ML17236A182: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
(3 intermediate revisions by the same user not shown) | |||
Line 3: | Line 3: | ||
| issue date = 08/24/2017 | | issue date = 08/24/2017 | ||
| title = Requalification Program Inspection - Nine Mile Point Nuclear Station, Unit 2 | | title = Requalification Program Inspection - Nine Mile Point Nuclear Station, Unit 2 | ||
| author name = Jackson D | | author name = Jackson D | ||
| author affiliation = NRC/RGN-I | | author affiliation = NRC/RGN-I | ||
| addressee name = Hanson B | | addressee name = Hanson B | ||
| addressee affiliation = NRC/RGN-III | | addressee affiliation = NRC/RGN-III | ||
| docket = 05000410 | | docket = 05000410 | ||
Line 16: | Line 16: | ||
=Text= | =Text= | ||
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 2100 RENAISSANCE BLVD. | {{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 2100 RENAISSANCE BLVD. | ||
KING OF PRUSSIA, PA | KING OF PRUSSIA, PA 19406-2713 August 24, 2017 Mr. Bryan C. Hanson Senior Vice President, Exelon Generation Company, LLC President and Chief Nuclear Officer (CNO), Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555 | ||
-2713 | |||
Warrenville, IL | |||
==SUBJECT:== | ==SUBJECT:== | ||
REQUALIFICATION PROGRAM INSPECTION | REQUALIFICATION PROGRAM INSPECTION - NINE MILE POINT NUCLEAR STATION, UNIT 2 | ||
==Dear Mr. Hanson:== | ==Dear Mr. Hanson:== | ||
In a telephone conversation on August 23, 2017, Mr. Peter Presby, Senior Operations Engineer | In a telephone conversation on August 23, 2017, Mr. Peter Presby, Senior Operations Engineer, and Mr. Gregory Elkins, Operations Training Manager, made arrangements for the U.S. Nuclear Regulatory Commission (NRC) to inspect the licensed operator requalification program at the Nine Mile Point Unit 2 facility. The inspection is planned for the week of October 16, 2017, which coincides with your regularly scheduled requalification examination cycle. The staff at your facility should prepare and conduct the requalification examinations in accordance with your NRC-approved requalification program. | ||
, and Mr. Gregory Elkins | In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 55.59(c), the NRC may request facility licensees to submit their biennial comprehensive requalification written examinations or annual operating tests as necessary to support the NRC's inspection program needs. In order for the NRC to adequately prepare for this inspection, please furnish: 1) an index or summary of condition reports written in the past two years in which licensed operator errors were determined to be the root or contributing cause; 2) an index or summary of condition reports written in the past two years on simulator performance problems; 3) an index or summary of simulator performance test results in the past two years; and 4) the examination schedule, sample plan, written examinations, and operating test scheduled for the week of the inspection to the NRC by October 10, 2017. Mr. Elkins has been advised of this request and provided with the name and address of the NRC lead inspector assigned to this inspection. | ||
, Operations Training Manager, made arrangements for the U.S. Nuclear Regulatory Commission (NRC) to inspect the licensed operator requalification program at the Nine Mile Point Unit 2 facility. The inspection is planned for the week of October 16, 2017 | This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of Management and Budget, approval number 3150-0018. | ||
, which coincides with your regularly scheduled requalification examination cycle. The staff at your facility should prepare and conduct the requalification examinations in accordance with your | The public reporting burden for this collection of information is estimated to average 4 hours per response, including the time for reviewing instructions, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of these information collections, including suggestions for reducing the burden, to the Records and FOIA/Privacy Services Branch (T-5 F52), U.S. | ||
Nuclear Regulatory Commission, Washington, D.C. 20555-0001, or by Internet electronic mail to INFOCOLLECTS@NRC.GOV; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management and Budget, Washington, D.C. | |||
NRC-approved requalification program. | |||
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 55.59(c), the NRC may request facility licensees to submit their biennial comprehensive requalification written examinations or annual operating tests as necessary to support the NRC's inspection program needs. In order for the NRC to adequately prepare for this inspection, please furnish | |||
: 1) an index or summary of condition reports written in the past two years in which licensed operator errors were determined to be the root or contributing cause; 2) an index or summary of condition reports written in the past two years on simulator performance problems; 3) an index or summary of simulator performance test results in the past two years; and 4) the examination schedule, sample plan, written examinations | |||
, and operating test scheduled for the week of the inspection to the NRC by October 10, 2017. Mr. Elkins has been advised of this request and provided with the name and address of the NRC lead inspector assigned to this inspection. | |||
This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of Management and Budget, approval number 3150 | |||
-0018. | |||
The public reporting burden for this collection of information is estimated to average 4 hours per response, including the time for reviewing instructions, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of these information collections, including suggestions for reducing the burden, to the Records and FOIA/Privacy Services Branch (T | |||
-5 F52), U.S. Nuclear Regulatory Commission, Washington, D.C. 20555 | |||
-0001, or by Internet electronic mail to INFOCOLLECTS@NRC.GOV | |||
; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB | |||
-10202, (3150 | |||
-0018), Office of Management and Budget, Washington, D.C. | |||
20503. | 20503. | ||
Docket No. | B. Hanson 2 The NRC may not conduct or sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number. In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRCs document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (The Public Electronic Reading Room). | ||
50-410 License No. NPF | Thank you for your cooperation in this matter. If you have any questions regarding this inspection, please contact Mr. Peter Presby at (610) 337-5392. | ||
-69 cc: Distribution via ListServ | Sincerely, | ||
/RA/ | |||
Donald E. Jackson, Chief Operations Branch Division of Reactor Safety Docket No. 50-410 License No. NPF-69 cc: Distribution via ListServ | |||
ML17236A182 | ML17236A182 Non-Sensitive Publicly Available SUNSI Review Sensitive Non-Publicly Available OFFICE RI/DRS RI/DRS NAME PPresby/DJ DJackson DATE 8/24/17 8/24/17}} |
Latest revision as of 20:34, 29 October 2019
ML17236A182 | |
Person / Time | |
---|---|
Site: | Nine Mile Point |
Issue date: | 08/24/2017 |
From: | Diane Jackson NRC Region 1 |
To: | Bryan Hanson NRC/RGN-III |
References | |
Download: ML17236A182 (3) | |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 2100 RENAISSANCE BLVD.
KING OF PRUSSIA, PA 19406-2713 August 24, 2017 Mr. Bryan C. Hanson Senior Vice President, Exelon Generation Company, LLC President and Chief Nuclear Officer (CNO), Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555
SUBJECT:
REQUALIFICATION PROGRAM INSPECTION - NINE MILE POINT NUCLEAR STATION, UNIT 2
Dear Mr. Hanson:
In a telephone conversation on August 23, 2017, Mr. Peter Presby, Senior Operations Engineer, and Mr. Gregory Elkins, Operations Training Manager, made arrangements for the U.S. Nuclear Regulatory Commission (NRC) to inspect the licensed operator requalification program at the Nine Mile Point Unit 2 facility. The inspection is planned for the week of October 16, 2017, which coincides with your regularly scheduled requalification examination cycle. The staff at your facility should prepare and conduct the requalification examinations in accordance with your NRC-approved requalification program.
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 55.59(c), the NRC may request facility licensees to submit their biennial comprehensive requalification written examinations or annual operating tests as necessary to support the NRC's inspection program needs. In order for the NRC to adequately prepare for this inspection, please furnish: 1) an index or summary of condition reports written in the past two years in which licensed operator errors were determined to be the root or contributing cause; 2) an index or summary of condition reports written in the past two years on simulator performance problems; 3) an index or summary of simulator performance test results in the past two years; and 4) the examination schedule, sample plan, written examinations, and operating test scheduled for the week of the inspection to the NRC by October 10, 2017. Mr. Elkins has been advised of this request and provided with the name and address of the NRC lead inspector assigned to this inspection.
This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of Management and Budget, approval number 3150-0018.
The public reporting burden for this collection of information is estimated to average 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> per response, including the time for reviewing instructions, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of these information collections, including suggestions for reducing the burden, to the Records and FOIA/Privacy Services Branch (T-5 F52), U.S.
Nuclear Regulatory Commission, Washington, D.C. 20555-0001, or by Internet electronic mail to INFOCOLLECTS@NRC.GOV; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management and Budget, Washington, D.C.
20503.
B. Hanson 2 The NRC may not conduct or sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number. In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRCs document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (The Public Electronic Reading Room).
Thank you for your cooperation in this matter. If you have any questions regarding this inspection, please contact Mr. Peter Presby at (610) 337-5392.
Sincerely,
/RA/
Donald E. Jackson, Chief Operations Branch Division of Reactor Safety Docket No. 50-410 License No. NPF-69 cc: Distribution via ListServ
ML17236A182 Non-Sensitive Publicly Available SUNSI Review Sensitive Non-Publicly Available OFFICE RI/DRS RI/DRS NAME PPresby/DJ DJackson DATE 8/24/17 8/24/17