ES-301 Administrative Topics Outline Form ES-301-1 Facility: DC COOK Date of Examination: 7-11-2016 Examination Level:
RO SRO Operating Test Number: __________
Administrative Topic (see Note)
Type Code*
Describe activity to be performed Conduct of Operations R-D Calculate Reactor Vessel Void Vent Time K/A 2.1.25 3.9/4.2 EPE 009 EA2.38 3.9/4.3 Conduct of Operations Equipment Control R-M P(2012)
Perform Unit 2 LTOP Verification KA 2.2.37 3.6/4.6 Radiation Control R-M Respond to a High SJAE Radiation Alarm (Graph Leakrate & Determine Actions) 12-OHP-4024-139 Drop 25 KA: 2.3.14 3.4/3.8 & APE037 AK3.05 3.7/4.0 Emergency Plan R-D Complete EMD-32A Nuclear Plant Event Notification Form per PMP-2080-EPP-107. K/A 2.4.39 3.9/3.8 (Loss of HSD S-5)
NOTE: All items (five total) are required for SROs. RO applicants require only four items unless they are retaking only the administrative topics (which would require all five items).
- Type Codes & Criteria:
(C)ontrol room, (S)imulator, or Class(R)oom (D)irect from bank ( 3 for ROs; 4 for SROs & RO retakes)
(N)ew or (M)odified from bank ( 1)
(P)revious 2 exams ( 1; randomly selected)
ES-301 Administrative Topics Outline Form ES-301-1 Facility: DC COOK Date of Examination: 7-11-2016 Examination Level:
RO SRO Operating Test Number: __________
Administrative Topic (see Note)
Type Code*
Describe activity to be performed Conduct of Operations R-D Calculate Reactor Vessel Void Vent Time K/A 2.1.25 3.9/4.2 EPE 009 EA2.38 3.9/4.3 Conduct of Operations R-D Verify Appropriate LCO Action for Inoperable Radiation Monitors per Tech Spec and OCDM. K/A 2.2.40 3.4/4.7 K/A 2.2.38 3.6/4.5 Equipment Control R-M P(2012)
Review Unit 2 LTOP Verification KA 2.2.42 3.9/4.6, KA 2.2.37 3.6/4.6 Radiation Control R-M Respond to a High SJAE Radiation Alarm (Graph Leakrate & Determine Actions) 12-OHP-4024-139 Drop 25 KA: 2.3.14 3.4/3.8 & APE037 AK3.05 3.7/4.0 Emergency Plan R-D Perform the duties of the Site Emergency Coordinator per PMP-2080-EPP-101.
KA 2.4.40 2.7/4.5, 2.4.41 2.9/4.6 NOTE: All items (five total) are required for SROs. RO applicants require only four items unless they are retaking only the administrative topics (which would require all five items).
- Type Codes & Criteria:
(C)ontrol room, (S)imulator, or Class(R)oom (D)irect from bank ( 3 for ROs; 4 for SROs & RO retakes)
(N)ew or (M)odified from bank ( 1)
(P)revious 2 exams ( 1; randomly selected)