Line 8: Line 8:
| addressee affiliation = NRC/NRR
| addressee affiliation = NRC/NRR
| docket = PROJ0689
| docket = PROJ0689
| license number =  
|| license number =  
| contact person = Golla J A
| contact person = Golla J
| document type = Meeting Briefing Package/Handouts, Slides and Viewgraphs
| document type = Meeting Briefing Package/Handouts, Slides and Viewgraphs
| page count = 10
| page count = 10
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:}}
{{#Wiki_filter:DI&C-ISG-06 Revision 2 Table Top Lessons Learned from Pilot Project Experiences 1
 
Introduction
* Captured Key Insights from Pilot Experiences
* Show How Key Lessons Learned were Incorporated into New DI&C-ISG-06 Revision 2 Guidance
* Identify Additional Lessons Learned to be Addressed in Industry Guidance for DI&C-ISG-06 Revision 2 2
 
Key Insights from Pilot Experiences (1/2)
* Diablo Canyon had key insights for lessons learned:
  - Role of architecture decisions affecting system test requirements
  - Allocation of system functional requirements to vendor subsystems
  - Treatment of maintenance needs in system functional requirements
  - Vendor understanding of system functional requirements by design and V&V personnel (Reference ADAMS Accession No. ML15181A063) 3
 
Key Insights from Pilot Experiences (2/2)
* Oconee project had key insights for lessons learned:
  - Role of architecture decisions affecting combination of echelons, use of inter-channel communication, and service unit connections
  - Expectations for licensee oversight of vendor activities (Reference ADAMS Accession No. ML060060427)
* NRC key insights for lessons learned:
  - There is no direct correlation between the information licensees are required to provide and the evaluations NRC performs (Reference ADAMS Accession No. ML15183A284) 4
 
Key Lessons Learned Incorporated into New DI&C-ISG-06 Revision 2 Guidance (1/2)
* There is an expanded discussion of expectations for licensee oversight of vendors in DI&C-ISG-06 Revision 2 Sections C.2.1, C.2.2, and D.5.1.2
* There is an expanded discussion of expectations for technical information to be provided related to system architecture features, system interfaces, and fundamental design principles in DI&C-ISG-06 Revision 2 Sections D.2.2, D.2.3, D.2.5, and D.2.6 5
 
Key Lessons Learned Incorporated into New DI&C-ISG-06 Revision 2 Guidance (2/2)
* There is an expanded discussion of expectations for technical information to be provided related to system requirements function allocation in DI&C-ISG-06 Revision 2 Section D.2.4
* There is an expanded discussion of expectations for technical information to be provided related to maintenance activities in DI&C-ISG-06 Revision 2 Sections D.2.2, D.2.3.3.1, and D.2.5.1 6
 
Key Lessons Learned to be Addressed in DI&C-ISG-06 Revision 2 Industry Guidance (1/2)
* There will be expanded guidance to address DI&C-ISG-06 Revision 2 Section D.4 for range of cases:
  - Vendor Software Program Manual Available
  - Vendor Application Methodology Reviewed with Plant Specific Follow-up Actions
  - Application-Specific Approach
* There will be expanded guidance to address vendor oversight plans 7
 
Key Lessons Learned to be Addressed in DI&C-ISG-06 Revision 2 Industry Guidance (2/2)
* There will be expanded guidance to address Sections D.2.3 and D.4.2.1.1 for plant and I&C system safety analysis to provide summary information to support vendor design, V&V, oversight, and regulatory reviews verification
* There will be guidance for a new Safety Function Summary Table to define design basis and to highlight changes
* FSAR Event (AOO/PA)
* Automated Protection Function
* Credited Trip/Actuation Signals
* Interlock / Permissive / Override
* Variable(s)
* Condition for Interlock / Permissive /
* Range                                Override Function
* Nominal (100% RTP) Analytical Limit
* Response Time Assumed in FSAR Event
* Number of Channels                    Analysis
* Logic 8
 
Conclusions
* New DI&C-ISG-06 Revision 2 Guidance Addresses Key Lessons Learned from Pilot Experiences
* New Guidance Has Direct Correlation between information to be Provided and NRC Regulatory Evaluations
* Industry Guidance for DI&C-ISG-06 Revision 2 will Capture Additional Insights from Table Top Exercise 9
 
Closing
* Questions?
10}}

Latest revision as of 23:27, 20 October 2019

June 13-14, 2018, Meeting Slide for DI&C-ISG-06 Revision 2 Tabletop Lessons Learned from Pilot Project Experiences
ML18163A356
Person / Time
Site: Nuclear Energy Institute
Issue date: 06/13/2018
From:
Nuclear Energy Institute
To:
Office of Nuclear Reactor Regulation
Golla J
References
Download: ML18163A356 (10)


Text

DI&C-ISG-06 Revision 2 Table Top Lessons Learned from Pilot Project Experiences 1

Introduction

  • Captured Key Insights from Pilot Experiences
  • Show How Key Lessons Learned were Incorporated into New DI&C-ISG-06 Revision 2 Guidance
  • Identify Additional Lessons Learned to be Addressed in Industry Guidance for DI&C-ISG-06 Revision 2 2

Key Insights from Pilot Experiences (1/2)

  • Diablo Canyon had key insights for lessons learned:

- Role of architecture decisions affecting system test requirements

- Allocation of system functional requirements to vendor subsystems

- Treatment of maintenance needs in system functional requirements

- Vendor understanding of system functional requirements by design and V&V personnel (Reference ADAMS Accession No. ML15181A063) 3

Key Insights from Pilot Experiences (2/2)

  • Oconee project had key insights for lessons learned:

- Role of architecture decisions affecting combination of echelons, use of inter-channel communication, and service unit connections

- Expectations for licensee oversight of vendor activities (Reference ADAMS Accession No. ML060060427)

  • NRC key insights for lessons learned:

- There is no direct correlation between the information licensees are required to provide and the evaluations NRC performs (Reference ADAMS Accession No. ML15183A284) 4

Key Lessons Learned Incorporated into New DI&C-ISG-06 Revision 2 Guidance (1/2)

  • There is an expanded discussion of expectations for licensee oversight of vendors in DI&C-ISG-06 Revision 2 Sections C.2.1, C.2.2, and D.5.1.2
  • There is an expanded discussion of expectations for technical information to be provided related to system architecture features, system interfaces, and fundamental design principles in DI&C-ISG-06 Revision 2 Sections D.2.2, D.2.3, D.2.5, and D.2.6 5

Key Lessons Learned Incorporated into New DI&C-ISG-06 Revision 2 Guidance (2/2)

  • There is an expanded discussion of expectations for technical information to be provided related to system requirements function allocation in DI&C-ISG-06 Revision 2 Section D.2.4
  • There is an expanded discussion of expectations for technical information to be provided related to maintenance activities in DI&C-ISG-06 Revision 2 Sections D.2.2, D.2.3.3.1, and D.2.5.1 6

Key Lessons Learned to be Addressed in DI&C-ISG-06 Revision 2 Industry Guidance (1/2)

  • There will be expanded guidance to address DI&C-ISG-06 Revision 2 Section D.4 for range of cases:

- Vendor Software Program Manual Available

- Vendor Application Methodology Reviewed with Plant Specific Follow-up Actions

- Application-Specific Approach

  • There will be expanded guidance to address vendor oversight plans 7

Key Lessons Learned to be Addressed in DI&C-ISG-06 Revision 2 Industry Guidance (2/2)

  • There will be expanded guidance to address Sections D.2.3 and D.4.2.1.1 for plant and I&C system safety analysis to provide summary information to support vendor design, V&V, oversight, and regulatory reviews verification
  • There will be guidance for a new Safety Function Summary Table to define design basis and to highlight changes
  • Automated Protection Function
  • Credited Trip/Actuation Signals
  • Interlock / Permissive / Override
  • Variable(s)
  • Condition for Interlock / Permissive /
  • Range Override Function
  • Nominal (100% RTP) Analytical Limit
  • Response Time Assumed in FSAR Event
  • Number of Channels Analysis
  • Logic 8

Conclusions

  • New DI&C-ISG-06 Revision 2 Guidance Addresses Key Lessons Learned from Pilot Experiences
  • New Guidance Has Direct Correlation between information to be Provided and NRC Regulatory Evaluations
  • Industry Guidance for DI&C-ISG-06 Revision 2 will Capture Additional Insights from Table Top Exercise 9

Closing

  • Questions?

10