ML18017A446: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(One intermediate revision by the same user not shown)
Line 3: Line 3:
| issue date = 11/28/2017
| issue date = 11/28/2017
| title = Submittal of Updated Final Safety Analysis Report, Amendment 27
| title = Submittal of Updated Final Safety Analysis Report, Amendment 27
| author name = Williams A L
| author name = Williams A
| author affiliation = Tennessee Valley Authority
| author affiliation = Tennessee Valley Authority
| addressee name =  
| addressee name =  
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:l Security Related Information Withhold Under 10CFR 2.390 This letter is decontrolled when separated from Enclosure 2 U.S. Nuclear Regulatory Commission Page 2 November 28, 2017 There are no new regulatory commitments contained in this letter. If you have any questions concerning this submittal, please call Michael McBrearty at (423) 843-7170.
{{#Wiki_filter:-
I declare under penalty of perjury that the foregoing is true and correct. Executed on this 28.!h day of November 2017. ny L. Williams Site Vice President Sequoyah Nuclear Plant  
                  ',\
I Security Related Information Withhold Under 10 CFR 2.390 This letter is decontrolled when separated from Enclosure 2 Tennessee Valley Authority, Sequoyah Nuclear Plant, P.O. Box 2000, Soddy Daisy, Tennessee 37384 November 28, 2017 10 CFR 50.4 10 CFR 50.71{e)
ATTN: Document Control Desk U. S. Nuclear Regulatory Commission Washington, D.C. 205550001 Sequ9yah Nuclear Plant, Units 1 and 2 Renewed Facility Operating License Nos. DPR-77 and DPR-79 NRC Docket Nos. 50-327 and 50-328
 
==Subject:==
Updated Final Safety Analysis Repbrt Amendment 27 Consistent with the requirements of 10 CFR 50.4(b)(6) and 1 O CFR 50:71 (e), enclosed for Sequoyah 'Nuclear Plant (SQN) Units 1 and 2, are two compact discs {CD-ROM) that contain Amendment 27 of the Updated Final Safety Analysis Report (UFSAR).
The Ten.nessee Valley Authority (TVA) has marked this Amendment for redaction as indicated by Regulatory Issue Summary 2015-17, "Review and Submission of updates to Final Safety Analysis Reports, Emergency Preparedness Documents, and Fire Protection Documents," dated December 23, 2015, using the criteria provided by the NRC in SECY-04-191.
Enclosure 1 to this letter is a copy redacted according to the marking for Nuclear Regulatory Commission {NRC) Public Use. Enclosure 2 provides the Non-Public Use version, which is marked, but not redacted. TVA has marked the information as "Security-Related Information -Withhold Under 10 CFR 2.390."
Internally to TVA, access to the UFSAR is not restricted.
This letter certifies that the information provided in the enclosed Amendment 27 accurately reflects the information and analyses from changes made since the issuance of ttie previous Amendment 26 on June 10, 2016.
                                                                                                          /cO S '!::,
                                                                                                          ;+1--45 oD4' R.
printed on recycled paper
 
Security Related Information Withhold Under 10CFR 2.390 This letter is decontrolled when separated from Enclosure 2 U.S. Nuclear Regulatory Commission Page 2 November 28, 2017 There are no new regulatory commitments contained in this letter. If you have any questions concerning this submittal, please call Michael McBrearty at (423) 843-7170.
I declare under penalty of perjury that the foregoing is true and correct. Executed on this 28.!h day of November 2017.
ny L. Williams Site Vice President Sequoyah Nuclear Plant


==Enclosures:==
==Enclosures:==
: 1. Redacted Updated Final Safety Analysis Report -Amendment 27 (Public Use Only) 2. Updated Final Safety Analysis Report -Amendment 27 (Non-Public Use) cc (w/o Enclosures):
: 1. Redacted Updated Final Safety Analysis Report - Amendment 27 (Public Use Only)
NRC Regional Administrator  
: 2. Updated Final Safety Analysis Report - Amendment 27 (Non-Public Use) cc (w/o Enclosures):
-Region II NRC Senior Resident Inspector  
NRC Regional Administrator - Region II NRC Senior Resident Inspector - Sequoyah Nuclear Plant NRC Project Manager - Sequoyah Nuclear Plant AREVA Nuclear Power, Inc.
-Sequoyah Nuclear Plant NRC Project Manager -Sequoyah Nuclear Plant AREVA Nuclear Power, Inc. Attn: Mr. Joshua L. Parker 3315 Old Forest Road OF-11 Lynchburg, Virginia 24501 ENCLOSURE 1 SEQUOYAH NUCLEAR PLANT REDACTED UPDATED FINAL SAFETY ANALYSIS REPORT AMENDMENT 27 (PUBLIC USE ONLY) (PROVIDED ON ENCLOSED COMPACT DISC)}}
Attn: Mr. Joshua L. Parker 3315 Old Forest Road OF-11 Lynchburg, Virginia 24501 l
 
ENCLOSURE 1 SEQUOYAH NUCLEAR PLANT REDACTED UPDATED FINAL SAFETY ANALYSIS REPORT AMENDMENT 27 (PUBLIC USE ONLY)
(PROVIDED ON ENCLOSED COMPACT DISC)}}

Latest revision as of 04:15, 22 October 2019

Submittal of Updated Final Safety Analysis Report, Amendment 27
ML18017A446
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 11/28/2017
From: Anthony Williams
Tennessee Valley Authority
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML18017A446 (3)


Text

-

',\

I Security Related Information Withhold Under 10 CFR 2.390 This letter is decontrolled when separated from Enclosure 2 Tennessee Valley Authority, Sequoyah Nuclear Plant, P.O. Box 2000, Soddy Daisy, Tennessee 37384 November 28, 2017 10 CFR 50.4 10 CFR 50.71{e)

ATTN: Document Control Desk U. S. Nuclear Regulatory Commission Washington, D.C. 205550001 Sequ9yah Nuclear Plant, Units 1 and 2 Renewed Facility Operating License Nos. DPR-77 and DPR-79 NRC Docket Nos. 50-327 and 50-328

Subject:

Updated Final Safety Analysis Repbrt Amendment 27 Consistent with the requirements of 10 CFR 50.4(b)(6) and 1 O CFR 50:71 (e), enclosed for Sequoyah 'Nuclear Plant (SQN) Units 1 and 2, are two compact discs {CD-ROM) that contain Amendment 27 of the Updated Final Safety Analysis Report (UFSAR).

The Ten.nessee Valley Authority (TVA) has marked this Amendment for redaction as indicated by Regulatory Issue Summary 2015-17, "Review and Submission of updates to Final Safety Analysis Reports, Emergency Preparedness Documents, and Fire Protection Documents," dated December 23, 2015, using the criteria provided by the NRC in SECY-04-191.

Enclosure 1 to this letter is a copy redacted according to the marking for Nuclear Regulatory Commission {NRC) Public Use. Enclosure 2 provides the Non-Public Use version, which is marked, but not redacted. TVA has marked the information as "Security-Related Information -Withhold Under 10 CFR 2.390."

Internally to TVA, access to the UFSAR is not restricted.

This letter certifies that the information provided in the enclosed Amendment 27 accurately reflects the information and analyses from changes made since the issuance of ttie previous Amendment 26 on June 10, 2016.

/cO S '!::,

+1--45 oD4' R.

printed on recycled paper

Security Related Information Withhold Under 10CFR 2.390 This letter is decontrolled when separated from Enclosure 2 U.S. Nuclear Regulatory Commission Page 2 November 28, 2017 There are no new regulatory commitments contained in this letter. If you have any questions concerning this submittal, please call Michael McBrearty at (423) 843-7170.

I declare under penalty of perjury that the foregoing is true and correct. Executed on this 28.!h day of November 2017.

ny L. Williams Site Vice President Sequoyah Nuclear Plant

Enclosures:

1. Redacted Updated Final Safety Analysis Report - Amendment 27 (Public Use Only)
2. Updated Final Safety Analysis Report - Amendment 27 (Non-Public Use) cc (w/o Enclosures):

NRC Regional Administrator - Region II NRC Senior Resident Inspector - Sequoyah Nuclear Plant NRC Project Manager - Sequoyah Nuclear Plant AREVA Nuclear Power, Inc.

Attn: Mr. Joshua L. Parker 3315 Old Forest Road OF-11 Lynchburg, Virginia 24501 l

ENCLOSURE 1 SEQUOYAH NUCLEAR PLANT REDACTED UPDATED FINAL SAFETY ANALYSIS REPORT AMENDMENT 27 (PUBLIC USE ONLY)

(PROVIDED ON ENCLOSED COMPACT DISC)