ML17228B447: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
(6 intermediate revisions by the same user not shown)
Line 3: Line 3:
| issue date = 04/01/1996
| issue date = 04/01/1996
| title = Forwards Summary Rept of Cycle 9 Plant Startup & Power Escalation Testing
| title = Forwards Summary Rept of Cycle 9 Plant Startup & Power Escalation Testing
| author name = BOHLKE W H
| author name = Bohlke W
| author affiliation = FLORIDA POWER & LIGHT CO.
| author affiliation = FLORIDA POWER & LIGHT CO.
| addressee name =  
| addressee name =  
Line 14: Line 14:
| document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE
| document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE
| page count = 3
| page count = 3
| revision = 0
}}
}}
=Text=
{{#Wiki_filter:CATEGORY            1y REGULATORY INFORMATION DISTRIBUTION SYSTEM            (RIDS)
ACCESSION NBR.:9604090120          DOC.DATE:  96/04/Ol    NGTARIZED: NO          DOCKET FACIL:50-389 St. Lucie Plant, Unit 2, Florida Power              &  Light  Co. 05000389 AUTH. NAME          AUTHOR AFFILIATION BOHLKE,W.H.          Florida  Power & Light Co.
RECIP.NAME          RECIPIENT AFFILIATION Document Control Branch (Document          Control Desk)
==SUBJECT:==
Forwards summary        rept of Cycle    9  plant startup &'ower escalation testing.
DISTRIBUTION CODE: IE26D        COPIES RECEIVED:LTR TITLE: Startup Report/Refueling Report (per Tech Specs)
ENCL      SIZE:    +l(
NOTES:
RECIPIENT            COPIES            RECIPIENT            COPIES ID CODE/NAME          LTTR ENCL        ID CODE/NAME        LTTR ENCL PD2-1 PD                  1    1      NORRIS,J                  1    1 0
INTERNAL: ACRS                        5    5      FILE  CENTER            1    1 NRR/DSSA/SRXB/B          1    1                                1    1          R EXTERNAL: NOAC                        1    1      NRC PDR                  1    1          Y D
0 N
NOTE TO ALL "RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTEI CONTACT THE DOCUMENT CONTROL DESK, ROOM OWFN 5D-5(EXT. 415-2083) TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEEDI TOTAL NUMBER OF COPIES REQUIRED: LTTR            12    ENCL    12
Florida Power 5 Light Company, P.O. Box 128, Fort Pierce, FL 34954-0128 April    1, 1996                          L-96-077 10 CFR 50.36 U. S.      Nuclear Regulatory Commission Attn:      Document Control Desk Washington,          DC 20555 Re:      St. Lucie Unit      2 Docket 50-389 C  cle    9  Startu    Ph sics Testin        Re    ort Pursuant to St. Lucie Unit 2 Technical Specification 6.9.1.1, the enclosed summary report of Cycle 9 plant startup and power escalation testing is hereby submitted.
Should you have any questions,              please contact us.
Very    truly yours, W. H.      Bohlke Vice President St. Lucie Plant WHB/RLD
==Enclosure:==
St. Lucie Unit 2, Cycle 9, Startup Physics Testing Report (Approved 3/14/96) cc:      Stewart D. Ebneter, Regional Administrator, Region                                    II, USNRC Senior Resident Inspector, USNRC, St. Lucie Plant
~6t,    C 9604090i20 960401 PDR      ADOCK    05000389 p                    PDR an FPL Group company}}

Latest revision as of 22:01, 29 October 2019

Forwards Summary Rept of Cycle 9 Plant Startup & Power Escalation Testing
ML17228B447
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 04/01/1996
From: Bohlke W
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML17228B448 List:
References
L-96-077, L-96-77, NUDOCS 9604090120
Download: ML17228B447 (3)


Text

CATEGORY 1y REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR.:9604090120 DOC.DATE: 96/04/Ol NGTARIZED: NO DOCKET FACIL:50-389 St. Lucie Plant, Unit 2, Florida Power & Light Co. 05000389 AUTH. NAME AUTHOR AFFILIATION BOHLKE,W.H. Florida Power & Light Co.

RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

SUBJECT:

Forwards summary rept of Cycle 9 plant startup &'ower escalation testing.

DISTRIBUTION CODE: IE26D COPIES RECEIVED:LTR TITLE: Startup Report/Refueling Report (per Tech Specs)

ENCL SIZE: +l(

NOTES:

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD2-1 PD 1 1 NORRIS,J 1 1 0

INTERNAL: ACRS 5 5 FILE CENTER 1 1 NRR/DSSA/SRXB/B 1 1 1 1 R EXTERNAL: NOAC 1 1 NRC PDR 1 1 Y D

0 N

NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTEI CONTACT THE DOCUMENT CONTROL DESK, ROOM OWFN 5D-5(EXT. 415-2083) TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEEDI TOTAL NUMBER OF COPIES REQUIRED: LTTR 12 ENCL 12

Florida Power 5 Light Company, P.O. Box 128, Fort Pierce, FL 34954-0128 April 1, 1996 L-96-077 10 CFR 50.36 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 Re: St. Lucie Unit 2 Docket 50-389 C cle 9 Startu Ph sics Testin Re ort Pursuant to St. Lucie Unit 2 Technical Specification 6.9.1.1, the enclosed summary report of Cycle 9 plant startup and power escalation testing is hereby submitted.

Should you have any questions, please contact us.

Very truly yours, W. H. Bohlke Vice President St. Lucie Plant WHB/RLD

Enclosure:

St. Lucie Unit 2, Cycle 9, Startup Physics Testing Report (Approved 3/14/96) cc: Stewart D. Ebneter, Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, St. Lucie Plant

~6t, C 9604090i20 960401 PDR ADOCK 05000389 p PDR an FPL Group company