ML16243A482: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(2 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML16243A482
| number = ML16243A482
| issue date = 08/29/2016
| issue date = 08/29/2016
| title = Perry Nuclear Power Plant - Confirmation of Initial License Examination
| title = Confirmation of Initial License Examination
| author name = Orlikowski R J
| author name = Orlikowski R
| author affiliation = NRC/RGN-III/DRS/OB
| author affiliation = NRC/RGN-III/DRS/OB
| addressee name = Hamilton D
| addressee name = Hamilton D
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE RD. SUIT E 210 LISLE, IL 60532
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE RD. SUITE 210 LISLE, IL 60532-4352 August 29, 2016 Mr. David Hamilton Site Vice President FirstEnergy Nuclear Operating Company Perry Nuclear Power Plant P. O. Box 97, 10 Center Road, A-PY-A290 Perry, OH 44081-0097
-4352 August 29, 2016 Mr. David Hamilton Site Vice President FirstEnergy Nuclear Operating Company Perry Nuclear Power Plant P. O. Box 97, 10 Center Road, A
-PY-A 290 Perry, OH 44081
-0097  


==SUBJECT:==
==SUBJECT:==
PERRY NUCLEAR POWER PLANT - CONFIRMATION OF INITIAL LICENSE EXAMINATION Dear Mr. Hamilton
PERRY NUCLEAR POWER PLANT - CONFIRMATION OF INITIAL LICENSE EXAMINATION
: In a telephone conversation on August 22 , 201 6 , between Mr.
R. Torres , Fleet Examination Author , and Mr. D. McNeil, Senior Operations Engineer, arrangements were made for the administration of licensing examinations
, at the Perry Nuclear Power Plant , during the weeks of February 5 and 13, 201 7. In addition, the U.S. Nuclear Regulatory Commission (NRC) will make an examination validation visit to your facility the week of January 9, 2017.
As agreed during the telephone conversation, your staff will prepare the examinations based on the guidelines in Revision 10 of NUREG-1021, "Operator Licensing Examination Standards for Power Reactors."
The NRC's regional office will prepare the outline package for the examination and discuss with your staff any changes that might be necessary before the examinations are administered.
The outline package will be delivered only to Mr. Torres in a separate letter because of examination security considerations.
To meet the above schedule, the NRC will furnish the examination outlines to Mr. Torres by August 31, 2016. The written examinations, operating tests, and supporting reference materials identified in Attachment 3 to ES
-201 , will be due from Mr. Torres
, by December 12, 2016. Pursuant to Title 10 of the Code of Federal Regulations (10 CFR) 55.40(b)(3), an authorized representative of the facility licensee shall approve the examinations and tests before they are


submitted to the Commission for review and approval.
==Dear Mr. Hamilton:==
All materials shall be complete and ready-to-use. We request that any personal, proprietary, sensitive unclassified, or safeguards information in your response be contained in a separate enclosure and appropriately marked.
 
In a telephone conversation on August 22, 2016, between Mr. R. Torres, Fleet Examination Author, and Mr. D. McNeil, Senior Operations Engineer, arrangements were made for the administration of licensing examinations, at the Perry Nuclear Power Plant, during the weeks of February 5 and 13, 2017. In addition, the U.S. Nuclear Regulatory Commission (NRC) will make an examination validation visit to your facility the week of January 9, 2017.
As agreed during the telephone conversation, your staff will prepare the examinations based on the guidelines in Revision 10 of NUREG-1021, Operator Licensing Examination Standards for Power Reactors. The NRCs regional office will prepare the outline package for the examination and discuss with your staff any changes that might be necessary before the examinations are administered. The outline package will be delivered only to Mr. Torres in a separate letter because of examination security considerations.
To meet the above schedule, the NRC will furnish the examination outlines to Mr. Torres by August 31, 2016. The written examinations, operating tests, and supporting reference materials identified in Attachment 3 to ES-201, will be due from Mr. Torres, by December 12, 2016.
Pursuant to Title 10 of the Code of Federal Regulations (10 CFR) 55.40(b)(3), an authorized representative of the facility licensee shall approve the examinations and tests before they are submitted to the Commission for review and approval. All materials shall be complete and ready-to-use. We request that any personal, proprietary, sensitive unclassified, or safeguards information in your response be contained in a separate enclosure and appropriately marked.
Any delay in receiving the required examination and reference materials, or the submittal of inadequate or incomplete materials, may cause the examinations to be rescheduled.
Any delay in receiving the required examination and reference materials, or the submittal of inadequate or incomplete materials, may cause the examinations to be rescheduled.
To conduct the requested written examinations and operating tests, it will be necessary for your staff to provide adequate space and accommodations in accordance with ES
To conduct the requested written examinations and operating tests, it will be necessary for your staff to provide adequate space and accommodations in accordance with ES-402, and to make the simulation facility available on the dates noted above. In accordance with ES-302, your staff should retain the original simulator performance data (e.g., system pressures, temperatures, and levels) generated during the dynamic operating tests until the examination results are final.
-402, and to make the simulation facility available on the dates noted above.
 
In accordance with ES
D. Hamilton                                   Appendix E to NUREG-1021 contains a number of NRC policies and guidelines that will be in effect while the written examinations and operating tests are being administered.
-302, your staff should retain the original simulator performance data (e.g., system pressures, temperatures, and levels) generated during the dynamic operating tests until the examination results are final.
To permit timely NRC review and evaluation, your staff should submit preliminary reactor operator and senior reactor operator license applications (Office of Management and Budget (OMB) approval number 3150-0090), medical certifications (OMB approval number 3150-0024), and waiver requests (if any)(OMB approval number 3150-0090), at least 30 days before the first examination date. If the applications are not received at least 30 days before the examination date, a postponement may be necessary. Signed applications certifying that all training has been completed should be submitted at least 14 days before the first examination date.
D. Hamilton Appendix E to NUREG
After you have been notified by the NRC Chief Examiner or Branch Chief that operator licenses have been issued, please direct any inquiries concerning a formal presentation of certificates to this office. Our goal is to have the operator certificates available for your celebration. At least one month advance notice of your celebration arrangements would be appreciated to plan our senior manager attendance and process the certificates.
-1021 contains a number of NRC policies and guidelines that will be in effect while the written examinations and operating tests are being administered.
This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by OMB, under approval number 3150-0018. The public reporting burden for this collection of information is estimated to average 500 hours per response, including the time for reviewing instructions, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments on any aspect of this collection of information, including suggestions for reducing the burden, to the Information and Records Management Branch (T-6 F33), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet electronic mail to BJS1@nrc.gov; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management and Budget, Washington, DC 20503.
To permit timely NRC review and evaluation, your staff should submit preliminary reactor operator and senior reactor operator license applications (Office of Management and Budget (OMB) approval number 3150
-0090), medical certifications (OMB approval number 3150-0024), and waiver requests (if any)(OMB approval number 3150
-0090), at least 30 days before the first examination date.
If the applications are not received at least 30 days before the examination date, a postponement may be necessary.
Signed applications certifying that all training has been completed should be submitted at least 14 days before the first examination date.
After you have been notified by the NRC Chief Examiner or Branch Chief that operator licenses have been issued, please direct any inquiries concerning a formal presentation of certificates to this office.
Our goal is to have the operator certificates available for your celebration.
At least one month advance notice of your celebration arrangements would be appreciated to plan our senior manager attendance and process the certificates.
This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.).
These information collections were approved by OMB, under approval number 3150
-0018. The public reporting burden for this collection of information is estimated to average 500 hours per response, including the time for reviewing instructions, gathering and maintaining the data needed, and completing and reviewing the collection of information.
Send comments on any aspect of this collection of information, including suggestions for reducing the burden, to the Information and Records Management Branch (T-6 F33), U.S. Nuclear Regulatory Commission, Washington, DC 20555
-0001, or by Internet electronic mail to BJS1@nrc.gov; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB
-10202, (3150
-0018), Office of Management and Budget, Washington, DC 20503.
The NRC may neither conduct nor sponsor, and a person is not required to respond to, an information collection, unless it displays a currently valid OMB control number.
The NRC may neither conduct nor sponsor, and a person is not required to respond to, an information collection, unless it displays a currently valid OMB control number.
In accordance with 10 CFR 2.390, "Public Inspections, Exemptions, Requests for Withholding,"
In accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding, of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRCs Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS).
of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC
ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
's Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Document s Access and Management System (ADAMS).
ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading
-rm/adams.html (the Public Electronic Reading Room).
D. Hamilton Thank you for your cooperation in this matter.
Mr. Torres has been advised of the policies and guidelines referenced in this letter.
If you have any questions regarding the NRC's examination procedures and guidelines, please contact Mr. D. McNeil at 630-829-9737 , or me at 630-829-9 834. Sincerely,  /RA/
Robert J. Orlikowski, Chief Operations Branch
 
Division of Reactor Safety Docket No. 50
-440 License No. NPF-5 8 cc:  Distribution via LISTSERV


D. Hamilton Thank you for your cooperation in this matter.
D. Hamilton                                   Thank you for your cooperation in this matter. Mr. Torres has been advised of the policies and guidelines referenced in this letter. If you have any questions regarding the NRCs examination procedures and guidelines, please contact Mr. D. McNeil at 630-829-9737, or me at 630-829-9834.
Mr. Torres has been advised of the policies and guidelines referenced in this letter.
Sincerely,
If you have any questions regarding the NRC's examination procedures and guidelines, please contact Mr. D. McNeil at 630-829-9737 , or me at 630-829-9 834. Sincerely, /RA/
                                              /RA/
Robert J. Orlikowski, Chief Operations Branch
Robert J. Orlikowski, Chief Operations Branch Division of Reactor Safety Docket No. 50-440 License No. NPF-58 cc: Distribution via LISTSERV


Division of Reactor Safety Docket No. 50
D. Hamilton                                                                Thank you for your cooperation in this matter. Mr. Torres has been advised of the policies and guidelines referenced in this letter. If you have any questions regarding the NRCs examination procedures and guidelines, please contact Mr. D. McNeil at 630-829-9737, or me at 630-829-9834.
-440 License No. NPF
Sincerely,
-58 cc: Distribution via LISTSERV DISTRIBUTION
                                                                          /RA/
: Jeremy Bowen RidsNrrPMPerry Resource RidsNrrDorlLpl3
Robert J. Orlikowski, Chief Operations Branch Division of Reactor Safety Docket No. 50-440 License No. NPF-58 cc: Distribution via LISTSERV DISTRIBUTION:
-2 Resource RidsNrrDirsIrib Resource Cynthia Pederson Darrell Roberts Richard Skokowski Allan Barker Carole Ariano Linda Linn DRPIII DRSIII Maurin S cheetz      ADAMS Accession Number: ML16243A482 Publicly Available Non-Publicly Available Sensitive Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII RIII RIII RIII NAME DMcNeil:jw ROrlikowski DATE 08/29/16 08/29/16   OFFICIAL RECORD COPY}}
Jeremy Bowen RidsNrrPMPerry Resource RidsNrrDorlLpl3-2 Resource RidsNrrDirsIrib Resource Cynthia Pederson Darrell Roberts Richard Skokowski Allan Barker Carole Ariano Linda Linn DRPIII DRSIII Maurin Scheetz ADAMS Accession Number: ML16243A482 Publicly Available                           Non-Publicly Available                   Sensitive               Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE             RIII                               RIII                           RIII                               RIII NAME               DMcNeil:jw                         ROrlikowski DATE               08/29/16                           08/29/16 OFFICIAL RECORD COPY}}

Latest revision as of 14:39, 30 October 2019

Confirmation of Initial License Examination
ML16243A482
Person / Time
Site: Perry FirstEnergy icon.png
Issue date: 08/29/2016
From: Robert Orlikowski
Operations Branch III
To: Hamilton D
FirstEnergy Nuclear Operating Co
Shared Package
ML16242A245 List:
References
Download: ML16243A482 (4)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE RD. SUITE 210 LISLE, IL 60532-4352 August 29, 2016 Mr. David Hamilton Site Vice President FirstEnergy Nuclear Operating Company Perry Nuclear Power Plant P. O. Box 97, 10 Center Road, A-PY-A290 Perry, OH 44081-0097

SUBJECT:

PERRY NUCLEAR POWER PLANT - CONFIRMATION OF INITIAL LICENSE EXAMINATION

Dear Mr. Hamilton:

In a telephone conversation on August 22, 2016, between Mr. R. Torres, Fleet Examination Author, and Mr. D. McNeil, Senior Operations Engineer, arrangements were made for the administration of licensing examinations, at the Perry Nuclear Power Plant, during the weeks of February 5 and 13, 2017. In addition, the U.S. Nuclear Regulatory Commission (NRC) will make an examination validation visit to your facility the week of January 9, 2017.

As agreed during the telephone conversation, your staff will prepare the examinations based on the guidelines in Revision 10 of NUREG-1021, Operator Licensing Examination Standards for Power Reactors. The NRCs regional office will prepare the outline package for the examination and discuss with your staff any changes that might be necessary before the examinations are administered. The outline package will be delivered only to Mr. Torres in a separate letter because of examination security considerations.

To meet the above schedule, the NRC will furnish the examination outlines to Mr. Torres by August 31, 2016. The written examinations, operating tests, and supporting reference materials identified in Attachment 3 to ES-201, will be due from Mr. Torres, by December 12, 2016.

Pursuant to Title 10 of the Code of Federal Regulations (10 CFR) 55.40(b)(3), an authorized representative of the facility licensee shall approve the examinations and tests before they are submitted to the Commission for review and approval. All materials shall be complete and ready-to-use. We request that any personal, proprietary, sensitive unclassified, or safeguards information in your response be contained in a separate enclosure and appropriately marked.

Any delay in receiving the required examination and reference materials, or the submittal of inadequate or incomplete materials, may cause the examinations to be rescheduled.

To conduct the requested written examinations and operating tests, it will be necessary for your staff to provide adequate space and accommodations in accordance with ES-402, and to make the simulation facility available on the dates noted above. In accordance with ES-302, your staff should retain the original simulator performance data (e.g., system pressures, temperatures, and levels) generated during the dynamic operating tests until the examination results are final.

D. Hamilton Appendix E to NUREG-1021 contains a number of NRC policies and guidelines that will be in effect while the written examinations and operating tests are being administered.

To permit timely NRC review and evaluation, your staff should submit preliminary reactor operator and senior reactor operator license applications (Office of Management and Budget (OMB) approval number 3150-0090), medical certifications (OMB approval number 3150-0024), and waiver requests (if any)(OMB approval number 3150-0090), at least 30 days before the first examination date. If the applications are not received at least 30 days before the examination date, a postponement may be necessary. Signed applications certifying that all training has been completed should be submitted at least 14 days before the first examination date.

After you have been notified by the NRC Chief Examiner or Branch Chief that operator licenses have been issued, please direct any inquiries concerning a formal presentation of certificates to this office. Our goal is to have the operator certificates available for your celebration. At least one month advance notice of your celebration arrangements would be appreciated to plan our senior manager attendance and process the certificates.

This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by OMB, under approval number 3150-0018. The public reporting burden for this collection of information is estimated to average 500 hours0.00579 days <br />0.139 hours <br />8.267196e-4 weeks <br />1.9025e-4 months <br /> per response, including the time for reviewing instructions, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments on any aspect of this collection of information, including suggestions for reducing the burden, to the Information and Records Management Branch (T-6 F33), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet electronic mail to BJS1@nrc.gov; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management and Budget, Washington, DC 20503.

The NRC may neither conduct nor sponsor, and a person is not required to respond to, an information collection, unless it displays a currently valid OMB control number.

In accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding, of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRCs Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS).

ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

D. Hamilton Thank you for your cooperation in this matter. Mr. Torres has been advised of the policies and guidelines referenced in this letter. If you have any questions regarding the NRCs examination procedures and guidelines, please contact Mr. D. McNeil at 630-829-9737, or me at 630-829-9834.

Sincerely,

/RA/

Robert J. Orlikowski, Chief Operations Branch Division of Reactor Safety Docket No. 50-440 License No. NPF-58 cc: Distribution via LISTSERV

D. Hamilton Thank you for your cooperation in this matter. Mr. Torres has been advised of the policies and guidelines referenced in this letter. If you have any questions regarding the NRCs examination procedures and guidelines, please contact Mr. D. McNeil at 630-829-9737, or me at 630-829-9834.

Sincerely,

/RA/

Robert J. Orlikowski, Chief Operations Branch Division of Reactor Safety Docket No. 50-440 License No. NPF-58 cc: Distribution via LISTSERV DISTRIBUTION:

Jeremy Bowen RidsNrrPMPerry Resource RidsNrrDorlLpl3-2 Resource RidsNrrDirsIrib Resource Cynthia Pederson Darrell Roberts Richard Skokowski Allan Barker Carole Ariano Linda Linn DRPIII DRSIII Maurin Scheetz ADAMS Accession Number: ML16243A482 Publicly Available Non-Publicly Available Sensitive Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII RIII RIII RIII NAME DMcNeil:jw ROrlikowski DATE 08/29/16 08/29/16 OFFICIAL RECORD COPY