L-2018-024, Submittal of Summary of Changes to Radiological Emergency Plan Revision 63

From kanterella
(Redirected from L-2018-024)
Jump to navigation Jump to search
Submittal of Summary of Changes to Radiological Emergency Plan Revision 63
ML18032A750
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 01/31/2018
From: Stamp B
Florida Power & Light Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
Shared Package
ML18032A750 List:
References
L-2018-024
Download: ML18032A750 (1)


Text

  • F=PL.

JAN 3 1 2018 L-2018-024 10 CFR 50.4 10 CFR 50 Appendix E U.S. Nuclear Regulatory Commission Attn : Document Control Desk Washington, D. C. 20555-0001 Re: Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Radiological Emergency Plan Revision 63 The Turkey Point Plant Radiological Emergency Plan, Revision 63 was implemented on January 5, 2018.

A summary of the changes to the revised document is attached. FPL has determined that the changes described do not result in a decrease in the effectiveness of the Emergency Plan.

Sincerely,

~

Brian Stamp Plant General Manager Turkey Point Nuclear Plant Attachment cc: Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, Turkey Point Plant Florida Power & Light Company 9760 SW 344 St Homestead, FL 33035