ML17137A183: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
(2 intermediate revisions by the same user not shown)
Line 9: Line 9:
| docket = PROJ0689
| docket = PROJ0689
|| license number =  
|| license number =  
| contact person = Wharton L R
| contact person = Wharton L
| case reference number = NEI 12-04
| case reference number = NEI 12-04
| document type = Meeting Briefing Package/Handouts, Slides and Viewgraphs
| document type = Meeting Briefing Package/Handouts, Slides and Viewgraphs
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:}}
{{#Wiki_filter:10 CFR 72.48 Implementation Guidance NEI 12-04 Endorsement Brian Gutherman for the Nuclear Energy Institute Meeting with NRC-DSFM May 11, 2017
* Rockville, MD 1
 
Latest Developments
* NEI summarized Industrys position on 11 issues requiring alignment with NRC to move forward in August, 2016
* NRC letter of March 2017 provided responses to all 11 issues
* Alignment was reached on 10 of 11 issues with Industry action to revise the 12-04 guidance identified
* Industry understands NRCs position on generic approval of Methods of Evaluation (MOEs) 2
 
Method of Evaluation (MOE)
* There are two potential departures from an MOE described in the FSAR, either of which would require prior NRC approval:
: 1. Change to an element of a method where the results are not essentially the same or conservative
: 2. Use of another MOE that has not been approved by the NRC for the intended application
* Industry proposes clarifying the guidance to avoid ambiguity for users and the NRC 3
 
Fundamentals
* NRC approves cask designs and ISFSI licenses, but does not generically approve the MOEs described in the FSARs
* FSARs are approved documents and MOEs used in the safety analyses are summarized in the FSARs for the ISFSI or cask
* MOEs summarized in the FSAR are used to evaluate other changes, such as modifications and procedure changes
* Computer codes supporting those MOEs evolve over time and cask designers often wish to (or have to) use the latest code versions
* Cask designers have common equipment in different CoCs and in different amendments for the same CoC
* MOE guidance between 50.59 and 72.48 should be consistent
* Some CoC amendments do not involve review or use of MOEs (e.g., administrative changes) 4
 
Method of Evaluation
* NRCs 3/3/17 letter
  - In order for a different MOE than that described in an FSAR to be used, it must be generically approved by the NRC either:
* via topical report, or
* in response to a specific request submitted as part of design approval applications
  - NRC does not currently have adequate guidance and practice to review amendment applications requesting generic MOE approval
* There is still some confusion on the details, e.g.,
what does generically approved mean?
5
 
Generic Approval of MOE 6
 
Remaining MOE Issues
* FSAR descriptions of analysis methods
* Using FSAR-described MOEs used across amendments within a CoC or across CoCs (by the same CoC holder)
* Evaluating use of later releases or versions of previously used codes that are described in the FSAR 7
 
Path Forward
* Industry will revise NEI 12-04 to reflect the agreements on the 11 issues and most other editorial or administrative suggestions in the NRC comment letters
* Public meeting to discuss proposed changes to MOE guidance before 12-04 is re-submitted
* Industry would like to reach agreement on the content of 12-04 in 2017 8}}

Latest revision as of 04:18, 30 October 2019

Presentation Slides: 10 CFR 72.48 Implementation Guidance NEI 12-04 Endorsement, Brian Gutherman/Nei - Public Meeting with NEI and Industry, Held on May 11, 2017
ML17137A183
Person / Time
Site: Nuclear Energy Institute
Issue date: 05/11/2017
From: Gutherman B
Nuclear Energy Institute
To:
NRC/NMSS/DSFM/IOB
Wharton L
References
NEI 12-04
Download: ML17137A183 (8)


Text

10 CFR 72.48 Implementation Guidance NEI 12-04 Endorsement Brian Gutherman for the Nuclear Energy Institute Meeting with NRC-DSFM May 11, 2017

  • Rockville, MD 1

Latest Developments

  • NEI summarized Industrys position on 11 issues requiring alignment with NRC to move forward in August, 2016
  • NRC letter of March 2017 provided responses to all 11 issues
  • Alignment was reached on 10 of 11 issues with Industry action to revise the 12-04 guidance identified
  • Industry understands NRCs position on generic approval of Methods of Evaluation (MOEs) 2

Method of Evaluation (MOE)

  • There are two potential departures from an MOE described in the FSAR, either of which would require prior NRC approval:
1. Change to an element of a method where the results are not essentially the same or conservative
2. Use of another MOE that has not been approved by the NRC for the intended application
  • Industry proposes clarifying the guidance to avoid ambiguity for users and the NRC 3

Fundamentals

  • NRC approves cask designs and ISFSI licenses, but does not generically approve the MOEs described in the FSARs
  • FSARs are approved documents and MOEs used in the safety analyses are summarized in the FSARs for the ISFSI or cask
  • MOEs summarized in the FSAR are used to evaluate other changes, such as modifications and procedure changes
  • Computer codes supporting those MOEs evolve over time and cask designers often wish to (or have to) use the latest code versions
  • Cask designers have common equipment in different CoCs and in different amendments for the same CoC
  • MOE guidance between 50.59 and 72.48 should be consistent
  • Some CoC amendments do not involve review or use of MOEs (e.g., administrative changes) 4

Method of Evaluation

  • NRCs 3/3/17 letter

- In order for a different MOE than that described in an FSAR to be used, it must be generically approved by the NRC either:

  • via topical report, or
  • in response to a specific request submitted as part of design approval applications

- NRC does not currently have adequate guidance and practice to review amendment applications requesting generic MOE approval

  • There is still some confusion on the details, e.g.,

what does generically approved mean?

5

Generic Approval of MOE 6

Remaining MOE Issues

  • FSAR descriptions of analysis methods
  • Using FSAR-described MOEs used across amendments within a CoC or across CoCs (by the same CoC holder)
  • Evaluating use of later releases or versions of previously used codes that are described in the FSAR 7

Path Forward

  • Industry will revise NEI 12-04 to reflect the agreements on the 11 issues and most other editorial or administrative suggestions in the NRC comment letters
  • Public meeting to discuss proposed changes to MOE guidance before 12-04 is re-submitted
  • Industry would like to reach agreement on the content of 12-04 in 2017 8