ML17088A167: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(5 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML17088A167
| number = ML17088A167
| issue date = 03/29/2017
| issue date = 03/29/2017
| title = Callaway Plant, Unit 1 - Final Safety Analysis Report, Revision OL-22, Chapter 17, Quality Assurance
| title = Final Safety Analysis Report, Revision OL-22, Chapter 17, Quality Assurance
| author name = Klos L J
| author name = Klos L
| author affiliation = NRC/NRR/DORL/LPLIV
| author affiliation = NRC/NRR/DORL/LPLIV
| addressee name = Diya F
| addressee name = Diya F
Line 9: Line 9:
| docket = 05000483
| docket = 05000483
| license number = NPF-030
| license number = NPF-030
| contact person = Klos L J
| contact person = Klos L
| document type = Final Safety Analysis Report (FSAR)
| document type = Final Safety Analysis Report (FSAR)
| page count = 4
| page count = 4
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:CALLAWAY - SP17.0-iTABLE OF CONTENTSCHAPTER 17.0QUALITY ASSURANCESectionPage17.1QUALITYASSURANCEDURINGDESIGNANDCONSTRUCTION...........17.0-117.2QUALITYASSURANCEDURINGTHEOPERATIONSPHASE..................17.0-1 CALLAWAY - SP17.0-1Rev. OL-135/03CHAPTER17.0QUALITYASSURANCE17.1QUALITYASSURANCEDURINGDESIGNANDCONSTRUCTIONThis section is not applicable to an FSAR.17.2QUALITYASSURANCEDURINGTHEOPERATIONSPHASEThe Operational Quality Assurance Program for the Union Electric Company's Callaway Plant is described in the Operational Quality Assurance Manual (OQAM). The Quality Assurance Program description, formerly maintained in this section of the FSAR, is now maintained in the OQAM as a separate licensing document. The OQAM will be maintained in accordance with the requirements of 10CFR50.54.
{{#Wiki_filter:CALLAWAY - SP TABLE OF CONTENTS CHAPTER 17.0 QUALITY ASSURANCE Section                                                                Page 17.1  QUALITY ASSURANCE DURING DESIGN AND CONSTRUCTION........... 17.0-1 17.2  QUALITY ASSURANCE DURING THE OPERATIONS PHASE .................. 17.0-1 17.0-i
CALLAWAY - SA17.0-iTABLE OF CONTENTSCHAPTER 17.0QUALITY ASSURANCESectionPage17.2QUALITY ASSURANCE DURING THE OPERATIONS PHASE..................17.2-1 CALLAWAY - SA17.2-1Rev. OL-135/0317.2QUALITY ASSURANCE DURING THE OPERATIONS PHASEThe Operational Quality Assurance Program for the Union Electric Company Callaway Plant is described in the Operating Quality Assurance Manual (OQAM). The Quality Assurance Program description, formerly also maintained in this section of the FSAR, is now maintained solely in the OQAM as a separate licensing document. The OQAM will be maintained in accordance with the requirements of 10 CFR 50.54.  
 
}}
CALLAWAY - SP CHAPTER 17.0 QUALITY ASSURANCE 17.1  QUALITY ASSURANCE DURING DESIGN AND CONSTRUCTION This section is not applicable to an FSAR.
17.2  QUALITY ASSURANCE DURING THE OPERATIONS PHASE The Operational Quality Assurance Program for the Union Electric Company's Callaway Plant is described in the Operational Quality Assurance Manual (OQAM). The Quality Assurance Program description, formerly maintained in this section of the FSAR, is now maintained in the OQAM as a separate licensing document. The OQAM will be maintained in accordance with the requirements of 10 CFR 50.54.
17.0-1                            Rev. OL-13 5/03
 
CALLAWAY - SA TABLE OF CONTENTS CHAPTER 17.0 QUALITY ASSURANCE Section                                                                Page 17.2  QUALITY ASSURANCE DURING THE OPERATIONS PHASE .................. 17.2-1 17.0-i
 
CALLAWAY - SA 17.2   QUALITY ASSURANCE DURING THE OPERATIONS PHASE The Operational Quality Assurance Program for the Union Electric Company Callaway Plant is described in the Operating Quality Assurance Manual (OQAM). The Quality Assurance Program description, formerly also maintained in this section of the FSAR, is now maintained solely in the OQAM as a separate licensing document. The OQAM will be maintained in accordance with the requirements of 10 CFR 50.54.
17.2-1                            Rev. OL-13 5/03}}

Latest revision as of 05:18, 30 October 2019

Final Safety Analysis Report, Revision OL-22, Chapter 17, Quality Assurance
ML17088A167
Person / Time
Site: Callaway Ameren icon.png
Issue date: 03/29/2017
From: Klos L
Plant Licensing Branch IV
To: Diya F
Union Electric Co
Klos L
References
Download: ML17088A167 (4)


Text

CALLAWAY - SP TABLE OF CONTENTS CHAPTER 17.0 QUALITY ASSURANCE Section Page 17.1 QUALITY ASSURANCE DURING DESIGN AND CONSTRUCTION........... 17.0-1 17.2 QUALITY ASSURANCE DURING THE OPERATIONS PHASE .................. 17.0-1 17.0-i

CALLAWAY - SP CHAPTER 17.0 QUALITY ASSURANCE 17.1 QUALITY ASSURANCE DURING DESIGN AND CONSTRUCTION This section is not applicable to an FSAR.

17.2 QUALITY ASSURANCE DURING THE OPERATIONS PHASE The Operational Quality Assurance Program for the Union Electric Company's Callaway Plant is described in the Operational Quality Assurance Manual (OQAM). The Quality Assurance Program description, formerly maintained in this section of the FSAR, is now maintained in the OQAM as a separate licensing document. The OQAM will be maintained in accordance with the requirements of 10 CFR 50.54.

17.0-1 Rev. OL-13 5/03

CALLAWAY - SA TABLE OF CONTENTS CHAPTER 17.0 QUALITY ASSURANCE Section Page 17.2 QUALITY ASSURANCE DURING THE OPERATIONS PHASE .................. 17.2-1 17.0-i

CALLAWAY - SA 17.2 QUALITY ASSURANCE DURING THE OPERATIONS PHASE The Operational Quality Assurance Program for the Union Electric Company Callaway Plant is described in the Operating Quality Assurance Manual (OQAM). The Quality Assurance Program description, formerly also maintained in this section of the FSAR, is now maintained solely in the OQAM as a separate licensing document. The OQAM will be maintained in accordance with the requirements of 10 CFR 50.54.

17.2-1 Rev. OL-13 5/03