©2021 Nuclear Energy Institute Fire Protection Team Inspection December 2, 2021
©2021 Nuclear Energy Institute 2 Attributes of the Fire Protection Team Inspection (FPTI) are redundant to attributes of other NRC inspections.
Low numbers of FPTI findings indicates strong industry performance.
Proposal:
Incorporate unique FPTI inspection criteria to Comprehensive Engineering Team Inspection (CETI) and credit other Inspection Procedures (IPs), as applicable Overview
©2021 Nuclear Energy Institute 3 SECY-99-140 provided initial stated benefits for Fire Protection Inspections.
All initial benefits have been realized.
Initial inspections identified additional focus areas to be addressed (e.g., fire barrier ratings, multiple spurious operations, etc.).
IP revisions and/or Temporary Instructions proven effective at enforcing resolution of emergent items.
Emergent items have been resolved.
Current FPTI focuses on Design Basis, Operating Experience, and Modifications Focus Areas
©2021 Nuclear Energy Institute 4 Duplicate Comparable Inspection Criteria FPTI Criteria Comparable Criteria 03.01, SSC Credited for Fire Prevention, Detection, Suppression, or Post-Fire SSD Review IP 71111.21M, Section 02.02, Design Review IP 71111.21M, Section 02.04, Maintenance Area Review IP 71111.21M, Section 02.06, Review of Operating Experience Issues 03.02, Fire Protection Program Administrative Controls IP 71111.05 Section 03.01, Fire Area Walkdown and Inspection Sample 03.03, Fire Protection Program Changes/Modifications IP 71111.21M, Section 02.03, Modification Review IP 71111.18, Plant Modifications
©2021 Nuclear Energy Institute 5 Quantity of FPTI with no (0) findings exceeds those with findings Total FPTI findings have decreased since 2013.
Zero (0) FPTI findings greater than green.
Findings per inspection is dropping significantly (2020 < 0.5 findings per inspection)
Strong industry performance and effective resolution of issues identified during inspections.
Inspection Results 0
2 4
6 8
10 12 14 16 2012 2013 2014 2015 2016 2017 2018 2019 2020 Inspections Results Finding(s)
No Finding(s) 0 5
10 15 20 25 30 35 0.00 0.50 1.00 1.50 2.00 2012 2013 2014 2015 2016 2017 2018 2019 2020 Inspection Findings Green None Findings per Inspection
©2021 Nuclear Energy Institute 6 Proposal Incorporate unique IP 71111-21N.05 criteria into the CETI and credit other existing IP criteria.
Utilize Temporary Instructions for emergent issues, as necessary.
NRC IP Owner, Fire Protection technical staff and NEI plan on scheduling a public meeting to engage further.
Recommended Path Forward