{{#Wiki_filter:'~,.fl~'~~K'&a&idaho FOAM fog G<50A (Rev.0584)NOTEGRAM We value innovation.
{{#Wiki_filter:'~,. fl
July 23, 1987 TO: T.K.McLellan ORG: NRC/EMEB FROM: ORG: D.I.Monni@S I&C.B.Ransom~EGBG/Mechani cal Systems Evaluations ADDRESS: Bethesda, MD ADDRESS: Idaho Falls, ID TRIP REPORT FOR THE PUMP AND VALVE INSERVICE TESTING PROGRAM WORKING MEETING FOR THE D.C.COOK NUCLEAR POWER STATION UNITS 1 AND 2 On July 14 and 15, 1987, a working meeting was held at the D.C.Cook Nuclear Power Station with the American Electric Power Service Corporation, NRC, and EG&G Idaho, Inc., representatives to discuss the questions resulting from the review of the D.C.Cook Nuclear Power Station, Units 1 and 2, pump and valve inservice testing (IST)programs.Attached is a list of the meeting attendees, the questions that served as an agenda for the meeting, and the responses to those questions as taken from the meeting minutes.The utility representatives were given a brief introduction outlining the agenda and the methods used for the documentation of questions and responses.
  ~'~~K'&a&                   idaho                           NOTEGRAM                                  We value innovation.
This was followed by detailed discussions concerning specific pumps and valves in the D.C.Cook Nuclear Power Station, Units 1 and 2, programs.Those discussions resulted in one open item for the NRC staff.The open item is specifically identified in this trip report.Jm  
FOAM   fog G<50A (Rev. 0584)
July 23, 1987 TO:
ORG:
T. K. McLellan NRC/EMEB FROM:
ORG:
D.
                                                                                & C.
I. Monni@S I B. Ransom EGBG/Mechani cal
                                                                                                  ~
Systems   Evaluations ADDRESS:     Bethesda,   MD                   ADDRESS:     Idaho   Falls, ID TRIP REPORT   FOR THE PUMP AND VALVE INSERVICE TESTING PROGRAM WORKING MEETING FOR THE D.C. COOK NUCLEAR POWER   STATION   UNITS 1 AND 2 On   July 14 and 15, 1987, a working meeting was held at the D. C. Cook Nuclear Power Station with the American Electric Power Service Corporation, NRC, and EG&G Idaho, Inc., representatives to discuss the questions resulting from the review of the D. C. Cook Nuclear Power Station, Units 1 and 2, pump and valve inservice testing ( IST) programs.
Attached is a list of the meeting attendees, the questions that served as an agenda for the meeting, and the responses to those questions as taken from the meeting minutes. The utility representatives were given a brief introduction outlining the agenda and the methods used for the documentation of questions and responses.         This was followed by detailed discussions concerning specific pumps and valves in the D. C. Cook Nuclear Power Station, Units 1 and 2, programs.
Those discussions       resulted in one open item for the NRC staff.         The open item is   specifically identified in this trip report.
Jm


==Attachment:==
==Attachment:==


As Stated E.-.-d H.L.Magleby+fan C.F.Obenchain H.C.Rockhold<7OeiSOOGS 85000Sa5 870806 PDR ADOCV 0 PDR.-...P ATTENDANCE LIST-INSERVICE TESTING PROGRAM WORKING MEETING Plant: D.C.Cook Nuclear Power Station, Units 1 and 2 Dates: July 14 and 15, 1987 Name Terry Postlewait Mary M.Terry T.K.McLellan Ted Sullivan Darrell Monnie Clair Ransom T.L.Cook D.L.Wigginton B.A.Svensson T.R.Stephens Scott Richardson David Climer Roger Rickman Lou Gibson Jim Kobyra Ed Gilabert Dilip Vadodaria Jim Feinstein N.P.Alexich D.J.Moellen Karl J.Toth Clair Manges Satyan Sharma Re resentin ISM Cook ISM Cook NRCNNRR NRCKNRR EG&G Idaho EG&G Idaho EG&G Idaho NRCNNRR ISN Cook ISM Cook I&M Cook ISN Cook ISN Cook ISN Cook AEPSC AEPSC AEPSC AEPSC AEPSC AEPSC AEPSC AEPSC AEPSC WORKING MEETING MINUTES D.C.COOK NUCLEAR POWER STATION, UNITS 1 AND 2 JULY 14 AND 15, 1987 D.C.COOK NUCL'EAR POWER STATION, UNITS 1 AND 2 PUMP AND VALVE INSERVICE TESTING PROGRAM QUESTIONS, COMMENTS, AND RESOLUTIONS 1.VALVE TESTING PROGRAM A.General uestions and Comments 1.List any valves that are Appendix J, Type C, leak rate tested that are not included in the D.C.Cook IST programs?Resolution:
As Stated E . . d H. L. Magleby +fan C. F. Obenchain H. C. Rockhold
All valves, except those excluded by IWV-1200, that are Appendix J, Type C, leak rate tested are included in the D.C.Cook IST program.2.The entry in the test mode column of the valve listing table is often misleading because it does not always reflect the frequency at which the Code testing requirements are being met (as an example, listing a"P" for testing during power operations when a valve is being partial-stroke exercised quarterly and full-stroke exercised during refueling outages leads a person to believe that the testing is completed quarterly, when in actuality it is not completed until the refueling outage).Resolution:
                <7OeiSOOGS 870806 85000Sa5 PDR     ADOCV   0     PDR   .- ...
Procedures are prepared for the detailed testing.These procedures identify the required testing and the associated testing frequency.
P
3.How does the SLT-1 seat leakage test differ from the leak'rate testing requirements of Section XI, Paragraph IWV-3420?
 
ATTENDANCE LIST
                - INSERVICE TESTING PROGRAM WORKING MEETING Plant: D. C. Cook Nuclear Power Station, Units   1 and 2 Dates: July 14 and 15, 1987 Name                         Re resentin Terry Postlewait                     ISM Cook Mary M. Terry                       ISM Cook T. K. McLellan                       NRCNNRR Ted   Sullivan                       NRCKNRR Darrell Monnie                       EG&G Idaho Clair   Ransom                       EG&G Idaho T. L. Cook                         EG&G Idaho D. L. Wigginton                   NRCNNRR B. A. Svensson                     ISN Cook T. R. Stephens                     ISM Cook Scott Richardson                     I&M Cook David Climer                         ISN Cook Roger Rickman                       ISN Cook Lou Gibson                           ISN Cook Jim Kobyra                           AEPSC Ed   Gilabert                       AEPSC Dilip Vadodaria                     AEPSC Jim Feinstein                       AEPSC N. P. Alexich                     AEPSC D. J. Moellen                     AEPSC Karl J. Toth                         AEPSC Clair   Manges                       AEPSC Satyan Sharma                       AEPSC
 
WORKING MEETING MINUTES D. C. COOK NUCLEAR POWER STATION, UNITS 1 AND 2 JULY 14 AND 15, 1987
 
D. C. COOK NUCL'EAR POWER STATION, UNITS 1 AND 2 PUMP AND VALVE INSERVICE TESTING PROGRAM QUESTIONS, COMMENTS, AND RESOLUTIONS
: 1. VALVE TESTING PROGRAM A. General   uestions and Comments
: 1. List any valves that are Appendix J,   Type C, leak rate tested that are not included in the     D. C. Cook IST programs?
Resolution:
Resolution:
The SLT-1 testing designation refers to testing as per Section XI requirements.
All valves, except those excluded    by IWV-1200,  that are Appendix J, Type C, leak rate tested are included in the D. C. Cook IST program.
The technical specifications identify as PIVs the same four valves identified in the first 10-year IST program.4.Has Testing Procedure No.12THP-4030-STP-237 been approved by the NRC staff to be used in lieu of the Appendix J testing for those valves identified for the SLT-2A seat leakage test?Resolution:
: 2. The  entry in the test mode column of the valve listing table is often misleading because it does not always reflect the frequency at which the Code testing requirements are being met (as an example, listing a "P" for testing during power operations when a valve is being partial-stroke exercised quarterly and full-stroke exercised during refueling outages leads a person to believe that the testing is completed quarterly, when in actuality it is not completed until the refueling outage).
The procedure has previously been approved by NRC.The procedure will be described in the revised IST program and the history of procedure approval wi 11 be described.
5.Test method EF-8 is identified to be performed on a cold shutdown frequency in the introduction, however, in the valve listing table it is sometimes identified for a refueling outage frequency.
Resolution:
Resolution:
The definition of EF-8 will be modified to include refueling outage frequency.
Procedures  are prepared for the detailed testing. These procedures  identify the required testing and the associated testing frequency.
6.What criteria is utilized for assigning limiting values of full-stroke time for power operated valves?Resolution:
: 3. How does  the SLT-1 seat leakage test differ from the leak 'rate testing requirements of Section XI, Paragraph IWV-3420?
The design data, manufacturers data and FSAR requirements have been reviewed and factored into the program.The average of 4 stroke times was determined for a valve.The limiting stroke time is 150%of the average time which is more restrictive than the code for valves that are trended.
 
Designated fast acting valves with less than a 2 second stroke time are not trended and are treated as fast acting valves as per the NRC method for fast acting valves.The licensee will provide a summary of the criteria used for assigning limiting values of the full-stroke time in the IST program resubmittal.
B.Main Steam S stem 1.What percentage of the steam flow required through valves MS-108-2 and-3 for the turbine driven auxiliary feedwater pump to pump 900 gpm into the steam generators at operating pressures is needed to pump 700 gpm through the pump test flow path?On what basis is this partial flow test considered sufficient to verify the full-stroke capability of these valves (refer to main steam system Note 2)?Resolution:
Ninety percent of the design steam flow is needed to pump 700 gpm.The relief request will be modified to provide a more detailed justification and basis for the impracticality of full-stroke exercising the valves.2.Radiography may be an acceptable alternate testing method to determine valve disk position, however, the reviewers are not aware of a method of testing by radiography that provides a reasonable assur ance of the reverse flow closure capability of check valves that perform a safety function in the closed position.How can radiography be used to assure the reverse flow capability of valves MS-108-2 and-3?Resolution:
The licensee will provide a detailed justification to support the use of radiography to provide assurance of valve full-stroking.
Also, the licensee will describe the method used to sample the valves and group the valves for disassembly.
C.Feedwater S stem 1.What flowrate is established through the pump test flow paths during the quarterly testi ng of the motor driven auxiliary feedwater pumps?What is the design accident flowrate through check valves FW-124 and-128?Resolution:
Greater than design accident flow is established during testing.2.How is it verified that sufficient flow pa'sses through valves FW-153 and-160 to full-stroke them open with flow quarterly?
Resolution:
Resolution:
A pressure decrease is used to determine that flow is established in the mini-flow linc'he test method for.stroking the valves will be described in the IST program.3.What is the safety related function of valve 12-CRV-51?
The SLT-1  testing designation refers to testing as per Section XI requirements. The technical specifications identify as PIVs the same four valves identified in the first  10-year IST program.
: 4. Has Testing Procedure No. 12THP-4030-STP-237 been approved by the NRC staff to be used in lieu of the Appendix J testing for those valves identified for the SLT-2A seat leakage test?
Resolution:
The procedure  has previously  been approved by NRC. The procedure will be described in the revised IST program and the history of procedure approval wi 11 be described.
: 5. Test method EF-8 is identified to be performed on a cold shutdown frequency in the introduction, however, in the valve listing table    it is sometimes identified for a refueling outage frequency.
Resolution:
The  definition of  EF-8 will  be  modified to include refueling outage frequency.
: 6. What  criteria is utilized for assigning limiting      values of full-stroke time for power operated valves?
Resolution:
The design    data, manufacturers data and FSAR requirements have been reviewed and factored into the program.        The average of 4 stroke times was determined for a valve. The limiting stroke time is 150% of the average time which is more restrictive than the code for valves that are trended.
 
Designated fast acting valves with less than a 2 second stroke time are not trended and are treated as fast acting valves as per the NRC method for fast acting valves. The licensee will provide a summary of the criteria used for assigning limiting values of the full-stroke time in the IST program resubmittal.
B. Main Steam S stem
: 1. What percentage    of the steam flow required through valves MS-108-2 and -3 for the turbine driven auxiliary feedwater pump to pump 900 gpm into the steam generators at operating pressures is needed to pump 700 gpm through the pump test flow path? On what basis is this partial flow test considered sufficient to verify the full-stroke capability of these valves (refer to main steam system Note 2)?
Resolution:
Ninety percent of the design steam flow is needed to pump 700 gpm. The relief request will be modified to provide a more detailed justification and basis for the impracticality of full-stroke exercising the valves.
: 2. Radiography may be an acceptable alternate testing method to determine valve disk position, however, the reviewers are not aware  of a method  of testing by radiography that provides a reasonable assur ance of the reverse flow closure capability of check valves that perform a safety function in the closed position. How can radiography be used to assure the reverse flow capability of valves MS-108-2 and -3?
Resolution:
The  licensee will provide a detailed justification to support the use of radiography to provide assurance of valve full-stroking. Also, the licensee will describe the method
 
used  to sample the valves    and group the valves        for disassembly.
C. Feedwater  S stem
: 1. What  flowrate is established through the pump test flow paths during the quarterly testi ng of the motor driven auxiliary feedwater pumps? What is the design accident flowrate through check valves FW-124 and -128?
Resolution:
Greater than design accident flow is established            during testing.
: 2. How  is  it verified  that sufficient flow    pa'sses    through valves FW-153 and -160    to full-stroke them    open  with flow quarterly?
Resolution:
A pressure decrease is used to determine that flow is established in the mini-flow     linc'he         test method for.
stroking the valves will be described in the IST program.
: 3. What   is the safety related function of valve           12-CRV-51?
Re'solution:
Re'solution:
The IST,.program will be amended to show the valve safety function is closed and it will be tested as per Code requirements.
The IST,. program will be amended   to show   the valve safety function is closed   and it will be tested as per Code requirements.
4 The NRC staff position is that verification of the maximum flow rate through a check valve identified in any of the plant's safety analyses would be an adequate demonstration of the full-stroke capability of the valve.Provide a detailed technical justification why this cannot be done to quarterly full-stroke exercise valves FW-134 and-135.Resolution:
4   The NRC   staff position is that verification of         the maximum flow rate through a check valve identified in any of the plant's safety analyses would be an adequate demonstration of the full-stroke capability of the valve. Provide a detailed
The licensee will provide additional justification for not testing these valves as per Section XI requirements.
 
5~Is credit taken for the reverse flow closure of any of the check valves in the flow paths of the auxiliary feedwater pumps to the steam generators?
technical   justification why this cannot be done to quarterly full-stroke exercise valves FW-134 and -135.
If so, how are these valves individually verified to close?Resolution:
Resolution:
The temperature of the auxiliary feed line is monitored to determine valve closure at least quarterly.
The   licensee   will provide additional justification for   not testing these valves       as per Section XI requirements.
This method will be described in the IST program and the closed safety function of the appropriate valves will be identified that are tested using this method.D.Essential Service Water S stem If valves ESW-101E and-101W perform a safety function in the closed position to prevent reverse flow through an idle pump, they must be tested to the closed position to verify their ability to perform that function.Resolution:
5 ~ Is credit taken for the reverse flow closure of any of the check valves in the flow paths of the auxiliary feedwater pumps to the steam generators?       If so, how are these valves individually verified to close?
The ESW trains are not cross-connected and further information is not required.
Resolution:
E.Reactor Coolant S stem 1.Provide a more detailed technical justification for not exercising valves NS0-021,-022,-023, and-024 during cold shutdowns.
The temperature       of the auxiliary feed line is monitored to determine valve closure at least quarterly. This method will be described in the IST program and the closed safety function of the appropriate valves will be identified that are tested using       this method.
D. Essential Service Water   S stem If valves     ESW-101E and -101W     perform a safety function in the closed position to prevent reverse flow through an idle pump, they must be tested to the closed position to verify their ability to perform that function.
Resolution:
The   ESW   trains are not cross-connected   and further information is not required.
 
E. Reactor Coolant S stem
: 1. Provide   a more detailed technical justification for not exercising valves NS0-021, -022, -023,       and -024 during cold shutdowns.
Resolution:
Resolution:
Justification will be provided in the IST program for not testing these valves during cold shutdowns.
Justification will     be provided in the IST program for not testing these valves during cold shutdowns.
2.Provide a more detailed technical justification for not exercising valves NS0-061,-062,-063, and-064 during cold shutdowns.
: 2. Provide   a more   detailed technical justification for not exercising valves NS0-061, -062, -063,       and -064 during cold shutdowns.
Resolution:
Resolution:
Same as Item E.1 except the referenced information in the technical specification will be included in the IST program.F.Chemical and Volume Control S stem l.Explain how radiography can be used to verify reverse flow closure of check valve CS-292.Resolution:
Same   as Item E. 1 except the referenced information in the technical specification will be included in the IST program.
Justification for using radiography to test this valve will be provided in'the IST program.A radiograph of this valve was examined.The radiograph showed that the valve was in the closed position and thus provided visual observation of valve closure.2.What is the safety function of control valves HARV-200 and-251?The NRC staff position is that requests for relief will not be  
F. Chemical and Volume Control     S stem
: l. Explain how radiography can be used to verify reverse flow closure of check valve CS-292.
Resolution:
Justification for using radiography to test this valve will be provided in'the IST program.       A radiograph of this valve was examined.     The radiograph showed that the valve was in the closed position and thus provided visual observation of valve closure.
: 2. What is the safety function of control valves HARV-200 and -251?
The NRC staff position is that requests       for relief will not be


evaluated for valves that do not perform a safety related function.Resolution:
evaluated for valves that do not perform       a safety related function.
Valves (}RV-200 and-251 are used for emergency boration in Modes 5 and 6 and should be in the IST program.Note 7 for valves gMO-200 and-201 will be corrected in the ISTprogram.
The function of valves HARV-200 and-251 will be reevaluated and Notes 8 and 9 may be deleted.If these notes aren't deleted they will be modified to show impracticality of testing.G.Post Accident Sam lin S stem l.Unless valve NS-283 is verified in the closed position during the quarterly exercising test, relief is still required from the Section XI requirement to full-stroke exercise this check valve quarterly.
Resolution:
Resolution:
The valve list will be revised to show that relief is requested.
Valves (}RV-200 and -251 are used for emergency boration in Modes 5 and 6 and should be in the IST program.         Note 7 for valves gMO-200 and -201 will be corrected in the ISTprogram. The function of valves   HARV-200 and -251  will be reevaluated and Notes 8 and 9 may be deleted.         If these notes aren't deleted they will be modified to       show impracticality of testing.
In addition, closure testing of other check valves will be reviewed to see that relief is being requested as appropriate and included in the IST program.H.Emer enc Core Coolin S stem 1.If valves IM0-51,-52,-53, and-54 are ever required to change position to accomplish a specific function, they are not passive and must be exercised in accordance with the Code.Resolution:
G. Post Accident  Sam lin  S  stem
These valves are passive and, therefore, need not be included in the program.
: l. Unless valve NS-283    is verified in the closed position during the quarterly exercising test, relief is still required from the Section XI requirement to full-stroke exercise this check valve quarterly.
2.The use of IWV-3416 in emergency core cooling Note 2 for valves IMO-128 and ICM-129 is not appropriate since the RHR system is not out of service during power operations.
An adequate justification is provided in the note which demonstrates the impracticality of exercising these valves during power operations and they should, therefore, be exercised on a cold shutdown frequency as provided for in the Code.Resolution:
The last sentence in Note 2 will be deleted to eliminate reference to IWV-3416.The note will be modified to identify and justify valve testing during shutdown.3.If.valve N-102 is opened during power operations to add nitrogen to the safety injection accumulators, then it is not a passive valve and should be tested to the requirements of IW-3520 unless relief is requested from the Code requirements.
Resolution:
Resolution:
This is an active valve and a relief request will be provided for exercising the valve.4.If any credit is taken for closing valves IM0-110,-120,-130, and-140 in order to allow the reduction of RCS pressure to permit the RHR system to be placed into operation in the recirculation mode, they perform an active safety function and should be included in the IST program.Resolution:
The  valve list will be revised to show that relief is requested. In addition, closure testing of other check valves will be reviewed to see that relief is being requested as appropriate and included in the IST program.
This is an open item for the NRC to determine whether these valves must be included in the program as active valves.  
H. Emer enc  Core Coolin    S  stem
: 1. If valves    IM0-51, -52, -53, and -54 are ever required to change position to accomplish a specific function, they are not passive and must be exercised in accordance with the Code.
Resolution:
These valves are passive    and, therefore,    need not be included in the program.
: 2. The use  of  IWV-3416  in emergency core cooling Note 2 for valves IMO-128 and ICM-129 is not appropriate since the RHR system is not out of service during power operations. An adequate justification is provided in the note which demonstrates the impracticality of exercising these valves during power operations and they should, therefore, be exercised on a cold shutdown frequency as provided for in the Code.
Resolution:
The  last sentence  in Note  2 will be deleted to eliminate reference to IWV-3416. The note will be modified to identify and justify valve testing during shutdown.
: 3. If. valve  N-102  is opened during power operations to add nitrogen to the safety injection accumulators, then it is not a passive valve and should be tested to the requirements of IW-3520 unless relief is requested from the Code requirements.
Resolution:
This is an active valve and a relief request     will be provided for exercising the valve.
: 4. If any   credit is taken for closing valves     IM0-110, -120, -130, and -140   in order to allow the reduction of RCS pressure to permit the RHR system to be placed into operation in the recirculation mode, they perform an active safety function and should be included in the IST program.
Resolution:
This is an open item for the NRC to determine whether these valves must be included in the program as active valves.
: 5. Is credit taken in any accident analysis for shifting low pressure safety injection (RHR) pump suction from the refueling water storage tank to the containment recirculation sump? If so, valve IMO-390 performs an active safety function to isolate the suction from the RWST and should be tested in accordance with the Code.
Resolution:
Valves IMO-310 and -320 are required to close and isolate the pump suction from the RWST, therefore, IMO-390 does not have    to  be in the program.
6.. Have system        modifications  been performed to allow full-stroke exercising check valve SI-148 in accordance with the Code without jeopardizing the availability of other safety systems?
Resolution:
The    licensee will rewrite the basis for requesting relief and will include in the resubmittal the resolution of the air entrainment problem identified in the SER for the first 10-year interval.
: 7. Provide      a more    detailed technical justification for not full-stroke exercising valves SI-158-L1, -L2, -L3, and -L4 during cold shutdowns.
Resolution:
The    licensee will add a justification for not full-stroking these valves during cold shutdown to Note 12.
: 8. Provide    a more    detailed technical justification for not full-stroke exercising valves SI-161-L1, -L2, -L3, and -L4 during cold shutdowns.


5.Is credit taken in any accident analysis for shifting low pressure safety injection (RHR)pump suction from the refueling water storage tank to the containment recirculation sump?If so, valve IMO-390 performs an active safety function to isolate the suction from the RWST and should be tested in accordance with the Code.Resolution:
Valves IMO-310 and-320 are required to close and isolate the pump suction from the RWST, therefore, IMO-390 does not have to be in the program.6..Have system modifications been performed to allow full-stroke exercising check valve SI-148 in accordance with the Code without jeopardizing the availability of other safety systems?Resolution:
The licensee will rewrite the basis for requesting relief and will include in the resubmittal the resolution of the air entrainment problem identified in the SER for the first 10-year interval.7.Provide a more detailed technical justification for not full-stroke exercising valves SI-158-L1,-L2,-L3, and-L4 during cold shutdowns.
Resolution:
Resolution:
The licensee will add a justification for not full-stroking these valves during cold shutdown to Note 12.8.Provide a more detailed technical justification for not full-stroke exercising valves SI-161-L1,-L2,-L3, and-L4 during cold shutdowns.
Same  as Item H.7.
: 9. Provide the detailed technical justification for not full or partial-stroke exercising valves SI-170-L1, -L2, -L3, and -L4 either quarterly during power operations or during cold shutdowns.
Resolution:
Resolution:
Same as Item H.7.9.Provide the detailed technical justification for not full or partial-stroke exercising valves SI-170-L1,-L2,-L3, and-L4 either quarterly during power operations or during cold shutdowns.
The  licensee will provide a more detailed justification including identifying partial-stroking during cold shutdown.
: 10. If valves   ICM-311 and -321 are ever    required to change position to accomplish a specific function, they are not passive and must be exercised in accordance with the Code.
Resolution:
Resolution:
The licensee will provide a more detailed justification including identifying partial-stroking during cold shutdown.10.If valves ICM-311 and-321 are ever required to change position to accomplish a specific function, they are not passive and must be exercised in accordance with the Code.Resolution:
These valves do not have     to change position, are passive, and do   not have to be included in the program.
These valves do not have to change position, are passive, and do not have to be included in the program.I.Containment S ra S stem 1.The NRC staff has concluded that a valve sample disassembly and inspection utilizing a manual full-stroke exercise of the valve disk is an acceptable method to verify a check valve's full-stroke capability.
I. Containment   S ra S stem
This program involves grouping similar valves together and testing one valve in each group during each refueling outage.The sampling technique requires that each valve in the group be of the same design (manufacturer, size, model number and materials of construction) and have the same service conditions.
: 1. The   NRC staff has concluded that a valve sample disassembly and inspection utilizing a manual full-stroke exercise of the valve disk is an acceptable method to verify a check valve's full-stroke capability. This program involves grouping similar valves together and testing one valve in each group during each refueling outage. The sampling technique requires that each valve in the group be of the same design (manufacturer, size, model number and materials of construction) and have the same service conditions. Additionally, at each disassembly         it must be verified that the disassembled valve is capable of full-stroking and that its internals are structurally sound (no loose or corroded parts).
Additionally, at each disassembly it must be verified that the disassembled valve is capable of full-stroking and that its internals are structurally sound (no loose or corroded parts).10 A different valve of each group is required to be disassembled, inspected and manually full-stroke exercised at each refueling outage, until the entire group has been tested.If it is found that the disassembled valve's full-stroke capability is in question, the remainder of the valves in that group must also be disassembled, inspected and manually full-stroke exer cised during the same outage.Are valves CTS-103E,-103W,-138E, and-138W grouped together for sample disassembly and inspection?
10
, These valves do not appear to meet, the NRC staff's criteria for grouping as explained above.Resolution:
 
The licensee will either sample, group, inspect, and disassemble valves as per the stated NRC position or justify a deviation from this position.2.Are valves CTS-127E,-127W,-131E, and-131W, and valves RH-141 and-142 grouped together for sample disassembly and inspection?
A different valve of       each group is required to be disassembled, inspected and manually full-stroke exercised at each refueling outage, until the entire group has been tested.               If it is found that the disassembled valve's full-stroke capability is in question, the remainder of the valves in that group must also be disassembled, inspected and manually         full-stroke   exer cised during the same outage.
These valves do not appear to meet the NRC staff's criteria for grouping as explained in guestion I.1 above.Resolution:
Are valves CTS-103E, -103W, -138E, and -138W grouped together for sample disassembly and inspection?         , These valves do not appear to meet, the NRC staff's criteria for grouping as explained above.
Same as Item I.l.J.Weld Channel Pressurization S stem 1.If valves CA-181-N and-S are opened during power operations, then they are not passive valves and should be tested to the requirements of IWV-3520 unless relief is requested from the Code requirements.
Resolution:
11 Resolution:
The   licensee   will either   sample, group, inspect, and disassemble     valves as per the stated     NRC position   or justify a deviation from this position.
These valves are not opened during power operation and are passive and need not be exercised.
: 2. Are valves CTS-127E, -127W, -131E, and -131W, and valves RH-141 and -142 grouped together for sample disassembly and inspection?
K.Ice Condenser Refri eration S stem 1.Unless valves R-156 and-157 are verified in the closed position during the quarterly exercising test, relief is still required from the Section XI requirement to full-stroke exercise these check valves quarterly.
These valves do not appear         to meet the NRC staff's     criteria for grouping as       explained in guestion I. 1 above.
Resolution:
Resolution:
The valve list will be changed to indicate relief is being requested and the basis for relief will be modified to include additional technical justifications L.Emer enc Diesel Generator Subs stems 1.Provide a more detailed technical justification for not measuring the stroke times for the following valves quarterly during power operations.
Same  as Item  I.l.
Explain how the proposed testing individually verifies the operability of these valves.Do these valves have required fail-safe positions?
J. Weld Channel  Pressurization    S  stem
XRV-220 XRV-225 XRV-221 XRV-226 XRV-222 XRV-227 Resolution:
: 1. If valves     CA-181-N and -S are opened during power          operations, then they are not passive valves and should be              tested to the requirements of IWV-3520 unless relief is requested              from the Code requirements.
The licensee will provide a more detailed technical justification for not measuring the stroke time of these valves.The licensee will review the fail-safe position of these valves and, if appropriate, provide a relief request for not fail-safe testing these valves.12
11


2.Review the safety related function of valves 2-DG-102C and-104C (P8ID 2-5151D-26 coordinates H-4 and F-4)to determine if they should be included in the IST program.Resolution:
These valves will be included in the licensee's IST program.N.Com ressed Air S stem 1.What are the consequences of loss of containment control air that make the quarterly testing of valves XCR-100,-101,-102, and-103 impractical?
Resol uti on: The licensee will provide a more detailed technical justification that shows that full-stroking these valves during power operation is impractical and will include a discussion of the consequences of loss of containment control air during operation.
'.Boron Nake-u S stem l.If valves CS-415-1,-2,'-3, and-4 perform a safety function in the closed position to prevent reverse flow through an idle boric acid transfer pump, they must be tested to the closed position to verify their ability to perform that function.Resolution:
These valves do not have a safety function in the closed position and, therefore, do not have to be tested to the closed position.13 0.S ent fuel Pit Coolin and Clean-u S stem 1.If valves SF-118N and S per form a safety function in the closed position to prevent reverse flow through an idle spent fuel pit pump, they must be tested to the closed position to verify their ability to perform that function.Resolution:
These valves do not have a safety function in the closed position because sufficient water will pass through the heat exchanger prior to returning to the fuel storage pool.P.HDS Vents and Drains S stem 1.Provide a more detailed technical justification for not exercising valve N-160 during cold shutdowns.
Resolution:
Resolution:
The licensee will provide justification for testing this valve during cold shutdowns.
These valves are not opened    during power operation  and are passive and need not be    exercised.
(}.PAL Sam lin and Instrumentation S stem 1.Reduction of redundancy is not an adequate justification for not performing the Code required testing;how long can one of the lower containment radiation monitor trains be inoperable before action must be taken?Resolution:
K. Ice Condenser Refri eration    S stem
The inlet valves will be tested as per the requirements of Section&#xc3;I and relief will be requested for the valve in the common return line.Both trains are not required to be in continuous operation by the technical specifications as there is a 30 day LCO.Also, additional justification will be provided in the relief request for valve SM-1.
: 1. Unless valves R-156 and -157      are  verified in the closed position during the quarterly exercising test, relief is still required from the Section XI requirement to full-stroke exercise these check valves    quarterly.
2.PUMP TESTING PROGRAM 1.Lack of installed instrumentation is not an adequate justification for not measuring the pump flowrate for the spent pool pit cooling pumps (refer to pump Code Relief Request III).Provide a more detailed technical justification for not measuring this Code required parameter to allow the detection of pump degradation.
Resolution:
The  valve list will be changed to indicate relief is being requested and the basis for relief will be modified to include additional technical justifications L. Emer enc  Diesel Generator  Subs stems
: 1. Provide a more detailed technical justification for not measuring the stroke times for the following valves quarterly during power operations. Explain how the proposed testing individually verifies the operability of these valves. Do these valves have required fail-safe positions?
XRV-220                    XRV-221                  XRV-222 XRV-225                    XRV-226                  XRV-227 Resolution:
The   licensee  will  provide a more detailed technical justification for not measuring the stroke time of these valves. The licensee will review the fail-safe position of these valves and,    if appropriate, provide a relief request for not fail-safe testing these valves.
12
: 2. Review the    safety related function of valves 2-DG-102C        and -104C (P8ID 2-5151D-26 coordinates H-4 and F-4) to determine            if they should be included in the IST program.
Resolution:
These valves    will  be  included in the licensee's    IST program.
N. Com  ressed  Air  S  stem
: 1. What are the consequences        of loss of containment control air that make the quarterly testing of valves XCR-100, -101, -102, and
    -103 impractical?
Resol  uti on:
The  licensee    will provide  a more  detailed technical justification that      shows  that full-stroking these valves during power operation is impractical and will include a discussion of the consequences of loss of containment control air during operation.
                      '. Boron Nake-u    S  stem
: l. If valves    CS-415-1, -2, '-3, and -4 perform      a  safety function in the closed position to prevent reverse flow through an idle boric acid transfer pump, they must be tested to the closed position to verify their ability to perform that function.
Resolution:
These valves do not have a        safety function in the closed position and, therefore, do not have to be tested to the closed position.
13
: 0.      S  ent fuel    Pit Coolin    and Clean-u    S  stem
: 1. If valves      SF-118N and    S  per form a  safety function in the closed position to prevent reverse flow through an idle spent fuel pit pump, they must be tested to the closed position to verify their ability to perform that function.
Resolution:
These valves do not have a            safety function in the closed position because sufficient water will pass through the heat exchanger prior to returning to the fuel storage pool.
P. HDS  Vents and Drains    S stem
: 1. Provide    a more      detailed technical justification for not exercising valve N-160 during cold shutdowns.
Resolution:
The    licensee will provide justification for testing this valve during cold shutdowns.
(}. PAL Sam   lin   and   Instrumentation   S stem
: 1. Reduction of redundancy is not an adequate justification for not performing the Code required testing; how long can one of the lower containment radiation monitor trains be inoperable before action must be taken?
Resolution:
The     inlet     valves will be tested as per the requirements of Section &#xc3;I and         relief will be requested for the valve in the common       return line. Both trains are not required to be in continuous operation by the technical specifications as there is a 30 day LCO. Also, additional justification will be provided in the relief request for valve SM-1.
: 2. PUMP TESTING PROGRAM
: 1. Lack of installed instrumentation is not an adequate justification for not measuring the pump flowrate for the spent pool pit cooling pumps (refer to pump Code Relief Request III).
Provide a more detailed technical justification for not measuring this Code required parameter to allow the detection of pump degradation.
Resolution:
Resolution:
More detailed justification will be included in the relief request.15}}
More detailed justification will be included in the relief request.
15}}

Latest revision as of 05:55, 29 October 2019

Trip Rept of 870714-15 Visit to Plant Re Pump & Valve Inservice Testing Program.List of Attendees Encl
ML17325A256
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 07/23/1987
From: Monnie D, Ransom C
EG&G IDAHO, INC.
To: Mclellan T
NRC
Shared Package
ML17325A255 List:
References
NUDOCS 8708130058
Download: ML17325A256 (21)


Text

'~,. fl

~'~~K'&a& idaho NOTEGRAM We value innovation.

FOAM fog G<50A (Rev. 0584)

July 23, 1987 TO:

ORG:

T. K. McLellan NRC/EMEB FROM:

ORG:

D.

& C.

I. Monni@S I B. Ransom EGBG/Mechani cal

~

Systems Evaluations ADDRESS: Bethesda, MD ADDRESS: Idaho Falls, ID TRIP REPORT FOR THE PUMP AND VALVE INSERVICE TESTING PROGRAM WORKING MEETING FOR THE D.C. COOK NUCLEAR POWER STATION UNITS 1 AND 2 On July 14 and 15, 1987, a working meeting was held at the D. C. Cook Nuclear Power Station with the American Electric Power Service Corporation, NRC, and EG&G Idaho, Inc., representatives to discuss the questions resulting from the review of the D. C. Cook Nuclear Power Station, Units 1 and 2, pump and valve inservice testing ( IST) programs.

Attached is a list of the meeting attendees, the questions that served as an agenda for the meeting, and the responses to those questions as taken from the meeting minutes. The utility representatives were given a brief introduction outlining the agenda and the methods used for the documentation of questions and responses. This was followed by detailed discussions concerning specific pumps and valves in the D. C. Cook Nuclear Power Station, Units 1 and 2, programs.

Those discussions resulted in one open item for the NRC staff. The open item is specifically identified in this trip report.

Jm

Attachment:

As Stated E . . d H. L. Magleby +fan C. F. Obenchain H. C. Rockhold

<7OeiSOOGS 870806 85000Sa5 PDR ADOCV 0 PDR .- ...

P

ATTENDANCE LIST

- INSERVICE TESTING PROGRAM WORKING MEETING Plant: D. C. Cook Nuclear Power Station, Units 1 and 2 Dates: July 14 and 15, 1987 Name Re resentin Terry Postlewait ISM Cook Mary M. Terry ISM Cook T. K. McLellan NRCNNRR Ted Sullivan NRCKNRR Darrell Monnie EG&G Idaho Clair Ransom EG&G Idaho T. L. Cook EG&G Idaho D. L. Wigginton NRCNNRR B. A. Svensson ISN Cook T. R. Stephens ISM Cook Scott Richardson I&M Cook David Climer ISN Cook Roger Rickman ISN Cook Lou Gibson ISN Cook Jim Kobyra AEPSC Ed Gilabert AEPSC Dilip Vadodaria AEPSC Jim Feinstein AEPSC N. P. Alexich AEPSC D. J. Moellen AEPSC Karl J. Toth AEPSC Clair Manges AEPSC Satyan Sharma AEPSC

WORKING MEETING MINUTES D. C. COOK NUCLEAR POWER STATION, UNITS 1 AND 2 JULY 14 AND 15, 1987

D. C. COOK NUCL'EAR POWER STATION, UNITS 1 AND 2 PUMP AND VALVE INSERVICE TESTING PROGRAM QUESTIONS, COMMENTS, AND RESOLUTIONS

1. VALVE TESTING PROGRAM A. General uestions and Comments
1. List any valves that are Appendix J, Type C, leak rate tested that are not included in the D. C. Cook IST programs?

Resolution:

All valves, except those excluded by IWV-1200, that are Appendix J, Type C, leak rate tested are included in the D. C. Cook IST program.

2. The entry in the test mode column of the valve listing table is often misleading because it does not always reflect the frequency at which the Code testing requirements are being met (as an example, listing a "P" for testing during power operations when a valve is being partial-stroke exercised quarterly and full-stroke exercised during refueling outages leads a person to believe that the testing is completed quarterly, when in actuality it is not completed until the refueling outage).

Resolution:

Procedures are prepared for the detailed testing. These procedures identify the required testing and the associated testing frequency.

3. How does the SLT-1 seat leakage test differ from the leak 'rate testing requirements of Section XI, Paragraph IWV-3420?

Resolution:

The SLT-1 testing designation refers to testing as per Section XI requirements. The technical specifications identify as PIVs the same four valves identified in the first 10-year IST program.

4. Has Testing Procedure No. 12THP-4030-STP-237 been approved by the NRC staff to be used in lieu of the Appendix J testing for those valves identified for the SLT-2A seat leakage test?

Resolution:

The procedure has previously been approved by NRC. The procedure will be described in the revised IST program and the history of procedure approval wi 11 be described.

5. Test method EF-8 is identified to be performed on a cold shutdown frequency in the introduction, however, in the valve listing table it is sometimes identified for a refueling outage frequency.

Resolution:

The definition of EF-8 will be modified to include refueling outage frequency.

6. What criteria is utilized for assigning limiting values of full-stroke time for power operated valves?

Resolution:

The design data, manufacturers data and FSAR requirements have been reviewed and factored into the program. The average of 4 stroke times was determined for a valve. The limiting stroke time is 150% of the average time which is more restrictive than the code for valves that are trended.

Designated fast acting valves with less than a 2 second stroke time are not trended and are treated as fast acting valves as per the NRC method for fast acting valves. The licensee will provide a summary of the criteria used for assigning limiting values of the full-stroke time in the IST program resubmittal.

B. Main Steam S stem

1. What percentage of the steam flow required through valves MS-108-2 and -3 for the turbine driven auxiliary feedwater pump to pump 900 gpm into the steam generators at operating pressures is needed to pump 700 gpm through the pump test flow path? On what basis is this partial flow test considered sufficient to verify the full-stroke capability of these valves (refer to main steam system Note 2)?

Resolution:

Ninety percent of the design steam flow is needed to pump 700 gpm. The relief request will be modified to provide a more detailed justification and basis for the impracticality of full-stroke exercising the valves.

2. Radiography may be an acceptable alternate testing method to determine valve disk position, however, the reviewers are not aware of a method of testing by radiography that provides a reasonable assur ance of the reverse flow closure capability of check valves that perform a safety function in the closed position. How can radiography be used to assure the reverse flow capability of valves MS-108-2 and -3?

Resolution:

The licensee will provide a detailed justification to support the use of radiography to provide assurance of valve full-stroking. Also, the licensee will describe the method

used to sample the valves and group the valves for disassembly.

C. Feedwater S stem

1. What flowrate is established through the pump test flow paths during the quarterly testi ng of the motor driven auxiliary feedwater pumps? What is the design accident flowrate through check valves FW-124 and -128?

Resolution:

Greater than design accident flow is established during testing.

2. How is it verified that sufficient flow pa'sses through valves FW-153 and -160 to full-stroke them open with flow quarterly?

Resolution:

A pressure decrease is used to determine that flow is established in the mini-flow linc'he test method for.

stroking the valves will be described in the IST program.

3. What is the safety related function of valve 12-CRV-51?

Re'solution:

The IST,. program will be amended to show the valve safety function is closed and it will be tested as per Code requirements.

4 The NRC staff position is that verification of the maximum flow rate through a check valve identified in any of the plant's safety analyses would be an adequate demonstration of the full-stroke capability of the valve. Provide a detailed

technical justification why this cannot be done to quarterly full-stroke exercise valves FW-134 and -135.

Resolution:

The licensee will provide additional justification for not testing these valves as per Section XI requirements.

5 ~ Is credit taken for the reverse flow closure of any of the check valves in the flow paths of the auxiliary feedwater pumps to the steam generators? If so, how are these valves individually verified to close?

Resolution:

The temperature of the auxiliary feed line is monitored to determine valve closure at least quarterly. This method will be described in the IST program and the closed safety function of the appropriate valves will be identified that are tested using this method.

D. Essential Service Water S stem If valves ESW-101E and -101W perform a safety function in the closed position to prevent reverse flow through an idle pump, they must be tested to the closed position to verify their ability to perform that function.

Resolution:

The ESW trains are not cross-connected and further information is not required.

E. Reactor Coolant S stem

1. Provide a more detailed technical justification for not exercising valves NS0-021, -022, -023, and -024 during cold shutdowns.

Resolution:

Justification will be provided in the IST program for not testing these valves during cold shutdowns.

2. Provide a more detailed technical justification for not exercising valves NS0-061, -062, -063, and -064 during cold shutdowns.

Resolution:

Same as Item E. 1 except the referenced information in the technical specification will be included in the IST program.

F. Chemical and Volume Control S stem

l. Explain how radiography can be used to verify reverse flow closure of check valve CS-292.

Resolution:

Justification for using radiography to test this valve will be provided in'the IST program. A radiograph of this valve was examined. The radiograph showed that the valve was in the closed position and thus provided visual observation of valve closure.

2. What is the safety function of control valves HARV-200 and -251?

The NRC staff position is that requests for relief will not be

evaluated for valves that do not perform a safety related function.

Resolution:

Valves (}RV-200 and -251 are used for emergency boration in Modes 5 and 6 and should be in the IST program. Note 7 for valves gMO-200 and -201 will be corrected in the ISTprogram. The function of valves HARV-200 and -251 will be reevaluated and Notes 8 and 9 may be deleted. If these notes aren't deleted they will be modified to show impracticality of testing.

G. Post Accident Sam lin S stem

l. Unless valve NS-283 is verified in the closed position during the quarterly exercising test, relief is still required from the Section XI requirement to full-stroke exercise this check valve quarterly.

Resolution:

The valve list will be revised to show that relief is requested. In addition, closure testing of other check valves will be reviewed to see that relief is being requested as appropriate and included in the IST program.

H. Emer enc Core Coolin S stem

1. If valves IM0-51, -52, -53, and -54 are ever required to change position to accomplish a specific function, they are not passive and must be exercised in accordance with the Code.

Resolution:

These valves are passive and, therefore, need not be included in the program.

2. The use of IWV-3416 in emergency core cooling Note 2 for valves IMO-128 and ICM-129 is not appropriate since the RHR system is not out of service during power operations. An adequate justification is provided in the note which demonstrates the impracticality of exercising these valves during power operations and they should, therefore, be exercised on a cold shutdown frequency as provided for in the Code.

Resolution:

The last sentence in Note 2 will be deleted to eliminate reference to IWV-3416. The note will be modified to identify and justify valve testing during shutdown.

3. If. valve N-102 is opened during power operations to add nitrogen to the safety injection accumulators, then it is not a passive valve and should be tested to the requirements of IW-3520 unless relief is requested from the Code requirements.

Resolution:

This is an active valve and a relief request will be provided for exercising the valve.

4. If any credit is taken for closing valves IM0-110, -120, -130, and -140 in order to allow the reduction of RCS pressure to permit the RHR system to be placed into operation in the recirculation mode, they perform an active safety function and should be included in the IST program.

Resolution:

This is an open item for the NRC to determine whether these valves must be included in the program as active valves.

5. Is credit taken in any accident analysis for shifting low pressure safety injection (RHR) pump suction from the refueling water storage tank to the containment recirculation sump? If so, valve IMO-390 performs an active safety function to isolate the suction from the RWST and should be tested in accordance with the Code.

Resolution:

Valves IMO-310 and -320 are required to close and isolate the pump suction from the RWST, therefore, IMO-390 does not have to be in the program.

6.. Have system modifications been performed to allow full-stroke exercising check valve SI-148 in accordance with the Code without jeopardizing the availability of other safety systems?

Resolution:

The licensee will rewrite the basis for requesting relief and will include in the resubmittal the resolution of the air entrainment problem identified in the SER for the first 10-year interval.

7. Provide a more detailed technical justification for not full-stroke exercising valves SI-158-L1, -L2, -L3, and -L4 during cold shutdowns.

Resolution:

The licensee will add a justification for not full-stroking these valves during cold shutdown to Note 12.

8. Provide a more detailed technical justification for not full-stroke exercising valves SI-161-L1, -L2, -L3, and -L4 during cold shutdowns.

Resolution:

Same as Item H.7.

9. Provide the detailed technical justification for not full or partial-stroke exercising valves SI-170-L1, -L2, -L3, and -L4 either quarterly during power operations or during cold shutdowns.

Resolution:

The licensee will provide a more detailed justification including identifying partial-stroking during cold shutdown.

10. If valves ICM-311 and -321 are ever required to change position to accomplish a specific function, they are not passive and must be exercised in accordance with the Code.

Resolution:

These valves do not have to change position, are passive, and do not have to be included in the program.

I. Containment S ra S stem

1. The NRC staff has concluded that a valve sample disassembly and inspection utilizing a manual full-stroke exercise of the valve disk is an acceptable method to verify a check valve's full-stroke capability. This program involves grouping similar valves together and testing one valve in each group during each refueling outage. The sampling technique requires that each valve in the group be of the same design (manufacturer, size, model number and materials of construction) and have the same service conditions. Additionally, at each disassembly it must be verified that the disassembled valve is capable of full-stroking and that its internals are structurally sound (no loose or corroded parts).

10

A different valve of each group is required to be disassembled, inspected and manually full-stroke exercised at each refueling outage, until the entire group has been tested. If it is found that the disassembled valve's full-stroke capability is in question, the remainder of the valves in that group must also be disassembled, inspected and manually full-stroke exer cised during the same outage.

Are valves CTS-103E, -103W, -138E, and -138W grouped together for sample disassembly and inspection? , These valves do not appear to meet, the NRC staff's criteria for grouping as explained above.

Resolution:

The licensee will either sample, group, inspect, and disassemble valves as per the stated NRC position or justify a deviation from this position.

2. Are valves CTS-127E, -127W, -131E, and -131W, and valves RH-141 and -142 grouped together for sample disassembly and inspection?

These valves do not appear to meet the NRC staff's criteria for grouping as explained in guestion I. 1 above.

Resolution:

Same as Item I.l.

J. Weld Channel Pressurization S stem

1. If valves CA-181-N and -S are opened during power operations, then they are not passive valves and should be tested to the requirements of IWV-3520 unless relief is requested from the Code requirements.

11

Resolution:

These valves are not opened during power operation and are passive and need not be exercised.

K. Ice Condenser Refri eration S stem

1. Unless valves R-156 and -157 are verified in the closed position during the quarterly exercising test, relief is still required from the Section XI requirement to full-stroke exercise these check valves quarterly.

Resolution:

The valve list will be changed to indicate relief is being requested and the basis for relief will be modified to include additional technical justifications L. Emer enc Diesel Generator Subs stems

1. Provide a more detailed technical justification for not measuring the stroke times for the following valves quarterly during power operations. Explain how the proposed testing individually verifies the operability of these valves. Do these valves have required fail-safe positions?

XRV-220 XRV-221 XRV-222 XRV-225 XRV-226 XRV-227 Resolution:

The licensee will provide a more detailed technical justification for not measuring the stroke time of these valves. The licensee will review the fail-safe position of these valves and, if appropriate, provide a relief request for not fail-safe testing these valves.

12

2. Review the safety related function of valves 2-DG-102C and -104C (P8ID 2-5151D-26 coordinates H-4 and F-4) to determine if they should be included in the IST program.

Resolution:

These valves will be included in the licensee's IST program.

N. Com ressed Air S stem

1. What are the consequences of loss of containment control air that make the quarterly testing of valves XCR-100, -101, -102, and

-103 impractical?

Resol uti on:

The licensee will provide a more detailed technical justification that shows that full-stroking these valves during power operation is impractical and will include a discussion of the consequences of loss of containment control air during operation.

'. Boron Nake-u S stem

l. If valves CS-415-1, -2, '-3, and -4 perform a safety function in the closed position to prevent reverse flow through an idle boric acid transfer pump, they must be tested to the closed position to verify their ability to perform that function.

Resolution:

These valves do not have a safety function in the closed position and, therefore, do not have to be tested to the closed position.

13

0. S ent fuel Pit Coolin and Clean-u S stem
1. If valves SF-118N and S per form a safety function in the closed position to prevent reverse flow through an idle spent fuel pit pump, they must be tested to the closed position to verify their ability to perform that function.

Resolution:

These valves do not have a safety function in the closed position because sufficient water will pass through the heat exchanger prior to returning to the fuel storage pool.

P. HDS Vents and Drains S stem

1. Provide a more detailed technical justification for not exercising valve N-160 during cold shutdowns.

Resolution:

The licensee will provide justification for testing this valve during cold shutdowns.

(}. PAL Sam lin and Instrumentation S stem

1. Reduction of redundancy is not an adequate justification for not performing the Code required testing; how long can one of the lower containment radiation monitor trains be inoperable before action must be taken?

Resolution:

The inlet valves will be tested as per the requirements of Section ÃI and relief will be requested for the valve in the common return line. Both trains are not required to be in continuous operation by the technical specifications as there is a 30 day LCO. Also, additional justification will be provided in the relief request for valve SM-1.

2. PUMP TESTING PROGRAM
1. Lack of installed instrumentation is not an adequate justification for not measuring the pump flowrate for the spent pool pit cooling pumps (refer to pump Code Relief Request III).

Provide a more detailed technical justification for not measuring this Code required parameter to allow the detection of pump degradation.

Resolution:

More detailed justification will be included in the relief request.