ML17332A714: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 18: Line 18:
=Text=
=Text=
{{#Wiki_filter:(ACCELERATED RIDS PROCESSING)
{{#Wiki_filter:(ACCELERATED RIDS PROCESSING)
REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)ACCESSION NBR:9504060176 DOC.DATE: 95/03/31 NOTARIZED:
REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
YES DOCKET FACIL:50-315 Donald C.Cook Nuclear Power Plant, Unit 1, Indiana M 05000315 50-316 Donald C.Cook Nuclear Power Plant, Unit 2, Indiana M 05000316 AUTH.NAME AUTHOR AFFILIATION FITZPATRICK,E.
ACCESSION NBR:9504060176               DOC.DATE:   95/03/31   NOTARIZED: YES       DOCKET FACIL:50-315 Donald C. Cook Nuclear Power Plant, Unit 1, Indiana                   M 05000315 50-316 Donald C. Cook Nuclear Power Plant, Unit 2, Indiana                 M 05000316 AUTH. NAME             AUTHOR AFFILIATION FITZPATRICK,E.       Indiana Michigan Power Co. (formerly Indiana & Michigan Ele RECIP.NAME             RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)
Indiana Michigan Power Co.(formerly Indiana&Michigan Ele RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)


==SUBJECT:==
==SUBJECT:==
Application for amends to licenses DPR-58&DPR-74.Amends
Application for amends to licenses DPR-58 & DPR-74.Amends
.would modify surveillance requirements, eliminating requirement to test certain safeguards pumps.DISTRIBUTION CODE: AOOID COPIES RECEIVED:LTR L ENCL L SIZE: 0+~TITLE: OR Submittal:
          . would modify surveillance requirements, eliminating requirement to test certain safeguards pumps.
General Distribution NOTES: RECIPIENT ID CODE/NAME PD3-1 LA HICKMAN,J INTERNAL: cgXXE CENTER 01 NRR/DRCH/HTCB NRR/DSSA/SRXB OGC/HDS2 EXTERNAL: NOAC COPIES LTTR ENCL 1 1 1 1 1 1 1 1 1 1 1 0 1 1 RECIPIENT ID CODE/NAME PD3-1 PD NMSS/DWM/LLDP NRR/DSSA/SPLB NUDOCS-ABSTRACT NRC PDR COPIES LTTR ENCL 1 1 2 2 1 1 1 1 1 1 NOTE TO ALL"Rl DS" RECIPIENTS:
DISTRIBUTION CODE: AOOID TITLE:  OR COPIES RECEIVED:LTR Submittal: General Distribution                  L ENCL L   SIZE:   0 +~
PLEASE HELP US TO REDUCE WASTE!CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT.504-2083)TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!TOTAL NUMBER OF COPIES REQUIRED: LTTR 13 ENCL 12 C~
NOTES:
indiana Michigan Power Company P.O.Box 16631 Columbus, OH 43216 FI Narch 31, 1995 AEP:NRC:1211 Docket Nos.: 50-315 50-316 U, S.Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C.20555 Gentlemen:
RECIPIENT                COPIES            RECIPIENT         COPIES ID CODE/NAME             LTTR ENCL        ID CODE/NAME      LTTR ENCL PD3-1 LA                       1    1    PD3-1 PD              1    1 HICKMAN,J                     1    1 INTERNAL:cgXXE CENTER 01                   1    1    NMSS/DWM/LLDP        2    2 NRR/DRCH/HTCB                 1    1    NRR/DSSA/SPLB        1   1 NRR/DSSA/SRXB                  1    1    NUDOCS-ABSTRACT       1   1 OGC/HDS2                      1     0 EXTERNAL: NOAC                              1     1     NRC PDR              1   1 NOTE TO ALL"RlDS" RECIPIENTS:
Donald C.Cook Nuclear Plant Units 1 and 2 PROPOSED AMENDMENT TO TECHNICAL SPECIFICATION SURVEILLANCE REQUIREMENTS'EVISE SAFETY RELATED PUMP TESTING TO ELIMINATE RECIRCULATION ALIGNMENTS AND BE CONSISTENT WITH THE INSERVICE TESTING PROGRAM (IST)AND NUREG-1431.
PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 504-2083 ) TO ELIMINATEYOUR NAME FROM DISTRIBUTIONLISTS FOR DOCUMENTS YOU DON'T NEED!
This letter and its attachments constitute an application for amendment to the technical specifications (T/Ss)for Donald C.Cook Nuclear Plant units 1, and 2~Specifically, we are proposing to modify the surveillance requirements to eliminate the requirement to test certain safeguards pumps via their recirculation flowpath.The following pumps are affected;the centrifugal charging pumps, residual heat removal pumps, motor driven auxiliary feedwater pumps, and the turbine driven auxiliary feedwater pumps.Two pumps, the containment spray pump and safety injection pump, will continue to be tested on their recirculation lines based on existing design.This proposed change would also eliminate references to specific discharge pressures and flows associated with these pumps.The specific test parameters being removed are controlled by the approved Cook Nuclear Plant IST program.The following unit 1 and unit 2 T/S surveillances are affected: 4.1.2.3.1, 4.1.2.4, 4.5.2f, 4.6.2.1b, 4.7.1.2a, and 4.7.1.2b.The existing Donald C.Cook Nuclear Plant T/S surveillance requirements associated with the above pumps require testing of the pumps utilizing their recirculation lines.This method of testing provides limited information on the pump/systems'bility to perform their safety related functions.
TOTAL NUMBER OF COPIES REQUIRED: LTTR                 13   ENCL   12
Therefore, a change to the T/S surveillance is being proposed to allow testing of these pumps using higher capacity flowpaths (where applicable).
 
{'GG038 PDR+0~7++>03ZZ 950g0~~<<l<osoooz>q 1 I PgR  
C~
indiana Michigan Power Company P.O. Box 16631 Columbus, OH 43216 FI Narch 31, 1995                                                 AEP:NRC:1211 Docket Nos.: 50-315 50-316 U, S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D. C. 20555 Gentlemen:
Donald C. Cook Nuclear Plant Units   1 and 2 PROPOSED AMENDMENT TO TECHNICAL SPECIFICATION SURVEILLANCE REQUIREMENTS'EVISE SAFETY RELATED PUMP TESTING TO ELIMINATE RECIRCULATION ALIGNMENTS AND BE CONSISTENT WITH THE INSERVICE TESTING PROGRAM (IST) AND NUREG-1431.
This     letter     and its attachments   constitute   an application for amendment       to the technical specifications (T/Ss) for Donald C. Cook Nuclear Plant units 1, and 2         ~ Specifically, we are proposing to modify the surveillance requirements to eliminate the requirement to test certain safeguards pumps via their recirculation flowpath. The following pumps are affected; the centrifugal charging pumps, residual heat removal pumps, motor driven auxiliary feedwater pumps, and the turbine driven auxiliary feedwater pumps.             Two pumps, the containment spray pump and safety injection pump, will continue to be tested on their recirculation lines based on existing design. This proposed change would also eliminate references to specific discharge pressures and flows associated with these pumps. The specific test parameters being removed are controlled by the approved Cook Nuclear Plant IST program. The following unit 1 and unit 2 T/S surveillances are affected: 4.1.2.3.1, 4.1.2.4, 4.5.2f, 4.6.2.1b, 4.7.1.2a, and 4.7.1.2b.
The     existing Donald C. Cook Nuclear Plant T/S surveillance requirements associated with the above pumps require testing of the pumps utilizing their recirculation lines.           This method of testing provides limited information on the pump/systems'bility to perform their safety related functions. Therefore, a change to the T/S surveillance is being proposed to allow testing of these pumps using higher capacity flowpaths (where applicable).
{'GG038 950g0 +0~7+ +>03ZZ PDR      ~~<<l< osoooz>q         1 I PgR
 
'
'
U.S.Nuclear Regulatory Commission Page 2 AEP:NRC:1211 Utilizing this test method would provide for more accurate data to better determine the actual pump/system conditions.
U. S. Nuclear   Regulatory Commission                     AEP:NRC:1211 Page 2 Utilizing this test   method would provide for more accurate   data to better determine the actual   pump/system conditions.
In addition to the improvement in the quality of acquired test data, the proposed amendment would also align the affected Cook Nuclear Plant T/Ss with the Merits Program T/Ss issued as NUREG-1431.
In addition to the improvement in the quality of acquired test data, the proposed amendment would also align the affected Cook Nuclear Plant T/Ss with the Merits Program T/Ss issued as NUREG-1431.
An administrative change to T/S surveillances 4.5.2.d.2, 4.5.2.e, 4.6.2.c, 4.7.1.2e, and 4.7.1.2f is also included in this amendment.
An administrative change to T/S surveillances 4.5.2.d.2, 4.5.2.e, 4.6.2.c, 4.7.1.2e, and 4.7.1.2f is also included in this amendment.
These specifications each contained a footnote associated with the unit 2 cycle 9-10 refueling outage which is no longer applicable, thus the footnotes are being removed.Attachment 1 provides a detailed description of the proposed changes, the justification for the changes, and our determination of no significant hazards consideration performed pursuant to 10 CFR 50.92.Attachment 2 contains the existing T/S pages marked to reflect the proposed changes.Attachment 3 contains the proposed T/S pages.We believe the proposed changes will not result in (1)a significant change in the types of any effluent that may be released offsite, or (2)a significant increase in individual or cumulative occupational radiation exposure.These proposed changes have been reviewed by the Plant Nuclear Safety Review Committee and the Nuclear Safety and Design Review Committee.
These specifications each contained a footnote associated with the unit 2 cycle 9-10 refueling outage which is no longer applicable, thus the footnotes are being removed. provides a detailed description of the proposed changes, the justification for the changes, and our determination of no significant hazards consideration performed pursuant to 10 CFR 50.92. contains the existing T/S pages marked to reflect the proposed changes. Attachment 3 contains the proposed T/S pages.
In compliance with the requirements of 10 CFR 50.91(b)(1), copies of this letter and its attachments have been transmitted to the Michigan Public Service Commission and to the Michigan Department of Public Health.Sincerely, EF E;E.Fitzpatrick Vice President SWORN TO AND SUBSCRIBED BEFORE ME eh THIS~~DAY OF 1995 Attachment cc: A.A.Blind G.Charnoff J.B.Martin NFEM Section Chief NRC Resident Inspector-Bridgman J.R.Padgett Notary Public i tt ATTACHMENT 1 TO AEP:NRC:1211 DESCRIPTION AND JUSTIFICATION OF CHANGES 10 CFR 50.92 ANALYSIS FOR CHANGES TO THE DONALD C.COOK NUCLEAR PLANT UNITS 1 AND 2 TECHNICAL SPECIFICATIONS 1 I Attachment 1 to AEP:NRC:1211 Page 1 DESCRIPTION OF CHANGES The proposed amendment to technical specifications (T/Ss)surveillances; 4.1.2.3.1, 4.1.2.4, 4.5,2.d.2, 4.5.2.e, 4.5.2f, 4.6.2.lb, 4.6.2.c, 4.7.1.2a, 4.7.1.2b, 4.7.1.2e, and 4.7.1.2f make the following specific changes to Cook Nuclear Plant Units 1 and 2 T/Ss: S 4 1 2 3 Changes surveillance 4.1.2.3.1 (page 3/4 l-ll)from: "The above required charging pump shall be demonstrated OPERABLE by verifying, that on recirculation flow, the pump develops a discharge pressure of greater than or equal to 2390 psig when tested pursuant to Specification 4.0.5." To: "The above required charging pump shall be demonstrated OPERABLE by verifying that the pump's developed head at the test flow point is greater than or equal to the required developed head when tested pursuant to Specification 4.0.5." Changes surveillance 4.1.2.4 (page 3/4 1-12)from: "At least two charging pumps shall be demonstrated OPERABLE by verifying, that on recirculation flow, the pump develops a discharge pressure of greater than or equal to 2405 psig when tested pursuant to Specification 4.0.5." To: "At least two charging pumps shall be demonstrated OPERABLE by verifying that the pump's developed head at the test flow point is greater than or equal to the required developed head when tested pursuant to Specification 4.0.5." Changes surveillance 4.5.2f (page 3/4 5-5)from: "By verifying that each of the following pumps develops the indicated discharge pressure on recirculation flow when tested pursuant to Specification 4.0.5.1.Centrifugal charging pump greater than or equal to 2405 psig 4
We believe the proposed changes   will not result in (1) a significant change   in the types of any effluent that may be released offsite, or (2) a   significant increase in individual or cumulative occupational radiation exposure.
Attachment 1 to AEP:NRC:1211 Page 2 2.Safety injection pump greater than or equal to 1409 psig 3.Residual heat removal pump greater than or equal to 190 psig" To: "By verifying that each of the following pump's developed head at the test flow point is greater than or equal to the required developed head when tested pursuant to Specification 4.0.5.1.Centrifugal charging pumps 2.Safety injection pumps 3.Residual heat removal pumps" Changes surveillance 4.6.2.1b (page 3/4 6-10)from: "By verifying, that on recirculation flow, each pump develops a discharge pressure of greater than or equal to 255 psig at a flow of greater than or equal to 700 gpm, when tested pursuant to Specification 4.0.5." To: "By verifying that each containment spray pump's developed head at the test flow point is greater than or equal to the required developed head." Changes surveillance 4.7.1,2a (page 3/4 7-6)from: "Verifying that each motor driven pump develops an equivalent discharge pressure of greater than or equal to 1375 psig (1240 psig for Unit 2)at 60 F on recirculation flow.TQ: "Verifying that each motor driven auxiliary feedwater pump's developed head at the test flow point is greater than or equal to the required developed head."  
These proposed changes have been reviewed by the Plant Nuclear Safety Review Committee and the Nuclear Safety and Design Review Committee.
In compliance with the requirements of 10 CFR 50.91(b)(1), copies of this letter and its attachments have been transmitted to the Michigan Public Service Commission and to the Michigan Department of Public Health.
Sincerely, EF E; E. Fitzpatrick                   SWORN TO AND SUBSCRIBED BEFORE ME Vice President eh THIS ~~   DAY OF             1995 Attachment                                         Notary Public cc:   A. A. Blind G. Charnoff J. B. Martin NFEM Section   Chief NRC Resident   Inspector - Bridgman J. R. Padgett
 
i tt ATTACHMENT 1 TO AEP:NRC:1211 DESCRIPTION AND JUSTIFICATION OF CHANGES 10 CFR 50.92 ANALYSIS FOR CHANGES TO THE DONALD C. COOK NUCLEAR PLANT UNITS 1 AND 2 TECHNICAL SPECIFICATIONS
 
1 I
 
Attachment 1 to AEP:NRC:1211                                             Page 1 DESCRIPTION OF CHANGES The   proposed     amendment     to technical specifications         (T/Ss) surveillances; 4.1.2.3.1, 4.1.2.4, 4.5,2.d.2, 4.5.2.e, 4.5.2f, 4.6.2.lb, 4.6.2.c, 4.7.1.2a, 4.7.1.2b, 4.7.1.2e, and 4.7.1.2f make the following specific changes to Cook Nuclear Plant Units 1 and 2 T/Ss:
S 4 1 2 3 Changes   surveillance 4.1.2.3.1 (page 3/4       l-ll) from:
      "The above required charging pump       shall be demonstrated OPERABLE by verifying,   that on recirculation   flow, the pump develops a discharge pressure of greater than or equal to 2390 psig when tested pursuant to Specification 4.0.5."
To:
      "The above required charging pump shall be demonstrated OPERABLE by verifying that the     pump's developed head at the test flow point is greater than or equal to the required developed head when tested pursuant to Specification 4.0.5."
Changes   surveillance 4.1.2.4 (page 3/4 1-12) from:
      "At least two charging pumps shall be demonstrated OPERABLE by verifying, that on recirculation flow, the pump develops a discharge pressure of greater than or equal to 2405 psig when tested pursuant to Specification 4.0.5."
To:
      "At least two charging       pumps   shall   be demonstrated OPERABLE by verifying that the pump's developed         head at the test flow point is greater than or equal     to   the required   developed head when tested pursuant to Specification 4.0.5."
Changes   surveillance 4.5.2f (page 3/4 5-5) from:
      "By verifying that each of the following pumps develops the indicated discharge pressure on recirculation flow when tested pursuant to Specification 4.0.5.
: 1.     Centrifugal charging     pump greater than or equal to   2405 psig
 
4 Attachment 1 to AEP:NRC:1211                                           Page 2
: 2. Safety injection pump greater than or equal to 1409 psig
: 3. Residual heat removal   pump greater than or equal to 190 psig" To:
      "By verifying that each of the following pump's developed head at the test flow point is greater than or equal to the required developed head when tested pursuant to Specification 4.0.5.
: 1.     Centrifugal charging   pumps
: 2.     Safety injection pumps
: 3. Residual heat removal pumps" Changes   surveillance 4.6.2.1b (page 3/4 6-10) from:
      "By verifying, that on recirculation flow, each pump develops a discharge pressure of greater than or equal to 255 psig at a flow of greater than or equal to 700 gpm, when tested pursuant to Specification 4.0.5."
To:
      "By verifying that each containment spray pump's developed head at the test flow point is greater than or equal to the required developed head."
Changes   surveillance 4.7.1,2a (page 3/4 7-6) from:
      "Verifying that each motor driven pump develops an equivalent discharge pressure of greater than or equal to 1375 psig (1240 psig for Unit   2) at 60 F on recirculation flow.
TQ:
      "Verifying that each motor driven         auxiliary feedwater pump's developed head at the test flow point     is greater than or equal to the required developed head."
 
Attachment      1 to AEP:NRC:1211                                          Page 3 T  S    4.7  1 2b Changes      surveillance 4.7.1.2b (page 3/4 7-6) from:
      "Verifying that the turbine driven pump develops an equivalent discharge pressure of greater than or equal to 1285 psig (1180 psig for Unit 2) at 60'F and at a flow of greater than or equal to 700 gpm when the secondary steam supply pressure is greater than 310 psig. The provisions of Specification 4        '.4  are not applicable for entry into      MODE  3.
To fying that the turbine driven auxiliary feedwater pump '
          .'Veri developed head at the test flow point is greater than or equal to the required developed head when the secondary steam supply pressure is greater than 310 psig. The provisions of Specification 4.0.4 are not applicable for entry into        MODE 3."
4.5 2.d.2        4 5 2 e  4 6 2 c  4 7.1 2e and 4.7.1 2f Delete the "daggers" and associated footnote reference to Technical Specification 4.0.8. This reference was specifically associated with a surveillance extension approved during Unit 2 cycle 9-10.          It is no longer applicable.
II. JUSTIFICATION      FOR CHANGES The        proposed technical specification change          eliminates the surveillance requirement to test the Unit 1 and Unit 2 centrifugal charging, safety injection, residual heat removal, containment spray, motor driven auxiliary feedwater and steam driven auxiliary feedwater pumps on their recirculation lines. It should be noted that the containment spray pumps and safety injection pumps will continue to be tested on their recirculation flowpaths as a result of existing system design. This proposed change would also remove the references to specific discharge pressures and flows associated with these pumps.
This change is consistent with the assumptions and guidance provided in NUREG - 1431, "Standard Technical Specifications, Westinghouse Plants," which states:
      "The purpose for conducting periodic testing of the pumps listed above is to detect gross degradation caused by impeller structural damage or other hydraulic component problems.              This testing is required by          Section XI of the American Society of Mechanical Engineers (ASME) Code.            The testing described above may be accomplished by measuring the pump developed head at only one point of the pump performance curve. This verifies both that the measured
 
Attachment    1 to AEP:NRC:1211                                        Page 4 performance is within an acceptable tolerance of the original pump baseline performance and that the performance at the test flow is greater than or equal to the performance assumed in the plant safety analysis. Surveillance requirements are specified in the Inservice Testing (IST) Program which encompasses Section XI of the ASME Code."
The purpose  of the proposed change is to eliminate the recirculation flowpath requirement for testing the above pumps and, where applicable, allow testing of the pumps utilizing a high capacity flowpath. Surveillance tests on pump recirculation lines provide limited information on the pump/system's ability to perform its safety function. The test performed on recirculation offers one data point at minimal flow and highest possible head, equivalent in most cases to the pump's shutoff head.        Such low flow operation could produce unstable hydraulic forces which may result in inaccurate performance data and may also be detrimental to the pump.
Pump performance test data should be obtained at flowrates as close as possible to the pump's best efficiency point. At such flowrates,
    'ydraulic forces are relatively stable and more accurate data is
    .,assured. Furthermore, while some pump degradation can be observed at both lower and higher flowrates, system degradation (e.g., pipe blockage) can be observed only at the higher flowrates, In general, pump/system degradation is far more apparent at higher flowrates.
      -
Testing on higher capacity flowpaths instead of the pump's recirculation line is, therefore, preferable in order to obtain more accurate data, better determine pump/system conditions, and minimize low flow pump operation.
In addition to its consistency with NUREG-1431, the above discussion is consistent with issues addressed in NUREG/CP-0123, "Proceedings of the Second NRC/ASME Symposium on Pump and Valve Testing," in particular with papers entitled, "Pump Testing in the Nuclear Industry: The Comprehensive Test and Other Considerations (page 133)," "Test Quality (page 159)," and "Operating Pumps on Minimum .
Flow (page 557)."
The T/S requirement    limiting the surveillance test to only the recirculation line also places undue demands on the pump, system, and operators for certain pumps, like the centrifugal charging pumps. Technical specification testing of these pumps on their recirculation lines require the pumps to be secured from operation, the  system  realigned,  and  the  pumps restarted  to support a recirculation alignment.        By  allowing for a higher capacity flowpath, system realignment becomes unnecessary and normal operational flowpaths need not be disturbed. Operator flexibility to test the pumps on a higher capacity flowpath, where possible, will aid in minimizing required system manipulations as well as maximizing component    availability.
 
t l  ~ ~ l'
 
Attachment    1  to AEP:NRC:1211                                            Page 5 The  proposed T/S also eliminates specific flow and pressure setpoints that correlate with testing the centrifugal charging, safety injection, residual heat removal, containment spray, and motor driven and turbine driven auxiliary feedwater pumps on their recirculation lines.
The  specific flows and pressures that demonstrate the capability of the pump to perform its intended safety function are identified in the Cook Nuclear Plant IST program. The minimum performance values, modeled in the accident analysis or identified as the minimum system requirement, are used in the IST program as the lowest acceptable values for continued operation.
A    final benefit of        changing  the  testing requirements of the centrifugal charging,        safety injection, residual heat removal, containment spray, and motor driven and turbine driven auxiliary feedwater pumps is that      it will assure uniform test requirements for T/S pumps with similar testing requirements.            Currently, essential service water and component cooling water pumps are required to be tested in accordance with the IST program.              Specific flow and pressure requirements are defined by the IST program and not the T/S surveillance.
In summary, the proposed change will assure the acquisition of accurate data, better determine pump/system conditions, and minimize low flow pump operation.          Additionally, the change will provide surveillance guidance consistent with NUREG-1431, NUREG/CP-0123, and existing service water component T/Ss currently resident in Cook Nuclear Plant T/Ss.
III. 10 CFR 50 92 CRITERI Per 10 CFR 50.92, a proposed change does not involve a          significant hazards consideration      if  the change does not:
: l.      involve    a  significant increase in the probability or consequences    of an accident previously evaluated,
: 2.      create the possibility of a new or different kind of accident from any accident previously evaluated, or
: 3.      involve  a  significant reduction in    a margin  of safety.
Criterion The purpose      for conducting periodic testing of the pumps identified in this proposed amendment is to detect gross degradation as required by Section XI of the ASME Code. The Cook Nuclear Plant IST program, which encompasses Section XI of the ASME Code, is the basis for the existing as well  as the proposed T/Ss.        Testing the  pumps  utilizing  a high capacity to AEP:NRC:1211                                          Page 6 flowpath instead of  a  recirculation flowpath  (where applicable) will have no impact on the  ability of  the pump to perform its intended function. In fact,  it is expected that the high capacity flowpath will provide a more accurate assessment of the pump/systems'onditions and ability to meet their safety function.
The removal  of specific test parameters, in favor of referencing the Cook Nuclear Plant IST Program, will not impact the ability of the pumps to perform their safety related function. IST Program parameters ensure that the pumps under test provide the support assumed in the plant's safety analyses.
Therefore, based on these considerations,        it  is concluded that the proposed change does not involve a significant increase in the probability or consequences of an accident previously evaluated.
Cr  terion  2 The proposed  change will preclude    the need to realign selected pumps to their recirculation flowpaths for testing purposes (where applicable).
Eliminating the need for alignment to the recirculation flowpath aids in maximizing the pump's availability to perform its safety function.
As  stated previously, the removal of the specific test parameters, in favor of referencing the Cook Nuclear Plant IST Program will not impact the ability of the pumps to perform their intended safety function.
Thus, it is concluded that the proposed changes          do  not create  the possibility of a new or different kind of accident        from any accident previously evaluated.
Criterion  3 As  stated previously, testing of the selected pumps utilizing a high capacity flowpath will provide greater assurance of pump capability and maximize pump availability.          Additionally, removing specific test parameters in favor of referencing the Cook Nuclear Plant IST Program will have no impact on the ability of the pumps to perform their intended safety function. Therefore, we believe that the margin for safety as defined in 10 CFR 100 has not been reduced.                  Based on these considerations,    it  is concluded that the changes do not involve a significant reduction in    a margin  of safety.
 
Jjl ATTACHMENT 2 TO AEP:NRC:1211 EXISTING TECHNICAL SPECIFICATION PAGES MARKED TO REFLECT PROPOSED CHANGES


Attachment 1 to AEP:NRC:1211 Page 3 T S 4.7 1 2b Changes surveillance 4.7.1.2b (page 3/4 7-6)from: "Verifying that the turbine driven pump develops an equivalent discharge pressure of greater than or equal to 1285 psig (1180 psig for Unit 2)at 60'F and at a flow of greater than or equal to 700 gpm when the secondary steam supply pressure is greater than 310 psig.The provisions of Specification 4'.4 are not applicable for entry into MODE 3.To.'Veri fying that the turbine driven auxiliary f eedwater pump'developed head at the test flow point is greater than or equal to the required developed head when the secondary steam supply pressure is greater than 310 psig.The provisions of Specification 4.0.4 are not applicable for entry into MODE 3." 4.5 2.d.2 4 5 2 e 4 6 2 c 4 7.1 2e and 4.7.1 2f Delete the"daggers" and associated footnote reference to Technical Specification 4.0.8.This reference was specifically associated with a surveillance extension approved during Unit 2 cycle 9-10.It is no longer applicable.
~
II.JUSTIFICATION FOR CHANGES The proposed technical specification change eliminates the surveillance requirement to test the Unit 1 and Unit 2 centrifugal charging, safety injection, residual heat removal, containment spray, motor driven auxiliary feedwater and steam driven auxiliary feedwater pumps on their recirculation lines.It should be noted that the containment spray pumps and safety injection pumps will continue to be tested on their recirculation flowpaths as a result of existing system design.This proposed change would also remove the references to specific discharge pressures and flows associated with these pumps.This change is consistent with the assumptions and guidance provided in NUREG-1431,"Standard Technical Specifications, Westinghouse Plants," which states: "The purpose for conducting periodic testing of the pumps listed above is to detect gross degradation caused by impeller structural damage or other hydraulic component problems.This testing is required by Section XI of the American Society of Mechanical Engineers (ASME)Code.The testing described above may be accomplished by measuring the pump developed head at only one point of the pump performance curve.This verifies both that the measured Attachment 1 to AEP:NRC:1211 Page 4 performance is within an acceptable tolerance of the original pump baseline performance and that the performance at the test flow is greater than or equal to the performance assumed in the plant safety analysis.Surveillance requirements are specified in the Inservice Testing (IST)Program which encompasses Section XI of the ASME Code." The purpose of the proposed change is to eliminate the recirculation flowpath requirement for testing the above pumps and, where applicable, allow testing of the pumps utilizing a high capacity flowpath.Surveillance tests on pump recirculation lines provide limited information on the pump/system's ability to perform its safety function.The test performed on recirculation offers one data point at minimal flow and highest possible head, equivalent in most cases to the pump's shutoff head.Such low flow operation could produce unstable hydraulic forces which may result in inaccurate performance data and may also be detrimental to the pump.Pump performance test data should be obtained at flowrates as close as possible to the pump's best efficiency point.At such flowrates,'ydraulic forces are relatively stable and more accurate data is.,assured.
  '
Furthermore, while some pump degradation can be observed at both lower and higher flowrates, system degradation (e.g., pipe blockage)can be observed only at the higher flowrates, In general, pump/system degradation is far more apparent at higher flowrates.
    ., ., cWw4}}
-Testing on higher capacity flowpaths instead of the pump's recirculation line is, therefore, preferable in order to obtain more accurate data, better determine pump/system conditions, and minimize low flow pump operation.
In addition to its consistency with NUREG-1431, the above discussion is consistent with issues addressed in NUREG/CP-0123,"Proceedings of the Second NRC/ASME Symposium on Pump and Valve Testing," in particular with papers entitled,"Pump Testing in the Nuclear Industry: The Comprehensive Test and Other Considerations (page 133),""Test Quality (page 159)," and"Operating Pumps on Minimum.Flow (page 557)." The T/S requirement limiting the surveillance test to only the recirculation line also places undue demands on the pump, system, and operators for certain pumps, like the centrifugal charging pumps.Technical specification testing of these pumps on their recirculation lines require the pumps to be secured from operation, the system realigned, and the pumps restarted to support a recirculation alignment.
By allowing for a higher capacity flowpath, system realignment becomes unnecessary and normal operational flowpaths need not be disturbed.
Operator flexibility to test the pumps on a higher capacity flowpath, where possible, will aid in minimizing required system manipulations as well as maximizing component availability.
t l~~l' Attachment 1 to AEP:NRC:1211 Page 5 The proposed T/S also eliminates specific flow and pressure setpoints that correlate with testing the centrifugal charging, safety injection, residual heat removal, containment spray, and motor driven and turbine driven auxiliary feedwater pumps on their recirculation lines.The specific flows and pressures that demonstrate the capability of the pump to perform its intended safety function are identified in the Cook Nuclear Plant IST program.The minimum performance values, modeled in the accident analysis or identified as the minimum system requirement, are used in the IST program as the lowest acceptable values for continued operation.
A final benefit of changing the testing requirements of the centrifugal charging, safety injection, residual heat removal, containment spray, and motor driven and turbine driven auxiliary feedwater pumps is that it will assure uniform test requirements for T/S pumps with similar testing requirements.
Currently, essential service water and component cooling water pumps are required to be tested in accordance with the IST program.Specific flow and pressure requirements are defined by the IST program and not the T/S surveillance.
In summary, the proposed change will assure the acquisition of accurate data, better determine pump/system conditions, and minimize low flow pump operation.
Additionally, the change will provide surveillance guidance consistent with NUREG-1431, NUREG/CP-0123, and existing service water component T/Ss currently resident in Cook Nuclear Plant T/Ss.III.10 CFR 50 92 CRITERI Per 10 CFR 50.92, a proposed change does not involve a significant hazards consideration if the change does not: l.involve a significant increase in the probability or consequences of an accident previously evaluated, 2.create the possibility of a new or different kind of accident from any accident previously evaluated, or 3.involve a significant reduction in a margin of safety.Criterion The purpose for conducting periodic testing of the pumps identified in this proposed amendment is to detect gross degradation as required by Section XI of the ASME Code.The Cook Nuclear Plant IST program, which encompasses Section XI of the ASME Code, is the basis for the existing as well as the proposed T/Ss.Testing the pumps utilizing a high capacity Attachment 1 to AEP:NRC:1211 Page 6 flowpath instead of a recirculation flowpath (where applicable) will have no impact on the ability of the pump to perform its intended function.In fact, it is expected that the high capacity flowpath will provide a more accurate assessment of the pump/systems'onditions and ability to meet their safety function.The removal of specific test parameters, in favor of referencing the Cook Nuclear Plant IST Program, will not impact the ability of the pumps to perform their safety related function.IST Program parameters ensure that the pumps under test provide the support assumed in the plant's safety analyses.Therefore, based on these considerations, it is concluded that the proposed change does not involve a significant increase in the probability or consequences of an accident previously evaluated.
Cr terion 2 The proposed change will preclude the need to realign selected pumps to their recirculation flowpaths for testing purposes (where applicable).
Eliminating the need for alignment to the recirculation flowpath aids in maximizing the pump's availability to perform its safety function.As stated previously, the removal of the specific test parameters, in favor of referencing the Cook Nuclear Plant IST Program will not impact the ability of the pumps to perform their intended safety function.Thus, it is concluded that the proposed changes do not create the possibility of a new or different kind of accident from any accident previously evaluated.
Criterion 3 As stated previously, testing of the selected pumps utilizing a high capacity flowpath will provide greater assurance of pump capability and maximize pump availability.
Additionally, removing specific test parameters in favor of referencing the Cook Nuclear Plant IST Program will have no impact on the ability of the pumps to perform their intended safety function.Therefore, we believe that the margin for safety as defined in 10 CFR 100 has not been reduced.Based on these considerations, it is concluded that the changes do not involve a significant reduction in a margin of safety.
Jjl ATTACHMENT 2 TO AEP:NRC:1211 EXISTING TECHNICAL SPECIFICATION PAGES MARKED TO REFLECT PROPOSED CHANGES
~'.,., cWw4}}

Revision as of 12:37, 22 October 2019

Application for Amends to Licenses DPR-58 & DPR-74.Amends Would Modify Surveillance Requirements,Eliminating Requirement to Test Certain Safeguards Pumps
ML17332A714
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 03/31/1995
From: Fitzpatrick E
INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML17332A715 List:
References
AEP:NRC:1211, NUDOCS 9504060176
Download: ML17332A714 (20)


Text

(ACCELERATED RIDS PROCESSING)

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:9504060176 DOC.DATE: 95/03/31 NOTARIZED: YES DOCKET FACIL:50-315 Donald C. Cook Nuclear Power Plant, Unit 1, Indiana M 05000315 50-316 Donald C. Cook Nuclear Power Plant, Unit 2, Indiana M 05000316 AUTH. NAME AUTHOR AFFILIATION FITZPATRICK,E. Indiana Michigan Power Co. (formerly Indiana & Michigan Ele RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

SUBJECT:

Application for amends to licenses DPR-58 & DPR-74.Amends

. would modify surveillance requirements, eliminating requirement to test certain safeguards pumps.

DISTRIBUTION CODE: AOOID TITLE: OR COPIES RECEIVED:LTR Submittal: General Distribution L ENCL L SIZE: 0 +~

NOTES:

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD3-1 LA 1 1 PD3-1 PD 1 1 HICKMAN,J 1 1 INTERNAL:cgXXE CENTER 01 1 1 NMSS/DWM/LLDP 2 2 NRR/DRCH/HTCB 1 1 NRR/DSSA/SPLB 1 1 NRR/DSSA/SRXB 1 1 NUDOCS-ABSTRACT 1 1 OGC/HDS2 1 0 EXTERNAL: NOAC 1 1 NRC PDR 1 1 NOTE TO ALL"RlDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 504-2083 ) TO ELIMINATEYOUR NAME FROM DISTRIBUTIONLISTS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED: LTTR 13 ENCL 12

C~

indiana Michigan Power Company P.O. Box 16631 Columbus, OH 43216 FI Narch 31, 1995 AEP:NRC:1211 Docket Nos.: 50-315 50-316 U, S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D. C. 20555 Gentlemen:

Donald C. Cook Nuclear Plant Units 1 and 2 PROPOSED AMENDMENT TO TECHNICAL SPECIFICATION SURVEILLANCE REQUIREMENTS'EVISE SAFETY RELATED PUMP TESTING TO ELIMINATE RECIRCULATION ALIGNMENTS AND BE CONSISTENT WITH THE INSERVICE TESTING PROGRAM (IST) AND NUREG-1431.

This letter and its attachments constitute an application for amendment to the technical specifications (T/Ss) for Donald C. Cook Nuclear Plant units 1, and 2 ~ Specifically, we are proposing to modify the surveillance requirements to eliminate the requirement to test certain safeguards pumps via their recirculation flowpath. The following pumps are affected; the centrifugal charging pumps, residual heat removal pumps, motor driven auxiliary feedwater pumps, and the turbine driven auxiliary feedwater pumps. Two pumps, the containment spray pump and safety injection pump, will continue to be tested on their recirculation lines based on existing design. This proposed change would also eliminate references to specific discharge pressures and flows associated with these pumps. The specific test parameters being removed are controlled by the approved Cook Nuclear Plant IST program. The following unit 1 and unit 2 T/S surveillances are affected: 4.1.2.3.1, 4.1.2.4, 4.5.2f, 4.6.2.1b, 4.7.1.2a, and 4.7.1.2b.

The existing Donald C. Cook Nuclear Plant T/S surveillance requirements associated with the above pumps require testing of the pumps utilizing their recirculation lines. This method of testing provides limited information on the pump/systems'bility to perform their safety related functions. Therefore, a change to the T/S surveillance is being proposed to allow testing of these pumps using higher capacity flowpaths (where applicable).

{'GG038 950g0 +0~7+ +>03ZZ PDR ~~<<l< osoooz>q 1 I PgR

'

U. S. Nuclear Regulatory Commission AEP:NRC:1211 Page 2 Utilizing this test method would provide for more accurate data to better determine the actual pump/system conditions.

In addition to the improvement in the quality of acquired test data, the proposed amendment would also align the affected Cook Nuclear Plant T/Ss with the Merits Program T/Ss issued as NUREG-1431.

An administrative change to T/S surveillances 4.5.2.d.2, 4.5.2.e, 4.6.2.c, 4.7.1.2e, and 4.7.1.2f is also included in this amendment.

These specifications each contained a footnote associated with the unit 2 cycle 9-10 refueling outage which is no longer applicable, thus the footnotes are being removed. provides a detailed description of the proposed changes, the justification for the changes, and our determination of no significant hazards consideration performed pursuant to 10 CFR 50.92. contains the existing T/S pages marked to reflect the proposed changes. Attachment 3 contains the proposed T/S pages.

We believe the proposed changes will not result in (1) a significant change in the types of any effluent that may be released offsite, or (2) a significant increase in individual or cumulative occupational radiation exposure.

These proposed changes have been reviewed by the Plant Nuclear Safety Review Committee and the Nuclear Safety and Design Review Committee.

In compliance with the requirements of 10 CFR 50.91(b)(1), copies of this letter and its attachments have been transmitted to the Michigan Public Service Commission and to the Michigan Department of Public Health.

Sincerely, EF E; E. Fitzpatrick SWORN TO AND SUBSCRIBED BEFORE ME Vice President eh THIS ~~ DAY OF 1995 Attachment Notary Public cc: A. A. Blind G. Charnoff J. B. Martin NFEM Section Chief NRC Resident Inspector - Bridgman J. R. Padgett

i tt ATTACHMENT 1 TO AEP:NRC:1211 DESCRIPTION AND JUSTIFICATION OF CHANGES 10 CFR 50.92 ANALYSIS FOR CHANGES TO THE DONALD C. COOK NUCLEAR PLANT UNITS 1 AND 2 TECHNICAL SPECIFICATIONS

1 I

Attachment 1 to AEP:NRC:1211 Page 1 DESCRIPTION OF CHANGES The proposed amendment to technical specifications (T/Ss) surveillances; 4.1.2.3.1, 4.1.2.4, 4.5,2.d.2, 4.5.2.e, 4.5.2f, 4.6.2.lb, 4.6.2.c, 4.7.1.2a, 4.7.1.2b, 4.7.1.2e, and 4.7.1.2f make the following specific changes to Cook Nuclear Plant Units 1 and 2 T/Ss:

S 4 1 2 3 Changes surveillance 4.1.2.3.1 (page 3/4 l-ll) from:

"The above required charging pump shall be demonstrated OPERABLE by verifying, that on recirculation flow, the pump develops a discharge pressure of greater than or equal to 2390 psig when tested pursuant to Specification 4.0.5."

To:

"The above required charging pump shall be demonstrated OPERABLE by verifying that the pump's developed head at the test flow point is greater than or equal to the required developed head when tested pursuant to Specification 4.0.5."

Changes surveillance 4.1.2.4 (page 3/4 1-12) from:

"At least two charging pumps shall be demonstrated OPERABLE by verifying, that on recirculation flow, the pump develops a discharge pressure of greater than or equal to 2405 psig when tested pursuant to Specification 4.0.5."

To:

"At least two charging pumps shall be demonstrated OPERABLE by verifying that the pump's developed head at the test flow point is greater than or equal to the required developed head when tested pursuant to Specification 4.0.5."

Changes surveillance 4.5.2f (page 3/4 5-5) from:

"By verifying that each of the following pumps develops the indicated discharge pressure on recirculation flow when tested pursuant to Specification 4.0.5.

1. Centrifugal charging pump greater than or equal to 2405 psig

4 Attachment 1 to AEP:NRC:1211 Page 2

2. Safety injection pump greater than or equal to 1409 psig
3. Residual heat removal pump greater than or equal to 190 psig" To:

"By verifying that each of the following pump's developed head at the test flow point is greater than or equal to the required developed head when tested pursuant to Specification 4.0.5.

1. Centrifugal charging pumps
2. Safety injection pumps
3. Residual heat removal pumps" Changes surveillance 4.6.2.1b (page 3/4 6-10) from:

"By verifying, that on recirculation flow, each pump develops a discharge pressure of greater than or equal to 255 psig at a flow of greater than or equal to 700 gpm, when tested pursuant to Specification 4.0.5."

To:

"By verifying that each containment spray pump's developed head at the test flow point is greater than or equal to the required developed head."

Changes surveillance 4.7.1,2a (page 3/4 7-6) from:

"Verifying that each motor driven pump develops an equivalent discharge pressure of greater than or equal to 1375 psig (1240 psig for Unit 2) at 60 F on recirculation flow.

TQ:

"Verifying that each motor driven auxiliary feedwater pump's developed head at the test flow point is greater than or equal to the required developed head."

Attachment 1 to AEP:NRC:1211 Page 3 T S 4.7 1 2b Changes surveillance 4.7.1.2b (page 3/4 7-6) from:

"Verifying that the turbine driven pump develops an equivalent discharge pressure of greater than or equal to 1285 psig (1180 psig for Unit 2) at 60'F and at a flow of greater than or equal to 700 gpm when the secondary steam supply pressure is greater than 310 psig. The provisions of Specification 4 '.4 are not applicable for entry into MODE 3.

To fying that the turbine driven auxiliary feedwater pump '

.'Veri developed head at the test flow point is greater than or equal to the required developed head when the secondary steam supply pressure is greater than 310 psig. The provisions of Specification 4.0.4 are not applicable for entry into MODE 3."

4.5 2.d.2 4 5 2 e 4 6 2 c 4 7.1 2e and 4.7.1 2f Delete the "daggers" and associated footnote reference to Technical Specification 4.0.8. This reference was specifically associated with a surveillance extension approved during Unit 2 cycle 9-10. It is no longer applicable.

II. JUSTIFICATION FOR CHANGES The proposed technical specification change eliminates the surveillance requirement to test the Unit 1 and Unit 2 centrifugal charging, safety injection, residual heat removal, containment spray, motor driven auxiliary feedwater and steam driven auxiliary feedwater pumps on their recirculation lines. It should be noted that the containment spray pumps and safety injection pumps will continue to be tested on their recirculation flowpaths as a result of existing system design. This proposed change would also remove the references to specific discharge pressures and flows associated with these pumps.

This change is consistent with the assumptions and guidance provided in NUREG - 1431, "Standard Technical Specifications, Westinghouse Plants," which states:

"The purpose for conducting periodic testing of the pumps listed above is to detect gross degradation caused by impeller structural damage or other hydraulic component problems. This testing is required by Section XI of the American Society of Mechanical Engineers (ASME) Code. The testing described above may be accomplished by measuring the pump developed head at only one point of the pump performance curve. This verifies both that the measured

Attachment 1 to AEP:NRC:1211 Page 4 performance is within an acceptable tolerance of the original pump baseline performance and that the performance at the test flow is greater than or equal to the performance assumed in the plant safety analysis. Surveillance requirements are specified in the Inservice Testing (IST) Program which encompassesSection XI of the ASME Code."

The purpose of the proposed change is to eliminate the recirculation flowpath requirement for testing the above pumps and, where applicable, allow testing of the pumps utilizing a high capacity flowpath. Surveillance tests on pump recirculation lines provide limited information on the pump/system's ability to perform its safety function. The test performed on recirculation offers one data point at minimal flow and highest possible head, equivalent in most cases to the pump's shutoff head. Such low flow operation could produce unstable hydraulic forces which may result in inaccurate performance data and may also be detrimental to the pump.

Pump performance test data should be obtained at flowrates as close as possible to the pump's best efficiency point. At such flowrates,

'ydraulic forces are relatively stable and more accurate data is

.,assured. Furthermore, while some pump degradation can be observed at both lower and higher flowrates, system degradation (e.g., pipe blockage) can be observed only at the higher flowrates, In general, pump/system degradation is far more apparent at higher flowrates.

-

Testing on higher capacity flowpaths instead of the pump's recirculation line is, therefore, preferable in order to obtain more accurate data, better determine pump/system conditions, and minimize low flow pump operation.

In addition to its consistency with NUREG-1431, the above discussion is consistent with issues addressed in NUREG/CP-0123, "Proceedings of the Second NRC/ASME Symposium on Pump and Valve Testing," in particular with papers entitled, "Pump Testing in the Nuclear Industry: The Comprehensive Test and Other Considerations (page 133)," "Test Quality (page 159)," and "Operating Pumps on Minimum .

Flow (page 557)."

The T/S requirement limiting the surveillance test to only the recirculation line also places undue demands on the pump, system, and operators for certain pumps, like the centrifugal charging pumps. Technical specification testing of these pumps on their recirculation lines require the pumps to be secured from operation, the system realigned, and the pumps restarted to support a recirculation alignment. By allowing for a higher capacity flowpath, system realignment becomes unnecessary and normal operational flowpaths need not be disturbed. Operator flexibility to test the pumps on a higher capacity flowpath, where possible, will aid in minimizing required system manipulations as well as maximizing component availability.

t l ~ ~ l'

Attachment 1 to AEP:NRC:1211 Page 5 The proposed T/S also eliminates specific flow and pressure setpoints that correlate with testing the centrifugal charging, safety injection, residual heat removal, containment spray, and motor driven and turbine driven auxiliary feedwater pumps on their recirculation lines.

The specific flows and pressures that demonstrate the capability of the pump to perform its intended safety function are identified in the Cook Nuclear Plant IST program. The minimum performance values, modeled in the accident analysis or identified as the minimum system requirement, are used in the IST program as the lowest acceptable values for continued operation.

A final benefit of changing the testing requirements of the centrifugal charging, safety injection, residual heat removal, containment spray, and motor driven and turbine driven auxiliary feedwater pumps is that it will assure uniform test requirements for T/S pumps with similar testing requirements. Currently, essential service water and component cooling water pumps are required to be tested in accordance with the IST program. Specific flow and pressure requirements are defined by the IST program and not the T/S surveillance.

In summary, the proposed change will assure the acquisition of accurate data, better determine pump/system conditions, and minimize low flow pump operation. Additionally, the change will provide surveillance guidance consistent with NUREG-1431, NUREG/CP-0123, and existing service water component T/Ss currently resident in Cook Nuclear Plant T/Ss.

III. 10 CFR 50 92 CRITERI Per 10 CFR 50.92, a proposed change does not involve a significant hazards consideration if the change does not:

l. involve a significant increase in the probability or consequences of an accident previously evaluated,
2. create the possibility of a new or different kind of accident from any accident previously evaluated, or
3. involve a significant reduction in a margin of safety.

Criterion The purpose for conducting periodic testing of the pumps identified in this proposed amendment is to detect gross degradation as required by Section XI of the ASME Code. The Cook Nuclear Plant IST program, which encompassesSection XI of the ASME Code, is the basis for the existing as well as the proposed T/Ss. Testing the pumps utilizing a high capacity to AEP:NRC:1211 Page 6 flowpath instead of a recirculation flowpath (where applicable) will have no impact on the ability of the pump to perform its intended function. In fact, it is expected that the high capacity flowpath will provide a more accurate assessment of the pump/systems'onditions and ability to meet their safety function.

The removal of specific test parameters, in favor of referencing the Cook Nuclear Plant IST Program, will not impact the ability of the pumps to perform their safety related function. IST Program parameters ensure that the pumps under test provide the support assumed in the plant's safety analyses.

Therefore, based on these considerations, it is concluded that the proposed change does not involve a significant increase in the probability or consequences of an accident previously evaluated.

Cr terion 2 The proposed change will preclude the need to realign selected pumps to their recirculation flowpaths for testing purposes (where applicable).

Eliminating the need for alignment to the recirculation flowpath aids in maximizing the pump's availability to perform its safety function.

As stated previously, the removal of the specific test parameters, in favor of referencing the Cook Nuclear Plant IST Program will not impact the ability of the pumps to perform their intended safety function.

Thus, it is concluded that the proposed changes do not create the possibility of a new or different kind of accident from any accident previously evaluated.

Criterion 3 As stated previously, testing of the selected pumps utilizing a high capacity flowpath will provide greater assurance of pump capability and maximize pump availability. Additionally, removing specific test parameters in favor of referencing the Cook Nuclear Plant IST Program will have no impact on the ability of the pumps to perform their intended safety function. Therefore, we believe that the margin for safety as defined in 10 CFR 100 has not been reduced. Based on these considerations, it is concluded that the changes do not involve a significant reduction in a margin of safety.

Jjl ATTACHMENT 2 TO AEP:NRC:1211 EXISTING TECHNICAL SPECIFICATION PAGES MARKED TO REFLECT PROPOSED CHANGES

~

'

., ., cWw4