Line 16: |
Line 16: |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 June 28, 2016 Mr. Benjamin C. Waldrep Site Vice President Shearon Harris Nuclear Power Plant M/C HNP01 | | {{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 June 28, 2016 Mr. Benjamin C. Waldrep Site Vice President Shearon Harris Nuclear Power Plant M/C HNP01 New Hill, NC 27562-0165 |
| | |
| New Hill, NC 27562-0165 | |
|
| |
|
| ==SUBJECT:== | | ==SUBJECT:== |
| SHEARON HARRIS NUCLEAR POWER PLANT - INVESTIGATIVE SYNOPSIS, OFFICE OF INVESTIGATIONS CASE NUMBER 2-2015-038 | | SHEARON HARRIS NUCLEAR POWER PLANT - INVESTIGATIVE SYNOPSIS, OFFICE OF INVESTIGATIONS CASE NUMBER 2-2015-038 |
|
| |
|
| ==Dear Mr. Waldrep:== | | ==Dear Mr. Waldrep:== |
|
| |
|
| The Nuclear Regulatory Commission (NRC) Office of Investigations (OI) has completed their investigation regarding alleged discrimination against a radiation protection technician for raising safety concerns. | | The Nuclear Regulatory Commission (NRC) Office of Investigations (OI) has completed their investigation regarding alleged discrimination against a radiation protection technician for raising safety concerns. |
| | |
| The NRC determined that there was insufficient evidence to substantiate that the individual was discriminated against for raising safety concerns. We plan no further action with regard to this matter. Should you have any questions concerning this letter, please contact us. | | The NRC determined that there was insufficient evidence to substantiate that the individual was discriminated against for raising safety concerns. We plan no further action with regard to this matter. Should you have any questions concerning this letter, please contact us. |
| In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/NRC/ADAMS/index.html (the Public Electronic Reading Room). | | In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/NRC/ADAMS/index.html (the Public Electronic Reading Room). |
| Sincerely, /RA/ George T. Hopper, Chief Reactor Projects Branch 4 Division of Reactor Projects | | Sincerely, |
| | | /RA/ |
| CERTIFIED MAIL 7012 1010 0002 6821 1875 RETURN RECEIPT REQUESTED | | George T. Hopper, Chief Reactor Projects Branch 4 Division of Reactor Projects CERTIFIED MAIL 7012 1010 0002 6821 1875 RETURN RECEIPT REQUESTED |
|
| |
|
| ML16180A272 SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII:DRP RII:EICS RII:DRP SIGNATURE DXW4 MXM3 via email GTH NAME DJackson MCheckle GHopper DATE 6/27/2016 6/27/2016 6/27/2016 E-MAIL COPY? YES NO YES NO YES NO}} | | ML16180A272 SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII:DRP RII:EICS RII:DRP SIGNATURE DXW4 MXM3 via email GTH NAME DJackson MCheckle GHopper DATE 6/27/2016 6/27/2016 6/27/2016 E-MAIL COPY? YES NO YES NO YES NO}} |
Latest revision as of 17:18, 30 October 2019
|
---|
Category:Letter
MONTHYEARIR 05000400/20240032024-11-0707 November 2024 Integrated Inspection Report 05000400/2024003 ML24290A1102024-10-24024 October 2024 Notification of Licensed Operator Initial Examination 05000400/2025301 05000400/LER-2024-001-01, Automatic Reactor Trip Due to Main Generator Lock-Out2024-10-23023 October 2024 Automatic Reactor Trip Due to Main Generator Lock-Out IR 05000400/20240112024-09-10010 September 2024 NRC Inspection Report 05000400/2024011 IR 05000400/20240052024-08-26026 August 2024 Updated Inspection Plan for Shearon Harris Nuclear Power Plant, Unit 1 (Report 05000400-2024005) Rev 1 ML24059A4252024-08-14014 August 2024 Issuance of Amendment No. 202 Regarding Alignment of Certain Technical Specifications with Improved Standard Technical Specifications ML24213A0522024-08-0202 August 2024 Issuance of Amendment No. 201 to Extend Completion Time of Inoperable Reactor Coolant System Accumulator Using Consolidated Line Item Improvement Process ML24212A3412024-07-31031 July 2024 Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection ML24170A7312024-07-29029 July 2024 – Exemption from the Requirements of 10 CFR 50.55a(H)(2) Using the Risk-Informed Process for Evaluations Letter IR 05000400/20240022024-07-29029 July 2024 – Integrated Inspection Report 05000400/2024002 05000400/LER-2024-001, Automatic Reactor Trip Due to Main Generator Lock-Out2024-07-22022 July 2024 Automatic Reactor Trip Due to Main Generator Lock-Out ML24183A0972024-07-12012 July 2024 ISFSI; Catawba 1, 2 & ISFSI; McGuire 1, 2 & ISFSI; Oconee 1, 2, 3 & ISFSI; Shearon Harris 1; H. B. Robinson 2 & ISFSI; and Radioactive Package Shipping Under 10 CFR 71 (71-266 & 71-345) – Review of QA Program Changes EPID L-2024-LLQ-0002 IR 05000400/20243022024-06-27027 June 2024 – NRC Operator Licensing Examination Approval 05000400/2024302 IR 05000400/20244012024-06-25025 June 2024 – Security Baseline Inspection Report05000400/2024401 ML24162A1372024-06-24024 June 2024 – Regulatory Audit Summary Related to the Review of Exemption Request from Certain Requirements in 10 CFR 50.55a(h)(2)(EPID L-2024-LLE-00040) ML24136A1382024-05-20020 May 2024 – Notification of an NRC Fire Protection Team Inspection (FPTI) (NRC Inspection Report 05000400/2024011) and Request for Information (RFI) ML24116A2592024-05-14014 May 2024 Staff Evaluation Related to Aging Management Plan and Inspection Plan for Reactor Vessel Internals ML24127A1592024-05-0808 May 2024 – Notification of Licensed Operator Initial Examination 05000400/2024302 IR 05000400/20240012024-05-0505 May 2024 Integrated Inspection Report 05000400/2024001 ML24100A0912024-04-10010 April 2024 Operator License Examination Report ML24058A2462024-03-18018 March 2024 – Supplemental Information Needed for Using the Risk-Informed Process for Evaluations for the Request for Exemption from Certain Requirements in 10 CFR 50.55a(h)(2) IR 05000400/20230062024-02-28028 February 2024 Annual Assessment Letter for Shearon Harris Nuclear Power Plant - NRC Inspection Report 05000400/2023006 ML24032A2632024-02-23023 February 2024 – Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0044 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) IR 05000400/20243012024-02-21021 February 2024 – NRC Operator Licensing Examination Approval 05000400/2024301 IR 05000400/20230042024-01-30030 January 2024 Integrated Inspection Report 05000400/2023004 ML23317A3462023-11-14014 November 2023 Duke Fleet - Correction Letter to License Amendment Nos. 312 & 340 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-554, Revision 1 IR 05000400/20230032023-11-0909 November 2023 Integrated Inspection Report 05000400/2023003 ML23346A1322023-10-0606 October 2023 Communication from C-10 Research & Education Foundation Regarding NextEra Common Emergency Fleet Plan License Amendment Request and Related Documents Subsequently Published ML23234A1702023-10-0303 October 2023 Issuance of Amendment No. 199 Regarding Administrative Changes to the Renewed Facility Operating License and Technical Specifications ML23256A0882023-09-25025 September 2023 Issuance of Alternative to Steam Generator Welds ML23195A0782023-08-29029 August 2023 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-554, Revision 1 IR 05000400/20230052023-08-23023 August 2023 Updated Inspection Plan for Shearon Harris Nuclear Power Plant, Unit 1 (Report 05000400/2023005) ML23234A2542023-08-22022 August 2023 RQ Inspection Notification Letter IR 05000400/20234022023-07-26026 July 2023 Security Baseline Inspection Report 05000400/2023402 IR 05000400/20230022023-07-24024 July 2023 Integrated Inspection Report 05000400/2023002 IR 05000400/20234402023-07-17017 July 2023 Special Inspection Report 05000400/2023440 and Preliminary Greater than Green Finding and Apparent Violation Cover Letter 05000400/LER-2022-006-02, Auxiliary Feedwater Pump Inoperability2023-07-11011 July 2023 Auxiliary Feedwater Pump Inoperability IR 05000400/20230012023-05-10010 May 2023 – Integrated Inspection Report 05000400 2023001 IR 05000400/20234042023-05-0404 May 2023 Cyber Security Inspection Report 05000400/2023404 ML23118A0762023-05-0101 May 2023 Approval for Use of Specific Provision of a Later Edition of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI ML23118A1392023-04-28028 April 2023 Submittal of Updated Final Safety Analysis Report (Amendment 65), Technical Specification Bases Revision, Report of Changes Pursuant to 10 CFR 50.59 and Summary of Commitment Changes IR 05000400/20234032023-04-0505 April 2023 Security Baseline Inspection Report 05000400/2023403 IR 05000400/20230102023-03-15015 March 2023 Comprehensive Engineering Team Inspection (CETI) Inspection Report 05000400/2023010 05000400/LER-1922-006-01, Auxiliary Feedwater Pump Inoperability2023-03-10010 March 2023 Auxiliary Feedwater Pump Inoperability ML22332A4932023-03-10010 March 2023 William States Lee III 1 and 2 - Issuance of Amendments Regarding the Relocation of the Emergency Operations Facility IR 05000400/20220062023-03-0101 March 2023 Annual Assessment Letter for Shearon Harris Nuclear Power Plant - NRC Inspection Report 05000400/2022006 ML23033A5272023-02-0808 February 2023 Correction of Typographical Errors Incurred During Issuance of License Amendment No. 196 IR 05000400/20220042023-02-0707 February 2023 Integrated Inspection Report 05000400/2022004 05000400/LER-2022-007-01, Automatic Reactor Trip Due to Loss of Power from the a Auxiliary Bus2023-01-26026 January 2023 Automatic Reactor Trip Due to Loss of Power from the a Auxiliary Bus ML23020A1252023-01-23023 January 2023 Notification of Target Set Inspection and Request for Information (NRC Inspection Report 05000400/2023403) 2024-09-10
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 June 28, 2016 Mr. Benjamin C. Waldrep Site Vice President Shearon Harris Nuclear Power Plant M/C HNP01 New Hill, NC 27562-0165
SUBJECT:
SHEARON HARRIS NUCLEAR POWER PLANT - INVESTIGATIVE SYNOPSIS, OFFICE OF INVESTIGATIONS CASE NUMBER 2-2015-038
Dear Mr. Waldrep:
The Nuclear Regulatory Commission (NRC) Office of Investigations (OI) has completed their investigation regarding alleged discrimination against a radiation protection technician for raising safety concerns.
The NRC determined that there was insufficient evidence to substantiate that the individual was discriminated against for raising safety concerns. We plan no further action with regard to this matter. Should you have any questions concerning this letter, please contact us.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/NRC/ADAMS/index.html (the Public Electronic Reading Room).
Sincerely,
/RA/
George T. Hopper, Chief Reactor Projects Branch 4 Division of Reactor Projects CERTIFIED MAIL 7012 1010 0002 6821 1875 RETURN RECEIPT REQUESTED
ML16180A272 SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII:DRP RII:EICS RII:DRP SIGNATURE DXW4 MXM3 via email GTH NAME DJackson MCheckle GHopper DATE 6/27/2016 6/27/2016 6/27/2016 E-MAIL COPY? YES NO YES NO YES NO