ML17123A385: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE RD. SUIT E 210 LISLE, IL 60532
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE RD. SUITE 210 LISLE, IL 60532-4352 May 3, 2017 Mr. Robert Coffey Site Vice President NextEra Energy Point Beach, LLC 6610 Nuclear Road Two Rivers, WI 54241-9516
-4352 May 3, 2017 Mr. Robert Coffey Site Vice President NextEra Energy Point Beach, LLC 6610 Nuclear Road Two Rivers, WI 54241
-9516  


==SUBJECT:==
==SUBJECT:==
POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2
POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2 - OPERATOR LICENSING EXAMINATION APPROVAL
- OPERATOR LICENSING EXAMINATION APPROVAL


==Dear Mr. Coffey:==
==Dear Mr. Coffey:==


The purpose of this letter is to confirm the final arrangements for the upcoming operator licensing examinations at the Point Beach Nuclear Plant. The U.S. Nuclear Regulatory Commission (NRC) has completed its review of the operator license applications in connection with this examination and separately provided a list of approved applicants to Mr. Darren Peterson , Interim Training Manager. Note that any examination waivers and application denials have been addressed in separate correspondence.
The purpose of this letter is to confirm the final arrangements for the upcoming operator licensing examinations at the Point Beach Nuclear Plant.
The NRC has approved the subject examinations and you may administer the written examinations in accordance with Revision 10, of NUREG
The U.S. Nuclear Regulatory Commission (NRC) has completed its review of the operator license applications in connection with this examination and separately provided a list of approved applicants to Mr. Darren Peterson, Interim Training Manager. Note that any examination waivers and application denials have been addressed in separate correspondence.
-1021, "Operator Licensi ng Examination Standards for Power Reactors," one day during the week of either May 15 or May 22, 2017. The NRC staff will administer the operating tests during the week s o f May 8 and May 15, 2017. This examination has undergone extensive review by my staff and representatives responsible for licensed operator training at your facility. Based on this review, I have concluded that the examination meets the guidelines of NUREG
The NRC has approved the subject examinations and you may administer the written examinations in accordance with Revision 10, of NUREG-1021, Operator Licensing Examination Standards for Power Reactors, one day during the week of either May 15 or May 22, 2017. The NRC staff will administer the operating tests during the weeks of May 8 and May 15, 2017. This examination has undergone extensive review by my staff and representatives responsible for licensed operator training at your facility. Based on this review, I have concluded that the examination meets the guidelines of NUREG-1021 for content, operational, and discrimination validity. By administering this examination, you also agree that it meets NUREG-1021 guidelines, and is appropriate for measuring the qualifications of licensed operator applicants at your facility. If you determine that this examination is not appropriate for licensing operators at your facility, do not administer the examination and contact me at 630-829-9834.
-1021 for content, operational, and discrimination validity. By administering this examination, you also agree that it meets NUREG
Please contact your Chief Examiner, Mr. Jesse Seymour, at 630-829-9561, if you have any questions or identify any errors or changes in the license level reactor operator or senior reactor operator or type of examination (partial or complete written examination and/or operating test) specified for each applicant.
-1021 guidelines, and is appropriate for measuring the qualifications of licensed operator applicants at your facility. If you determine that this examination is not appropriate for licensing operators at your facility, do not administer the examination and contact me at 630-829-9 834. Please contact your Chief Examiner, Mr. Jesse Seymour , at 630-829-9561, if you have any questions or identify any errors or changes in the license level reactor operator or senior reactor operator or type of examination (partial or complete written examination and/or operating test) specified for each applicant.


R. Coffey     In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading
R. Coffey                                       In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
-rm/adams.html (the Public Electronic Reading Room).
Sincerely,
Sincerely, /RA/   Robert J. Orlikowski, Chief Operations Branch Division of Reactor Safety Docket Nos. 50
                                                /RA/
-266; 50-301 License Nos. DPR
Robert J. Orlikowski, Chief Operations Branch Division of Reactor Safety Docket Nos. 50-266; 50-301 License Nos. DPR-24; DPR-27 cc: Distribution via LISTSERV Darren Peterson, Interim Training Manager
-24; DPR-27 cc: Distribution via LISTSERV Darren Peterson, Interim Training Manager R. Coffey     Letter to Robert Coffey from Robert J. Orlikowski dated May 3, 2017  
 
R. Coffey                                   Letter to Robert Coffey from Robert J. Orlikowski dated May 3, 2017


==SUBJECT:==
==SUBJECT:==
POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2
POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2 - OPERATOR LICENSING EXAMINATION APPROVAL DISTRIBUTION:
- OPERATOR LICENSING EXAMINATION APPROVAL DISTRIBUTION
Jeremy Bowen RidsNrrDorlLpl3 RidsNrrPMPointBeach RidsNrrDirsIrib Resource Cynthia Pederson Darrell Roberts Richard Skokowski Allan Barker Carole Ariano Linda Linn DRPIII DRSIII Nancy Salgado Colleen Schmidt ADAMS Accession Number: ML17123A385 OFFICE     RIII                 RIII               RIII         RIII NAME       JSeymour:jw         ROrlikowski DATE       05/02/17             05/03/17 OFFICIAL RECORD COPY}}
: Jeremy Bowen RidsNrrDorlLpl3 RidsNrrPMPointBeach RidsNrrDirsIrib Resource Cynthia Pederson Darrell Roberts Richard Skokowski Allan Barker Carole Ariano Linda Linn DRPIII DRSIII Nancy Salgado Colleen Schmidt  
 
ADAMS Accession Number: ML17123A385 OFFICE RIII RIII RIII RIII NAME JSeymour:jw ROrlikowski DATE 0 5/02/17 0 5/03/17   OFFICIAL RECORD COPY}}

Revision as of 05:02, 30 October 2019

Ltr 05/03/2017 Point Beach Nuclear Plant, Units 1 and 2 - Operator Licensing Examination Approval (Jls)
ML17123A385
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 05/03/2017
From: Robert Orlikowski
Operations Branch III
To: Coffey R
Point Beach
Shared Package
ML16319A327 List:
References
Download: ML17123A385 (3)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE RD. SUITE 210 LISLE, IL 60532-4352 May 3, 2017 Mr. Robert Coffey Site Vice President NextEra Energy Point Beach, LLC 6610 Nuclear Road Two Rivers, WI 54241-9516

SUBJECT:

POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2 - OPERATOR LICENSING EXAMINATION APPROVAL

Dear Mr. Coffey:

The purpose of this letter is to confirm the final arrangements for the upcoming operator licensing examinations at the Point Beach Nuclear Plant.

The U.S. Nuclear Regulatory Commission (NRC) has completed its review of the operator license applications in connection with this examination and separately provided a list of approved applicants to Mr. Darren Peterson, Interim Training Manager. Note that any examination waivers and application denials have been addressed in separate correspondence.

The NRC has approved the subject examinations and you may administer the written examinations in accordance with Revision 10, of NUREG-1021, Operator Licensing Examination Standards for Power Reactors, one day during the week of either May 15 or May 22, 2017. The NRC staff will administer the operating tests during the weeks of May 8 and May 15, 2017. This examination has undergone extensive review by my staff and representatives responsible for licensed operator training at your facility. Based on this review, I have concluded that the examination meets the guidelines of NUREG-1021 for content, operational, and discrimination validity. By administering this examination, you also agree that it meets NUREG-1021 guidelines, and is appropriate for measuring the qualifications of licensed operator applicants at your facility. If you determine that this examination is not appropriate for licensing operators at your facility, do not administer the examination and contact me at 630-829-9834.

Please contact your Chief Examiner, Mr. Jesse Seymour, at 630-829-9561, if you have any questions or identify any errors or changes in the license level reactor operator or senior reactor operator or type of examination (partial or complete written examination and/or operating test) specified for each applicant.

R. Coffey In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Robert J. Orlikowski, Chief Operations Branch Division of Reactor Safety Docket Nos. 50-266; 50-301 License Nos. DPR-24; DPR-27 cc: Distribution via LISTSERV Darren Peterson, Interim Training Manager

R. Coffey Letter to Robert Coffey from Robert J. Orlikowski dated May 3, 2017

SUBJECT:

POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2 - OPERATOR LICENSING EXAMINATION APPROVAL DISTRIBUTION:

Jeremy Bowen RidsNrrDorlLpl3 RidsNrrPMPointBeach RidsNrrDirsIrib Resource Cynthia Pederson Darrell Roberts Richard Skokowski Allan Barker Carole Ariano Linda Linn DRPIII DRSIII Nancy Salgado Colleen Schmidt ADAMS Accession Number: ML17123A385 OFFICE RIII RIII RIII RIII NAME JSeymour:jw ROrlikowski DATE 05/02/17 05/03/17 OFFICIAL RECORD COPY