| issue date = 06/05/1975
| issue date = 06/05/1975
| title = Wppss Nuclear Project No. 2. BWR Mark Ii Containment Additional Design Information
| title = Wppss Nuclear Project No. 2. BWR Mark II Containment Additional Design Information
| author name = Stein J J
| author name = Stein J
| author affiliation = Washington Public Power Supply System
| author affiliation = Washington Public Power Supply System
| addressee name = Butler W R
| addressee name = Butler W
| addressee affiliation = NRC/NRR
| addressee affiliation = NRC/NRR
| docket = 05000397
| docket = 05000397
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:fdRC DISTRIBUTION FOR PART 50 DOCKET MATERIAL (TEMPORARY FORM)CONTROL NO: IP Z FILE FROM.Was ington Public Pwr Richland, Wash JJ Stein'6<<5-'75 6-9-DATE OF DOC DATE REC'D LTR'WX RPT OTHER TO: DR Butler ORIG one signed CC OTHER SF-NT 1BC PDR XX SENT LOCAL PDR CLASS UNCLASS PROPINFO XXXXXXXXX DESCRIPTION:
{{#Wiki_filter:fdRC DISTRIBUTION FOR PART 50 DOCKET MATERIAL (TEMPORARY FORM)
INPUT NO CYS REC'D 1 ENC LOSUR ES:.DOCKET NO: 50-397 Ltr re their 5-8-75 ltr....furnishing addi info with regard to a schedule for submission of lmaterial dealing with Mark II containment design info BONOT REMOVE ZCKWOWLEDGED PLANT NAME: WPPS 82 FOR ACTION/INFORMATION 6-10-75.ehf BU f LER (L)~W/copies CLARK (L)W/Copies PARR (L)Vd/Copies KNIEL (L)W/Copies SCHWENCER (L)W/Copies STOLZ (L)W/Copies VASSALLO (L)W/Copies PURPLE (L)W/Copies Zl EMANN (L)W/Copies DICKER (E)W/Copies KNIGHTON (E)W/Copies YOUNGBLOOD (E)W/Copies REGAN (E)W/Copies LEAR (L)W/Copies SPIES W/Copies LPM W/opuses INTERNAL DISTRIBUTION iNRC PDR~GC, ROOM P-506A~OSS I C K/STA F F ENCASE~Is<M BUSSO gBOYD MOORE (L)~DEYOUNG (L)SKOVHOLT (L)GOLLER (L)(Ltr)P.COLLINS DENISE REG OPR WILE 5 REGION (2)MIPC TFCH REVIEW SCHROEDER MACCARY KNI G HT PAWI ICKI SHAO COSTELLO HOUSTON+!OVAK cross(>>IPPO LITO WEDESCO LONG ALAI NAS BENAROYA VOLLMER DENTON G R I MES GAMMI LL KASTNER BALLARD SPANGLER ENVIRO MULLER DICKER KN IG HTON YOUNGBLOOD BEGAN PROJECT LDR HAR LESS LIC ASST R.DIGGS (L)H.GEARIN (L)E.GOULBOURNE (L)P.KREUTZER (E)J.LEE (L)M.MAIGRET (L)S.REED (E)M.SERVICE (L)S.SHEPPARD (L)M.SLATER (E)H.SMITH (L)S.TEETS (L)G.WILLIAMS (E)V.WILSON (L)R.INGRAM (L)M.DUNCAH A/T IND~B RA ITMAN SALTZMAN ME LTZ PLANS~MCDONALD CHAPMAN DUBE (Ltr).E.COUPE PETERSON HARTFIELD (2)KLECKF R EISENHUT Wl G G I NTON EXTERNAL DISTR I BUTION~1-LOCAL PDRW~~Io~~i~~~1-TIC (ABERNATHY)
CONTROL NO: IP     Z FILE FROM.       Was ington Public Pwr       DATE OF DOC      DATE REC'D      LTR    'WX      RPT        OTHER Richland, Wash JJ Stein'                     6<<5-'75         6                                                 ORIG       CC     OTHER       SF-NT 1BC PDR           XX TO:            Butler DR                          one signed SENT LOCAL PDR CLASS       UNCLASS       PROPINFO           INPUT       NO CYS REC'D         DOCKET NO:
(1)(2)(10)
XXXXXXXXX                                                1             50-397 DESCRIPTION:                                              ENC LOSUR ES:.
~1-NSIC (BUCHANAN) 1 1-ASLB 1 1-Newton Anderson Z/'/-ACRS I~++HSENT 7 0 4, 4, g(o.rgb o4-NATIONAL LABS 1-PD R-SAN/LA/NY
Ltr re their 5-8-75 ltr....furnishing addi info with regard to a schedule                           BONOT REMOVE for submission of lmaterial dealing with Mark     II containment design info ZCKWOWLEDGED PLANT NAME:             WPPS 82 FOR ACTION/INFORMATION             6-10-75   . ehf f LER (L)             SCHWENCER (L) Zl EMANN (L)              REGAN (E)
-W.PENNINGTON, Rrn E-201 GT 1-BROOKHAVEN NAT LAB CON SU LTAN TS 1-G.ULRIKSON ORNL'NEWMAR K/B LUME/AG BABI AN ll Y~~~I 4 y h  
~BUW/copies                  W/ Copies          W/ Copies            W/ Copies CLARK (L)                 STOLZ (L)         DICKER (E)            LEAR (L)
~~REGULATORY DOCKET FILE COPY Washington Public Power Supply System A JOINT OPERATING AGENCY P.0.BOX 968 3000 GEO WASHINGTON WAY RICHI.ANDWASHINGTON 99252 PHONE (509)946.968l Docket No.50-397 June 5, 1975 G02-75-163 Dr.W.R.Butler, Chief BWR-Projects Branch No.1-2 Directorate of Licensing U.S.Nuclear Regulatory Commission Washington, D.C.20545  
W/ Copies                 W/ Copies           W/ Copies           W/ Copies PARR (L)                   VASSALLO (L)       KNIGHTON (E)         SPIES Vd/ Copies                W/ Copies           W/ Copies           W/ Copies KNIEL (L)                  PURPLE (L)        YOUNGBLOOD    (E)     LPM W/ Copies                 W/ Copies         W/ Copies           W/ opuses INTERNAL DISTRIBUTION TFCH REVIEW        DENTON                LIC ASST                A/T IND  ~
iNRC     PDR                 SCHROEDER          G R I MES        R. DIGGS (L)                B RA ITMAN
~GC,     ROOM P-506A         MACCARY            GAMMILL          H. GEARIN (L)                SALTZMAN
~OSS   I C K/STA F F       KNIG HT            KASTNER            E. GOULBOURNE (L)          ME LTZ ENCASE                       PAWI ICKI          BALLARD            P. KREUTZER (E)
~ Is<M BUSSO gBOYD SHAO COSTELLO SPANGLER          J.
M.
LEE (L)
MAIGRET (L)
PLANS
                                                                                              ~MCDONALD MOORE (L)                 HOUSTON            ENVIRO            S. REED (E)                CHAPMAN
~DEYOUNG (L)               +!OVAK              MULLER            M. SERVICE (L)             DUBE (Ltr).
SKOVHOLT (L)             cross(>>             DICKER KN IG HTON S. SHEPPARD (L)
SLATER (E)
E. COUPE PETERSON GOLLER (L) (Ltr)           IPPO LITO                            M.
P. COLLINS                WEDESCO            YOUNGBLOOD        H. SMITH (L)               HARTFIELD (2)
DENISE                    LONG                BEGAN            S. TEETS (L)               KLECKF R REG OPR                ALAINAS              PROJECT LDR      G. WILLIAMS(E)               EISENHUT WILE 5 REGION        (2)    BENAROYA                            V. WILSON (L)               Wl G G I NTON MIPC                      VOLLMER            HAR LESS          R. INGRAM (L)
M. DUNCAH EXTERNAL DISTR I BUTION
  ~1 LOCAL PDRW~~Io ~ ~i ~~                                                         PD R-SAN/LA/NY
  ~1 TIC (ABERNATHY) (1)(2)(10) NATIONALLABS                                      1 BROOKHAVEN NAT LAB
  ~1 NSIC (BUCHANAN)                   1 W. PENNINGTON, Rrn E-201 GT            1 1 ASLB                             1  CON SU LTANTS                        1 G. ULRIKSON ORNL 1 Newton Anderson                     'NEWMARK/B LUME/AGBABIAN Z/'/- ACRS I~++HSENT 7 0 4, 4, g(o.rgb o4
 
ll Y
    ~   ~ ~ I 4 y
h
 
                          ~                                           ~
REGULATORY DOCKET FILE COPY Washington Public Power Supply System A JOINT OPERATING AGENCY P. 0. BOX 968   3000 GEO WASHINGTON WAY RICHI.ANDWASHINGTON 99252 PHONE   (509) 946.968l Docket No. 50-397                                         June 5, 1975 G02-75-163 Dr. W.R. Butler, Chief BWR-Projects Branch No. 1-2                                                                     ~f/pp              YLL Directorate of Licensing U.S. Nuclear Regulatory Commission Washington, D.C. 20545
                                                                                          <ng~~~rg q+ e~,'~ir>
                                                                                              '6,
                                                                                                        ~r 4,
                                                                                                                  .,:    I g~
                                                                                                                  ~~ ~)


==Subject:==
==Subject:==
WPPSS NUCLEAR PROJECT NO.2 BWR MARK II CONTAINMENT ADDITIONAL DESIGN INFORMATION I  
WPPSS NUCLEAR PROJECT NO. 2 BWR MARK     II CONTAINMENT ADDITIONAL DESIGN INFORMATION I


==References:==
==References:==
: 1)    Letter,    W.R. Butler to J.J. Stein,                      Oz Suppression    pool hydrodynamic loads                              90CKETED QSEERC during LOCA, dated April 17, 1975,,
: 2)    Letter,  W.R. Butler to J.J. Stein, Pool dynamic loads due        to relief valve operation, dated April 23, 1975 JUN        P "97~
HIIClEAR REGWAT0 02T CnH ~ c> IO I
                                                                                                              ~
: 3)    Letter, J.J. Stein to W.R. Butler,                                        IIIoll SoHlo BWR Mark II Containment  Additional Design Information, dated May 8, 1975              .
==Dear Dr. Butler:==
This  letter provides        a schedule for the information requested by refer-ences  1  and 2 as promised by our reference 3. The attachment to this letter provides a schedule and program for resolving your concerns with the Boiling Water Reactor Mark              II  containment concept. The schedule calls for the submittal of containment present-design data in July 1975 and continues through the            first  quarter of 1976, with the schedule for final assessment of'containment. We believe for      to submit it  would be inappropriate us                a  gross assessment of the highly geometry-related phe-nomena    identified in other containment configurations for the WPPSS Nuclear Project No. 2 containment design at this time'.
In the event the results of the program reveal a change or modification to the WPPSS Nuclear Project No. 2 Mark II containment is necessary, we
-will inform you. The WPPSS Nuclear Project No. 2 containment is essen-tially 100&#xc3; complete and the construction pressure test required by'he f
6278
I I/
P I
j
  ~or. W. R. Butler Page 2 June  5, 1975                                                  G02-.75-163
~,    ACME  Code is being conducted.      it If becomes established that a modifi-cation to the containment vessel is required, we have determined, through contact with our authorized inspection agency (Factory Mutual Engineering),
that certain modifications could be accommodated in this ASME Section III containment vessel. Such modifications would be made in accordance with the ASME Section XI requirements. We therefore do not feel that we are precluding the ability to accommodate modifications to the containment vessel  if these become necessary in the future.
Very truly yours,
                                                  ~
                                              ~
J. J. STEIN Managing  Director JJS:CLF:vlm Attachment cc:  DJ  Anderson - Bonneville Power Administration JJ Byrnes - Burns and Roe, Inc, FA MacLean - General Electric Company JJ Verderber - Burns and Roe, Inc,
  +C 1
t


1)Letter, W.R.Butler to J.J.Stein, Suppression pool hydrodynamic loads during LOCA, dated April 17, 1975,, 2)Letter, W.R.Butler to J.J.Stein, Pool dynamic loads due to relief valve operation, dated April 23, 1975 3)Letter, J.J.Stein to W.R.Butler, BWR Mark II Containment
ATTACHMENT "A" MARK  II SCHEDULE 8( PROGRAM LOCA        SRV
-Additional Design Information, dated May 8, 1975.
                ~Pro ram                                    Schedule        guestions  questions Submit plant unique suppression pool and                July, 1975                  ] 5*
relief valve drawings reflecting current design.
: 2. Submit a generic "Preliminary Forcing                  Sept.,  1975        7*    1*,2,4*,6 Function Report" which will provide the time history of pool dynamic forcing functions and the methods for relating these functions to the containment structures and components.
: 3. Submit a description    of a suppression pool           Oct., 1975     Not. Appl . 7,8,9,10 temperature monitoring system.       (Temperature limits and transients will be described in the Final Safety Analysis Report).
: 4. Submit a plant unique preliminary assess-              Nov., 1975    3,4,5,6,7*,3,4*,5 ment of containment structures and compo-nents based on the Preliminary Forcing Function Report.
: 5. Submit a schedule for the generic test                  Dec., 1975 program and mathematical models which justify  the forcing functions used to assess containment structures    and components.
6 ~ Submit  a  schedule  for the final assess-             First quarter ment of containment    structures  and                      1976 components.
* Partial  Answer


==Dear Dr.Butler:==
                                                          'I 4           1 0
~f/pp YLL<ng~~~rg~r.,: I q+e~,'~ir>4, g~'6,~~~)Oz 90CKETED QSEERC JUN P"97~HIIClEAR REGWAT0 02T CnH~c>~IO I IIIoll SoHlo This letter provides a schedule for the information requested by refer-ences 1 and 2 as promised by our reference 3.The attachment to this letter provides a schedule and program for resolving your concerns with the Boiling Water Reactor Mark II containment concept.The schedule calls for the submittal of containment present-design data in July 1975 and continues through the first quarter of 1976, with the schedule for final assessment of'containment.
I                                             4 1'
We believe it would be inappropriate for us to submit a gross assessment of the highly geometry-related phe-nomena identified in other containment configurations for the WPPSS Nuclear Project No.2 containment design at this time'.In the event the results of the program reveal a change or modification to the WPPSS Nuclear Project No.2 Mark II containment is necessary, we-will inform you.The WPPSS Nuclear Project No.2 containment is essen-tially 100&#xc3;complete and the construction pressure test required by'he f 6278 I I/P I j~or.W.R.Butler Page 2 June 5, 1975 G02-.75-163
4 P
~, ACME Code is being conducted.
w1
If it becomes established that a modifi-cation to the containment vessel is required, we have determined, through contact with our authorized inspection agency (Factory Mutual Engineering), that certain modifications could be accommodated in this ASME Section III containment vessel.Such modifications would be made in accordance with the ASME Section XI requirements.
  'I
We therefore do not feel that we are precluding the ability to accommodate modifications to the containment vessel if these become necessary in the future.Very truly yours,~~JJS:CLF:vlm Attachment J.J.STEIN Managing Director cc: DJ Anderson-Bonneville Power Administration JJ Byrnes-Burns and Roe, Inc, FA MacLean-General Electric Company JJ Verderber-Burns and Roe, Inc,
                              ~'
+C 1 t ATTACHMENT"A" MARK II SCHEDULE 8(PROGRAM 2.3.4.5.6~~Pro ram Submit plant unique suppression pool and relief valve drawings reflecting current design.Submit a generic"Preliminary Forcing Function Report" which will provide the time history of pool dynamic forcing functions and the methods for relating these functions to the containment structures and components.
I
Submit a description of a suppression pool temperature monitoring system.(Temperature limits and transients will be described in the Final Safety Analysis Report).Submit a plant unique preliminary assess-ment of containment structures and compo-nents based on the Preliminary Forcing Function Report.Submit a schedule for the generic test program and mathematical models which justify the forcing functions used to assess containment structures and components.
                  ~     \                 V E
Submit a schedule for the final assess-ment of containment structures and components.
E J
Schedule July, 1975 Sept., 1975 Oct., 1975 Nov., 1975 Dec., 1975 First quarter 1976 LOCA guestions 7*Not.Appl.3,4,5,6,7*,8 SRV questions]5*1*,2,4*,6 7,8,9,10 3,4*,5*Partial Answer
P V
'I I 4 1 0 4 1'4 P w1'I~'I~\V E E J P V h I p V 4'1~~L f;d J'}}
h I
p V
4             '1
                                                ~ ~
L f;
d J'}}

Latest revision as of 20:55, 20 October 2019

Wppss Nuclear Project No. 2. BWR Mark II Containment Additional Design Information
ML18191A287
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 06/05/1975
From: Stein J
Washington Public Power Supply System
To: Butler W
Office of Nuclear Reactor Regulation
References
G02-75-163
Download: ML18191A287 (8)


Text

fdRC DISTRIBUTION FOR PART 50 DOCKET MATERIAL (TEMPORARY FORM)

CONTROL NO: IP Z FILE FROM. Was ington Public Pwr DATE OF DOC DATE REC'D LTR 'WX RPT OTHER Richland, Wash JJ Stein' 6<<5-'75 6 ORIG CC OTHER SF-NT 1BC PDR XX TO: Butler DR one signed SENT LOCAL PDR CLASS UNCLASS PROPINFO INPUT NO CYS REC'D DOCKET NO:

XXXXXXXXX 1 50-397 DESCRIPTION: ENC LOSUR ES:.

Ltr re their 5-8-75 ltr....furnishing addi info with regard to a schedule BONOT REMOVE for submission of lmaterial dealing with Mark II containment design info ZCKWOWLEDGED PLANT NAME: WPPS 82 FOR ACTION/INFORMATION 6-10-75 . ehf f LER (L) SCHWENCER (L) Zl EMANN (L) REGAN (E)

~BUW/copies W/ Copies W/ Copies W/ Copies CLARK (L) STOLZ (L) DICKER (E) LEAR (L)

W/ Copies W/ Copies W/ Copies W/ Copies PARR (L) VASSALLO (L) KNIGHTON (E) SPIES Vd/ Copies W/ Copies W/ Copies W/ Copies KNIEL (L) PURPLE (L) YOUNGBLOOD (E) LPM W/ Copies W/ Copies W/ Copies W/ opuses INTERNAL DISTRIBUTION TFCH REVIEW DENTON LIC ASST A/T IND ~

iNRC PDR SCHROEDER G R I MES R. DIGGS (L) B RA ITMAN

~GC, ROOM P-506A MACCARY GAMMILL H. GEARIN (L) SALTZMAN

~OSS I C K/STA F F KNIG HT KASTNER E. GOULBOURNE (L) ME LTZ ENCASE PAWI ICKI BALLARD P. KREUTZER (E)

~ Is<M BUSSO gBOYD SHAO COSTELLO SPANGLER J.

M.

LEE (L)

MAIGRET (L)

PLANS

~MCDONALD MOORE (L) HOUSTON ENVIRO S. REED (E) CHAPMAN

~DEYOUNG (L) +!OVAK MULLER M. SERVICE (L) DUBE (Ltr).

SKOVHOLT (L) cross(>> DICKER KN IG HTON S. SHEPPARD (L)

SLATER (E)

E. COUPE PETERSON GOLLER (L) (Ltr) IPPO LITO M.

P. COLLINS WEDESCO YOUNGBLOOD H. SMITH (L) HARTFIELD (2)

DENISE LONG BEGAN S. TEETS (L) KLECKF R REG OPR ALAINAS PROJECT LDR G. WILLIAMS(E) EISENHUT WILE 5 REGION (2) BENAROYA V. WILSON (L) Wl G G I NTON MIPC VOLLMER HAR LESS R. INGRAM (L)

M. DUNCAH EXTERNAL DISTR I BUTION

~1 LOCAL PDRW~~Io ~ ~i ~~ PD R-SAN/LA/NY

~1 TIC (ABERNATHY) (1)(2)(10) NATIONALLABS 1 BROOKHAVEN NAT LAB

~1 NSIC (BUCHANAN) 1 W. PENNINGTON, Rrn E-201 GT 1 1 ASLB 1 CON SU LTANTS 1 G. ULRIKSON ORNL 1 Newton Anderson 'NEWMARK/B LUME/AGBABIAN Z/'/- ACRS I~++HSENT 7 0 4, 4, g(o.rgb o4

ll Y

~ ~ ~ I 4 y

h

~ ~

REGULATORY DOCKET FILE COPY Washington Public Power Supply System A JOINT OPERATING AGENCY P. 0. BOX 968 3000 GEO WASHINGTON WAY RICHI.ANDWASHINGTON 99252 PHONE (509) 946.968l Docket No. 50-397 June 5, 1975 G02-75-163 Dr. W.R. Butler, Chief BWR-Projects Branch No. 1-2 ~f/pp YLL Directorate of Licensing U.S. Nuclear Regulatory Commission Washington, D.C. 20545

<ng~~~rg q+ e~,'~ir>

'6,

~r 4,

.,: I g~

~~ ~)

Subject:

WPPSS NUCLEAR PROJECT NO. 2 BWR MARK II CONTAINMENT ADDITIONAL DESIGN INFORMATION I

References:

1) Letter, W.R. Butler to J.J. Stein, Oz Suppression pool hydrodynamic loads 90CKETED QSEERC during LOCA, dated April 17, 1975,,
2) Letter, W.R. Butler to J.J. Stein, Pool dynamic loads due to relief valve operation, dated April 23, 1975 JUN P "97~

HIIClEAR REGWAT0 02T CnH ~ c> IO I

~

3) Letter, J.J. Stein to W.R. Butler, IIIoll SoHlo BWR Mark II Containment Additional Design Information, dated May 8, 1975 .

Dear Dr. Butler:

This letter provides a schedule for the information requested by refer-ences 1 and 2 as promised by our reference 3. The attachment to this letter provides a schedule and program for resolving your concerns with the Boiling Water Reactor Mark II containment concept. The schedule calls for the submittal of containment present-design data in July 1975 and continues through the first quarter of 1976, with the schedule for final assessment of'containment. We believe for to submit it would be inappropriate us a gross assessment of the highly geometry-related phe-nomena identified in other containment configurations for the WPPSS Nuclear Project No. 2 containment design at this time'.

In the event the results of the program reveal a change or modification to the WPPSS Nuclear Project No. 2 Mark II containment is necessary, we

-will inform you. The WPPSS Nuclear Project No. 2 containment is essen-tially 100Ã complete and the construction pressure test required by'he f

6278

I I/

P I

j

~or. W. R. Butler Page 2 June 5, 1975 G02-.75-163

~, ACME Code is being conducted. it If becomes established that a modifi-cation to the containment vessel is required, we have determined, through contact with our authorized inspection agency (Factory Mutual Engineering),

that certain modifications could be accommodated in this ASME Section III containment vessel. Such modifications would be made in accordance with the ASME Section XI requirements. We therefore do not feel that we are precluding the ability to accommodate modifications to the containment vessel if these become necessary in the future.

Very truly yours,

~

~

J. J. STEIN Managing Director JJS:CLF:vlm Attachment cc: DJ Anderson - Bonneville Power Administration JJ Byrnes - Burns and Roe, Inc, FA MacLean - General Electric Company JJ Verderber - Burns and Roe, Inc,

+C 1

t

ATTACHMENT "A" MARK II SCHEDULE 8( PROGRAM LOCA SRV

~Pro ram Schedule guestions questions Submit plant unique suppression pool and July, 1975 ] 5*

relief valve drawings reflecting current design.

2. Submit a generic "Preliminary Forcing Sept., 1975 7* 1*,2,4*,6 Function Report" which will provide the time history of pool dynamic forcing functions and the methods for relating these functions to the containment structures and components.
3. Submit a description of a suppression pool Oct., 1975 Not. Appl . 7,8,9,10 temperature monitoring system. (Temperature limits and transients will be described in the Final Safety Analysis Report).
4. Submit a plant unique preliminary assess- Nov., 1975 3,4,5,6,7*,8 3,4*,5 ment of containment structures and compo-nents based on the Preliminary Forcing Function Report.
5. Submit a schedule for the generic test Dec., 1975 program and mathematical models which justify the forcing functions used to assess containment structures and components.

6 ~ Submit a schedule for the final assess- First quarter ment of containment structures and 1976 components.