ML18043A165: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
(2 intermediate revisions by the same user not shown) | |||
Line 1: | Line 1: | ||
# | {{Adams | ||
| number = ML18043A165 | |||
| issue date = 01/31/2018 | |||
| title = Summary of Changes to Radiological Emergency Plan, Revision 63 | |||
| author name = | |||
| author affiliation = Florida Power & Light Co | |||
| addressee name = | |||
| addressee affiliation = NRC/NRR | |||
| docket = 05000250, 05000251 | |||
| license number = | |||
| contact person = | |||
| case reference number = L-2018-024 | |||
| package number = ML18043A167 | |||
| document type = Emergency Preparedness-Emergency Plan | |||
| page count = 1 | |||
}} | |||
=Text= | |||
{{#Wiki_filter:Attachment to L-2018-024 Page 1 of 1 Summary of Changes to Turkey Point Plant Radiological Emergency Plan, Revision 63 AR 2162227 Implementation Date: 1/5/2018 The Turkey Point Plant Radiological Emergency Plan was revised to incorporate the following changes: | |||
Appendix D Emergency Action Levels (EALs) were revised to implement changes due to updated design basis document changes to reflect elimination of the Auxiliary Building Laundry Room exhaust fan: | |||
RU1 values for: | |||
o PRMS R-14, Plant Vent from 6.4E+4 cpm to 7.4E+4 cpm o RAD 6304, Plant Vent SPING from 3.2E-4 µCi/cc to 3.7E-4 µCi/cc RA1 value for : | |||
o RAD 6304, Plant Vent SPING from 3.2E-2 µCi/cc to 3.7E-2 µCi/cc RS1 value for : | |||
o RAD 6304, Plant Vent SPING from 2.0E-1 µCi/cc to 3.3E-1 µCi/cc RG1 value for : | |||
o RAD 6304, Plant Vent SPING from 2.8E+0 µCi/cc to 3.3E+0 µCi/cc Editorial changes included updates to: | |||
Letters of Agreement with offsite response organizations Response facility titles Offsite organization titles Onsite emergency facilities map - Figure 2-6 Plant normal operating organization - Figure 2-3 Clarify the means by which the Emergency Coordinator may communicate information to the Recovery Manager (page 4-2) | |||
Change TLD to Dosimeter of Legal Record in Step 5.1.6 Replace page 1 of 5 of Figure 5-1, Protective Action Recommendations Based on Plant Conditions and Offsite Does Estimates, to correct a typographical error in note(1) | |||
Add clarifying statements to note(1) on page 2 of 5 of Figure 5-1 to incorporate revisions made to 0-EPIP-20134 regarding the Containment High Range Radiation Monitoring System (CHRRMS) channels RD-3/4-6311A/B Revise Table 5-4, Evacuation Time and Traffic Capacity Estimates, to reference the most current evacuation time estimate data Correct typographical error in Appendix C by deleting outdated note Revise main steam line radiation monitor nomenclature to reflect current equipment identification o Changed RAD 6426 (DAM1) to MSL 3[4]-RAD 6426 A, B, C for EALs RU1, RA1, RS1, RG1 Revised Appendix D threshold value description for RA2 to be consistent with NRC SER dated 12/14/09}} |
Latest revision as of 00:40, 29 October 2019
ML18043A165 | |
Person / Time | |
---|---|
Site: | Turkey Point |
Issue date: | 01/31/2018 |
From: | Florida Power & Light Co |
To: | Office of Nuclear Reactor Regulation |
Shared Package | |
ML18043A167 | List: |
References | |
L-2018-024 | |
Download: ML18043A165 (1) | |
Text
Attachment to L-2018-024 Page 1 of 1 Summary of Changes to Turkey Point Plant Radiological Emergency Plan, Revision 63 AR 2162227 Implementation Date: 1/5/2018 The Turkey Point Plant Radiological Emergency Plan was revised to incorporate the following changes:
Appendix D Emergency Action Levels (EALs) were revised to implement changes due to updated design basis document changes to reflect elimination of the Auxiliary Building Laundry Room exhaust fan:
RU1 values for:
o PRMS R-14, Plant Vent from 6.4E+4 cpm to 7.4E+4 cpm o RAD 6304, Plant Vent SPING from 3.2E-4 µCi/cc to 3.7E-4 µCi/cc RA1 value for :
o RAD 6304, Plant Vent SPING from 3.2E-2 µCi/cc to 3.7E-2 µCi/cc RS1 value for :
o RAD 6304, Plant Vent SPING from 2.0E-1 µCi/cc to 3.3E-1 µCi/cc RG1 value for :
o RAD 6304, Plant Vent SPING from 2.8E+0 µCi/cc to 3.3E+0 µCi/cc Editorial changes included updates to:
Letters of Agreement with offsite response organizations Response facility titles Offsite organization titles Onsite emergency facilities map - Figure 2-6 Plant normal operating organization - Figure 2-3 Clarify the means by which the Emergency Coordinator may communicate information to the Recovery Manager (page 4-2)
Change TLD to Dosimeter of Legal Record in Step 5.1.6 Replace page 1 of 5 of Figure 5-1, Protective Action Recommendations Based on Plant Conditions and Offsite Does Estimates, to correct a typographical error in note(1)
Add clarifying statements to note(1) on page 2 of 5 of Figure 5-1 to incorporate revisions made to 0-EPIP-20134 regarding the Containment High Range Radiation Monitoring System (CHRRMS) channels RD-3/4-6311A/B Revise Table 5-4, Evacuation Time and Traffic Capacity Estimates, to reference the most current evacuation time estimate data Correct typographical error in Appendix C by deleting outdated note Revise main steam line radiation monitor nomenclature to reflect current equipment identification o Changed RAD 6426 (DAM1) to MSL 3[4]-RAD 6426 A, B, C for EALs RU1, RA1, RS1, RG1 Revised Appendix D threshold value description for RA2 to be consistent with NRC SER dated 12/14/09