR LIST OF EFFECTIVE PAGES
**VOLUME 7**VOLUME 7**VOLUME 7**VOLUME 7**VOLUME 7**
Page, Table (T), or                                  Revision Figure (F)                                      Number FO.5-1 (1 of 1).........................................5 FO.5-2 (1 of 1).........................................5 FO.5-3 (1 of 1).........................................5 FO.5-4 (1 of 1).........................................5 O.6-1...................................................9 O.6-2...................................................9 O.6-3..................................................16 O.6-4..................................................16 O.6-5..................................................16 O.6-6..................................................22 O.6-6a.................................................22 O.6-7..................................................15 O.6-8..................................................15 O.6-9..................................................15 TO.6-1 (1 of 3).........................................5 TO.6-1 (2 of 3).........................................5 TO.6-1 (3 of 3)........................................13 TO.6-2 (1 of 1)........................................23 TO.6-3 (1 of 5).........................................5 TO.6-3 (2 of 5).........................................5 TO.6-3 (3 of 5).........................................5 TO.6-3 (4 of 5).........................................9 TO.6-3 (5 of 5)........................................13 FO.6-1 (1 of 1).........................................5 FO.6-2 (1 of 1).........................................5 FO.6-3 (1 of 1).........................................5 FO.6-4 (1 of 1).........................................5 FO.6-5 (1 of 1).........................................5 FO.6-6 (1 of 1).........................................5 FO.6-7 (1 of 1).........................................5 FO.6-8 (1 of 1).........................................5 FO.6-9 (1 of 1).........................................5 FO.6-10 (1 of 1)........................................5 FO.6-11 (1 of 1)........................................5 FO.6-12 (1 of 1)........................................5 FO.6-13 (1 of 1)........................................5 FO.6-14 (1 of 1)........................................5 FO.6-15 (1 of 1)........................................5 FO.6-16 (1 of 1)........................................5 FO.6-17 (1 of 1)........................................5 EP7 - 5 of 10            Rev. 30 - Nov. 2015
 
PNPS-FSAR LIST OF EFFECTIVE PAGES
**VOLUME 7**VOLUME 7**VOLUME 7**VOLUME 7**VOLUME 7**
Page, Table (T), or                                  Revision Figure (F)                                      Number FO.6-18 (1 of 1)........................................5 FO.6-19 (1 of 1)........................................5 FO.6-20 (1 of 1)........................................5 FO.6-21 (1 of 1)........................................5 FO.6-22 (1 of 1).......................................15 FO.6-23 (1 of 1)........................................5 FO.6-24 (1 of 1).......................................15 FO.6-25 (1 of 1)........................................5 FO.6-26 (1 of 1)........................................5 FO.6-27 (1 of 1)........................................5 O.7-1...................................................9 APPENDIX P P.1-1  (Deleted).......................................15 APPENDIX Q Q-i....................................................30 Q-ii...................................................30 Q-iii..................................................30 Q.1 Pages 1-4..........................................30 APPENDIX R R-i....................................................23 R-ii...................................................23 R-iii..................................................23 R-iv...................................................23 R-v....................................................23 R-vi...................................................23 R-vii..................................................23 R-viii.................................................23 R.1-1...................................................6 R.2-1...................................................6 R.2-2...................................................6 R.2-3..................................................19 R.2-4..................................................19 R.2-4a.................................................19 R.2-5...................................................6 R.2-6...................................................6 EP7 - 6 of 10            Rev. 30 - Nov. 2015
 
PNPS-FSAR LIST OF EFFECTIVE PAGES
**VOLUME 7**VOLUME 7**VOLUME 7**VOLUME 7**VOLUME 7**
Page, Table (T), or                                  Revision Figure (F)                                      Number R.2-7...................................................6 R.2-8...................................................6 R.2-9...................................................6 R.2-10..................................................6 R.2-11..................................................6 R.2-12..................................................6 R.2-13..................................................6 R.2-14.................................................23 R.2-15..................................................6 R.2-16.................................................13 R.2-17..................................................6 R.2-18..................................................6 R.2-19..................................................6 R.2-20..................................................6 FR.2-1 (1 of 1).........................................6 FR.2-2 (1 of 1).........................................6 FR.2-3 (1 of 1).........................................6 FR.2-4 (1 of 1).........................................6 FR.2-5 (1 of 2).........................................6 FR.2-5 (2 of 2).........................................6 FR.2-6 (1 of 1).........................................6 FR.2-7 (1 of 1).........................................6 FR.2-8 (1 of 1).........................................6 FR.2-9 (1 of 1).........................................6 FR.2-10 (1 of 1)........................................6 FR.2-11 (1 of 1)........................................6 FR.2-12 (1 of 1)........................................6 FR.2-13 (1 of 2)........................................6 FR.2-13 (2 of 2)........................................6 FR.2-14 (1 of 2)........................................6 FR.2-14 (2 of 2)........................................6 FR.2-15 (1 of 2)........................................6 FR.2-15 (2 of 2)........................................6 FR.2-16 (1 of 2)........................................6 FR.2-16 (2 of 2)........................................6 FR.2-17 (1 of 2)........................................6 FR.2-17 (2 of 2)........................................6 FR.2-18 (1 of 1)........................................6 FR.2-19 (1 of 1)........................................6 FR.2-20 (1 of 1)........................................6 FR.2-21 (1 of 1)........................................6 FR.2-22 (1 of 1)........................................6 FR.2-23 (1 of 1)........................................6 FR.2-24 (1 of 1)........................................6 FR.2-25 (1 of 1)........................................6 EP7 - 7 of 10            Rev. 30 - Nov. 2015
 
PNPS-FSAR LIST OF EFFECTIVE PAGES
**VOLUME 7**VOLUME 7**VOLUME 7**VOLUME 7**VOLUME 7**
Page, Table (T), or                                  Revision Figure (F)                                      Number R.3-1..................................................16 R.3-2..................................................16 R.3-3..................................................23 R.3-4..................................................23 R.3-5...................................................6 R.3-6...................................................6 R.3-7...................................................6 R.3-8...................................................6 R.3-9..................................................23 R.3-10..................................................6 R.3-11.................................................23 R.3-12.................................................23 R.3-13.................................................23 R.3-14..................................................6 R.3-15..................................................6 R.3-16..................................................6 R.3-17..................................................6 R.3-18..................................................6 R.3-19..................................................6 R.3-20..................................................9 R.3-21.................................................23 R.3-22.................................................17 R.3-23.................................................23 R.3-24..................................................6 R.3-25..................................................6 R.3-26..................................................6 TR.3-1 (1 of 1)........................................16 TR.3-2 (1 of 1).........................................9 TR.3-3 (1 of 1).........................................9 TR.3-4 (1 of 1)........................................16 TR.3-5 (1 of 1)........................................16 TR.3-6 (1 of 1).........................................9 TR.3-7 (1 of 1).........................................9 TR.3-8 (1 of 1)........................................16 TR.3-9 (1 of 1)........................................23 TR.3-10 (1 of 1)........................................9 TR.3-11 (1 of 1)........................................6 FR.3-1 (1 of 1).........................................6 FR.3-2 (1 of 1).........................................6 FR.3-3 (1 of 1).........................................6 FR.3-4 (1 of 1).........................................6 FR.3-5 (1 of 1).........................................6 FR.3-6 (1 of 1).........................................6 FR.3-7 (1 of 1).........................................6 FR.3-8 (1 of 1).........................................6 EP7 - 8 of 10            Rev. 30 - Nov. 2015
 
PNPS-FSAR LIST OF EFFECTIVE PAGES
**VOLUME 7**VOLUME 7**VOLUME 7**VOLUME 7**VOLUME 7**
Page, Table (T), or                                  Revision Figure (F)                                      Number R.4-1...................................................6 R.5-1..................................................23 R.5-2...................................................6 R.5-3...................................................6 R.5-4...................................................6 R.5-5...................................................6 R.5-6...................................................6 R.5-7..................................................23 R.5-8...................................................6 R.5-9...................................................6 R.5-10.................................................24 R.5-11..................................................6 R.5-12..................................................6 R.5-13..................................................6 R.5-14..................................................6 R.5-15..................................................6 R.5-16..................................................6 R.5-17..................................................6 R.5-18..................................................6 R.5-19.................................................23 R.5-20..................................................6 R.5-21..................................................6 R.5-22..................................................6 R.5-23..................................................6 R.5-24.................................................24 R.5-25..................................................6 R.5-26.................................................23 R.5-27.................................................23 R.5-28.................................................23 R.5-29..................................................6 R.5-30..................................................6 R.5-31..................................................6 R.5-32..................................................6 R.5-33..................................................6 R.5-34.................................................24 R.5-35..................................................6 R.5-36..................................................6 TR.5-1 (1 of 1).........................................9 TR.5-2 (1 of 1).........................................9 TR.5-3 (1 of 1).........................................9 TR.5-4 (1 of 1).........................................9 TR.5-5 (1 of 1).........................................9 TR.5-6 (1 of 1).........................................9 EP7 - 9 of 10            Rev. 30 - Nov. 2015
 
PNPS-FSAR LIST OF EFFECTIVE PAGES
**VOLUME 7**VOLUME 7**VOLUME 7**VOLUME 7**VOLUME 7**
Page, Table (T), or                                  Revision Figure (F)                                      Number TR.5-7 (1 of 1).........................................9 TR.5-8 (1 of 1).........................................9 FR.5-1 (1 of 1).........................................6 R.6-1...................................................6 R.6-2..................................................16 R.6-3..................................................10 R.6-4...................................................6 R.6-5..................................................21 R.6-6..................................................23 R.6-6a.................................................21 R.6-7...................................................6 R.6-8..................................................24 R.6-9..................................................24 R.6-10..................................................6 R.6-11..................................................6 TR.6-1 (1 of 1).........................................9 TR.6-2 (1 of 1).........................................9 TR.6-3 (1 of 1)........................................10 TR.6-4 (1 of 1)........................................23 TR.6-5 (1 of 1)........................................23 TR.6-6 (1 of 1)........................................23 TR.6-7 (1 of 1).........................................9 TR.6-8 (1 of 1).........................................9 TR.6-9 (1 of 1)........................................24 TR.6-10 (1 of 2)........................................6 TR.6-10 (2 of 2)........................................6 TR.6-11 (1 of 2)........................................6 TR.6-11 (2 of 2)........................................6 TR.6-12 (1 of 1)........................................9 TR.6-13 (1 of 1)........................................9 FR.6-1 (1 of 1).........................................6 FR.6-2 (1 of 1).........................................6 APPENDIX S S-i....................................................30 S-ii...................................................30 S.1 Page 1-1...........................................29 S.2 Pages 1-23.........................................30 S.3 Pages 1-10.........................................29 S.4 Pages 1-3..........................................29 EP7 - 10 of 10          Rev. 30 - Nov. 2015}}

Latest revision as of 22:37, 30 October 2019

Redacted - Updated Final Safety Analysis Report (UFSAR) Part 5 - November 2015
ML16083A469
Person / Time
Site: Pilgrim
Issue date: 11/30/2015
From:
Entergy Nuclear Operations
To: Booma Venkataraman
Plant Licensing Branch 1
Ventkataraman V, DORL/LPLI-I, 415-2934
Shared Package
ML16083A494 List:
References
CAC MF7229
Download: ML16083A469 (381)


Text

PNPS-FSAR

SUMMARY

TABLE OF CONTENTS Section Title Volume Section 1 Introduction and Summary 1 1.1 Project Identification 1 1.2 Definitions 1 1.3 Methods of Technical Presentation 1 1.4 Classification of BWR Systems, Criteria, 1 and Requirements for Safety Evaluation 1.5 Principal Design Criteria 1 1.6 Station Description 1 1.7 Comparison of Principal Design Characteristics 1 1.8 Summary of Radiation Effects 1 1.9 Station Management 1 1.10 Quality Assurance Program 1 1.11 Station Research, Development, and Further Information Requirements and Resolutions Summary 1 Section 2 Station Site and Environs 1 2.1 Introduction 1 2.2 Site Description 1 2.3 Meteorology 1 2.4 Hydrology 1 2.5 Geology and Seismology 1 2.6 Environs Radiation Surveillance Program 1 Section 3 Reactor 1 3.1 Summary Description 1 3.2 Fuel Mechanical Design 1 3.3 Reactor Vessel Internals Mechanical Design 1 3.4 Reactivity Control Mechanical Design 1 3.5 Control Rod Drive Housing Supports 1 3.6 Nuclear Design 1 3.7 Thermal and Hydraulic Design 1 3.8 Standby Liquid Control System 1 3.9 Recirculation Pump Trip, Alternate Rod Insertion, and Feedwater Pump Trip Systems 1 Section 4 Reactor Coolant System 2 4.1 Summary Description 2 4.2 Reactor Vessel and Appurtenances Mechanical Design 2 4.3 Recirculation System 2 4.4 Nuclear System Pressure Relief System 2 4.5 Main Steam Line Flow Restrictor 2 Summ T of C-i Rev. 30 - Nov. 2015

PNPS-FSAR

SUMMARY

TABLE OF CONTENTS (Cont)

Section Title Volume 4.6 Main Steam Line Isolation Valves 2 4.7 Reactor Core Isolation Cooling System 2 4.8 Residual Heat Removal System 2 4.9 Reactor Water Cleanup System 2 4.10 Nuclear System Leakage Rate Limits 2 4.11 Main Steam Lines and Feedwater Piping 2 Section 5 Containment 2 5.1 Summary Descriptions 2 5.2 Primary Containment System 2 5.3 Secondary Containment System 2 5.4 Control of Combustible Gas Concentrations in Containment 2 Section 6 Core Standby Cooling Systems 2 6.1 Safety Objective 2 6.2 Safety Design Bases 2 6.3 Summary Description - Core Standby Cooling Systems 2 6.4 Description 2 6.5 Safety Evaluation 2 6.6 Inspection and Testing 2 6.7 The Nuclear Safety Requirements for Plant Operation 2 6.8 Current Technical Specifications 2 Section 7 Control and Instrumentation 3 7.1 Summary Description 3 7.2 Reactor Protection System 3 7.3 Primary Containment and Reactor Vessel Isolation Control System 3 7.4 Core Standby Cooling Systems Control and Instrumentation 3 7.5 Neutron Monitoring System 3 7.6 Refueling Interlocks 3 7.7 Reactor Manual Control System 3 7.8 Reactor Vessel Instrumentation 3 7.9 Recirculation Flow Control System 3 7.10 Feedwater Control System 3 7.11 Turbine Generator Control System 3 7.12 Process Radiation Monitoring 3 7.13 Area Radiation Monitoring System 3 7.14 Environs Radiation Monitors 3 7.15 Health Physics and Laboratory Analysis Radiation Monitors 3 Summ T of C-ii Rev. 30 - Nov. 2015

PNPS-FSAR

SUMMARY

TABLE OF CONTENTS (Cont)

Section Title Volume 7.16 Process Computer System 3 7.17 Nuclear System Stability Analysis for Initial Core 3 7.18 Reactor Building Isolation and Control System 3 7.19 RHR Service Water System (SSW, RBCCW) 3 7.20 Equipment Area Cooling System 3 7.21 Meteorological Instrumentation 3 Section 8 Electrical Power System 4 8.1 Summary Description 4 8.2 Unit and Preferred AC Power Sources 4 8.3 Secondary AC Power Source 4 8.4 Auxiliary Power Distribution System 4 8.5 Standby AC Power Source 4 8.6 125 and 250 Volt DC Power Systems 4 8.7 24 Volt DC Power System 4 8.8 120 Volt AC Power Systems 4 8.9 Cable Installation Criteria 4 8.10 Blackout AC Power Source 4 Section 9 Radioactive Waste Systems 4 9.1 Summary Description 4 9.2 Liquid Radwaste System 4 9.3 Solid Radwaste System 4 9.4 Gaseous Radwaste System 4 9.5 Trash Compaction and Decontamination Facilities 4 Section 10 Auxiliary Systems 4 10.1 Summary Description 4 10.2 New Fuel Storage 4 10.3 Spent Fuel Storage 4 10.4 Fuel Pool Cooling and Cleanup System 4 10.5 Reactor Building Closed Cooling Water System 4 10.6 Turbine Building Closed Cooling Water System 4 10.7 Salt Service Water System 4 10.8 Fire Protection System 4 10.9 HVAC Systems 4 10.10 Makeup Water Treatment System 4 10.11 Instrument and Service Air Systems 4 10.12 Potable and Sanitary Water System 4 10.13 Equipment and Floor Drainage Systems 4 10.14 Process Sampling Systems 4 10.15 Communications Systems 4 10.16 Station Lighting System 4 10.17 Main Control Room Environmental Control System 4 10.18 Equipment Area Cooling System 4 10.19 Post Accident Sampling System 4 Summ T of C-iii Rev. 30 - Nov. 2015

PNPS-FSAR

SUMMARY

TABLE OF CONTENTS (Cont)

Section Title Volume 10.20 Crack Arrest Verification System 4 10.21 Hydrogen Water Chemistry Extended Test System 4 10.22 Electrolytic Hydrogen Water Chemistry System 4 10.23 Mitigation Monitoring System 4 Section 11 Power Conversion Systems 4 11.1 Summary Description 4 11.2 Turbine-Generator 4 11.3 Main Condenser 4 11.4 Main Condenser Gas Removal and Turbine Sealing Systems 4 11.5 Turbine Bypass System 4 11.6 Circulating Water System 4 11.7 Condensate Demineralizer System 4 11.8 Condensate and Feedwater System 4 11.9 Condensate Storage System 4 Section 12 Structures and Shielding 4 12.1 Summary Description 4 12.2 Structural Design 4 12.3 Shielding and Radiation Protection 4 12.4 Radioactive Materials Safety 4 Section 13 Conduct of Operations 5 13.1 Introduction and Summary 5 13.2 Organization and Responsibilities 5 13.3 Training 5 13.4 Preoperational Test Program 5 13.5 Reactor Startup and Power Test Program 5 13.6 Station Procedures 5 13.7 Records 5 13.8 Operational Review and Audits 5 Section 14 Station Safety Analysis 5 14.1 Introduction 5 14.2 Reactor Limits 5 14.3 Method of Approach 5 14.4 Abnormal Operational Transients 5 14.5 Postulated Design Basis Accidents 5 14.6 Special Events 5 14.7 References 5 Summ T of C-iv Rev. 30 - Nov. 2015

PNPS-FSAR

SUMMARY

TABLE OF CONTENTS (Cont)

Section Title Volume Appendix A Pressure Integrity of Piping and Equipment Pressure Parts 5 A.1 Scope 5 A.2 Classification of Piping and Equipment Pressure Parts 5 A.3 Design Requirements 5 A.4 Materials 5 A.5 Fabrication and Installation Requirements 5 A.6 Testing and Inspection Requirements 5 A.7 Final Cleaning and Protection 5 A.8 F1, F2, F3, and F4 Fabrication and Erection Schedule 5 A.9 M1, M2, and M3 Material Schedules 5 A.10 T1, T2, T3, T4, and T5 Inspection and Testing Schedules 5 Appendix B Technical Specifications 5 B.1 Technical Specifications 5 B.2 Technical Specifications Relocated to the FSAR 5 B.3 Relocated Technical Specifications and Related 5 Bases 5 B.4 References 5 Appendix C Structural Loading Criteria 5 C.1 Scope 5 C.2 Concrete and Steel Structures 5 C.3 Components 5 Appendix D Quality Assurance Program 5 D.1 General 5 D.2 Program Organization and Responsibility 5 D.3 Quality Surveillance and Auditing 5 D.4 Quality Controls and Assurance Measures 5 D.5 QC-QA Documentation and Records 5 D.6 Project Communications 5 Attachment D.I General Electric Quality System for BWR Nuclear Steam Supply Projects 5 Attachment D.II Bechtel Quality Assurance Program, Pilgrim Nuclear Power Station 5 Attachment D.III Site Handling and Storage of Nuclear Steam Supply System Equipment, Pilgrim Nuclear Power Station 5 Summ T of C-v Rev. 30 - Nov. 2015

PNPS-FSAR

SUMMARY

TABLE OF CONTENTS (Cont)

Section Title Volume Appendix E Stack Release Limit Calculations for Pilgrim Station Site 5 E.1 Analytical Model 5 E.2 Verification of Analytical Model 5 E.3 Stack Release Limit Calculations for Pilgrim Station Site 5 E.4 Building Exhaust Vent Release 5 E.5 Summary 5 E.6 References 5 Appendix F Comparison of Pilgrim Nuclear Power Station with the Proposed General Design Criteria Published by the AEC for Public Comment in The Federal Register July 11, 1967 6 F.1 Summary Description 6 F.2 Criteria Conformance 6 Appendix G Station Nuclear Safety Operation Analysis Supporting Nuclear Safety Requirements for Plant Operation 6 G.1 Analytical Objective 6 G.2 Bases for Selecting Operation Requirements for Plant Operation 6 G.3 Bases for Selecting Surveillance Test Frequencies for Nuclear Safety Systems and Engineered Safeguards for Plant Operation 6 G.4 Method of Analysis 6 G.5 Analysis and Results 6 G.6 Conclusion 6 Appendix H Tornado Criteria for Nuclear Power Plants 6 H.0 Foreword 6 H.1 Introduction 6 H.2 Characteristics of Tornadoes 6 H.3 Tornado Probability 6 H.4 Wind Loading 6 H.5 Pressure Differential 6 H.6 Water Loss 6 H.7 Tornado Missiles 6 H.8 References 6 Summ T of C-vi Rev. 30 - Nov. 2015

PNPS-FSAR

SUMMARY

TABLE OF CONTENTS (Cont)

Appendix I Site Investigation of the Seabreezes 6 I.1 Introduction 6 I.2 Results and Conclusions 6 Section Title Volume I.3 Discussion 6 I.4 Data and Calculations 6 I.5 References 6 Appendix J Station Research, Development, and Further Information Requirements and Resolution 6 J.1 Resolution of ACRS Concerns 6 J.2 Areas Specified in the ACRS Construction Permit Letter for Pilgrim Nuclear Power Station 6 J.3 Areas Specified in the AEC Staff Construction Permit - Safety Evaluation Report for Pilgrim Nuclear Power Station 6 J.4 Areas Specified in Recent, Related ACRS Construction and Operating Permit Letters 6 J.5 Summary Conclusions 6 J.6 References 6 Appendix K Inservice Inspection Program 6 K.1 General 6 K.2 Inspection Program Development 6 K.3 Inspection Program Implementation 6 K.4 Reference Base Examinations 6 K.5 Documentation and Records 6 Appendix L Containment Report 7 L.1 Introduction and Summary 7 L.2 Basis for Containment Design 7 L.3 Containment System Design 7 L.4 Initial Overload and Leakage Rate Test 7 L.5 Manufacturer's Data Report for Nuclear Vessels 7 Appendix M Reactor Pressure Vessel Design Report 7 M.1 Introduction to the Report 7 M.2 Summary 7 Appendix N Emergency Plan 7 Summ T of C-vii Rev. 30 - Nov. 2015

PNPS-FSAR

SUMMARY

TABLE OF CONTENTS (Cont)

Section Title Volume Appendix O Analysis of the Consequences of High Energy Piping Failures Outside The Primary Containment 7 O.1 Introduction 7 O.2 Analysis Assumptions 7 O.3 Analysis Approach 7 O.4 Structural Loading Analytical Technique 7 O.5 Jet and Fluid Forces Analytical Techniques 7 O.6 Detailed System Analyses 7 O.7 Environmental Qualification of Electrical Equipment 7 Appendix P Deleted 7 Appendix Q Supplemental Reload Submittal 7 Q.1 Introduction 7 Appendix R Initial Core Station Safety Analysis 7 R.1 Introduction 7 R.2 Analyses of Abnormal Operational Transients (Initial Core) 7 R.3 Analysis of Design Basis Accidents (Initial Core) 7 R.4 Special Events (Initial Core) 7 R.5 Analytical Methods (Initial Core) 7 R.6 Evaluation Using Standard NRC Approach (Initial Core) 7 Appendix S License Renewal Commitments 7 S.1 Supplement for Renewed Operating License 7 S.2 Aging Management programs and Activities 7 Transients (Initial Core) 7 S.3 Evaluation of Time-Limited Aging Analyses 7 S.4 References 7 Summ T of C-viii Rev. 30 - Nov. 2015

PNPS-FSAR LIST OF EFFECTIVE PAGES

    • VOLUME 7**VOLUME 7**VOLUME 7**VOLUME 7**VOLUME 7**

Page, Table (T), or Revision Figure (F) Number VOLUME 7 Summ T of C-i..........................................30 Summ T of C-ii.........................................30 Summ T of C-iii........................................30 Summ T of C-iv.........................................30 Summ T of C-v..........................................30 Summ T of C-vi.........................................30 Summ T of C-vii........................................30 Summ T of C-viii.......................................30 List of Effective Pages Vol. 7 (1 thru 10).............30 APPENDIX L L-i....................................................28 L-ii...................................................28 L-iii..................................................28 L-iv...................................................28 L-v....................................................28 L.1-1...................................................0 FL.1-1 Refer to C1A 1-8 ...............................17 L.2-1...................................................0 TL.2-1 (1 of 9)........................................25 TL.2-1 (2 of 9)........................................25 TL.2-1 (3 of 9)........................................25 TL.2-1 (4 of 9)........................................25 TL.2-1 (5 of 9)........................................25 TL.2-1 (6 of 9)........................................25 TL.2-1 (7 of 9)........................................25 TL.2-1 (8 of 9)........................................25 TL.2-1 (9 of 9)........................................25 FL.2-1 Refer to C1A 2-11 ..............................17 FL.2-2 Refer to C1A 3-5 ...............................17 FL.2-3 Refer to C1A 4-8 ...............................17 FL.2-4 Refer to C1A 5-11 ..............................17 FL.2-5 Refer to C1A 6-8 ...............................17 FL.2-6 Refer to C1A 7-6 ...............................17 FL.2-7 Refer to C1A 8-7 ...............................17 FL.2-8 Refer to C1A 9-7 ...............................17 FL.2-9 Refer to C1A 10-4 ..............................17 FL.2-10 Refer to C1A 12-5 .............................17 FL.2-11 Refer to C1A 13-4 .............................17 EP7 - 1 of 10 Rev. 30 - Nov. 2015

PNPS-FSAR LIST OF EFFECTIVE PAGES

    • VOLUME 7**VOLUME 7**VOLUME 7**VOLUME 7**VOLUME 7**

Page, Table (T), or Revision Figure (F) Number FL-2-12 Refer to C1A 14-4 .............................17 FL.2-13 Refer to C1A 15-6 .............................17 FL.2-14 Refer to C1A 16-4 .............................17 FL.2-15 Refer to C1A 17-5 .............................17 FL.2-16 Refer to C1A 19-10 ............................17 FL.2-17 Refer to C1A 20-7 .............................17 FL.2-18 Refer to C1A 21-5 .............................17 FL.2-19 Refer to C1A 50-5 .............................17 FL.2-20 Refer to C1A 51-7 .............................17 FL.2-21 Refer to C1A 52-5 .............................17 FL.2-22 Refer to C1A 58-4 .............................17 FL.2-23 Refer to C1A 62-4 .............................17 FL.2-24 Refer to C1A 100-3 ............................17 FL.2-25 Refer to C1A 185 ..............................17 L.3-1 Pages (1-13).....................................28 TL.3-1 (1 of 1)........................................28 TL.3-2 (1 of 1).........................................9 TL.3-3 (1 of 2)........................................11 TL.3-3 (2 of 2)........................................11 TL.3-4 (1 of 1).........................................5 TL.3-5 (1 of 1).........................................0 TL.3-6 (1 of 1).........................................0 TL.3-7 (1 of 1).........................................0 TL.3-8 (1 of 2).........................................1 TL.3-8 (2 of 2).........................................1 TL.3-9 (1 of 1).........................................2 TL.3-10 (1 of 1)........................................0 TL.3-11 (1 of 1).......................................21 TL.3-12 (1 of 1).......................................21 FL.3-1 (1 of 1).........................................0 FL.3-2 (1 of 1).........................................0 L.4-1...................................................0 L.5-1 (Form N-1)........................................0 L.5-2 (Form N-1)........................................0 L.5-3 (Form N-2)........................................0 L.5-4 (Form N-2)........................................0 EP7 - 2 of 10 Rev. 30 - Nov. 2015

PNPS-FSAR LIST OF EFFECTIVE PAGES

    • VOLUME 7**VOLUME 7**VOLUME 7**VOLUME 7**VOLUME 7**

Page, Table (T), or Revision Figure (F) Number APPENDIX M M-i....................................................29 M-ii...................................................29 M.1-1..................................................29 M.1-2..................................................29 FM.1-1 Refer to 1979-216-6 (C.E.)......................17 FM.1-2 Refer to 1979-185-3 (C.E.)......................17 M.2-1..................................................25 M.2-2..................................................25 APPENDIX N N.1-1...................................................9 APPENDIX O O-i....................................................11 O-ii...................................................11 O-iii...................................................9 O-iv....................................................5 O-v.....................................................5 O-vi....................................................5 O.1-1..................................................15 O.2-1..................................................15 O.2-1a.................................................15 O.2-2...................................................5 O.2-3...................................................5 TO.2-1 (1 of 1).........................................5 FO.2-1 (1 of 1).........................................5 FO.2-2 (1 of 1).........................................5 O.3-1...................................................9 EP7 - 3 of 10 Rev. 30 - Nov. 2015

PNPS-FSAR LIST OF EFFECTIVE PAGES

    • VOLUME 7**VOLUME 7**VOLUME 7**VOLUME 7**VOLUME 7**

Page, Table (T), or Revision Figure (F) Number O.4-1...................................................5 O.4-2...................................................5 O.4-3...................................................5 O.4-4...................................................5 O.4-5...................................................5 O.4-6...................................................5 O.4-7...................................................5 O.4-8...................................................5 O.4-9...................................................5 O.4-10..................................................5 O.4-11..................................................5 O.4-12..................................................5 O.4-13..................................................5 O.4-14..................................................5 O.4-15..................................................5 O.4-16..................................................5 O.4-17..................................................5 O.4-18..................................................5 O.4-19..................................................5 O.4-20..................................................5 O.4-21..................................................5 O.4-22..................................................5 TO.4-1 (1 of 1).........................................5 TO.4-2 (1 of 1).........................................5 TO.4-3 (1 of 2).........................................5 TO.4-3 (2 of 2).........................................5 TO.4-4 (1 of 1).........................................5 FO.4-1 (1 of 1).........................................5 FO.4-2 (1 of 1).........................................5 FO.4-3 (1 of 1).........................................5 FO.4-4 (1 of 1).........................................5 FO.4-5 (1 of 1).........................................5 FO.4-6 (1 of 1).........................................5 FO.4-7 (1 of 1).........................................5 O.5-1...................................................5 O.5-2...................................................5 O.5-3...................................................5 O.5-4...................................................5 O.5-5...................................................5 O.5-6...................................................5 O.5-7...................................................5 O.5-8...................................................5 O.5-9...................................................5 EP7 - 4 of 10 Rev. 30 - Nov. 2015

PNPS-FSAR LIST OF EFFECTIVE PAGES

    • VOLUME 7**VOLUME 7**VOLUME 7**VOLUME 7**VOLUME 7**

Page, Table (T), or Revision Figure (F) Number FO.5-1 (1 of 1).........................................5 FO.5-2 (1 of 1).........................................5 FO.5-3 (1 of 1).........................................5 FO.5-4 (1 of 1).........................................5 O.6-1...................................................9 O.6-2...................................................9 O.6-3..................................................16 O.6-4..................................................16 O.6-5..................................................16 O.6-6..................................................22 O.6-6a.................................................22 O.6-7..................................................15 O.6-8..................................................15 O.6-9..................................................15 TO.6-1 (1 of 3).........................................5 TO.6-1 (2 of 3).........................................5 TO.6-1 (3 of 3)........................................13 TO.6-2 (1 of 1)........................................23 TO.6-3 (1 of 5).........................................5 TO.6-3 (2 of 5).........................................5 TO.6-3 (3 of 5).........................................5 TO.6-3 (4 of 5).........................................9 TO.6-3 (5 of 5)........................................13 FO.6-1 (1 of 1).........................................5 FO.6-2 (1 of 1).........................................5 FO.6-3 (1 of 1).........................................5 FO.6-4 (1 of 1).........................................5 FO.6-5 (1 of 1).........................................5 FO.6-6 (1 of 1).........................................5 FO.6-7 (1 of 1).........................................5 FO.6-8 (1 of 1).........................................5 FO.6-9 (1 of 1).........................................5 FO.6-10 (1 of 1)........................................5 FO.6-11 (1 of 1)........................................5 FO.6-12 (1 of 1)........................................5 FO.6-13 (1 of 1)........................................5 FO.6-14 (1 of 1)........................................5 FO.6-15 (1 of 1)........................................5 FO.6-16 (1 of 1)........................................5 FO.6-17 (1 of 1)........................................5 EP7 - 5 of 10 Rev. 30 - Nov. 2015

PNPS-FSAR LIST OF EFFECTIVE PAGES

    • VOLUME 7**VOLUME 7**VOLUME 7**VOLUME 7**VOLUME 7**

Page, Table (T), or Revision Figure (F) Number FO.6-18 (1 of 1)........................................5 FO.6-19 (1 of 1)........................................5 FO.6-20 (1 of 1)........................................5 FO.6-21 (1 of 1)........................................5 FO.6-22 (1 of 1).......................................15 FO.6-23 (1 of 1)........................................5 FO.6-24 (1 of 1).......................................15 FO.6-25 (1 of 1)........................................5 FO.6-26 (1 of 1)........................................5 FO.6-27 (1 of 1)........................................5 O.7-1...................................................9 APPENDIX P P.1-1 (Deleted).......................................15 APPENDIX Q Q-i....................................................30 Q-ii...................................................30 Q-iii..................................................30 Q.1 Pages 1-4..........................................30 APPENDIX R R-i....................................................23 R-ii...................................................23 R-iii..................................................23 R-iv...................................................23 R-v....................................................23 R-vi...................................................23 R-vii..................................................23 R-viii.................................................23 R.1-1...................................................6 R.2-1...................................................6 R.2-2...................................................6 R.2-3..................................................19 R.2-4..................................................19 R.2-4a.................................................19 R.2-5...................................................6 R.2-6...................................................6 EP7 - 6 of 10 Rev. 30 - Nov. 2015

PNPS-FSAR LIST OF EFFECTIVE PAGES

    • VOLUME 7**VOLUME 7**VOLUME 7**VOLUME 7**VOLUME 7**

Page, Table (T), or Revision Figure (F) Number R.2-7...................................................6 R.2-8...................................................6 R.2-9...................................................6 R.2-10..................................................6 R.2-11..................................................6 R.2-12..................................................6 R.2-13..................................................6 R.2-14.................................................23 R.2-15..................................................6 R.2-16.................................................13 R.2-17..................................................6 R.2-18..................................................6 R.2-19..................................................6 R.2-20..................................................6 FR.2-1 (1 of 1).........................................6 FR.2-2 (1 of 1).........................................6 FR.2-3 (1 of 1).........................................6 FR.2-4 (1 of 1).........................................6 FR.2-5 (1 of 2).........................................6 FR.2-5 (2 of 2).........................................6 FR.2-6 (1 of 1).........................................6 FR.2-7 (1 of 1).........................................6 FR.2-8 (1 of 1).........................................6 FR.2-9 (1 of 1).........................................6 FR.2-10 (1 of 1)........................................6 FR.2-11 (1 of 1)........................................6 FR.2-12 (1 of 1)........................................6 FR.2-13 (1 of 2)........................................6 FR.2-13 (2 of 2)........................................6 FR.2-14 (1 of 2)........................................6 FR.2-14 (2 of 2)........................................6 FR.2-15 (1 of 2)........................................6 FR.2-15 (2 of 2)........................................6 FR.2-16 (1 of 2)........................................6 FR.2-16 (2 of 2)........................................6 FR.2-17 (1 of 2)........................................6 FR.2-17 (2 of 2)........................................6 FR.2-18 (1 of 1)........................................6 FR.2-19 (1 of 1)........................................6 FR.2-20 (1 of 1)........................................6 FR.2-21 (1 of 1)........................................6 FR.2-22 (1 of 1)........................................6 FR.2-23 (1 of 1)........................................6 FR.2-24 (1 of 1)........................................6 FR.2-25 (1 of 1)........................................6 EP7 - 7 of 10 Rev. 30 - Nov. 2015

PNPS-FSAR LIST OF EFFECTIVE PAGES

    • VOLUME 7**VOLUME 7**VOLUME 7**VOLUME 7**VOLUME 7**

Page, Table (T), or Revision Figure (F) Number R.3-1..................................................16 R.3-2..................................................16 R.3-3..................................................23 R.3-4..................................................23 R.3-5...................................................6 R.3-6...................................................6 R.3-7...................................................6 R.3-8...................................................6 R.3-9..................................................23 R.3-10..................................................6 R.3-11.................................................23 R.3-12.................................................23 R.3-13.................................................23 R.3-14..................................................6 R.3-15..................................................6 R.3-16..................................................6 R.3-17..................................................6 R.3-18..................................................6 R.3-19..................................................6 R.3-20..................................................9 R.3-21.................................................23 R.3-22.................................................17 R.3-23.................................................23 R.3-24..................................................6 R.3-25..................................................6 R.3-26..................................................6 TR.3-1 (1 of 1)........................................16 TR.3-2 (1 of 1).........................................9 TR.3-3 (1 of 1).........................................9 TR.3-4 (1 of 1)........................................16 TR.3-5 (1 of 1)........................................16 TR.3-6 (1 of 1).........................................9 TR.3-7 (1 of 1).........................................9 TR.3-8 (1 of 1)........................................16 TR.3-9 (1 of 1)........................................23 TR.3-10 (1 of 1)........................................9 TR.3-11 (1 of 1)........................................6 FR.3-1 (1 of 1).........................................6 FR.3-2 (1 of 1).........................................6 FR.3-3 (1 of 1).........................................6 FR.3-4 (1 of 1).........................................6 FR.3-5 (1 of 1).........................................6 FR.3-6 (1 of 1).........................................6 FR.3-7 (1 of 1).........................................6 FR.3-8 (1 of 1).........................................6 EP7 - 8 of 10 Rev. 30 - Nov. 2015

PNPS-FSAR LIST OF EFFECTIVE PAGES

    • VOLUME 7**VOLUME 7**VOLUME 7**VOLUME 7**VOLUME 7**

Page, Table (T), or Revision Figure (F) Number R.4-1...................................................6 R.5-1..................................................23 R.5-2...................................................6 R.5-3...................................................6 R.5-4...................................................6 R.5-5...................................................6 R.5-6...................................................6 R.5-7..................................................23 R.5-8...................................................6 R.5-9...................................................6 R.5-10.................................................24 R.5-11..................................................6 R.5-12..................................................6 R.5-13..................................................6 R.5-14..................................................6 R.5-15..................................................6 R.5-16..................................................6 R.5-17..................................................6 R.5-18..................................................6 R.5-19.................................................23 R.5-20..................................................6 R.5-21..................................................6 R.5-22..................................................6 R.5-23..................................................6 R.5-24.................................................24 R.5-25..................................................6 R.5-26.................................................23 R.5-27.................................................23 R.5-28.................................................23 R.5-29..................................................6 R.5-30..................................................6 R.5-31..................................................6 R.5-32..................................................6 R.5-33..................................................6 R.5-34.................................................24 R.5-35..................................................6 R.5-36..................................................6 TR.5-1 (1 of 1).........................................9 TR.5-2 (1 of 1).........................................9 TR.5-3 (1 of 1).........................................9 TR.5-4 (1 of 1).........................................9 TR.5-5 (1 of 1).........................................9 TR.5-6 (1 of 1).........................................9 EP7 - 9 of 10 Rev. 30 - Nov. 2015

PNPS-FSAR LIST OF EFFECTIVE PAGES

    • VOLUME 7**VOLUME 7**VOLUME 7**VOLUME 7**VOLUME 7**

Page, Table (T), or Revision Figure (F) Number TR.5-7 (1 of 1).........................................9 TR.5-8 (1 of 1).........................................9 FR.5-1 (1 of 1).........................................6 R.6-1...................................................6 R.6-2..................................................16 R.6-3..................................................10 R.6-4...................................................6 R.6-5..................................................21 R.6-6..................................................23 R.6-6a.................................................21 R.6-7...................................................6 R.6-8..................................................24 R.6-9..................................................24 R.6-10..................................................6 R.6-11..................................................6 TR.6-1 (1 of 1).........................................9 TR.6-2 (1 of 1).........................................9 TR.6-3 (1 of 1)........................................10 TR.6-4 (1 of 1)........................................23 TR.6-5 (1 of 1)........................................23 TR.6-6 (1 of 1)........................................23 TR.6-7 (1 of 1).........................................9 TR.6-8 (1 of 1).........................................9 TR.6-9 (1 of 1)........................................24 TR.6-10 (1 of 2)........................................6 TR.6-10 (2 of 2)........................................6 TR.6-11 (1 of 2)........................................6 TR.6-11 (2 of 2)........................................6 TR.6-12 (1 of 1)........................................9 TR.6-13 (1 of 1)........................................9 FR.6-1 (1 of 1).........................................6 FR.6-2 (1 of 1).........................................6 APPENDIX S S-i....................................................30 S-ii...................................................30 S.1 Page 1-1...........................................29 S.2 Pages 1-23.........................................30 S.3 Pages 1-10.........................................29 S.4 Pages 1-3..........................................29 EP7 - 10 of 10 Rev. 30 - Nov. 2015