ML16341C656: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
(6 intermediate revisions by the same user not shown) | |||
Line 2: | Line 2: | ||
| number = ML16341C656 | | number = ML16341C656 | ||
| issue date = 12/02/2016 | | issue date = 12/02/2016 | ||
| title = DC Cook 2016 ES-301-5s Combined for Crew 1 | | title = DC Cook 2016 ES-301-5s Combined for Crew 1 Thru 5 | ||
| author name = | | author name = | ||
| author affiliation = NRC/RGN-III | | author affiliation = NRC/RGN-III | ||
Line 15: | Line 15: | ||
| page count = 4 | | page count = 4 | ||
}} | }} | ||
=Text= | |||
{{#Wiki_filter:ES-301 Transient and Event Checklist Form ES-301-5 Facility: DC Cook Date of Exam: 07/11/2016 Operating Test No.: Crews 1,3 & 5 A E Scenarios P V 2016-3 2016-5 T M P E O I L N CREW CREW CREW CREW T N I T POSITION POSITION POSITION POSITION A I | |||
M C S A B S A B S A B S A B L U A T R T O R T O R T O R T O M(*) | |||
N Y O C P O C P O C P O C P R I U T P E | |||
RO RX 1 0 0 1 0 0 0 0 0 0 0 0 2 1 1 0 SRO-I NOR 1 0 0 1 0 0 0 0 0 0 0 0 2 1 1 1 I/C 4 0 0 4 0 0 0 0 0 0 0 0 8 4 4 2 SRO-U MAJ 1 0 0 1 0 0 0 0 0 0 0 0 2 2 2 1 TS 3 0 0 3 0 0 0 0 0 0 0 0 6 0 2 2 RO RX 0 1 0 0 0 0 0 0 0 0 0 0 1 1 1 0 NOR 0 0 0 0 0 1 0 0 0 0 0 0 1 1 1 1 SRO-I I/C 0 2 0 0 0 2 0 0 0 0 0 0 4 4 4 2 SRO-U MAJ 0 1 0 0 0 1 0 0 0 0 0 0 2 2 2 1 TS 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2 2 RO RX 0 0 0 0 1 0 0 0 0 0 0 0 1 1 1 0 SRO-I NOR 0 0 1 0 0 0 0 0 0 0 0 0 1 1 1 1 I/C 0 0 2 0 2 0 0 0 0 0 0 0 4 4 4 2 SRO-U MAJ 0 0 1 0 1 0 0 0 0 0 0 0 2 2 2 1 TS 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2 2 RO RX 0 0 0 0 0 0 0 0 0 0 0 0 0 1 1 0 SRO-I NOR 0 0 0 0 0 0 0 0 0 0 0 0 0 1 1 1 I/C 0 0 0 0 0 0 0 0 0 0 0 0 0 4 4 2 SRO-U MAJ 0 0 0 0 0 0 0 0 0 0 0 0 0 2 2 1 TS 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2 2 Instructions: | |||
: 1. Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the at-the-controls (ATC) and balance-of-plant (BOP) positions; Instant SROs must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an Instant SRO additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position. | |||
: 2. Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional instrument or component malfunctions on a 1-for-1 basis. | |||
: 3. Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicants competence count toward the minimum requirements specified for the applicants license level in the right-hand columns. | |||
ES-301 Transient and Event Checklist Form ES-301-5 Facility: DC Cook Date of Exam: 7/11/2016 Operating Test No.: Crew 2 A E Scenarios P V 2016-1 2016-4 2016-2 T M P E O I L N CREW CREW CREW CREW T N I T POSITION POSITION POSITION POSITION A I | |||
M C S A B S A B S A B S A B L U A T R T O R T O R T O R T O M(*) | |||
N Y O C P O C P O C P O C P R I U T P E | |||
RO RX 1 0 0 0 0 0 0 1 0 0 0 0 2 1 1 0 SRO-I NOR 1 0 0 0 0 1 0 0 0 0 0 0 2 1 1 1 I/C 4 0 0 0 0 2 0 2 0 0 0 0 8 4 4 2 SRO-U MAJ 1 0 0 0 0 1 0 1 0 0 0 0 3 2 2 1 TS 2 0 0 0 0 0 0 0 0 0 0 0 2 0 2 2 RO RX 0 1 0 1 0 0 0 0 0 0 0 0 2 1 1 0 NOR 0 0 0 1 0 0 0 0 0 0 0 0 1 1 1 1 SRO-I I/C 0 2 0 4 0 0 0 0 1 0 0 0 7 4 4 2 SRO-U MAJ 0 1 0 1 0 0 0 0 1 0 0 0 3 2 2 1 TS 0 0 0 2 0 0 0 0 0 0 0 0 2 0 2 2 RO RX 0 0 0 0 1 0 1 0 0 0 0 0 2 1 1 0 SRO-I NOR 0 0 1 0 0 0 0 0 0 0 0 0 1 1 1 1 I/C 0 0 2 0 2 0 3 0 0 0 0 0 7 4 4 2 SRO-U MAJ 0 0 1 0 1 0 1 0 0 0 0 0 3 2 2 1 TS 0 0 0 0 0 0 2 0 0 0 0 0 2 0 2 2 RO RX 0 0 0 0 0 0 0 0 0 0 0 0 0 1 1 0 SRO-I NOR 0 0 0 0 0 0 0 0 0 0 0 0 0 1 1 1 I/C 0 0 0 0 0 0 0 0 0 0 0 0 0 4 4 2 SRO-U MAJ 0 0 0 0 0 0 0 0 0 0 0 0 0 2 2 1 TS 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2 2 Instructions: | |||
: 1. Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the at-the-controls (ATC) and balance-of-plant (BOP) positions; Instant SROs must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an Instant SRO additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position. | |||
: 2. Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional instrument or component malfunctions on a 1-for-1 basis. | |||
: 3. Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicants competence count toward the minimum requirements specified for the applicants license level in the right-hand columns. | |||
ES-301 Transient and Event Checklist Form ES-301-5 Facility: DC Cook Date of Exam: 7/11/2016 Operating Test No.: Crew 4a A E Scenarios P V 2016-4 2016-1 T M P E O I L N CREW CREW CREW CREW T N I T POSITION POSITION POSITION POSITION A I | |||
M C S A S S A B S A B S A B L U A T R T U U T O R T O R T O M(*) | |||
N Y O C R R C P O C P O C P R I U T P R R E | |||
RO RX 1 0 0 0 1 0 0 0 0 2 1 1 0 SRO-I NOR 1 0 0 0 0 0 0 0 0 1 1 1 1 I/C 4 0 0 0 2 0 0 0 0 6 4 4 2 SRO-U MAJ 1 0 0 0 1 0 0 0 0 2 2 2 1 TS 2 0 0 0 0 0 0 0 0 2 0 2 2 RO RX 0 1 0 0 0 0 0 0 0 1 1 1 0 NOR 0 0 0 0 0 1 0 0 0 1 1 1 1 SRO-I I/C 0 2 0 0 0 2 0 0 0 4 4 4 2 SRO-U MAJ 0 1 0 0 0 1 0 0 0 2 2 2 1 TS 0 0 0 0 0 0 0 0 0 0 0 2 2 RO RX 0 0 0 0 1 1 0 SRO-I NOR 0 0 0 0 1 1 1 I/C 0 0 0 0 4 4 2 SRO-U MAJ 0 0 0 0 2 2 1 TS 0 0 0 0 0 2 2 RO RX 0 0 0 0 0 0 0 0 0 0 0 0 0 1 1 0 SRO-I NOR 0 0 0 0 0 0 0 0 0 0 0 0 0 1 1 1 I/C 0 0 0 0 0 0 0 0 0 0 0 0 0 4 4 2 SRO-U MAJ 0 0 0 0 0 0 0 0 0 0 0 0 0 2 2 1 TS 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2 2 Instructions: | |||
: 1. Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the at-the-controls (ATC) and balance-of-plant (BOP) positions; Instant SROs must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an Instant SRO additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position. | |||
: 2. Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional instrument or component malfunctions on a 1-for-1 basis. | |||
: 3. Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicants competence count toward the minimum requirements specified for the applicants license level in the right-hand columns. | |||
ES-301 Transient and Event Checklist Form ES-301-5 Facility: DC Cook Date of Exam: 7/11/2016 Operating Test No.: Crew 4b A E Scenarios P V 2016-1 2016-2 T M P E O I L N CREW CREW CREW CREW T N I T POSITION POSITION POSITION POSITION A I | |||
M C S A S S A S S A B S A B L U A T R T U R T U R T O R T O M(*) | |||
N Y O C R O C R O C P O C P R I U T P R R E | |||
RO RX 1 0 0 0 1 0 0 0 0 2 1 1 0 SRO-I NOR 1 0 0 0 0 0 0 0 0 1 1 1 1 I/C 4 0 0 0 2 0 0 0 0 6 4 4 2 SRO-U MAJ 1 0 0 0 1 0 0 0 0 2 2 2 1 TS 2 0 0 0 0 0 0 0 0 2 0 2 2 RO RX 0 1 0 1 0 0 0 0 0 2 1 1 0 NOR 0 0 0 0 0 0 0 0 0 0 1 1* 1 SRO-I I/C 0 2 0 3 0 0 0 0 0 5 4 4* 2 SRO-U MAJ 0 1 0 1 0 0 0 0 0 2 2 2 1 TS 0 0 0 2 0 0 0 0 0 2 0 2 2 RO RX 0 0 0 0 0 0 0 0 0 0 1 1 0 SRO-I NOR 0 0 0 0 0 0 0 0 0 0 1 1 1 I/C 0 0 0 0 0 0 0 0 0 0 4 4 2 SRO-U MAJ 0 0 0 0 0 0 0 0 0 0 2 2 1 TS 0 0 0 0 0 0 0 0 0 0 0 2 2 RO RX 0 0 0 0 0 0 0 0 0 0 0 0 0 1 1 0 SRO-I NOR 0 0 0 0 0 0 0 0 0 0 0 0 0 1 1 1 I/C 0 0 0 0 0 0 0 0 0 0 0 0 0 4 4 2 SRO-U MAJ 0 0 0 0 0 0 0 0 0 0 0 0 0 2 2 1 TS 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2 2 Instructions: | |||
: 1. Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the at-the-controls (ATC) and balance-of-plant (BOP) positions; Instant SROs must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an Instant SRO additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position. | |||
: 2. Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional instrument or component malfunctions on a 1-for-1 basis. | |||
: 3. Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicants competence count toward the minimum requirements specified for the applicants license level in the right-hand columns.}} |
Latest revision as of 10:37, 30 October 2019
ML16341C656 | |
Person / Time | |
---|---|
Site: | Cook |
Issue date: | 12/02/2016 |
From: | NRC/RGN-III |
To: | Indiana Michigan Power Co, American Electric Power |
Shared Package | |
ML15274A374 | List: |
References | |
ES-301-5 | |
Download: ML16341C656 (4) | |
Text
ES-301 Transient and Event Checklist Form ES-301-5 Facility: DC Cook Date of Exam: 07/11/2016 Operating Test No.: Crews 1,3 & 5 A E Scenarios P V 2016-3 2016-5 T M P E O I L N CREW CREW CREW CREW T N I T POSITION POSITION POSITION POSITION A I
M C S A B S A B S A B S A B L U A T R T O R T O R T O R T O M(*)
N Y O C P O C P O C P O C P R I U T P E
RO RX 1 0 0 1 0 0 0 0 0 0 0 0 2 1 1 0 SRO-I NOR 1 0 0 1 0 0 0 0 0 0 0 0 2 1 1 1 I/C 4 0 0 4 0 0 0 0 0 0 0 0 8 4 4 2 SRO-U MAJ 1 0 0 1 0 0 0 0 0 0 0 0 2 2 2 1 TS 3 0 0 3 0 0 0 0 0 0 0 0 6 0 2 2 RO RX 0 1 0 0 0 0 0 0 0 0 0 0 1 1 1 0 NOR 0 0 0 0 0 1 0 0 0 0 0 0 1 1 1 1 SRO-I I/C 0 2 0 0 0 2 0 0 0 0 0 0 4 4 4 2 SRO-U MAJ 0 1 0 0 0 1 0 0 0 0 0 0 2 2 2 1 TS 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2 2 RO RX 0 0 0 0 1 0 0 0 0 0 0 0 1 1 1 0 SRO-I NOR 0 0 1 0 0 0 0 0 0 0 0 0 1 1 1 1 I/C 0 0 2 0 2 0 0 0 0 0 0 0 4 4 4 2 SRO-U MAJ 0 0 1 0 1 0 0 0 0 0 0 0 2 2 2 1 TS 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2 2 RO RX 0 0 0 0 0 0 0 0 0 0 0 0 0 1 1 0 SRO-I NOR 0 0 0 0 0 0 0 0 0 0 0 0 0 1 1 1 I/C 0 0 0 0 0 0 0 0 0 0 0 0 0 4 4 2 SRO-U MAJ 0 0 0 0 0 0 0 0 0 0 0 0 0 2 2 1 TS 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2 2 Instructions:
- 1. Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the at-the-controls (ATC) and balance-of-plant (BOP) positions; Instant SROs must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an Instant SRO additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position.
- 2. Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional instrument or component malfunctions on a 1-for-1 basis.
- 3. Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicants competence count toward the minimum requirements specified for the applicants license level in the right-hand columns.
ES-301 Transient and Event Checklist Form ES-301-5 Facility: DC Cook Date of Exam: 7/11/2016 Operating Test No.: Crew 2 A E Scenarios P V 2016-1 2016-4 2016-2 T M P E O I L N CREW CREW CREW CREW T N I T POSITION POSITION POSITION POSITION A I
M C S A B S A B S A B S A B L U A T R T O R T O R T O R T O M(*)
N Y O C P O C P O C P O C P R I U T P E
RO RX 1 0 0 0 0 0 0 1 0 0 0 0 2 1 1 0 SRO-I NOR 1 0 0 0 0 1 0 0 0 0 0 0 2 1 1 1 I/C 4 0 0 0 0 2 0 2 0 0 0 0 8 4 4 2 SRO-U MAJ 1 0 0 0 0 1 0 1 0 0 0 0 3 2 2 1 TS 2 0 0 0 0 0 0 0 0 0 0 0 2 0 2 2 RO RX 0 1 0 1 0 0 0 0 0 0 0 0 2 1 1 0 NOR 0 0 0 1 0 0 0 0 0 0 0 0 1 1 1 1 SRO-I I/C 0 2 0 4 0 0 0 0 1 0 0 0 7 4 4 2 SRO-U MAJ 0 1 0 1 0 0 0 0 1 0 0 0 3 2 2 1 TS 0 0 0 2 0 0 0 0 0 0 0 0 2 0 2 2 RO RX 0 0 0 0 1 0 1 0 0 0 0 0 2 1 1 0 SRO-I NOR 0 0 1 0 0 0 0 0 0 0 0 0 1 1 1 1 I/C 0 0 2 0 2 0 3 0 0 0 0 0 7 4 4 2 SRO-U MAJ 0 0 1 0 1 0 1 0 0 0 0 0 3 2 2 1 TS 0 0 0 0 0 0 2 0 0 0 0 0 2 0 2 2 RO RX 0 0 0 0 0 0 0 0 0 0 0 0 0 1 1 0 SRO-I NOR 0 0 0 0 0 0 0 0 0 0 0 0 0 1 1 1 I/C 0 0 0 0 0 0 0 0 0 0 0 0 0 4 4 2 SRO-U MAJ 0 0 0 0 0 0 0 0 0 0 0 0 0 2 2 1 TS 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2 2 Instructions:
- 1. Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the at-the-controls (ATC) and balance-of-plant (BOP) positions; Instant SROs must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an Instant SRO additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position.
- 2. Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional instrument or component malfunctions on a 1-for-1 basis.
- 3. Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicants competence count toward the minimum requirements specified for the applicants license level in the right-hand columns.
ES-301 Transient and Event Checklist Form ES-301-5 Facility: DC Cook Date of Exam: 7/11/2016 Operating Test No.: Crew 4a A E Scenarios P V 2016-4 2016-1 T M P E O I L N CREW CREW CREW CREW T N I T POSITION POSITION POSITION POSITION A I
M C S A S S A B S A B S A B L U A T R T U U T O R T O R T O M(*)
N Y O C R R C P O C P O C P R I U T P R R E
RO RX 1 0 0 0 1 0 0 0 0 2 1 1 0 SRO-I NOR 1 0 0 0 0 0 0 0 0 1 1 1 1 I/C 4 0 0 0 2 0 0 0 0 6 4 4 2 SRO-U MAJ 1 0 0 0 1 0 0 0 0 2 2 2 1 TS 2 0 0 0 0 0 0 0 0 2 0 2 2 RO RX 0 1 0 0 0 0 0 0 0 1 1 1 0 NOR 0 0 0 0 0 1 0 0 0 1 1 1 1 SRO-I I/C 0 2 0 0 0 2 0 0 0 4 4 4 2 SRO-U MAJ 0 1 0 0 0 1 0 0 0 2 2 2 1 TS 0 0 0 0 0 0 0 0 0 0 0 2 2 RO RX 0 0 0 0 1 1 0 SRO-I NOR 0 0 0 0 1 1 1 I/C 0 0 0 0 4 4 2 SRO-U MAJ 0 0 0 0 2 2 1 TS 0 0 0 0 0 2 2 RO RX 0 0 0 0 0 0 0 0 0 0 0 0 0 1 1 0 SRO-I NOR 0 0 0 0 0 0 0 0 0 0 0 0 0 1 1 1 I/C 0 0 0 0 0 0 0 0 0 0 0 0 0 4 4 2 SRO-U MAJ 0 0 0 0 0 0 0 0 0 0 0 0 0 2 2 1 TS 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2 2 Instructions:
- 1. Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the at-the-controls (ATC) and balance-of-plant (BOP) positions; Instant SROs must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an Instant SRO additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position.
- 2. Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional instrument or component malfunctions on a 1-for-1 basis.
- 3. Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicants competence count toward the minimum requirements specified for the applicants license level in the right-hand columns.
ES-301 Transient and Event Checklist Form ES-301-5 Facility: DC Cook Date of Exam: 7/11/2016 Operating Test No.: Crew 4b A E Scenarios P V 2016-1 2016-2 T M P E O I L N CREW CREW CREW CREW T N I T POSITION POSITION POSITION POSITION A I
M C S A S S A S S A B S A B L U A T R T U R T U R T O R T O M(*)
N Y O C R O C R O C P O C P R I U T P R R E
RO RX 1 0 0 0 1 0 0 0 0 2 1 1 0 SRO-I NOR 1 0 0 0 0 0 0 0 0 1 1 1 1 I/C 4 0 0 0 2 0 0 0 0 6 4 4 2 SRO-U MAJ 1 0 0 0 1 0 0 0 0 2 2 2 1 TS 2 0 0 0 0 0 0 0 0 2 0 2 2 RO RX 0 1 0 1 0 0 0 0 0 2 1 1 0 NOR 0 0 0 0 0 0 0 0 0 0 1 1* 1 SRO-I I/C 0 2 0 3 0 0 0 0 0 5 4 4* 2 SRO-U MAJ 0 1 0 1 0 0 0 0 0 2 2 2 1 TS 0 0 0 2 0 0 0 0 0 2 0 2 2 RO RX 0 0 0 0 0 0 0 0 0 0 1 1 0 SRO-I NOR 0 0 0 0 0 0 0 0 0 0 1 1 1 I/C 0 0 0 0 0 0 0 0 0 0 4 4 2 SRO-U MAJ 0 0 0 0 0 0 0 0 0 0 2 2 1 TS 0 0 0 0 0 0 0 0 0 0 0 2 2 RO RX 0 0 0 0 0 0 0 0 0 0 0 0 0 1 1 0 SRO-I NOR 0 0 0 0 0 0 0 0 0 0 0 0 0 1 1 1 I/C 0 0 0 0 0 0 0 0 0 0 0 0 0 4 4 2 SRO-U MAJ 0 0 0 0 0 0 0 0 0 0 0 0 0 2 2 1 TS 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2 2 Instructions:
- 1. Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the at-the-controls (ATC) and balance-of-plant (BOP) positions; Instant SROs must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an Instant SRO additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position.
- 2. Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional instrument or component malfunctions on a 1-for-1 basis.
- 3. Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicants competence count toward the minimum requirements specified for the applicants license level in the right-hand columns.