ML18095A352: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:Public Service Electric and Gas Company P.O. Box E Hancocks Bridge, New Jersey 08038 Salem Generating Station July 13, 1990 U.S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555  
{{#Wiki_filter:Public Service Electric and Gas Company P.O. Box E Hancocks Bridge, New Jersey 08038 Salem Generating Station July 13, 1990 U.S. Nuclear Regulatory Commission Document Control Desk Washington, DC               20555


==Dear Sir:==
==Dear Sir:==
MONTHLY OPERATING REPORT SALEM NO . 1 DOCKET NO. 50-272 In compliance with Section 6.9.1.6, Reporting Requirements for the Salem Technical Specifications, the original copy of che monthly operating reports for the month of June 1990 are being sent to you. Average Daily Unit Power Level Operating Data Reporc Unit Shutdowns and Power Reductions Safety Related Maintenance Major Plant Modifications Operating Summary Refueling Information Sincerely
 
: yours, L. K. Miller RH:pc cc: Mr. Thomas T. Martin Regional Administrator USNRC Region I 631 Park Avenue King of Prussia, PA 19046 Enclosures 8-1-7.R4 The Energy People General Manager -Salem Operations 95-2189 (11 M) 12-84 Month JUNE, 1990 Day Average Daily (MWe-NET) 1 0 2 0 3 0 4 0 5 0 6 0 7 244 8 810 9 1003 10 1055 11 1061 12 1074 13 1077 14 1111 15 1101 16 1094 P. 8.1-7 Rl AVERAGE DAILY UNIT POWER LEVEL Power Level Docket No. Unit Name Date Completed by Telephone 50-272 Salem # 1 07-10-90 Art Orticelle 609-339-2122 Day Average Daily Power Level (MWe-NET) 17 1084 18 1104 19 1070 20 1093 21 1082 22 1099 23 1012 24 984 25 1067 26 1026 27 912 28 911 29 1072 30 598 31
MONTHLY OPERATING REPORT SALEM NO . 1 DOCKET NO. 50-272 In compliance with Section 6.9.1.6, Reporting Requirements for the Salem Technical Specifications, the original copy of che monthly operating reports for the month of June 1990 are being sent to you.
,-1 I I I OPERATING DATA REPORT Docket No: 50-272 Date: Completed by: Art Orticelle Telephone:
Average Daily Unit Power Level Operating Data Reporc Unit Shutdowns and Power Reductions Safety Related Maintenance Major Plant Modifications Operating Summary Refueling Information Sincerely yours,
Operating Status 1. Unit Name Salem No. 1 Notes 2. Reporting Period June 1990 3. Licensed Thermal Power (MWt) 3411 4. Nameplate Rating (Gross MWe) 1170 5. Design Electrical Rating (Net MWe) 1115 6. Maximum Dependable Capacity(Gross MWe) 1149 7. Maximum Dependable Capacity (Net MWe) 1106 8. If Changes Occur in Capacity Ratings (items 3 through 7) since Last Report, Give
                                                          ¥~~ tf/~
: 9. Power Level to Which Restricted, if any (Net MWe)
L. K. Miller                 ~./r: *~"/~~
: 10. Reasons for Restrictions, if any This Month Year to Date Cumulative
General Manager -
: 11. Hours in Reporting Period 720 4343 113976 12. No. of Hrs. Reactor was Critical 614.4 2777 73685.6 13. Reactor Reserve Shutdown Hrs. 0 0 0 14. Hours Generator On-Line 570.2 2673 71368.8 15. Unit Reserve Shutdown Hours 0 0 0 16. Gross Thermal Energy (MWH) 1831912.8 8724475.2 223825401.2
Salem Operations RH:pc cc:     Mr. Thomas T. Martin Regional Administrator USNRC Region I 631 Park Avenue King of Prussia, PA               19046 Enclosures 8-1-7.R4 The Energy People 95-2189 (11 M) 12-84
: 17. Gross Elec. Energy Generated (MWH) 596260 2887020 74348380 18. Net Elec. Energy Generated (MWH) 565595 2758769 70770479 19. Unit Service Factor 79.2 61.5 62.6 20. Unit Availability Factor 79.2 61.5 62.6 21. Unit Capacity Factor (using MDC Net) 71. 0 57.4 56.1 22. Unit Capacity Factor (using DER Net) 70.5 57.0 55.7 23. Unit Forced Outage Rate 20.8 38.5 22.3 24. Shutdowns scheduled over next 6 months (type, date and duration of each) Refueling Outage scheduled to start 10-20-90 and last 55 days. 25. If shutdown at end of Report Period, Estimated Date of Startup: N/A DURATION NO. DA'IE TYPE i (HOURS) REASON z 0035 06-01-90 F 137.5 A 0036 06-06-90 F 12.3 A 0046 06-30-90 F 0 A 0045 06-30-90 F 0 A 0048 06-30-90 F 0 A UNIT SHUTDOWN AND POWER REDUCTIONS REPORI' MONTH JUNE 1990 MEI'HOD OF SHUITING LICENSE OOWN EVENT SYSTEM REACIDR REPORI' # CDDE 4 4 CH 4 CH 5 HF 5 HF 5 HF rotPONENT CDDE INSTRU MECFUN HTEXCH HTEXCH PUMP XX OOCKEr NO. : 50-272 ------:---
 
UNIT NAME: Salem #1 DA'IE: 07-10-90 mMPLEI'ED BY: Art Orticelle TELEPHONE:
AVERAGE DAILY UNIT POWER LEVEL Docket No. 50-272 Unit Name      Salem # 1 Date          07-10-90 Completed by  Art Orticelle Telephone      609-339-2122 Month  JUNE, 1990 Day Average Daily Power Level            Day Average Daily Power Level (MWe-NET)                                (MWe-NET) 1           0                                17        1084 2          0                                18         1104 3          0                                19         1070 4          0                                20         1093 5          0                                21         1082 6          0                                22         1099 7        244                                23         1012 8        810                                24           984 9        1003                                25         1067 10      1055                                26         1026 11      1061                                27           912 12      1074                                28           911 13      1077                                29         1072 14      1111                                30           598 15      1101                                31 16      1094 P. 8.1-7 Rl
339-2122 CAUSE AND OORRECTIVE ACTION 'ID PREVENT RECURRENCE  
 
#12 S.G. FEED PUMP #12 S.G. FEED PUMP 13A WATERBOX CLEANING e 13A WATERBOX CLEANING 13A & B C.W. PUMPS 1 2 3 4 5 F: Forced Reason: S: Scheduled A-Equipnent Failure (Explain)
1 I
B-Maintenance or Test C-Refueling D-Regulatory Restriction E--Operator Training & License Exarrri.nation F-Adrninistrative G--Operational Error (Explain)
OPERATING DATA REPORT I
H-Other (Explain)
I                                            Docket No:     50-272 Date:
Method: 1-Manual 2-Manual Scram 3-Autanatic Scram 4--continuation of Previous Outage 5-1.Dad Reduction 9-0ther Exhibit G -Instructions Exhibit 1 -Same for Preparation of Data Source Entry Sheets for Licensee Event Report (LER) File (NUREG-0161)
Completed by:   Art Orticelle             Telephone:
SAFETY RELATED MAINTENANCE MONTH: -JUNE 1990 DOCKET NO: UNIT NAME: 50-272 SALEM 1 WO NO 890619099 891128117 900501084 900605066 900621154 900625112 UNIT 1 1 1 1 1 Dli.TE: COMPLETED BY: *TELEPHONE:
Operating Status
J"ULY 10, 1990 M. MORRONI (609) 339-2068 EQUIPMENT IDENTIFICATION 14GB3 BODY TO BONNET LEAK FAILURE DESCRIPTION:
: 1. Unit Name                         Salem No. 1     Notes
BODY TO BONNET LEAK -PERFORM LEAK REPAIR 1VC6 STROKE TIME FAILURE DESCRIPTION:
: 2. Reporting Period                 June 1990
FAILED STROKE TIME TEST -REPAIR 1CH168 POSITIONER FAILURE DESCRIPTION:
: 3. Licensed Thermal Power (MWt)             3411
Ul CONTROL ROOM EMERGENCY AIR CONDITIONER OUTLET -REBUILD POSITIONER 2PR3, 4, 5 AL}1.RM FAILURE DESCRIPTION:
: 4. Nameplate Rating (Gross MWe)             1170
VALVE OPEN ALARM IN -INVESTIGATE AND REPAIR lH 230V GROUP BUS TEST FAILURE DESCRIPTION:
: 5. Design Electrical Rating (Net MWe)       1115
PERFORM TRANSFORMER DOBLE TEST 1 AXIAL FLUX RECORDER FAILURE DESCRIPTION:
: 6. Maximum Dependable Capacity(Gross MWe) 1149
RECORDER FAILED LOW -INVESTIGATE AND REPP.IR MAJOR PLANT MODIFICATIONS MONTH: -JUNE 1990 *DCR PRINCIPAL SYSTEM 1SM-0369A Motor Operated *DCR -Design Change Request DOCKET NO: UNIT NAME: DATE: COMPLETED BY: TELEPHONE; 50-272 S.P.LEM 1 JULY 10, 1990 M. MORRONI (609) 339-2068 DESCRIPTION This design change modified the closed indication to provide the Operator with more accurate indication of an actual closed condition.
: 7. Maximum Dependable Capacity (Net MWe)     1106
Additionally, the open torque switch bypasses were increased to 25% of the open stroke.
: 8. If Changes Occur in Capacity Ratings (items 3 through 7) since Last Report, Give Reason~~N~/~AO--~~~~~~~~~~~~~~~~~~~~~~~~
MAJOR PLANT MODIFICATIONS MONTH: -JUNE 1990 DOCKET NO: UNIT NAME: 50-272 SALEM 1 *DCR 1SM-0369A DATE: COMPLE'I'ED BY: TELEPHONE:
: 9. Power Level to Which Restricted, if any (Net MWe)     ~~-=-N~/~A=--~~~~~~
SAFETY EVALUATION 10 CFR 50.59 JULY 10, 1990 M. MORRON! (609) 339-2068 This design change modified the closed indication to provide the Operator with more accurate indication of an actual closed condition.
: 10. Reasons for Restrictions, if any   ~~N~/~A~~~~~~~~~~~~~~~~~~
Additionally, the open torque switch bypasses were increased to 25% of the open stroke, thus reducing the possibility of the valve de-energizing at high unseating loads. This design change did not alter the original operational design, thus it does not introduce possible accident scenarios not previously analyzed.
This Month     Year to Date   Cumulative
There is no change to any plant process or discharge or to the environmental impact of the plant. No unreviewed safety or environmental questions are involved.  
: 11. Hours in Reporting Period               720           4343       113976
*DCR -Design Change Request I SALEM UNIT NO. 1 SALEM GENERATING STATION MONTHLY OPERATING  
: 12. No. of Hrs. Reactor was Critical         614.4         2777       73685.6
: 13. Reactor Reserve Shutdown Hrs.               0             0           0
: 14. Hours Generator On-Line                 570.2         2673       71368.8
: 15. Unit Reserve Shutdown Hours               0             0           0
: 16. Gross Thermal Energy G~nerated (MWH)                       1831912.8       8724475.2 223825401.2
: 17. Gross Elec. Energy Generated (MWH)                         596260       2887020     74348380
: 18. Net Elec. Energy Generated (MWH)     565595       2758769     70770479
: 19. Unit Service Factor                       79.2           61.5         62.6
: 20. Unit Availability Factor                 79.2           61.5         62.6
: 21. Unit Capacity Factor (using MDC Net)                     71. 0         57.4         56.1
: 22. Unit Capacity Factor (using DER Net)                     70.5           57.0         55.7
: 23. Unit Forced Outage Rate                   20.8           38.5         22.3
: 24. Shutdowns scheduled over next 6 months (type, date and duration of each)
Refueling Outage scheduled to start 10-20-90 and last 55 days.
: 25. If shutdown at end of Report Period, Estimated Date of Startup:
N/A
 
UNIT SHUTDOWN AND POWER REDUCTIONS                              OOCKEr NO. : 272
                                                                                                                                        -----:---
REPORI' MONTH JUNE 1990                                         UNIT NAME:  Salem #1 DA'IE:  07-10-90 mMPLEI'ED BY:  Art Orticelle TELEPHONE:   339-2122 MEI'HOD OF SHUITING        LICENSE DURATION              OOWN            EVENT          SYSTEM  rotPONENT            CAUSE AND OORRECTIVE ACTION NO.      DA'IE  TYPE i      (HOURS)    REASON z  REACIDR        REPORI' #      CDDE 4  CDDE  ~                'ID PREVENT RECURRENCE 0035  06-01-90    F          137.5        A          4                            CH    INSTRU          #12 S.G. FEED PUMP 0036  06-06-90    F          12.3         A          4                           CH    MECFUN          #12 S.G. FEED PUMP 0046    06-30-90    F            0          A          5                            HF    HTEXCH          13A WATERBOX CLEANING                    e 0045    06-30-90    F            0          A          5                            HF    HTEXCH          13A WATERBOX CLEANING 0048    06-30-90    F            0          A          5                            HF    PUMPXX          13A &B C.W. PUMPS 1                2                                                3                    4                              5
                                                                                                                                                      ~
F: Forced        Reason:                                        Method:                Exhibit G - Instructions      Exhibit 1 - Same S: Scheduled    A-Equipnent Failure (Explain)                   1-Manual              for Preparation of Data      Source B-Maintenance or Test                            2-Manual Scram         Entry Sheets for Licensee C-Refueling                                      3-Autanatic Scram     Event Report (LER) File D-Regulatory Restriction                          4--continuation of     (NUREG-0161)
E--Operator Training &License Exarrri.nation        Previous Outage F-Adrninistrative                                5-1.Dad Reduction G--Operational Error (Explain)                   9-0ther H-Other (Explain)
 
SAFETY RELATED MAINTENANCE                   DOCKET NO:    50-272 MONTH: - JUNE 1990                           UNIT NAME:   SALEM 1 Dli.TE: J"ULY 10, 1990 COMPLETED BY:    M. MORRONI
                                            *TELEPHONE:    (609) 339-2068 WO NO    UNIT                      EQUIPMENT IDENTIFICATION 890619099    1    14GB3 BODY TO BONNET LEAK FAILURE DESCRIPTION:   BODY TO BONNET LEAK     - PERFORM LEAK REPAIR 891128117    1    1VC6 STROKE TIME FAILURE DESCRIPTION:   FAILED STROKE TIME TEST - REPAIR 900501084    1    1CH168 POSITIONER FAILURE DESCRIPTION:   Ul CONTROL ROOM EMERGENCY AIR CONDITIONER OUTLET - REBUILD POSITIONER 900605066    1    2PR3, 4, 5 AL}1.RM FAILURE DESCRIPTION:   VALVE OPEN ALARM IN - INVESTIGATE AND REPAIR 900621154    1    lH 230V GROUP BUS TEST FAILURE DESCRIPTION:     PERFORM TRANSFORMER DOBLE TEST 900625112    1   AXIAL FLUX RECORDER FAILURE DESCRIPTION:   RECORDER FAILED LOW - INVESTIGATE AND REPP.IR
 
MAJOR PLANT MODIFICATIONS               DOCKET NO:  50-272 MONTH: - JUNE 1990                     UNIT NAME:  S.P.LEM 1 DATE: JULY 10, 1990 COMPLETED BY:  M. MORRONI TELEPHONE;  (609) 339-2068
    *DCR          PRINCIPAL SYSTEM          DESCRIPTION 1SM-0369A      Motor Operated  This design change modified the closed indication to provide the Operator with more accurate indication of an actual closed condition. Additionally, the open torque switch bypasses were increased to 25% of the open stroke.
  *DCR - Design Change Request
 
MAJOR PLANT MODIFICATIONS                   DOCKET NO:    50-272 MONTH: - JUNE 1990                           UNIT NAME:     SALEM 1 DATE:   JULY 10, 1990 COMPLE'I'ED BY:   M. MORRON!
TELEPHONE:     (609) 339-2068
    *DCR          SAFETY EVALUATION 10 CFR 50.59 1SM-0369A      This design change modified the closed indication to provide the Operator with more accurate indication of an actual closed condition. Additionally, the open torque switch bypasses were increased to 25% of the open stroke, thus reducing the possibility of the valve de-energizing at high unseating loads. This design change did not alter the original operational design, thus it does not introduce possible accident scenarios not previously analyzed. There is no change to any plant process or discharge or to the environmental impact of the plant. No unreviewed safety or environmental questions are involved.
  *DCR - Design Change Request I
 
SALEM GENERATING STATION MONTHLY OPERATING  


==SUMMARY==
==SUMMARY==
  -UNIT 1 JUNE 1990 The Unit began the period shutdown for resolution of Residual Heat Removal (RHR) problems.
  - UNIT 1 JUNE 1990 SALEM UNIT NO. 1 The Unit began the period shutdown for resolution of Residual Heat Removal (RHR) problems. The RHR problems were satisfactorily resolved and star~up operations commenced. The Unit was returned ~o service on June 7, 1990 and reached 100% power on June 10, 1990. The Unit continued to operate at essentially full power until June 23, 1990, when load was briefly reduced to approximately 74% power ~o maintain condenser vacuum following the loss of a vacuum pump, which resulted from a transformer failure. During the period between June 26-30, 1990, the Unit experienced several load reductions due to Circulating Water System (CWS) problems.
The RHR problems were satisfactorily resolved and operations commenced.
 
The Unit was returned service on June 7, 1990 and reached 100% power on June 10, 1990. The Unit continued to operate at essentially full power until June 23, 1990, when load was briefly reduced to approximately 74% power maintain condenser vacuum following the loss of a vacuum pump, which resulted from a transformer failure. During the period between June 26-30, 1990, the Unit experienced several load reductions due to Circulating Water System (CWS) problems.
REFUELING INFORMATION                         DOCKET l\TO:  50-272 MONTH: - JUNE 1990                           UNIT NAME:   SALEM 1 DATE:   JULY 10, 1990 COMPLETED BY:   M. MORRONI TELEPHONE:     (609) 339-2068 MONTH JUNE 1990
REFUELING INFORMATION MONTH: -JUNE 1990 MONTH JUNE 1990 DOCKET l\TO: UNIT NAME: DATE: COMPLETED BY: TELEPHONE:
: 1. Refueling information has changed from lasL month:
: 1. Refueling information has changed from lasL month: YES NO x 50-272 SALEM 1 JULY 10, 1990 M. MORRONI (609) 339-2068 2 . Scheduled date for next refueling:
YES                 NO   x
October 20, 1990 3. Scheduled date for restart following refueling:
: 2. Scheduled date for next refueling:     October 20, 1990
December 13, 1990 4. a) Will Technical Specification changes or other license amendments be required?:
: 3. Scheduled date for restart following refueling:     December 13, 1990
YES NO NOT DETERMINED TO DATE x ----b) Has the reload fuel design been reviewed by the Station Operating Review Committee?:
: 4. a)   Will Technical Specification changes or other license amendments be required?:
YES NO x If no, when is it scheduled?:
YES                 NO NOT DETERMINED TO DATE - -x --
September 1990 5. Scheduled date(s) for submitting proposed licensing action: N/A 6. Important licensing considerations associated with refueling:
b)   Has the reload fuel design been reviewed by the Station Operating Review Committee?:
: 7. Number of Fuel Assemblies: 8 . a. b. Inc ore In Spent Fuel Storage Present licensed spent fuel storage capacity:
YES                 NO   x If no, when is it scheduled?:   September 1990
Future spent fuel storage capacity:
: 5. Scheduled date(s)   for submitting proposed licensing action:
193 540 1170 1170 9. Date of last refueling that can be discharged to the spent fuel pool assuming the present licensed capacity:
N/A
September 2001 8-1-7.R4}}
: 6. Important licensing considerations associated with refueling:
: 7. Number of Fuel Assemblies:
: a. Inc ore                                                        193
: b. In Spent Fuel Storage                                         540
: 8. Present licensed spent fuel storage capacity:                     1170 Future spent fuel storage capacity:                               1170
: 9. Date of last refueling that can be discharged to the spent fuel pool assuming the present licensed capacity:                                         September 2001 8-1-7.R4}}

Revision as of 10:52, 21 October 2019

Monthly Operating Rept for June 1990 for Salem Generating Station Unit 1.W/900713 Ltr
ML18095A352
Person / Time
Site: Salem PSEG icon.png
Issue date: 06/30/1990
From: Miller L, Morroni M
Public Service Enterprise Group
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9007190271
Download: ML18095A352 (9)


Text

Public Service Electric and Gas Company P.O. Box E Hancocks Bridge, New Jersey 08038 Salem Generating Station July 13, 1990 U.S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555

Dear Sir:

MONTHLY OPERATING REPORT SALEM NO . 1 DOCKET NO. 50-272 In compliance with Section 6.9.1.6, Reporting Requirements for the Salem Technical Specifications, the original copy of che monthly operating reports for the month of June 1990 are being sent to you.

Average Daily Unit Power Level Operating Data Reporc Unit Shutdowns and Power Reductions Safety Related Maintenance Major Plant Modifications Operating Summary Refueling Information Sincerely yours,

¥~~ tf/~

L. K. Miller ~./r: *~"/~~

General Manager -

Salem Operations RH:pc cc: Mr. Thomas T. Martin Regional Administrator USNRC Region I 631 Park Avenue King of Prussia, PA 19046 Enclosures 8-1-7.R4 The Energy People 95-2189 (11 M) 12-84

AVERAGE DAILY UNIT POWER LEVEL Docket No. 50-272 Unit Name Salem # 1 Date 07-10-90 Completed by Art Orticelle Telephone 609-339-2122 Month JUNE, 1990 Day Average Daily Power Level Day Average Daily Power Level (MWe-NET) (MWe-NET) 1 0 17 1084 2 0 18 1104 3 0 19 1070 4 0 20 1093 5 0 21 1082 6 0 22 1099 7 244 23 1012 8 810 24 984 9 1003 25 1067 10 1055 26 1026 11 1061 27 912 12 1074 28 911 13 1077 29 1072 14 1111 30 598 15 1101 31 16 1094 P. 8.1-7 Rl

1 I

OPERATING DATA REPORT I

I Docket No: 50-272 Date:

Completed by: Art Orticelle Telephone:

Operating Status

1. Unit Name Salem No. 1 Notes
2. Reporting Period June 1990
3. Licensed Thermal Power (MWt) 3411
4. Nameplate Rating (Gross MWe) 1170
5. Design Electrical Rating (Net MWe) 1115
6. Maximum Dependable Capacity(Gross MWe) 1149
7. Maximum Dependable Capacity (Net MWe) 1106
8. If Changes Occur in Capacity Ratings (items 3 through 7) since Last Report, Give Reason~~N~/~AO--~~~~~~~~~~~~~~~~~~~~~~~~
9. Power Level to Which Restricted, if any (Net MWe) ~~-=-N~/~A=--~~~~~~
10. Reasons for Restrictions, if any ~~N~/~A~~~~~~~~~~~~~~~~~~

This Month Year to Date Cumulative

11. Hours in Reporting Period 720 4343 113976
12. No. of Hrs. Reactor was Critical 614.4 2777 73685.6
13. Reactor Reserve Shutdown Hrs. 0 0 0
14. Hours Generator On-Line 570.2 2673 71368.8
15. Unit Reserve Shutdown Hours 0 0 0
16. Gross Thermal Energy G~nerated (MWH) 1831912.8 8724475.2 223825401.2
17. Gross Elec. Energy Generated (MWH) 596260 2887020 74348380
18. Net Elec. Energy Generated (MWH) 565595 2758769 70770479
19. Unit Service Factor 79.2 61.5 62.6
20. Unit Availability Factor 79.2 61.5 62.6
21. Unit Capacity Factor (using MDC Net) 71. 0 57.4 56.1
22. Unit Capacity Factor (using DER Net) 70.5 57.0 55.7
23. Unit Forced Outage Rate 20.8 38.5 22.3
24. Shutdowns scheduled over next 6 months (type, date and duration of each)

Refueling Outage scheduled to start 10-20-90 and last 55 days.

25. If shutdown at end of Report Period, Estimated Date of Startup:

N/A

UNIT SHUTDOWN AND POWER REDUCTIONS OOCKEr NO. : 272


:---

REPORI' MONTH JUNE 1990 UNIT NAME: Salem #1 DA'IE: 07-10-90 mMPLEI'ED BY: Art Orticelle TELEPHONE: 339-2122 MEI'HOD OF SHUITING LICENSE DURATION OOWN EVENT SYSTEM rotPONENT CAUSE AND OORRECTIVE ACTION NO. DA'IE TYPE i (HOURS) REASON z REACIDR REPORI' # CDDE 4 CDDE ~ 'ID PREVENT RECURRENCE 0035 06-01-90 F 137.5 A 4 CH INSTRU #12 S.G. FEED PUMP 0036 06-06-90 F 12.3 A 4 CH MECFUN #12 S.G. FEED PUMP 0046 06-30-90 F 0 A 5 HF HTEXCH 13A WATERBOX CLEANING e 0045 06-30-90 F 0 A 5 HF HTEXCH 13A WATERBOX CLEANING 0048 06-30-90 F 0 A 5 HF PUMPXX 13A &B C.W. PUMPS 1 2 3 4 5

~

F: Forced Reason: Method: Exhibit G - Instructions Exhibit 1 - Same S: Scheduled A-Equipnent Failure (Explain) 1-Manual for Preparation of Data Source B-Maintenance or Test 2-Manual Scram Entry Sheets for Licensee C-Refueling 3-Autanatic Scram Event Report (LER) File D-Regulatory Restriction 4--continuation of (NUREG-0161)

E--Operator Training &License Exarrri.nation Previous Outage F-Adrninistrative 5-1.Dad Reduction G--Operational Error (Explain) 9-0ther H-Other (Explain)

SAFETY RELATED MAINTENANCE DOCKET NO: 50-272 MONTH: - JUNE 1990 UNIT NAME: SALEM 1 Dli.TE: J"ULY 10, 1990 COMPLETED BY: M. MORRONI

  • TELEPHONE: (609) 339-2068 WO NO UNIT EQUIPMENT IDENTIFICATION 890619099 1 14GB3 BODY TO BONNET LEAK FAILURE DESCRIPTION: BODY TO BONNET LEAK - PERFORM LEAK REPAIR 891128117 1 1VC6 STROKE TIME FAILURE DESCRIPTION: FAILED STROKE TIME TEST - REPAIR 900501084 1 1CH168 POSITIONER FAILURE DESCRIPTION: Ul CONTROL ROOM EMERGENCY AIR CONDITIONER OUTLET - REBUILD POSITIONER 900605066 1 2PR3, 4, 5 AL}1.RM FAILURE DESCRIPTION: VALVE OPEN ALARM IN - INVESTIGATE AND REPAIR 900621154 1 lH 230V GROUP BUS TEST FAILURE DESCRIPTION: PERFORM TRANSFORMER DOBLE TEST 900625112 1 AXIAL FLUX RECORDER FAILURE DESCRIPTION: RECORDER FAILED LOW - INVESTIGATE AND REPP.IR

MAJOR PLANT MODIFICATIONS DOCKET NO: 50-272 MONTH: - JUNE 1990 UNIT NAME: S.P.LEM 1 DATE: JULY 10, 1990 COMPLETED BY: M. MORRONI TELEPHONE; (609) 339-2068

  • DCR PRINCIPAL SYSTEM DESCRIPTION 1SM-0369A Motor Operated This design change modified the closed indication to provide the Operator with more accurate indication of an actual closed condition. Additionally, the open torque switch bypasses were increased to 25% of the open stroke.
  • DCR - Design Change Request

MAJOR PLANT MODIFICATIONS DOCKET NO: 50-272 MONTH: - JUNE 1990 UNIT NAME: SALEM 1 DATE: JULY 10, 1990 COMPLE'I'ED BY: M. MORRON!

TELEPHONE: (609) 339-2068

  • DCR SAFETY EVALUATION 10 CFR 50.59 1SM-0369A This design change modified the closed indication to provide the Operator with more accurate indication of an actual closed condition. Additionally, the open torque switch bypasses were increased to 25% of the open stroke, thus reducing the possibility of the valve de-energizing at high unseating loads. This design change did not alter the original operational design, thus it does not introduce possible accident scenarios not previously analyzed. There is no change to any plant process or discharge or to the environmental impact of the plant. No unreviewed safety or environmental questions are involved.
  • DCR - Design Change Request I

SALEM GENERATING STATION MONTHLY OPERATING

SUMMARY

- UNIT 1 JUNE 1990 SALEM UNIT NO. 1 The Unit began the period shutdown for resolution of Residual Heat Removal (RHR) problems. The RHR problems were satisfactorily resolved and star~up operations commenced. The Unit was returned ~o service on June 7, 1990 and reached 100% power on June 10, 1990. The Unit continued to operate at essentially full power until June 23, 1990, when load was briefly reduced to approximately 74% power ~o maintain condenser vacuum following the loss of a vacuum pump, which resulted from a transformer failure. During the period between June 26-30, 1990, the Unit experienced several load reductions due to Circulating Water System (CWS) problems.

REFUELING INFORMATION DOCKET l\TO: 50-272 MONTH: - JUNE 1990 UNIT NAME: SALEM 1 DATE: JULY 10, 1990 COMPLETED BY: M. MORRONI TELEPHONE: (609) 339-2068 MONTH JUNE 1990

1. Refueling information has changed from lasL month:

YES NO x

2. Scheduled date for next refueling: October 20, 1990
3. Scheduled date for restart following refueling: December 13, 1990
4. a) Will Technical Specification changes or other license amendments be required?:

YES NO NOT DETERMINED TO DATE - -x --

b) Has the reload fuel design been reviewed by the Station Operating Review Committee?:

YES NO x If no, when is it scheduled?: September 1990

5. Scheduled date(s) for submitting proposed licensing action:

N/A

6. Important licensing considerations associated with refueling:
7. Number of Fuel Assemblies:
a. Inc ore 193
b. In Spent Fuel Storage 540
8. Present licensed spent fuel storage capacity: 1170 Future spent fuel storage capacity: 1170
9. Date of last refueling that can be discharged to the spent fuel pool assuming the present licensed capacity: September 2001 8-1-7.R4