ML17228B447

From kanterella
Jump to navigation Jump to search
Forwards Summary Rept of Cycle 9 Plant Startup & Power Escalation Testing
ML17228B447
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 04/01/1996
From: Bohlke W
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML17228B448 List:
References
L-96-077, L-96-77, NUDOCS 9604090120
Download: ML17228B447 (3)


Text

CATEGORY 1y REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR.:9604090120 DOC.DATE: 96/04/Ol NGTARIZED: NO DOCKET FACIL:50-389 St. Lucie Plant, Unit 2, Florida Power & Light Co. 05000389 AUTH. NAME AUTHOR AFFILIATION BOHLKE,W.H. Florida Power & Light Co.

RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

SUBJECT:

Forwards summary rept of Cycle 9 plant startup &'ower escalation testing.

DISTRIBUTION CODE: IE26D COPIES RECEIVED:LTR TITLE: Startup Report/Refueling Report (per Tech Specs)

ENCL SIZE: +l(

NOTES:

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD2-1 PD 1 1 NORRIS,J 1 1 0

INTERNAL: ACRS 5 5 FILE CENTER 1 1 NRR/DSSA/SRXB/B 1 1 1 1 R EXTERNAL: NOAC 1 1 NRC PDR 1 1 Y D

0 N

NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTEI CONTACT THE DOCUMENT CONTROL DESK, ROOM OWFN 5D-5(EXT. 415-2083) TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEEDI TOTAL NUMBER OF COPIES REQUIRED: LTTR 12 ENCL 12

Florida Power 5 Light Company, P.O. Box 128, Fort Pierce, FL 34954-0128 April 1, 1996 L-96-077 10 CFR 50.36 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 Re: St. Lucie Unit 2 Docket 50-389 C cle 9 Startu Ph sics Testin Re ort Pursuant to St. Lucie Unit 2 Technical Specification 6.9.1.1, the enclosed summary report of Cycle 9 plant startup and power escalation testing is hereby submitted.

Should you have any questions, please contact us.

Very truly yours, W. H. Bohlke Vice President St. Lucie Plant WHB/RLD

Enclosure:

St. Lucie Unit 2, Cycle 9, Startup Physics Testing Report (Approved 3/14/96) cc: Stewart D. Ebneter, Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, St. Lucie Plant

~6t, C 9604090i20 960401 PDR ADOCK 05000389 p PDR an FPL Group company