| | number = ML17270A165 | | | number = ML17270A165 |
| | issue date = 09/25/2017 | | | issue date = 09/25/2017 |
| | title = Three Mile Island Nuclear Generating Station, Unit 1 - Baseline Security Inspection Report 05000289/2017403 (Cover Letter) | | | title = Baseline Security Inspection Report 05000289/2017403 (Cover Letter) |
| | author name = McKinley R R | | | author name = Mckinley R |
| | author affiliation = NRC/RGN-I/DRS | | | author affiliation = NRC/RGN-I/DRS |
| | addressee name = Hanson B | | | addressee name = Hanson B |
Line 18: |
Line 18: |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 2100 RENAISSANCE BLVD., Suite 100 KING OF PRUSSIA, PA 19406 | | {{#Wiki_filter:September 25, 2017 |
| -2713 September 25, 2017 Mr. Bryan Hanson Senior Vice President, Exelon Generation, LLC President and Chief Nuclear Officer, Exelon Nuclear 4300 Winfield Rd.
| |
|
| |
|
| Warrenville, IL 60555
| | ==SUBJECT:== |
| | | THREE MILE ISLAND NUCLEAR GENERATING STATION, UNIT 1 - |
| SUBJECT: THREE MILE ISLAND NUCLEAR GENERATING STATION, UNIT 1 | | BASELINE SECURITY INSPECTION REPORT 05000289/2017403 |
| - BASELINE SECURITY INSPECTION REPORT 05000 289/2017403
| |
|
| |
|
| ==Dear Mr. Hanson:== | | ==Dear Mr. Hanson:== |
| On September 6, 2017, the U.S. Nuclear Regulatory Commission (NRC) completed a security inspection at Three Mile Island Nuclear Generating Station, Unit 1. The NRC's inspectors discussed the results with Mr. Ed Callan | | On September 6, 2017, the U.S. Nuclear Regulatory Commission (NRC) completed a security inspection at Three Mile Island Nuclear Generating Station, Unit 1. The NRCs inspectors discussed the results with Mr. Ed Callan, Site Vice President, and other members of your staff. |
| , Site Vice President | |
| , and other members of your staff. | |
|
| |
|
| The results of this inspection are documented in the enclosed report. | | The results of this inspection are documented in the enclosed report. |
|
| |
|
| The NRC's inspectors documented three findings of very low security significance (Green) in this report. One of these findings involved a violation of NRC requirements. The NRC is treating this violation as a non | | The NRCs inspectors documented three findings of very low security significance (Green) in this report. One of these findings involved a violation of NRC requirements. The NRC is treating this violation as a non-cited violation consistent with section 2.3.2.a of the Enforcement Policy. |
| -cited violation consistent with section 2.3.2.a of the Enforcement Policy. If you contest th e violation or significance of the violation | |
| , you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the U.S.
| |
| | |
| Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington
| |
| , DC 20555-0001; with copies to the Regional Administrator, Region I; the Director, Office of Enforcement; the Director, Office of Nuclear Security and Incident Response; and the NRC
| |
| 's resident inspector at Three Mile Island Nuclear Generating Station. Two cross-cutting aspects were assigned to the findings in the area s of Problem Identification and Resolution and Human Performance
| |
| . Specifically, Exelon failed to take effective corrective actions to address issues in a timely manner
| |
| [P.3], and Exelon failed to ensure individuals follow processes, procedures, and work instructions [H.8
| |
| ].
| |
| If you disagree with a cross
| |
| -cutting aspect assignment or a finding not associated with a regulatory requirement in this report, you should provide a response within 30 days of the date of this inspection report, with the basis for your disagreement, to the U.S.
| |
| | |
| Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001; with copies to the Regional Administrator, Region I; and the NRC's resident inspector at Three Mile Island Nuclear Generating Station
| |
| . Enclosure contains Sensitive Unclassified Non
| |
| -Safeguards Information.
| |
| | |
| When separated from the Enclosure, the transmittal document is decontrolled. This letter will be made available for public inspection and copying at http://www.nrc.gov/reading
| |
| -rm/adams.html and at the NRC's Public Document Room in accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, "Public Inspections, Exemptions, Requests for Withholding."
| |
| | |
| However, the enclosed report contains Security
| |
| -Related Information, so the enclosed report will not be made publically available in accordance with 10 CFR 2.390(d)(1).
| |
| | |
| If you choose to provide a response that contains Security-Related Information, please mark your entire response "Security
| |
| -Related Information
| |
| - Withhold From Public Disclosure Under 10 CFR 2.390" in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1).
| |
| | |
| The NRC is waiving the affidavit requirements for your response in accordance with 10 CFR 2.390(b)(1)(ii)
| |
| .
| |
| | |
| Sincerely,/RA/ Raymond R. McKinley, Chief Plant Support Branch 1 Division of Reactor Safety Docket No.
| |
|
| |
|
| 50-289 License No.
| | If you contest the violation or significance of the violation, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001; with copies to the Regional Administrator, Region I; the Director, Office of Enforcement; the Director, Office of Nuclear Security and Incident Response; and the NRCs resident inspector at Three Mile Island Nuclear Generating Station. |
|
| |
|
| DPR-50
| | Two cross-cutting aspects were assigned to the findings in the areas of Problem Identification and Resolution and Human Performance. Specifically, Exelon failed to take effective corrective actions to address issues in a timely manner [P.3], and Exelon failed to ensure individuals follow processes, procedures, and work instructions [H.8]. |
| | If you disagree with a cross-cutting aspect assignment or a finding not associated with a regulatory requirement in this report, you should provide a response within 30 days of the date of this inspection report, with the basis for your disagreement, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001; with copies to the Regional Administrator, Region I; and the NRCs resident inspector at Three Mile Island Nuclear Generating Station. |
|
| |
|
| ===Enclosure:===
| | Enclosure contains Sensitive Unclassified Non-Safeguards Information. When separated from the Enclosure, the transmittal document is decontrolled. This letter will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRCs Public Document Room in accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public Inspections, Exemptions, Requests for Withholding. |
| Inspection Report No. 05000289/2017403
| |
|
| |
|
| ===w/Attachment:===
| | However, the enclosed report contains Security-Related Information, so the enclosed report will not be made publically available in accordance with 10 CFR 2.390(d)(1). If you choose to provide a response that contains Security-Related Information, please mark your entire response Security-Related Information - Withhold From Public Disclosure Under 10 CFR 2.390 in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). The NRC is waiving the affidavit requirements for your response in accordance with 10 CFR 2.390(b)(1)(ii). |
| Supplemental Information cc w/o encl:
| |
| w/o OUO-RPT: Distribution via ListServ cc w/encl: w/OUO-RPT: R. Campbell, Security Manager D. Allard, State Liaison Officer, PA SUBJECT: THREE MILE ISLAND NUCLEAR GENERATING STATION, UNIT 1
| |
| - BASELINE SECURITY INSPECTION REPORT 05000 289/2017403, DATED SEPTEMBER 25, 2017 DISTRIBUTION w/ | |
| o encl: DDorman, RA DLew, DRA RLorson, DRP DPelton, DRP JYerokun, DRS BWelling, DRS SKennedy, DRP SShaffer, DRP CSafouri, DRP SKennedy, DRP ZHollcraft, SRI BLin, DRP, RI ADiaz, DRP, AA JBowen, RI, OEDO RidsNrrPMThreeMileIsland Resource RidsNrrDorlLpl1 Resource ROPReports Resource cc w/encl: w/OUO-RPT: R. Campbell, Security Manager D. Allard, State Liaison Officer, PA Distribution w/encl:
| |
| w/OUO-RPT: CJohnson, NSIR NSimonian, NSIR EWharton, NSIR BDesai, DRS, RII SOrth, DRS, RIII MHaire, DRS, RIV SKennedy, BC ZHollcraft, SRI
| |
|
| |
|
| DOCUMENT NAME:
| | Sincerely, |
| G:\DRS\Plant Support Branch 1\Security\2017 IR Draft
| | /RA/ |
| \TMI\TMI 2017403 Pub.docx ADAMS ACCESSION NO
| | Raymond R. McKinley, Chief Plant Support Branch 1 Division of Reactor Safety Docket No. 50-289 License No. DPR-50 Enclosure: |
| . ML17270A165 (cover letter) | | Inspection Report No. 05000289/2017403 w/Attachment: Supplemental Information cc w/o encl: w/o OUO-RPT: Distribution via ListServ cc w/encl: w/OUO-RPT: |
| ADAMS ACCESSION NO. ML17270A158 (cover letter w/Rpt.) Coverletter:
| | R. Campbell, Security Manager D. Allard, State Liaison Officer, PA |
| SUNSI Review Non-Sensitive Sensitive Publicly Available Non-Publicly Available Coverletter w/RPT SUNSI Review Non-Sensitive Sensitive Publicly Available Non-Publicly Available OFFICE RI/DRS RI/DRS RI/DRS RI/DRS RI/DRS RI/DRP NAME K Hussar J Bream J Rey D Caron R McKinley S Kennedy DATE 9/19/17 9/18/17 9/14/17 9/19/17 9/25/17 9/18/17 OFFICIAL RECORD COPY
| |
| }} | | }} |
|
---|
Category:Letter
MONTHYEARML24240A2222024-08-27027 August 2024 Response to Request for Additional Information for the TMI-2 Post-Shutdown Decommissioning Activities Report, Rev. 6 IR 07200077/20240012024-06-18018 June 2024 Constellation Energy Generation, LLC, Three Mile Island Nuclear Station, Unit 1 - NRC Inspection Report No. 07200077/2024001 ML24157A3672024-06-13013 June 2024 Updated Post-Shutdown Decommissioning Activities Report Request for Additional Information Transmittal Letter ML24135A1972024-06-13013 June 2024 – Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0091 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ML24151A6482024-06-0303 June 2024 Changes in Reactor Decommissioning Branch Project Management Assignments for Some Decommissioning Facilities ML24120A3242024-05-24024 May 2024 TMI-2 Email to Fws RS-24-055, 2023 Corporate Regulatory Commitment Change Summary Report2024-05-17017 May 2024 2023 Corporate Regulatory Commitment Change Summary Report ML24120A2552024-04-29029 April 2024 Annual Radiological Environmental Operating Report ML24121A2472024-04-29029 April 2024 and Three Mile Island, Unit 2 - 2023 Occupational Radiation Exposure Annual Report ML24113A0212024-04-18018 April 2024 (TMI-2), Supplement to Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation RS-24-002, Constellation Energy Generation, LLC - Annual Property Insurance Status Report2024-04-0101 April 2024 Constellation Energy Generation, LLC - Annual Property Insurance Status Report ML24088A0122024-03-28028 March 2024 Notification of Amended Post-Shutdown Decommissioning Activities Report (PSDAR) in Accordance with 10 CFR 50.82(a)(7), Revision 6 ML24065A0042024-03-28028 March 2024 Submittal of 2023 Aircraft Movement Data Annual Report ML24092A0012024-03-28028 March 2024 (TMI-2), Decommissioning Trust Fund Annual Report ML24085A2152024-03-25025 March 2024 (TMI-2) - Annual Notification of Property Insurance Coverage RS-24-023, Report on Status of Decommissioning Funding.2024-03-22022 March 2024 Report on Status of Decommissioning Funding. ML24052A0602024-03-20020 March 2024 – Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0061 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ML24074A3922024-03-14014 March 2024 Response to Request for Additional Information for the TMI-2 Post-Shutdown Decommissioning Activities Report, Rev. 5 ML24075A0062024-03-14014 March 2024 List of Threatened and Endangered Species That May Occur in Your Proposed Project Location or May Be Affected by Your Proposed Project ML24073A2312024-03-13013 March 2024 and Three Mile Island Nuclear Station, Unit 2 - Management Change ML24044A0092024-02-12012 February 2024 License Amendment Request – Three Mile Island, Unit 2, Historic and Cultural Resources Review, Response to Request for Additional Information IR 05000320/20230042024-02-0707 February 2024 TMI-2 Solutions, LLC, Three Mile Island Nuclear Station, Unit 2 - NRC Inspection Report 05000320/2023004 ML24038A0222024-02-0505 February 2024 Achp Letter on Section 106 Programmatic Agreement Participation IR 05000289/20230062024-01-29029 January 2024 Constellation Energy Generation, LLC, Three Mile Island Nuclear Station, Unit 1 - NRC Inspection Report No. 05000289/2023006 ML23342A1242024-01-0909 January 2024 Independent Spent Fuel Storage Installation Security Inspection Plan ML23325A1092024-01-0505 January 2024 Review of the Management Plan for Three Mile Island Station, Unit No. 2, Debris Material ML23354A2062023-12-20020 December 2023 (TMI-2), Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23354A2112023-12-20020 December 2023 Response to Request for Additional Information for the TMI-2 Post-Shutdown Decommissioning Activities Report, Rev. 5 IR 05000320/20230032023-11-28028 November 2023 TMI-2 Solutions, LLC, Three Mile Island Nuclear Station, Unit 2, NRC Inspection Report No. 05000320/2023003 ML23243A9082023-08-29029 August 2023 Shpo Letter to TMI-2 Regarding Section 106 Activities IR 05000320/20230022023-08-17017 August 2023 TMI-2 Solutions, LLC, Three Mile Island Nuclear Station, Unit 2 - NRC Inspection Report 05000320/2023002 ML23216A1742023-08-14014 August 2023 Consultation Letter to David Morrison for TMI-2 ML23216A1732023-08-14014 August 2023 Consultation Letter to Christine Turner for TMI-2 IR 05000289/20230052023-08-14014 August 2023 Constellation Energy Generation, LLC, Three Mile Island Nuclear Station, Unit 1 - NRC Inspection Report 05000289/2023005 ML23216A1782023-08-14014 August 2023 Consultation Letter to Steve Letavic for TMI-2 ML23216A1772023-08-14014 August 2023 Consultation Letter to Rebecca Countess for TMI-2 ML23216A1752023-08-14014 August 2023 Consultation Letter to Joanna Cain for TMI-2 ML23221A1402023-08-0808 August 2023 (TMI-2), Response to Requests for Additional Information for the TMI-2 Post-Shutdown Decommissioning Activities Report, Rev. 5 ML23200A1882023-07-31031 July 2023 TMI-2 Correction Letter Amendment 67 ML23209A7632023-07-28028 July 2023 Letter from PA Shpo to TMI-2 Solutions on Cultural and Historic Impacts of Decommissioning ML23192A8272023-07-10010 July 2023 TMI-2 Solutions, LLC - Response to Shpo Request for Additional Information for Er Project 2021PR03278.006, TMI-2 Decommissioning Project ML23167A4642023-07-0505 July 2023 Letter - TMI-2- Exemption 10 CFR Part 20 Append G Issuance ML23167A0312023-06-28028 June 2023 Acceptance Review and Schedule for the Request for Exemption from a Requirement from 10 CFR 20, Appendix G, Section Iii.E, EPID L-2023-LLE-0016 ML23171B0222023-06-19019 June 2023 (TMI-2) - Notification Pursuant to 10 CFR 72.140(d) Regarding Application of Previously Approved TMI-2 Quality Assurance Program to Independent Spent Fuel Storage Installation Activities ML23137A2822023-05-17017 May 2023 (TMI-2), Request for Exemption from 10 CFR 20, Appendix G, Section Iii.E ML23138A0662023-05-17017 May 2023 TMI-2 NHPA Section 106 Shpo Letter to NRC 5-17-23 ML23026A3132023-05-0202 May 2023 Issuance of Exemption from 10 CFR 70.24 (EPID-L-2023-LLE-0003) ML23121A2492023-05-0101 May 2023 License Amendment Request, Historic and Cultural Resources Review, Response to Request for Additional Information ML23122A1842023-05-0101 May 2023 Shpo_Er_Summary_Letter ML23117A0012023-04-26026 April 2023 Commitment Revision Summary Report 2024-08-27
[Table view] |
Text
September 25, 2017
SUBJECT:
THREE MILE ISLAND NUCLEAR GENERATING STATION, UNIT 1 -
BASELINE SECURITY INSPECTION REPORT 05000289/2017403
Dear Mr. Hanson:
On September 6, 2017, the U.S. Nuclear Regulatory Commission (NRC) completed a security inspection at Three Mile Island Nuclear Generating Station, Unit 1. The NRCs inspectors discussed the results with Mr. Ed Callan, Site Vice President, and other members of your staff.
The results of this inspection are documented in the enclosed report.
The NRCs inspectors documented three findings of very low security significance (Green) in this report. One of these findings involved a violation of NRC requirements. The NRC is treating this violation as a non-cited violation consistent with section 2.3.2.a of the Enforcement Policy.
If you contest the violation or significance of the violation, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001; with copies to the Regional Administrator, Region I; the Director, Office of Enforcement; the Director, Office of Nuclear Security and Incident Response; and the NRCs resident inspector at Three Mile Island Nuclear Generating Station.
Two cross-cutting aspects were assigned to the findings in the areas of Problem Identification and Resolution and Human Performance. Specifically, Exelon failed to take effective corrective actions to address issues in a timely manner [P.3], and Exelon failed to ensure individuals follow processes, procedures, and work instructions [H.8].
If you disagree with a cross-cutting aspect assignment or a finding not associated with a regulatory requirement in this report, you should provide a response within 30 days of the date of this inspection report, with the basis for your disagreement, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001; with copies to the Regional Administrator, Region I; and the NRCs resident inspector at Three Mile Island Nuclear Generating Station.
Enclosure contains Sensitive Unclassified Non-Safeguards Information. When separated from the Enclosure, the transmittal document is decontrolled. This letter will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRCs Public Document Room in accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public Inspections, Exemptions, Requests for Withholding.
However, the enclosed report contains Security-Related Information, so the enclosed report will not be made publically available in accordance with 10 CFR 2.390(d)(1). If you choose to provide a response that contains Security-Related Information, please mark your entire response Security-Related Information - Withhold From Public Disclosure Under 10 CFR 2.390 in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). The NRC is waiving the affidavit requirements for your response in accordance with 10 CFR 2.390(b)(1)(ii).
Sincerely,
/RA/
Raymond R. McKinley, Chief Plant Support Branch 1 Division of Reactor Safety Docket No. 50-289 License No. DPR-50 Enclosure:
Inspection Report No. 05000289/2017403 w/Attachment: Supplemental Information cc w/o encl: w/o OUO-RPT: Distribution via ListServ cc w/encl: w/OUO-RPT:
R. Campbell, Security Manager D. Allard, State Liaison Officer, PA