| | title = Salem Generating Station, Unit 1, U.S. Nuclear Regulatory Commission Response to Disputed Notice of Non-Cited Violation 05000272/2017003-02 | | | title = U.S. Nuclear Regulatory Commission Response to Disputed Notice of Non-Cited Violation 05000272/2017003-02 |
| | author name = Bower F L | | | author name = Bower F |
| | author affiliation = NRC/RGN-I/DRP/PB3 | | | author affiliation = NRC/RGN-I/DRP/PB3 |
| | addressee name = Sena P P | | | addressee name = Sena P |
| | addressee affiliation = PSEG Nuclear, LLC | | | addressee affiliation = PSEG Nuclear, LLC |
| | docket = 05000272 | | | docket = 05000272 |
Line 15: |
Line 15: |
| | page count = 3 | | | page count = 3 |
| }} | | }} |
| See also: [[followed by::IR 05000272/2017003]] | | See also: [[see also::IR 05000272/2017003]] |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter: | | {{#Wiki_filter:UNITED STATES |
| [[Issue date::January 9, 2018]]
| | NUCLEAR REGULATORY COMMISSION |
| | | REGION I |
| EA-17-198 Mr. Peter Sena, III President and Chief Nuclear Officer PSEG Nuclear LLC - N09 P.O. Box 236 Hancocks Bridge, NJ 08038 | | 2100 RENAISSANCE BLVD., Suite 100 |
| | | KING OF PRUSSIA, PA 19406-2713 |
| SUBJECT: U.S. NUCLEAR REGULATORY COMMISSION RESPONSE TO DISPUTED NOTICE OF NON-CITED VIOLATION 05000272/2017003-02 | | January 9, 2018 |
| | | EA-17-198 |
| ==Dear Mr. Sena:==
| | Mr. Peter Sena, III |
| I am writing to acknowledge receipt of PSEG's letter dated December 14, 2017, in response to the U.S. Nuclear Regulatory Commission (NRC) Inspection Report 05000272/2017003 and 05000311/2017003 issued on November 14, 2017 (ML17319A152)1. The letter requests withdrawal of the Salem Generating Station (Salem) Unit 1 technical specification (TS) limiting condition for operation (LCO) 3.6.1.1 Green non-cited violation (NCV 05000272/2017003-02) that was issued because PSEG did not ensure that the air particulate detector (APD) backup containment isolation valves (CIV), associated with penetrations required to be closed during accident conditions, were unisolated intermittently under appropriate administrative controls. The letter stated that the administrative controls that PSEG had put in place to govern the open remote manual CIVs were adequate. Attachment 1 to the letter also raises two additional considerations of prosecuting this NCV related to unintended safety consequences and backfit concerns. The NRC intends to review PSEG's response and provide you a letter documenting the basis for any decision relative to the disputed NCV within approximately 90 days. | | President and Chief Nuclear Officer |
| | | PSEG Nuclear LLC - N09 |
| We noted that the PSEG letter also stated that during the pendency of the NRC review of the appeal of the NCV, PSEG Nuclear indicated that it intended to toll the timing related to submission of a licensee event report (LER) as may be required under 10 CFR 50.73(a)(2)(i)(B). As it wasn't necessarily clear to NRC Region I that PSEG Nuclear possesses the authority, upon its own accord, to toll the required timing of a LER required under 10 CFR 50.73(a)(2)(i)(B), Region I communicated this to PSEG. In response, during a telephone conversation on January 8, 2018, Mr. C. McFeaters, Salem Site Vice President, informed Mr. D. Pelton, Acting Director, NRC Region I, Division of Reactor Projects that PSEG no longer intends to toll the timing related to submission of a LER. Hence, the NRC now considers the proposal to toll withdrawn and moot. 1 Designation refers to an Agencywide Documents Access and Management System (ADAMS) accession number. Documents referenced in this letter are publicly-available using the accession number in ADAMS at https://adams.nrc.gov/wba/ For problems with ADAMS, please contact the NRC's Public Document Room (PDR) reference staff at 1-800-397-4209, 301-415-4737, or by e-mail to pdr.resource@nrc.gov. In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRC's "Rules of Practice," a copy of this letter, its enclosure, and your response (if any) will be available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC's website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). Your letter has also been added to ADAMS for the information of the public, and may be found under ADAMS Accession Number ML17348A477. Inspection Report 05000272/2017003 and 05000311/2017003 may be found under ADAMS Accession Number ML17319A152. | | P.O. Box 236 |
| | Hancocks Bridge, NJ 08038 |
| | SUBJECT: U.S. NUCLEAR REGULATORY COMMISSION RESPONSE TO DISPUTED |
| | NOTICE OF NON-CITED VIOLATION 05000272/2017003-02 |
| | Dear Mr. Sena: |
| | I am writing to acknowledge receipt of PSEGs letter dated December 14, 2017, in response to |
| | the U.S. Nuclear Regulatory Commission (NRC) Inspection Report 05000272/2017003 and |
| | 05000311/2017003 issued on November 14, 2017 (ML17319A152)1. |
| | The letter requests withdrawal of the Salem Generating Station (Salem) Unit 1 technical |
| | specification (TS) limiting condition for operation (LCO) 3.6.1.1 Green non-cited violation |
| | (NCV 05000272/2017003-02) that was issued because PSEG did not ensure that the air |
| | particulate detector (APD) backup containment isolation valves (CIV), associated with |
| | penetrations required to be closed during accident conditions, were unisolated intermittently |
| | under appropriate administrative controls. The letter stated that the administrative controls that |
| | PSEG had put in place to govern the open remote manual CIVs were adequate. Attachment 1 |
| | to the letter also raises two additional considerations of prosecuting this NCV related to |
| | unintended safety consequences and backfit concerns. The NRC intends to review PSEGs |
| | response and provide you a letter documenting the basis for any decision relative to the |
| | disputed NCV within approximately 90 days. |
| | We noted that the PSEG letter also stated that during the pendency of the NRC review of the |
| | appeal of the NCV, PSEG Nuclear indicated that it intended to toll the timing related to |
| | submission of a licensee event report (LER) as may be required under 10 CFR |
| | 50.73(a)(2)(i)(B). As it wasnt necessarily clear to NRC Region I that PSEG Nuclear possesses |
| | the authority, upon its own accord, to toll the required timing of a LER required under 10 CFR |
| | 50.73(a)(2)(i)(B), Region I communicated this to PSEG. In response, during a telephone |
| | conversation on January 8, 2018, Mr. C. McFeaters, Salem Site Vice President, informed |
| | Mr. D. Pelton, Acting Director, NRC Region I, Division of Reactor Projects that PSEG no longer |
| | intends to toll the timing related to submission of a LER. Hence, the NRC now considers the |
| | proposal to toll withdrawn and moot. |
| | 1 |
| | Designation refers to an Agencywide Documents Access and Management System (ADAMS) accession number. |
| | Documents referenced in this letter are publicly-available using the accession number in ADAMS at |
| | https://adams.nrc.gov/wba/ For problems with ADAMS, please contact the NRCs Public Document Room (PDR) |
| | reference staff at 1-800-397-4209, 301-415-4737, or by e-mail to pdr.resource@nrc.gov. |
|
| |
|
| | P. Sena 2 |
| | In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs |
| | Rules of Practice, a copy of this letter, its enclosure, and your response (if any) will be |
| | available electronically for public inspection in the NRCs Public Document Room or from the |
| | Publicly Available Records component of the NRCs Agencywide Documents Access and |
| | Management System (ADAMS). ADAMS is accessible from the NRCs website at |
| | http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). |
| | Your letter has also been added to ADAMS for the information of the public, and may be found |
| | under ADAMS Accession Number ML17348A477. Inspection Report 05000272/2017003 and |
| | 05000311/2017003 may be found under ADAMS Accession Number ML17319A152. |
| Should you have any questions concerning this letter, please contact me at (610) 337-5200. | | Should you have any questions concerning this letter, please contact me at (610) 337-5200. |
| | Sincerely, |
| | /RA/ |
| | Fred L Bower, Chief |
| | Projects Branch 3 |
| | Division of Reactor Projects |
| | Docket No. 50-272 |
| | License No. DPR-70 |
| | cc: 2017-SST-1261 and 2017-SST-1271 |
| | Distribution via ListServ |
|
| |
|
| Sincerely,/RA/ Fred L Bower, Chief Projects Branch 3 Division of Reactor Projects Docket No. 50-272 License No. DPR-70
| |
|
| |
| cc: 2017-SST-1261 and 2017-SST-1271 Distribution via ListServ SUBJECT: U.S. NUCLEAR REGULATORY COMMISSION RESPONSE TO DISPUTED NOTICE OF NON-CITED VIOLATION 05000272/2017003-02 DATED JANUARY 9, 2018
| |
|
| |
| DISTRIBUTION: (via email) DLew, DRA DCollins, DRA RLorson, DRP DPelton, DRP MGray, DRP JYerokun, DRS BWelling, DRS BKlukan, RC BBickett, ORA, AET FBower, DRP RBarkley, DRP MDraxton, DRP PFinney, DRP, SRI AZiedonis, DRP, RI FArner, DRS GBarber, DRP COtt, DRP, AA JBowen, RI OEDO RidsNrrPMSalem Resource RidsNrrDorlLpl1 Resource
| |
|
| |
|
| DOC NAME: \\nrc.gov\nrc\R1\Office\DRP\BRANCH3\Enforcement\Salem APD Violation Challenge\Salem Disputed APD NCV Ack Letter_Final.docx ADAMS Accession No. ML18009A953 SUNSI Review Non-Sensitive Sensitive Publicly Available Non-Publicly Available OFFICE RI/DRS RI/ORA/AET RI/RC RI/DRP NAME FArner BBickett BKlukan FBower DATE 01/09/18 01/09/18 01/09/18 01/09/18 OFFICIAL RECORD COPY
| | ML18009A953 |
| | Non-Sensitive Publicly Available |
| | SUNSI Review |
| | Sensitive Non-Publicly Available |
| | OFFICE RI/DRS RI/ORA/AET RI/RC RI/DRP |
| | NAME FArner BBickett BKlukan FBower |
| | DATE 01/09/18 01/09/18 01/09/18 01/09/18 |
| }} | | }} |
Similar Documents at Salem |
---|
Category:Letter
MONTHYEARIR 05000272/20244032024-09-25025 September 2024 and Salem Nuclear Generating Station, Units 1 and 2, Cybersecurity Inspection Report 05000354/2024403, 05000272/2024403, and 05000311/2024403 (Cover Letter Only) ML24267A1082024-09-23023 September 2024 Submittal of the Reactor Vessel Material Surveillance Program Capsule Technical Report IR 05000272/20244022024-09-23023 September 2024 and Salem Nuclear Generating Station, Units 1 and 2 - Security Baseline Inspection Report 05000354/2024402, 05000272/2024402, and 05000311/2024402 (Cover Letter Only) IR 05000272/20240052024-08-29029 August 2024 Updated Inspection Plan for Salem Nuclear Generating Station, Units 1 and 2 (Report 05000272/2024005 and 05000311/2024005) IR 05000272/20240022024-07-30030 July 2024 Integrated Inspection Report 05000272/2024002 and 05000311/2024002 LR-N24-0012, Application to Revise Technical Specifications and 10 CFR 50.12 Exemption Request to Implement Optimized ZIRLO Fuel Rod Cladding2024-07-24024 July 2024 Application to Revise Technical Specifications and 10 CFR 50.12 Exemption Request to Implement Optimized ZIRLO Fuel Rod Cladding ML24145A1772024-07-15015 July 2024 and Salem Nuclear Generating Station, Unit Nos. 1 and 2 - Issuance of Amendment Nos. 236, 349, and 331 Modify Exclusion Area Boundary IR 05000272/20245012024-06-12012 June 2024 and Salem Nuclear Generating Station, Units 1 and 2 - Emergency Preparedness Biennial Exercise Inspection Report 05000354/2024501, 05000272/2024501 and 05000311/2024501 ML24099A1572024-05-29029 May 2024 Issuance of Amendment Nos. 348 and 330 Permanent Extension of Type a and Type C Containment Leak Rate Test Frequencies ML24150A0032024-05-28028 May 2024 Request for Exemptions from 10 CFR 50.82(a)(8)(i)(A) and 10 CFR 50.75(h)(1)(iv) and Proposed Amendment to the Decommissioning Trust Agreement LR-N24-0041, Stations, Revisions to Emergency Plan Document Nc EP-EP-ZZ-01102, Rev. 28, Emergency Coordinator Response2024-05-22022 May 2024 Stations, Revisions to Emergency Plan Document Nc EP-EP-ZZ-01102, Rev. 28, Emergency Coordinator Response IR 05000272/20240102024-05-16016 May 2024 Fire Protection Team Inspection Report 05000272/2024010 and 05000311/2024010 LR-N24-0038, Pressure Boundary Leakage Through a Reactor Coolant Pump Thermal Barrier Heat Exchanger2024-05-0909 May 2024 Pressure Boundary Leakage Through a Reactor Coolant Pump Thermal Barrier Heat Exchanger IR 05000272/20240012024-05-0707 May 2024 Integrated Inspection Report 05000272/2024001 and 05000311/2024001 LR-N24-0039, Steam Generator Tube Inspection Report - Twenty-ninth Refueling Outage2024-05-0606 May 2024 Steam Generator Tube Inspection Report - Twenty-ninth Refueling Outage LR-N24-0035, 2023 Annual Radiological Environmental Operating Report (AREOR)2024-04-30030 April 2024 2023 Annual Radiological Environmental Operating Report (AREOR) LR-N24-0034, 2023 Annual Radioactive Effluent Release Report (ARERR)2024-04-30030 April 2024 2023 Annual Radioactive Effluent Release Report (ARERR) LR-N24-0024, Response to Request for Additional Information Associated with License Amendment Request (LAR) to Modify the Salem and Hope Creek Exclusion Area Boundary2024-04-26026 April 2024 Response to Request for Additional Information Associated with License Amendment Request (LAR) to Modify the Salem and Hope Creek Exclusion Area Boundary LR-N24-0011, Supplemental Information to License Amendment Request (LAR) to Modify the Salem and Hope Creek Exclusion Area Boundary2024-04-0505 April 2024 Supplemental Information to License Amendment Request (LAR) to Modify the Salem and Hope Creek Exclusion Area Boundary IR 05000272/20240112024-04-0101 April 2024 and Salem Nuclear Generating Station, Units 1 and 2 - Plant Modification and Annual Problem Identification and Resolution Inspection Report 05000354/2024011, 05000272/2024011, and 05000311/2024011 LR-N24-0028, and Salem Generating Station - Notice of Intent to Pursue Subsequent License Renewal2024-03-28028 March 2024 and Salem Generating Station - Notice of Intent to Pursue Subsequent License Renewal LR-N24-0021, and Salem Generating Station, Units 1 and 2 - Guarantees of Payment of Deferred Premiums2024-03-20020 March 2024 and Salem Generating Station, Units 1 and 2 - Guarantees of Payment of Deferred Premiums ML24071A2132024-03-12012 March 2024 Senior Reactor and Reactor Operator Initial License Examinations LR-N24-0020, Generation Station and Salem Generating Station, Units 1 & 2 - Annual Property Insurance Status Report2024-03-0707 March 2024 Generation Station and Salem Generating Station, Units 1 & 2 - Annual Property Insurance Status Report LR-N24-0022, Spent Fuel Cask Registration2024-02-29029 February 2024 Spent Fuel Cask Registration IR 05000272/20230062024-02-28028 February 2024 Annual Assessment Letter for Salem Nuclear Generating Station, Units 1 and 2 (Reports 05000272/2023006 and 05000311/2023006 IR 05000272/20244012024-02-26026 February 2024 and Salem Nuclear Generating Station, Units 1 and 2 - Security Baseline Inspection Report 05000354/2024401, 05000272/2024401 and 05000311/2024401 (Cover Letter Only) IR 05000272/20230042024-02-0505 February 2024 Integrated Inspection Report 05000272/2023004 and 05000311/2023004 LR-N24-0009, In-Service Inspection Activities2024-02-0505 February 2024 In-Service Inspection Activities ML24009A1022024-01-26026 January 2024 – Exemption from Select Requirements of 10 CF Part 73 (EPID L-2023-LLE-0045 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) IR 05000272/20234012024-01-22022 January 2024 Material Control and Accounting Program Inspection Report 05000272/2023401 and 05000311/2023401 ML24004A1542024-01-0808 January 2024 Notification of Conduct of a Fire Protection Team Inspection LR-N23-0079, Special Report 23-02-00 Pursuant to the Requirements of Salem Unit 1 Technical Specification 3.3.3.7, Action 10, for the Unit 1 Main Steam Line Rad Monitor Inoperable for Greater than Seven Days2023-12-0707 December 2023 Special Report 23-02-00 Pursuant to the Requirements of Salem Unit 1 Technical Specification 3.3.3.7, Action 10, for the Unit 1 Main Steam Line Rad Monitor Inoperable for Greater than Seven Days ML23270C0072023-11-29029 November 2023 Notice of Proposed Amendment to Decommissioning Trust Agreement LR-N23-0077, Loss of Coolant Accident Peak Cladding Temperature Margin Tracking - Annual Report 2023 & 30 Day Report for Salem Unit 1 Upflow Conversion2023-11-29029 November 2023 Loss of Coolant Accident Peak Cladding Temperature Margin Tracking - Annual Report 2023 & 30 Day Report for Salem Unit 1 Upflow Conversion ML23324A3072023-11-17017 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML24250A0582023-11-14014 November 2023 PSEG to Marine Mammal Stranding Center, Salem Sea Turtle Stranding Response Services IR 05000272/20230032023-11-13013 November 2023 Integrated Inspection Report 05000272/2023003 and 05000311/2023003 LR-N23-0072, Core Operating Limits Report Cycle 302023-11-0101 November 2023 Core Operating Limits Report Cycle 30 IR 05000272/20230102023-10-12012 October 2023 Biennial Problem Identification and Resolution Inspection Report O5000272/2023010 and 05000311/2023010 IR 05000272/20234022023-10-12012 October 2023 and Salem Nuclear Generating Station, Units 1 and 2 - Security Baseline Inspection Report 05000354/2023402, 05000272/2023402 and 05000311/2023402 (Cover Letter Only) LR-N23-0045, and Peach Bottom Atomic Power Station, Units 2 and 3 - Notice of Proposed Amendment to Decommissioning Trust Agreement2023-09-0808 September 2023 and Peach Bottom Atomic Power Station, Units 2 and 3 - Notice of Proposed Amendment to Decommissioning Trust Agreement ML23249A2612023-09-0606 September 2023 License Amendment Request to Modify the Salem and Hope Creek Exclusion Area Boundary IR 05000272/20230052023-08-31031 August 2023 Updated Inspection Plan for Salem Nuclear Generating Station, Units 1 and 2 (Reports 05000272/2023005 and 05000311/2023005) ML23233A0762023-08-21021 August 2023 Requalification Program Inspection ML23192A8212023-08-14014 August 2023 and Salem Nuclear Generating Station, Unit Nos. 1 and 2 - Issuance of Amendment Nos. 234, 347, and 329 Revise Technical Specifications to Delete Meteorological Tower Location IR 05000272/20230022023-08-0909 August 2023 Integrated Inspection Report 05000272/2023002 and 05000311/2023002 LR-N23-0055, Special Report 272/23-01-00, Pursuant to the Requirements of Technical Specification 3.3.3.1, Action 23, for the Vent Noble Gas Rad Monitor Inoperable for Greater than Seven Days2023-08-0303 August 2023 Special Report 272/23-01-00, Pursuant to the Requirements of Technical Specification 3.3.3.1, Action 23, for the Vent Noble Gas Rad Monitor Inoperable for Greater than Seven Days IR 05000354/20230022023-08-0303 August 2023 Integrated Inspection Report 05000354/2023002 and Independent Spent Fuel Storage Installation Inspection Report 07200048/2023001 LR-N23-0054, In-Service Inspection Activities2023-07-26026 July 2023 In-Service Inspection Activities 2024-09-25
[Table view] |
See also: IR 05000272/2017003
Text
UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION I
2100 RENAISSANCE BLVD., Suite 100
KING OF PRUSSIA, PA 19406-2713
January 9, 2018
EA-17-198
Mr. Peter Sena, III
President and Chief Nuclear Officer
PSEG Nuclear LLC - N09
P.O. Box 236
Hancocks Bridge, NJ 08038
SUBJECT: U.S. NUCLEAR REGULATORY COMMISSION RESPONSE TO DISPUTED
NOTICE OF NON-CITED VIOLATION 05000272/2017003-02
Dear Mr. Sena:
I am writing to acknowledge receipt of PSEGs letter dated December 14, 2017, in response to
the U.S. Nuclear Regulatory Commission (NRC) Inspection Report 05000272/2017003 and
05000311/2017003 issued on November 14, 2017 (ML17319A152)1.
The letter requests withdrawal of the Salem Generating Station (Salem) Unit 1 technical
specification (TS) limiting condition for operation (LCO) 3.6.1.1 Green non-cited violation
(NCV 05000272/2017003-02) that was issued because PSEG did not ensure that the air
particulate detector (APD) backup containment isolation valves (CIV), associated with
penetrations required to be closed during accident conditions, were unisolated intermittently
under appropriate administrative controls. The letter stated that the administrative controls that
PSEG had put in place to govern the open remote manual CIVs were adequate. Attachment 1
to the letter also raises two additional considerations of prosecuting this NCV related to
unintended safety consequences and backfit concerns. The NRC intends to review PSEGs
response and provide you a letter documenting the basis for any decision relative to the
disputed NCV within approximately 90 days.
We noted that the PSEG letter also stated that during the pendency of the NRC review of the
appeal of the NCV, PSEG Nuclear indicated that it intended to toll the timing related to
submission of a licensee event report (LER) as may be required under 10 CFR
50.73(a)(2)(i)(B). As it wasnt necessarily clear to NRC Region I that PSEG Nuclear possesses
the authority, upon its own accord, to toll the required timing of a LER required under 10 CFR
50.73(a)(2)(i)(B), Region I communicated this to PSEG. In response, during a telephone
conversation on January 8, 2018, Mr. C. McFeaters, Salem Site Vice President, informed
Mr. D. Pelton, Acting Director, NRC Region I, Division of Reactor Projects that PSEG no longer
intends to toll the timing related to submission of a LER. Hence, the NRC now considers the
proposal to toll withdrawn and moot.
1
Designation refers to an Agencywide Documents Access and Management System (ADAMS) accession number.
Documents referenced in this letter are publicly-available using the accession number in ADAMS at
https://adams.nrc.gov/wba/ For problems with ADAMS, please contact the NRCs Public Document Room (PDR)
reference staff at 1-800-397-4209, 301-415-4737, or by e-mail to pdr.resource@nrc.gov.
P. Sena 2
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs
Rules of Practice, a copy of this letter, its enclosure, and your response (if any) will be
available electronically for public inspection in the NRCs Public Document Room or from the
Publicly Available Records component of the NRCs Agencywide Documents Access and
Management System (ADAMS). ADAMS is accessible from the NRCs website at
http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Your letter has also been added to ADAMS for the information of the public, and may be found
under ADAMS Accession Number ML17348A477. Inspection Report 05000272/2017003 and
05000311/2017003 may be found under ADAMS Accession Number ML17319A152.
Should you have any questions concerning this letter, please contact me at (610) 337-5200.
Sincerely,
/RA/
Fred L Bower, Chief
Projects Branch 3
Division of Reactor Projects
Docket No. 50-272
License No. DPR-70
cc: 2017-SST-1261 and 2017-SST-1271
Distribution via ListServ
ML18009A953
Non-Sensitive Publicly Available
SUNSI Review
Sensitive Non-Publicly Available
OFFICE RI/DRS RI/ORA/AET RI/RC RI/DRP
NAME FArner BBickett BKlukan FBower
DATE 01/09/18 01/09/18 01/09/18 01/09/18