U.S. Nuclear Regulatory Commission Response to Disputed Notice of Non-Cited Violation 05000272/2017003-02
ML18009A953
Person / Time
Site: Salem PSEG icon.png
Issue date: 01/09/2018
From: Fred Bower
Reactor Projects Branch 3
To: Sena P
Public Service Enterprise Group
References
EA-17-198 IR 2017003
Download: ML18009A953 (3)


See also: IR 05000272/2017003

Text

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION I

2100 RENAISSANCE BLVD., Suite 100

KING OF PRUSSIA, PA 19406-2713

January 9, 2018

EA-17-198

Mr. Peter Sena, III

President and Chief Nuclear Officer

PSEG Nuclear LLC - N09

P.O. Box 236

Hancocks Bridge, NJ 08038

SUBJECT: U.S. NUCLEAR REGULATORY COMMISSION RESPONSE TO DISPUTED

NOTICE OF NON-CITED VIOLATION 05000272/2017003-02

Dear Mr. Sena:

I am writing to acknowledge receipt of PSEGs letter dated December 14, 2017, in response to

the U.S. Nuclear Regulatory Commission (NRC) Inspection Report 05000272/2017003 and

05000311/2017003 issued on November 14, 2017 (ML17319A152)1.

The letter requests withdrawal of the Salem Generating Station (Salem) Unit 1 technical

specification (TS) limiting condition for operation (LCO) 3.6.1.1 Green non-cited violation

(NCV 05000272/2017003-02) that was issued because PSEG did not ensure that the air

particulate detector (APD) backup containment isolation valves (CIV), associated with

penetrations required to be closed during accident conditions, were unisolated intermittently

under appropriate administrative controls. The letter stated that the administrative controls that

PSEG had put in place to govern the open remote manual CIVs were adequate. Attachment 1

to the letter also raises two additional considerations of prosecuting this NCV related to

unintended safety consequences and backfit concerns. The NRC intends to review PSEGs

response and provide you a letter documenting the basis for any decision relative to the

disputed NCV within approximately 90 days.

We noted that the PSEG letter also stated that during the pendency of the NRC review of the

appeal of the NCV, PSEG Nuclear indicated that it intended to toll the timing related to

submission of a licensee event report (LER) as may be required under 10 CFR

50.73(a)(2)(i)(B). As it wasnt necessarily clear to NRC Region I that PSEG Nuclear possesses

the authority, upon its own accord, to toll the required timing of a LER required under 10 CFR

50.73(a)(2)(i)(B), Region I communicated this to PSEG. In response, during a telephone

conversation on January 8, 2018, Mr. C. McFeaters, Salem Site Vice President, informed

Mr. D. Pelton, Acting Director, NRC Region I, Division of Reactor Projects that PSEG no longer

intends to toll the timing related to submission of a LER. Hence, the NRC now considers the

proposal to toll withdrawn and moot.

1

Designation refers to an Agencywide Documents Access and Management System (ADAMS) accession number.

Documents referenced in this letter are publicly-available using the accession number in ADAMS at

https://adams.nrc.gov/wba/ For problems with ADAMS, please contact the NRCs Public Document Room (PDR)

reference staff at 1-800-397-4209, 301-415-4737, or by e-mail to pdr.resource@nrc.gov.

P. Sena 2

In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs

Rules of Practice, a copy of this letter, its enclosure, and your response (if any) will be

available electronically for public inspection in the NRCs Public Document Room or from the

Publicly Available Records component of the NRCs Agencywide Documents Access and

Management System (ADAMS). ADAMS is accessible from the NRCs website at

http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Your letter has also been added to ADAMS for the information of the public, and may be found

under ADAMS Accession Number ML17348A477. Inspection Report 05000272/2017003 and

05000311/2017003 may be found under ADAMS Accession Number ML17319A152.

Should you have any questions concerning this letter, please contact me at (610) 337-5200.

Sincerely,

/RA/

Fred L Bower, Chief

Projects Branch 3

Division of Reactor Projects

Docket No. 50-272

License No. DPR-70

cc: 2017-SST-1261 and 2017-SST-1271

Distribution via ListServ

ML18009A953

Non-Sensitive Publicly Available

SUNSI Review

Sensitive Non-Publicly Available

OFFICE RI/DRS RI/ORA/AET RI/RC RI/DRP

NAME FArner BBickett BKlukan FBower

DATE 01/09/18 01/09/18 01/09/18 01/09/18