ML16308A328: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(3 intermediate revisions by the same user not shown)
Line 3: Line 3:
| issue date = 11/03/2016
| issue date = 11/03/2016
| title = U.S. Nuclear Regulatory Commission Response to Disputed Notice of Non-Cited Violation 05000311/2016002-02
| title = U.S. Nuclear Regulatory Commission Response to Disputed Notice of Non-Cited Violation 05000311/2016002-02
| author name = McKinley R R
| author name = Mckinley R
| author affiliation = NRC/RGN-I/DRS/PSB1
| author affiliation = NRC/RGN-I/DRS/PSB1
| addressee name = Sena P
| addressee name = Sena P
Line 9: Line 9:
| docket = 05000311
| docket = 05000311
| license number = DPR-075
| license number = DPR-075
| contact person = McKinley R R
| contact person = McKinley R
| case reference number = EA-16-244
| case reference number = EA-16-244
| document report number = IR 2016002
| document report number = IR 2016002
Line 15: Line 15:
| page count = 3
| page count = 3
}}
}}
See also: [[followed by::IR 05000311/2016002]]
See also: [[see also::IR 05000311/2016002]]


=Text=
=Text=
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 2100 RENAISSANCE BLVD. KING OF PRUSSIA, PA 19406-2713
{{#Wiki_filter:UNITED STATES
November 3, 2016   EA-16-244  
                          NUCLEAR REGULATORY COMMISSION
                                            REGION I
Mr. Peter Sena, III  
                                      2100 RENAISSANCE BLVD.
President and Chief Nuclear Officer PSEG Nuclear LLC - N09 P.O. Box 236  
                                KING OF PRUSSIA, PA 19406-2713
Hancocks Bridge, NJ 08038  
                                      November 3, 2016
EA-16-244
SUBJECT: U.S. NUCLEAR REGULATORY COMMISSION RESPONSE TO DISPUTED NOTICE OF NON-CITED VIOLATION 05000311/2016002-02
Mr. Peter Sena, III
Dear Mr. Sena:  
President and Chief Nuclear Officer
PSEG Nuclear LLC - N09
I am writing to acknowledge receipt of PSEG's letter dated October 24, 2016, in response to the  
P.O. Box 236
U.S. Nuclear Regulatory Commission (NRC) Inspection Report 05000272/2016002 and 05000311/2016002 issued on September 22, 2016.
Hancocks Bridge, NJ 08038
The letter requests withdrawal of the 10 CFR Part 50, Appendix B, Criterion V, "Instructions,  
SUBJECT:         U.S. NUCLEAR REGULATORY COMMISSION RESPONSE TO DISPUTED
Procedures, and Drawings," Green non-cited violation (NCV 0500311/2016002-02) concerning the failure to follow the operability process as prescribed in OP-AA-108-115, "Operability Determinations & Functionality Assessments.The letter stated that PSEG was in full compliance with procedure OP-AA-108-115 when evaluating the baffle former bolt condition  
                NOTICE OF NON-CITED VIOLATION 05000311/2016002-02
discovered at Unit 1 as it applied to Unit 2. The NRC will review PSEG's response and provide you a letter documenting the basis for any decision within 90 days.  
Dear Mr. Sena:
I am writing to acknowledge receipt of PSEGs letter dated October 24, 2016, in response to the
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRC's "Rules of Practice," a copy of this letter, its enclosure, and your response (if any) will be available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records component of the NRC's Agencywide Documents Access and  
U.S. Nuclear Regulatory Commission (NRC) Inspection Report 05000272/2016002 and
Management System (ADAMS). ADAMS is accessible from the NRC website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). Your letter has also been added to ADAMS for the information of the public, and may be found under ADAMS Accession Number ML16298A161.  
05000311/2016002 issued on September 22, 2016.
 
The letter requests withdrawal of the 10 CFR Part 50, Appendix B, Criterion V, Instructions,
P. Sena -2- 
Procedures, and Drawings, Green non-cited violation (NCV 0500311/2016002-02) concerning
Should you have any questions concerning this letter, please contact me at (610) 337-5150.  Sincerely,              /RA/  Raymond R. McKinley, Chief Plant Support Branch 1
the failure to follow the operability process as prescribed in OP-AA-108-115, Operability
Division of Reactor Safety 
Determinations & Functionality Assessments. The letter stated that PSEG was in full
Docket No. 50-311 License No. DPR-75 
compliance with procedure OP-AA-108-115 when evaluating the baffle former bolt condition
cc:  Distribution via ListServ
discovered at Unit 1 as it applied to Unit 2. The NRC will review PSEGs response and provide
you a letter documenting the basis for any decision within 90 days.
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs
Rules of Practice, a copy of this letter, its enclosure, and your response (if any) will be
available electronically for public inspection in the NRCs Public Document Room or from the
Publicly Available Records component of the NRCs Agencywide Documents Access and
Management System (ADAMS). ADAMS is accessible from the NRC website at
http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). Your letter
has also been added to ADAMS for the information of the public, and may be found under
ADAMS Accession Number ML16298A161.


  ML16308A328   SUNSI Review  Non-Sensitive Sensitive  Publicly Available Non-Publicly Available OFFICE RI/DRP RI/DRP RI/DRP NAME RVadella/rb for FBower/flb RMcKinley/rrm DATE 11/3/16 11/3/1611/3/16
P. Sena                                      -2-
Should you have any questions concerning this letter, please contact me at (610) 337-5150.
                                          Sincerely,
                                          /RA/
                                          Raymond R. McKinley, Chief
                                          Plant Support Branch 1
                                          Division of Reactor Safety
Docket No.    50-311
License No.    DPR-75
cc: Distribution via ListServ
 
 
ML16308A328
                                      Non-Sensitive                   Publicly Available
    SUNSI Review
                                      Sensitive                        Non-Publicly Available
  OFFICE         RI/DRP         RI/DRP           RI/DRP
  NAME           RVadella/rb for FBower/flb       RMcKinley/rrm
  DATE           11/3/16         11/3/16          11/3/16
}}
}}

Latest revision as of 13:28, 30 October 2019

U.S. Nuclear Regulatory Commission Response to Disputed Notice of Non-Cited Violation 05000311/2016002-02
ML16308A328
Person / Time
Site: Salem PSEG icon.png
Issue date: 11/03/2016
From: Raymond Mckinley
Plant Support Branch 1
To: Sena P
Public Service Enterprise Group
McKinley R
References
EA-16-244 IR 2016002
Download: ML16308A328 (3)


See also: IR 05000311/2016002

Text

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION I

2100 RENAISSANCE BLVD.

KING OF PRUSSIA, PA 19406-2713

November 3, 2016

EA-16-244

Mr. Peter Sena, III

President and Chief Nuclear Officer

PSEG Nuclear LLC - N09

P.O. Box 236

Hancocks Bridge, NJ 08038

SUBJECT: U.S. NUCLEAR REGULATORY COMMISSION RESPONSE TO DISPUTED

NOTICE OF NON-CITED VIOLATION 05000311/2016002-02

Dear Mr. Sena:

I am writing to acknowledge receipt of PSEGs letter dated October 24, 2016, in response to the

U.S. Nuclear Regulatory Commission (NRC) Inspection Report 05000272/2016002 and

05000311/2016002 issued on September 22, 2016.

The letter requests withdrawal of the 10 CFR Part 50, Appendix B, Criterion V, Instructions,

Procedures, and Drawings, Green non-cited violation (NCV 0500311/2016002-02) concerning

the failure to follow the operability process as prescribed in OP-AA-108-115, Operability

Determinations & Functionality Assessments. The letter stated that PSEG was in full

compliance with procedure OP-AA-108-115 when evaluating the baffle former bolt condition

discovered at Unit 1 as it applied to Unit 2. The NRC will review PSEGs response and provide

you a letter documenting the basis for any decision within 90 days.

In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs

Rules of Practice, a copy of this letter, its enclosure, and your response (if any) will be

available electronically for public inspection in the NRCs Public Document Room or from the

Publicly Available Records component of the NRCs Agencywide Documents Access and

Management System (ADAMS). ADAMS is accessible from the NRC website at

http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). Your letter

has also been added to ADAMS for the information of the public, and may be found under

ADAMS Accession Number ML16298A161.

P. Sena -2-

Should you have any questions concerning this letter, please contact me at (610) 337-5150.

Sincerely,

/RA/

Raymond R. McKinley, Chief

Plant Support Branch 1

Division of Reactor Safety

Docket No. 50-311

License No. DPR-75

cc: Distribution via ListServ

ML16308A328

Non-Sensitive Publicly Available

SUNSI Review

Sensitive Non-Publicly Available

OFFICE RI/DRP RI/DRP RI/DRP

NAME RVadella/rb for FBower/flb RMcKinley/rrm

DATE 11/3/16 11/3/16 11/3/16