ML18024A069: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
(5 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML18024A069
| number = ML18024A069
| issue date = 05/31/1978
| issue date = 05/31/1978
| title = Susquehanna Units 1 and 2 - Letter Referring to the December 1, 1977 Letter Providing an Interim Report of a Deficiency in Physical Separation of Electrical Circuits and Advising the Commission That the Definitive Report Will Be Submitted b
| title = Letter Referring to the December 1, 1977 Letter Providing an Interim Report of a Deficiency in Physical Separation of Electrical Circuits and Advising the Commission That the Definitive Report Will Be Submitted by September
| author name = Curtis N W
| author name = Curtis N
| author affiliation = Pennsylvania Power & Light Co
| author affiliation = Pennsylvania Power & Light Co
| addressee name = Grier B H
| addressee name = Grier B
| addressee affiliation = NRC/RGN-I
| addressee affiliation = NRC/RGN-I
| docket = 05000387, 05000388
| docket = 05000387, 05000388
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:REGULATORYINFORMATIONDISTRIBUTIONSYSTEM<RIDS)DISTRIBUTIONFORINCOMINGMATERIAL50-387REC:GRIERBHNRCORG:CURTISNW.PAPNR8(LIGHTDOCDATE'5/31/78DATERCVD:06/07/78DOCTYPE:LETTERNOTARIZED:NOCOPIESRECEIVED
{{#Wiki_filter:REGULATORY INFORMATION DISTRIBUTION SYSTEM            < RIDS)
DISTRIBUTION FOR INCOMING MATERIAL                                50-387 REC:   GRIER B H                  ORG: CURTIS  N  W .                     DOCDATE'5/31/78 NRC                                PA PNR  8( LIGHT                      DATE RCVD: 06/07/78 DOCTYPE:   LETTER    NOTARIZED: NO                                            COPIES RECEIVED


==SUBJECT:==
==SUBJECT:==
LTR1ENCL0ADVISINGFINALCONSTRUCTIONDEFICIENCYREPTCONCERNINGADEFICIENCYINPHYSICALSEPARATIONOFELECCIRCUITSOFSUBJECTFACILITYSUBMITTEDBYLTRDTD12/01/77'ILLBESUBMITTEDBY09/05f78.PLANTNAME:SUSQUEHANNA-UNIT1DISTRIBUTIONOFTHISMATERIALISCONSTRUCTIONDEFICIENCYREPORT<10CFR50.55E)(DISTRIBUTIONCODEB019>REVIEWERINITIAL:XJMDISTRIBUTORINITIAL:~ASFOLLOWS+www~~~~~~~~~~+~~~FORACTION:INTERNAL:ASSTDIRVASSALLO++LTRONLY(i>PROIMINER+wLTRONLY(1)GFIL+LTRONLY<1)TRONLY(2)GOSSICK5STAFF+4LTRONLY(1)DIRECTORDPM++LTRONLY(i>QAB44LTRONLY<1)ADFORENG++LTRONLY(1)ADFORPLANTSYSTEMS++LTRONLY(SD++LTRONLY(i>FERDDREHER/IE4+LTRONLY<i)BRCHIEFLWR03BC++LTRONLY<1>LICASSTRUSHBROOK++LTRONLY<i)NRCPDR44LTRONLY<i)OELD>>LTRONLY(i>MIPC4+LTRONLY<1)DEPUTYDIRDPM++LTRONLY(i>DIRECTORDSS44LTRONLY<1)ADFORREACSFTY~+LTRONLY(i>ADFOROPERTECH<<LTRONLY<1)KSEYFRIT/IE++LTRONLY(1)EXTERNAL:LPDRiSWILKESBARREiPA>>LTRONLY(1>TIC+4LTRONLY<1)NSIC++LTRONLY(1>ACRSCATB~4LTRONLY<16)DISTRIBUTION:LTR41ENCL0SIZE:2PCONTROLNBR:781580019rp,k,(END%%%%%44%%%%%%%%%%4%%%%<%%%4'%%%  
LTR 1    ENCL 0 ADVISING FINAL CONSTRUCTION DEFICIENCY REPT CONCERNING A DEFICIENCY                IN PHYSICAL SEPARATION OF ELEC CIRCUITS OF SUBJECT FACILITY SUBMITTED BY LTR DTD  12/01/77'ILL  BE SUBMITTED BY 09/05f78.
~iII 0PPata;)la,~TWONORTHNINTHSTRE~T.ALL~NTOWN,PA.15101KOIMftlgP82IHASID~gP)fIigNORMANW.CURTISVicePresident.Engineering&Construction821.5381May31,1978Mr.BoyceH.GrierDirector,RegionIU.S.NuclearRegulatoryCommission631ParkAvenueKingofPrussia,Pennsylvania17406RR>>qg)Rr52>>rrJ~Cog-yPlAP(C/)SUSQUEHANNASTEAMELECTRICSTATIONINTERIMREPORTOFADEFICIENCYINPHYSICALSEPARATIONOFELECTRICALCIRCUITS(STATUSUPDATE)DOCKETNO.:50-387LICENSENO.:CPPR-101ER100450FILE840-4PLA-259
PLANT NAME:SUSQUEHANNA UNIT                                    REVIEWER    INITIAL: X JM 1
DISTRIBUTOR    INITIAL: ~
DISTRIBUTION OF THIS MATERIAL IS AS FOLLOWS +www~~~~~~~~~~+~~~
CONSTRUCTION DEFICIENCY REPORT      < 10CFR50. 55E)
(DISTRIBUTION CODE  B019 >
FOR ACTION:     ASST DIR VASSALLO++LTR ONLY(i>           BR CHIEF LWR03 BC++LTR ONLY< 1   >
PRO I        MINER+wLTR ONLY(1)           LIC ASST  RUSHBROOK++LTR ONLY<i)
INTERNAL:          G  FIL    +LTR ONLY<1)                NRC PDR44LTR    ONLY<i)
TR ONLY(2)                   OELD>>LTR ONLY(i>
GOSSICK 5 STAFF+4LTR ONLY( 1)            MIPC4+LTR ONLY< 1)
DIRECTOR DPM++LTR ONLY(i>                 DEPUTY DIR DPM++LTR ONLY(i>
QAB44LTR ONLY< 1)                        DIRECTOR DSS44LTR ONLY< 1)
AD FOR ENG++LTR ONLY(1)                  AD FOR REAC SFTY~+LTR ONLY(i>
AD FOR PLANT      SYSTEMS++LTR      ONLY( AD FOR OPER TECH<<LTR ONLY< 1)
SD++LTR ONLY(i>                          K SEYFRIT/IE++LTR ONLY(1)
FERD DREHER/IE4+LTR ONLY<i)
EXTERNAL:       LPDRiS WILKES BARREi PA>>LTR ONLY(1>
TIC+4LTR ONLY< 1)
NSIC++LTR ONLY(1>
ACRS    CAT B~4LTR ONLY< 16)
DISTRIBUTION:     LTR 41      ENCL 0                              CONTROL NBR:     781580019  r SIZE: 2P                                                                                    p,k,(
END     %%%%%44%%%%%%%%%%4%%%%<%%%4'%%%


==DearMr.Grier:==
  ~i II
MyletterPLA-201,datedDecember1,1977providedaninterimreportofadeficiencyreportableundertheprovisionsof10CFR50.55(e).TheletterfurtherstatedthatPPGLanticipatedsubmittingafinaldefinitive'eportbyJune5,1978.However,wenowconclude,baseduponthemanufacturer's(G.E.)progressincompletingcertainitemsofrework,thatJune5,1978isnolongerarealisticdateforsubmittalofthedefinitivereport.Thisconclusionisderivedfromthefactthatcertainpanelinsertswhichrequireremanufacturing;andwereinstrumentalinthediscoveryofthedeficiency,willnotbecompletedbeforeJuly,1978.Iti.sPPGL'sintentiontoobtainassurancethatthespecificsofthosedeficienciesandthecausefortheiroccurrencehavebeencompletelycorrectedbeforethereportissubmitted.Therefore,wearenowprojectingsubmittalofthedefinitivereportbySeptember5,1978.Youwillbeadvisedshoulddevelopmentsorothercircumstancesaffectthislatestcommitment.Weregretthedelaybutoptinfavorofamorecompletereport.Verytrulyyours,N.W.CurtisVicePresident-EngineeringaConstruction78158001,nARS:mcbPENNSYLVANIAPOWER&LIGHTCOMPANY 4
 
Mr.B.H.GrierMay31,1978cc:Mr.ErnstVolgenau(15)Director-OfficeofInspection6EnforcementU.S.NuclearRegulatoryCommissionWashington,D.C.20555,ilMr.G.McDonald(1)Director-OfficeofInspection&Enforcement'.S.NuclearRegulatoryCommissionWashington,D.C.20555 0)I~  
0            PPata;)la, ~
}}
TWO NORTH NINTH STRE ~ T. ALL~ NTOWN, PA. 15101  KOIMftlgP82IHASID~    gP)f Iig NORMAN W. CURTIS Vice President. Engineering & Construction 821.5381 May 31, 1978 RR>>
qg) R r52
                                                                                              >>r rJ
                                                                                        ~Cog-y Mr. Boyce H. Grier                                                              Pl Director, Region I                                                            (
AP U. S. Nuclear Regulatory Commission                                            C/)
631 Park Avenue King of Prussia, Pennsylvania                17406 SUSQUEHANNA STEAM ELECTRIC STATION INTERIM REPORT OF A DEFICIENCY IN PHYSICAL SEPARATION OF ELECTRICAL CIRCUITS (STATUS UPDATE)
DOCKET NO.: 50-387                      LICENSE NO.: CPPR-101 ER 100450                                            FILE 840-4 PLA-259
 
==Dear Mr.       Grier:==
 
My  letter PLA-201, dated December 1, 1977 provided an interim report of a deficiency reportable under the provisions of 10CFR50.55(e). The letter further stated that PPGL anticipated submitting a final definitive'eport by June 5, 1978.
However, we now conclude, based upon the manufacturer's (G.E.) progress in completing certain items of rework, that June 5, 1978 is no longer a realistic date for submittal of the definitive report. This conclusion is derived from the fact that certain panel inserts which require remanufacturing; and were instrumental in the discovery of the deficiency, will not be completed before July, 1978.             It  i.s PPGL's intention to obtain assurance that the specifics of those deficiencies and the cause for their occurrence have been completely corrected before the report is submitted. Therefore, we are now projecting submittal of the definitive report by September 5, 1978.
You    will be        advised should developments or other circumstances affect this latest      commitment.         We regret the delay but opt in favor of a more complete report.
Very      truly yours, N. W. Curtis Vice President-Engineering              a Construction                    78158001,n ARS:mcb PENNSYLVANIA POWER  & LIGHT COMPANY
 
4 Mr. B. H. Grier                                          May 31, 1978 cc: Mr. Ernst Volgenau (15)
Director-Office of Inspection  6 Enforcement U. S. Nuclear Regulatory Commission Washington, D.C. 20555, il Mr. G. McDonald (1)
Director Office of Inspection  & Enforcement'.
S. Nuclear Regulatory Commission Washington, D.C. 20555
 
0
      )
I ~}}

Latest revision as of 03:15, 22 October 2019

Letter Referring to the December 1, 1977 Letter Providing an Interim Report of a Deficiency in Physical Separation of Electrical Circuits and Advising the Commission That the Definitive Report Will Be Submitted by September
ML18024A069
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 05/31/1978
From: Curtis N
Pennsylvania Power & Light Co
To: Grier B
NRC Region 1
References
PLA-201, PLA-259
Download: ML18024A069 (6)


Text

REGULATORY INFORMATION DISTRIBUTION SYSTEM < RIDS)

DISTRIBUTION FOR INCOMING MATERIAL 50-387 REC: GRIER B H ORG: CURTIS N W . DOCDATE'5/31/78 NRC PA PNR 8( LIGHT DATE RCVD: 06/07/78 DOCTYPE: LETTER NOTARIZED: NO COPIES RECEIVED

SUBJECT:

LTR 1 ENCL 0 ADVISING FINAL CONSTRUCTION DEFICIENCY REPT CONCERNING A DEFICIENCY IN PHYSICAL SEPARATION OF ELEC CIRCUITS OF SUBJECT FACILITY SUBMITTED BY LTR DTD 12/01/77'ILL BE SUBMITTED BY 09/05f78.

PLANT NAME:SUSQUEHANNA UNIT REVIEWER INITIAL: X JM 1

DISTRIBUTOR INITIAL: ~

DISTRIBUTION OF THIS MATERIAL IS AS FOLLOWS +www~~~~~~~~~~+~~~

CONSTRUCTION DEFICIENCY REPORT < 10CFR50. 55E)

(DISTRIBUTION CODE B019 >

FOR ACTION: ASST DIR VASSALLO++LTR ONLY(i> BR CHIEF LWR03 BC++LTR ONLY< 1 >

PRO I MINER+wLTR ONLY(1) LIC ASST RUSHBROOK++LTR ONLY<i)

INTERNAL: G FIL +LTR ONLY<1) NRC PDR44LTR ONLY<i)

TR ONLY(2) OELD>>LTR ONLY(i>

GOSSICK 5 STAFF+4LTR ONLY( 1) MIPC4+LTR ONLY< 1)

DIRECTOR DPM++LTR ONLY(i> DEPUTY DIR DPM++LTR ONLY(i>

QAB44LTR ONLY< 1) DIRECTOR DSS44LTR ONLY< 1)

AD FOR ENG++LTR ONLY(1) AD FOR REAC SFTY~+LTR ONLY(i>

AD FOR PLANT SYSTEMS++LTR ONLY( AD FOR OPER TECH<<LTR ONLY< 1)

SD++LTR ONLY(i> K SEYFRIT/IE++LTR ONLY(1)

FERD DREHER/IE4+LTR ONLY<i)

EXTERNAL: LPDRiS WILKES BARREi PA>>LTR ONLY(1>

TIC+4LTR ONLY< 1)

NSIC++LTR ONLY(1>

ACRS CAT B~4LTR ONLY< 16)

DISTRIBUTION: LTR 41 ENCL 0 CONTROL NBR: 781580019 r SIZE: 2P p,k,(

END  %%%%%44%%%%%%%%%%4%%%%<%%%4'%%%

~i II

0 PPata;)la, ~

TWO NORTH NINTH STRE ~ T. ALL~ NTOWN, PA. 15101 KOIMftlgP82IHASID~ gP)f Iig NORMAN W. CURTIS Vice President. Engineering & Construction 821.5381 May 31, 1978 RR>>

qg) R r52

>>r rJ

~Cog-y Mr. Boyce H. Grier Pl Director, Region I (

AP U. S. Nuclear Regulatory Commission C/)

631 Park Avenue King of Prussia, Pennsylvania 17406 SUSQUEHANNA STEAM ELECTRIC STATION INTERIM REPORT OF A DEFICIENCY IN PHYSICAL SEPARATION OF ELECTRICAL CIRCUITS (STATUS UPDATE)

DOCKET NO.: 50-387 LICENSE NO.: CPPR-101 ER 100450 FILE 840-4 PLA-259

Dear Mr. Grier:

My letter PLA-201, dated December 1, 1977 provided an interim report of a deficiency reportable under the provisions of 10CFR50.55(e). The letter further stated that PPGL anticipated submitting a final definitive'eport by June 5, 1978.

However, we now conclude, based upon the manufacturer's (G.E.) progress in completing certain items of rework, that June 5, 1978 is no longer a realistic date for submittal of the definitive report. This conclusion is derived from the fact that certain panel inserts which require remanufacturing; and were instrumental in the discovery of the deficiency, will not be completed before July, 1978. It i.s PPGL's intention to obtain assurance that the specifics of those deficiencies and the cause for their occurrence have been completely corrected before the report is submitted. Therefore, we are now projecting submittal of the definitive report by September 5, 1978.

You will be advised should developments or other circumstances affect this latest commitment. We regret the delay but opt in favor of a more complete report.

Very truly yours, N. W. Curtis Vice President-Engineering a Construction 78158001,n ARS:mcb PENNSYLVANIA POWER & LIGHT COMPANY

4 Mr. B. H. Grier May 31, 1978 cc: Mr. Ernst Volgenau (15)

Director-Office of Inspection 6 Enforcement U. S. Nuclear Regulatory Commission Washington, D.C. 20555, il Mr. G. McDonald (1)

Director Office of Inspection & Enforcement'.

S. Nuclear Regulatory Commission Washington, D.C. 20555

0

)

I ~