ML18228A835: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
(5 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML18228A835
| number = ML18228A835
| issue date = 08/22/2018
| issue date = 08/22/2018
| title = Edwin I. Hatch Nuclear Plant, Unit Nos. 1 and 2 - Online Reference Portal for License Amendment Request to Adopt National Fire Protection Association Standard 805 (EPID L-2018-LLA-0107)
| title = Online Reference Portal for License Amendment Request to Adopt National Fire Protection Association Standard 805
| author name = Hall J R
| author name = Hall J
| author affiliation = NRC/NRR/DORL/LPLII-1
| author affiliation = NRC/NRR/DORL/LPLII-1
| addressee name = Gayheart C A
| addressee name = Gayheart C
| addressee affiliation = Southern Nuclear Operating Co, Inc
| addressee affiliation = Southern Nuclear Operating Co, Inc
| docket = 05000321, 05000366
| docket = 05000321, 05000366
| license number = DPR-057, NPF-005
| license number = DPR-057, NPF-005
| contact person = Hall J R
| contact person = Hall J
| case reference number = EPID L-2018-LLA-0107
| case reference number = EPID L-2018-LLA-0107
| document type = Letter
| document type = Letter
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:Ms. Cheryl A. Gayheart Regulatory Affairs Director UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 August 22, 2018 Southern Nuclear Operating Company, Inc. P. 0. Box 1295, Bin 038 Birmingham, AL 35201-1295  
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 August 22, 2018 Ms. Cheryl A. Gayheart Regulatory Affairs Director Southern Nuclear Operating Company, Inc.
P. 0. Box 1295, Bin 038 Birmingham, AL 35201-1295


==SUBJECT:==
==SUBJECT:==
EDWIN I. HATCH NUCLEAR PLANT, UNIT NOS. 1 AND 2 -ONLINE REFERENCE PORTAL FOR LICENSE AMENDMENT REQUEST TO ADOPT NATIONAL FIRE PROTECTION ASSOCIATION STANDARD 805 (EPID L-2018-LLA-0107)  
EDWIN I. HATCH NUCLEAR PLANT, UNIT NOS. 1 AND 2 - ONLINE REFERENCE PORTAL FOR LICENSE AMENDMENT REQUEST TO ADOPT NATIONAL FIRE PROTECTION ASSOCIATION STANDARD 805 (EPID L-2018-LLA-0107)


==Dear Ms. Gayheart:==
==Dear Ms. Gayheart:==


By application dated April 4, 2018 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML 18096A936), Southern Nuclear Operating Company (SNC or the licensee) submitted a license amendment request for the Edwin I. Hatch Nuclear Plant, Unit Nos. 1 and 2. In the license amendment request, SNC proposes to adopt National Fire Protection Association Standard 805 (NFPA 805), "Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants," 2001 Edition (ADAMS Accession No. ML010800360), as an alternative to compliance with existing fire protection program requirements.
By application dated April 4, 2018 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML18096A936), Southern Nuclear Operating Company (SNC or the licensee) submitted a license amendment request for the Edwin I. Hatch Nuclear Plant, Unit Nos. 1 and 2. In the license amendment request, SNC proposes to adopt National Fire Protection Association Standard 805 (NFPA 805), "Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants," 2001 Edition (ADAMS Accession No. ML010800360), as an alternative to compliance with existing fire protection program requirements.
To improve the efficiency of the U.S. Nuclear Regulatory Commission (NRC) reviews, the NRC staff and SNC staff have discussed the use of an online reference portal that would allow the NRC staff and contractors limited read-only access to the basis documents and other reference materials cited in the application.
To improve the efficiency of the U.S. Nuclear Regulatory Commission (NRC) reviews, the NRC staff and SNC staff have discussed the use of an online reference portal that would allow the NRC staff and contractors limited read-only access to the basis documents and other reference materials cited in the application. In a meeting summary dated December 20, 2011 (ADAMS Accession No. ML113340218), the NRC staff described the portal process for NFPA 805 reviews. The online reference portal would allow the NRC staff to audit basis documents to determine whether the information included in the documents support the application.
In a meeting summary dated December 20, 2011 (ADAMS Accession No. ML 113340218), the NRC staff described the portal process for NFPA 805 reviews. The online reference portal would allow the NRC staff to audit basis documents to determine whether the information included in the documents support the application.
Documents identified as necessary for analysis of the application will be identified by the NRC staff. The licensee will be formally requested to submit those documents on the NRC docket.
Documents identified as necessary for analysis of the application will be identified by the NRC staff. The licensee will be formally requested to submit those documents on the NRC docket. Use of the online reference portal is acceptable, as long as the following conditions are met:
Use of the online reference portal is acceptable, as long as the following conditions are met:
* The online reference portal will be password-protected and passwords will be assigned to those directly involved in the review on a need-to-know basis;
* The online reference portal will be password-protected and passwords will be assigned to those directly involved in the review on a need-to-know basis;
* The online reference portal will be sufficiently secure to prevent staff from printing, saving, or downloading any documents; and
* The online reference portal will be sufficiently secure to prevent staff from printing, saving, or downloading any documents; and
* Conditions of use of the online reference portal will be displayed on the login screen and will require concurrence by each user. The NRC staff requests that the portal be populated with the documents listed in the enclosure to this letter. This will help the NRC staff in preparing for any site audits and will enhance the effectiveness of the staff's review of the application.
* Conditions of use of the online reference portal will be displayed on the login screen and will require concurrence by each user.
C. Gayheart A list of the NRC staff and contractors requiring portal access will be transmitted separately.
The NRC staff requests that the portal be populated with the documents listed in the enclosure to this letter. This will help the NRC staff in preparing for any site audits and will enhance the effectiveness of the staff's review of the application.
Please provide access to the portal, including usernames and passwords, to the designated NRC staff and contractors as soon as possible upon receipt of the list. The conditions associated with the online reference portal must be maintained throughout the duration of the review process. Please also provide written confirmation that SNC agrees to the terms and conditions set forth in this letter. If you have any questions, please contact me at (301) 415-4032.
 
Docket Nos. 50-321 and 50-366  
C. Gayheart                                       A list of the NRC staff and contractors requiring portal access will be transmitted separately.
Please provide access to the portal, including usernames and passwords, to the designated NRC staff and contractors as soon as possible upon receipt of the list. The conditions associated with the online reference portal must be maintained throughout the duration of the review process. Please also provide written confirmation that SNC agrees to the terms and conditions set forth in this letter.
If you have any questions, please contact me at (301) 415-4032.
Sincerely,
                                                      >>~;?./~
emes R. Hall, Senior Project Manager Plant Licensing Branch 11-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-321 and 50-366


==Enclosure:==
==Enclosure:==


Generic List of SharePoint Portal Requested Documents for NFPA 805 cc: Listserv Sincerely, >>~;?./~ emes R. Hall, Senior Project Manager Plant Licensing Branch 11-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation GENERIC LIST OF SHAREPOINT PORTAL REQUESTED DOCUMENTS FOR NFPA 805 1. National Fire Protection Association (NFPA) Code Deviations and Justifications  
Generic List of SharePoint Portal Requested Documents for NFPA 805 cc: Listserv
: 2. All applicable Probabilistic Risk Assessment (PRA) Peer Review Reports 3. All site calculations referenced in the License Amendment Request 4. Credited Fire Protection (FP) System and Feature Drawings a. Layout Drawings:
 
fire barriers, installed fire detection and suppression systems, fire areas, fire zones, stairwells, fire doors, fire dampers, etc. b. Piping and Instrumentation Diagrams (P&IDs): FP Water System c. System Descriptions for Fire Suppression, Water Supply, and Detection (including incipient or very early warning fire detection)  
GENERIC LIST OF SHAREPOINT PORTAL REQUESTED DOCUMENTS FOR NFPA 805
: d. Hydraulic Calculations for Fire Service and Fire Suppression System Water Demand (if used to support non-fire water use in Title 1 O of the Code of Federal Regulations, paragraph 50.48(c)(2)(vii))  
: 1. National Fire Protection Association (NFPA) Code Deviations and Justifications
: 5. Drawings related to systems credited in the Nuclear Safety Capability Assessment (NSCA) as well as those required to fully understand plant response:  
: 2. All applicable Probabilistic Risk Assessment (PRA) Peer Review Reports
: a. P&IDs: Reactor Coolant System, Main Steam, Main Feedwater, Circulating Water, Service Water, etc. b. Safe Shutdown/NSCA Logic Diagrams (if used) c. Electrical Distribution System One-Lines (alternating current and direct current) 6. Those documents that fulfill the NFPA 805 requirement for "Design Basis Document (DBD)" a. Fire Area Calculations (e.g. Fire Safety Analyses, Fire Risk Analyses, Plant Change Evaluations, Fire Risk Evaluations)  
: 3. All site calculations referenced in the License Amendment Request
: b. NSCA Calculation (Safe Shutdown/Circuit Analysis)  
: 4. Credited Fire Protection (FP) System and Feature Drawings
: c. Multiple Spurious Operation Expert Panel Report d. Thermo-hydraulic Analysis serving as the basis for Variance from Deterministic Requirements (VFDR) and recovery action timing e. Evaluation of Recovery Actions for feasibility  
: a.       Layout Drawings: fire barriers, installed fire detection and suppression systems, fire areas, fire zones, stairwells, fire doors, fire dampers, etc.
: f. Fire Hazards Analysis (if separate from the fire area calculations)   g. Non-Power Operation Calculation(s)  
: b.       Piping and Instrumentation Diagrams (P&IDs): FP Water System
: h. Radioactive Release Calculation(s)  
: c.       System Descriptions for Fire Suppression, Water Supply, and Detection (including incipient or very early warning fire detection)
: i. Pre-fire Plans 7. Fire PRA Calculations  
: d.       Hydraulic Calculations for Fire Service and Fire Suppression System Water Demand (if used to support non-fire water use in Title 1O of the Code of Federal Regulations, paragraph 50.48(c)(2)(vii))
: a. Plant Boundary/Partitioning Methods and Results (TASK 1) b. Component Selection Calculation (TASK 2) c. Cable Selection and Circuit Analysis (TASKS 3, 9, and 10) d. Ignition Frequency Calculation (TASK 6) e. Fire PRA Quantification Calculations (TASK 5) including:  
: 5. Drawings related to systems credited in the Nuclear Safety Capability Assessment (NSCA) as well as those required to fully understand plant response:
: i. Seismic Fire Interactions (TASK 13) Methodologies and results (including assumptions) ii. Screening Methodologies and Results (TASKS 4 and 7) (including assumptions) iii. Fire Risk Quantifications (TASK 14) Methodologies and Results (including assumptions) iv. Multi-compartment Screening and Analysis v. Post-fire Human Reliability Analysis Methodologies and Results (including assumptions) (TASK 12) vi. Detailed proposed modification descriptions (Engineering Change Requests/Records) sufficient to comprehend potential impact/improvement to Fire PRA f. NFPA 805 Application Calculation (provides all the delta risk calculations for VFDRs) g. Control Room Risk Calculation  
: a.       P&IDs: Reactor Coolant System, Main Steam, Main Feedwater, Circulating Water, Service Water, etc.
: h. Uncertainty and Sensitivity Calculations (TASK 15) i. Fire Modeling Calculations used to support the Fire PRA (zone of influence (ZOI), hot gas layer, bounding, detailed fire modeling, etc.) ii Plant Specific Verification and Validation (V&V) Analysis iii. Non-public V&V References (e.g., Electric Power Research Institute (EPRI) Fire Modeling, Generic Treatment)   iv. Fire Modeling Assumptions and Calculations performed to support target selection (e.g.; ZOI, secondary fires, transient combustible/ignition sources) including those that deviate from NUREG/CR-6850 (TASKS 8 and 11) 8. Fire Modeling used in the Fire Modeling Performance-based Approach a. Plant Specific V&V Analysis performed  
: b.       Safe Shutdown/NSCA Logic Diagrams (if used)
: b. Non-public V&V References (e.g., EPRI Fire Modeling, Generic Treatments)  
: c.       Electrical Distribution System One-Lines (alternating current and direct current)
: c. Fire Modeling Assumptions and Calculations performed to support Based Evaluations (e.g., ZOI, secondary fires, transient combustible/ignition sources) considered outside NUREG/CR 6850 Assumptions and Parameters (TASKS 8 and 11) d. Hot Gas Layer Determination Calculations (including assumptions)  
: 6. Those documents that fulfill the NFPA 805 requirement for "Design Basis Document (DBD)"
: 9. Fire Protection Program Manual 10. Fire Protection Quality Assurance Program (including FP Structure System Components and FP Features)  
: a.       Fire Area Calculations (e.g. Fire Safety Analyses, Fire Risk Analyses, Plant Change Evaluations, Fire Risk Evaluations)
: 11. NFPA 805 Monitoring Program Calculations and Procedures  
: b.       NSCA Calculation (Safe Shutdown/Circuit Analysis)
: 12. Technical Requirements Manual 13. Updated Final Safety Analysis Report (UFSAR) Changes (including current UFSAR Section 9.5.1, "Fire Protection Program," and Section 7.4, "Systems Required for Safe Shutdown")
: c.       Multiple Spurious Operation Expert Panel Report
C. Gayheart
: d.       Thermo-hydraulic Analysis serving as the basis for Variance from Deterministic Requirements (VFDR) and recovery action timing
: e.       Evaluation of Recovery Actions for feasibility
: f.       Fire Hazards Analysis (if separate from the fire area calculations)
: g.     Non-Power Operation Calculation(s)
: h.     Radioactive Release Calculation(s)
: i. Pre-fire Plans
: 7. Fire PRA Calculations
: a.     Plant Boundary/Partitioning Methods and Results (TASK 1)
: b.     Component Selection Calculation (TASK 2)
: c.     Cable Selection and Circuit Analysis (TASKS 3, 9, and 10)
: d.     Ignition Frequency Calculation (TASK 6)
: e.     Fire PRA Quantification Calculations (TASK 5) including:
: i.     Seismic Fire Interactions (TASK 13) Methodologies and results (including assumptions) ii. Screening Methodologies and Results (TASKS 4 and 7) (including assumptions) iii. Fire Risk Quantifications (TASK 14) Methodologies and Results (including assumptions) iv. Multi-compartment Screening and Analysis
: v.     Post-fire Human Reliability Analysis Methodologies and Results (including assumptions) (TASK 12) vi. Detailed proposed modification descriptions (Engineering Change Requests/Records) sufficient to comprehend potential impact/improvement to Fire PRA
: f.     NFPA 805 Application Calculation (provides all the delta risk calculations for VFDRs)
: g.     Control Room Risk Calculation
: h.     Uncertainty and Sensitivity Calculations (TASK 15)
: i.     Fire Modeling Calculations used to support the Fire PRA (zone of influence (ZOI), hot gas layer, bounding, detailed fire modeling, etc.)
ii     Plant Specific Verification and Validation (V&V) Analysis iii. Non-public V&V References (e.g., Electric Power Research Institute (EPRI) Fire Modeling, Generic Treatment)
 
iv. Fire Modeling Assumptions and Calculations performed to support target selection (e.g.; ZOI, secondary fires, transient combustible/ignition sources) including those that deviate from NUREG/CR-6850 (TASKS 8 and 11)
: 8. Fire Modeling used in the Fire Modeling Performance-based Approach
: a.     Plant Specific V&V Analysis performed
: b.     Non-public V&V References (e.g., EPRI Fire Modeling, Generic Treatments)
: c.     Fire Modeling Assumptions and Calculations performed to support Performance-Based Evaluations (e.g., ZOI, secondary fires, transient combustible/ignition sources) considered outside NUREG/CR 6850 Assumptions and Parameters (TASKS 8 and 11)
: d.     Hot Gas Layer Determination Calculations (including assumptions)
: 9. Fire Protection Program Manual
: 10. Fire Protection Quality Assurance Program (including FP Structure System Components and FP Features)
: 11. NFPA 805 Monitoring Program Calculations and Procedures
: 12. Technical Requirements Manual
: 13. Updated Final Safety Analysis Report (UFSAR) Changes (including current UFSAR Section 9.5.1, "Fire Protection Program," and Section 7.4, "Systems Required for Safe Shutdown")


==SUBJECT:==
ML18228A835                          *via e-mail OFFICE DORULPL2-1/PM     DORULPL2-1 /LA     DRA/APLB/BC*   DORL/LPL2-1 /BC DORULPL2-1 /PM NAME   JHall           KGoldstein         GCasto         MMarkley       JHall DATE     8/20/18         08/20/18           8/21/18         8/22/18         8/22/18}}
EDWIN I. HATCH NUCLEAR PLANT, UNIT NOS. 1 AND 2 -ONLINE REFERENCE PORTAL FOR LICENSE AMENDMENT REQUEST TO ADOPT NATIONAL FIRE PROTECTION ASSOCIATION STANDARD 805 (EPID L-2018-LLA-0107)
DATED AUGUST 22, 2018 DISTRIBUTION:
PUBLIC RidsNrrDraAplb Resource RidsACRS_MailCTR Resource RidsNrrDorlLpl2-1 Resource RidsNrrLAKGoldstein Resource RidsNrrPMHatch Resource RidsRgn2Mail Center Resource BMetzger SDinsmore RidsNrrDraApla Resource RidsNrrDssStsb Resource RidsNrrDraArcb Resource JRobinson JHyslop AWu Nlqbal MSmith TDinh ADAMS Accession No. ML 18228A835
*via e-mail OFFICE DORULPL2-1/PM DORULPL2-1  
/LA DRA/APLB/BC*
DORL/LPL2-1  
/BC NAME JHall KGoldstein GCasto MMarkley DATE 8/20/18 08/20/18 8/21/18 8/22/18 OFFICIAL RECORD COPY DORULPL2-1
/PM JHall 8/22/18}}

Latest revision as of 16:33, 20 October 2019

Online Reference Portal for License Amendment Request to Adopt National Fire Protection Association Standard 805
ML18228A835
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 08/22/2018
From: Hall J
Plant Licensing Branch II
To: Gayheart C
Southern Nuclear Operating Co
Hall J
References
EPID L-2018-LLA-0107
Download: ML18228A835 (6)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 August 22, 2018 Ms. Cheryl A. Gayheart Regulatory Affairs Director Southern Nuclear Operating Company, Inc.

P. 0. Box 1295, Bin 038 Birmingham, AL 35201-1295

SUBJECT:

EDWIN I. HATCH NUCLEAR PLANT, UNIT NOS. 1 AND 2 - ONLINE REFERENCE PORTAL FOR LICENSE AMENDMENT REQUEST TO ADOPT NATIONAL FIRE PROTECTION ASSOCIATION STANDARD 805 (EPID L-2018-LLA-0107)

Dear Ms. Gayheart:

By application dated April 4, 2018 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML18096A936), Southern Nuclear Operating Company (SNC or the licensee) submitted a license amendment request for the Edwin I. Hatch Nuclear Plant, Unit Nos. 1 and 2. In the license amendment request, SNC proposes to adopt National Fire Protection Association Standard 805 (NFPA 805), "Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants," 2001 Edition (ADAMS Accession No. ML010800360), as an alternative to compliance with existing fire protection program requirements.

To improve the efficiency of the U.S. Nuclear Regulatory Commission (NRC) reviews, the NRC staff and SNC staff have discussed the use of an online reference portal that would allow the NRC staff and contractors limited read-only access to the basis documents and other reference materials cited in the application. In a meeting summary dated December 20, 2011 (ADAMS Accession No. ML113340218), the NRC staff described the portal process for NFPA 805 reviews. The online reference portal would allow the NRC staff to audit basis documents to determine whether the information included in the documents support the application.

Documents identified as necessary for analysis of the application will be identified by the NRC staff. The licensee will be formally requested to submit those documents on the NRC docket.

Use of the online reference portal is acceptable, as long as the following conditions are met:

  • The online reference portal will be password-protected and passwords will be assigned to those directly involved in the review on a need-to-know basis;
  • The online reference portal will be sufficiently secure to prevent staff from printing, saving, or downloading any documents; and
  • Conditions of use of the online reference portal will be displayed on the login screen and will require concurrence by each user.

The NRC staff requests that the portal be populated with the documents listed in the enclosure to this letter. This will help the NRC staff in preparing for any site audits and will enhance the effectiveness of the staff's review of the application.

C. Gayheart A list of the NRC staff and contractors requiring portal access will be transmitted separately.

Please provide access to the portal, including usernames and passwords, to the designated NRC staff and contractors as soon as possible upon receipt of the list. The conditions associated with the online reference portal must be maintained throughout the duration of the review process. Please also provide written confirmation that SNC agrees to the terms and conditions set forth in this letter.

If you have any questions, please contact me at (301) 415-4032.

Sincerely,

>>~;?./~

emes R. Hall, Senior Project Manager Plant Licensing Branch 11-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-321 and 50-366

Enclosure:

Generic List of SharePoint Portal Requested Documents for NFPA 805 cc: Listserv

GENERIC LIST OF SHAREPOINT PORTAL REQUESTED DOCUMENTS FOR NFPA 805

1. National Fire Protection Association (NFPA) Code Deviations and Justifications
2. All applicable Probabilistic Risk Assessment (PRA) Peer Review Reports
3. All site calculations referenced in the License Amendment Request
4. Credited Fire Protection (FP) System and Feature Drawings
a. Layout Drawings: fire barriers, installed fire detection and suppression systems, fire areas, fire zones, stairwells, fire doors, fire dampers, etc.
b. Piping and Instrumentation Diagrams (P&IDs): FP Water System
c. System Descriptions for Fire Suppression, Water Supply, and Detection (including incipient or very early warning fire detection)
d. Hydraulic Calculations for Fire Service and Fire Suppression System Water Demand (if used to support non-fire water use in Title 1O of the Code of Federal Regulations, paragraph 50.48(c)(2)(vii))
5. Drawings related to systems credited in the Nuclear Safety Capability Assessment (NSCA) as well as those required to fully understand plant response:
a. P&IDs: Reactor Coolant System, Main Steam, Main Feedwater, Circulating Water, Service Water, etc.
b. Safe Shutdown/NSCA Logic Diagrams (if used)
c. Electrical Distribution System One-Lines (alternating current and direct current)
6. Those documents that fulfill the NFPA 805 requirement for "Design Basis Document (DBD)"
a. Fire Area Calculations (e.g. Fire Safety Analyses, Fire Risk Analyses, Plant Change Evaluations, Fire Risk Evaluations)
b. NSCA Calculation (Safe Shutdown/Circuit Analysis)
c. Multiple Spurious Operation Expert Panel Report
d. Thermo-hydraulic Analysis serving as the basis for Variance from Deterministic Requirements (VFDR) and recovery action timing
e. Evaluation of Recovery Actions for feasibility
f. Fire Hazards Analysis (if separate from the fire area calculations)
g. Non-Power Operation Calculation(s)
h. Radioactive Release Calculation(s)
i. Pre-fire Plans
7. Fire PRA Calculations
a. Plant Boundary/Partitioning Methods and Results (TASK 1)
b. Component Selection Calculation (TASK 2)
c. Cable Selection and Circuit Analysis (TASKS 3, 9, and 10)
d. Ignition Frequency Calculation (TASK 6)
e. Fire PRA Quantification Calculations (TASK 5) including:
i. Seismic Fire Interactions (TASK 13) Methodologies and results (including assumptions) ii. Screening Methodologies and Results (TASKS 4 and 7) (including assumptions) iii. Fire Risk Quantifications (TASK 14) Methodologies and Results (including assumptions) iv. Multi-compartment Screening and Analysis
v. Post-fire Human Reliability Analysis Methodologies and Results (including assumptions) (TASK 12) vi. Detailed proposed modification descriptions (Engineering Change Requests/Records) sufficient to comprehend potential impact/improvement to Fire PRA
f. NFPA 805 Application Calculation (provides all the delta risk calculations for VFDRs)
g. Control Room Risk Calculation
h. Uncertainty and Sensitivity Calculations (TASK 15)
i. Fire Modeling Calculations used to support the Fire PRA (zone of influence (ZOI), hot gas layer, bounding, detailed fire modeling, etc.)

ii Plant Specific Verification and Validation (V&V) Analysis iii. Non-public V&V References (e.g., Electric Power Research Institute (EPRI) Fire Modeling, Generic Treatment)

iv. Fire Modeling Assumptions and Calculations performed to support target selection (e.g.; ZOI, secondary fires, transient combustible/ignition sources) including those that deviate from NUREG/CR-6850 (TASKS 8 and 11)

8. Fire Modeling used in the Fire Modeling Performance-based Approach
a. Plant Specific V&V Analysis performed
b. Non-public V&V References (e.g., EPRI Fire Modeling, Generic Treatments)
c. Fire Modeling Assumptions and Calculations performed to support Performance-Based Evaluations (e.g., ZOI, secondary fires, transient combustible/ignition sources) considered outside NUREG/CR 6850 Assumptions and Parameters (TASKS 8 and 11)
d. Hot Gas Layer Determination Calculations (including assumptions)
9. Fire Protection Program Manual
10. Fire Protection Quality Assurance Program (including FP Structure System Components and FP Features)
11. NFPA 805 Monitoring Program Calculations and Procedures
12. Technical Requirements Manual
13. Updated Final Safety Analysis Report (UFSAR) Changes (including current UFSAR Section 9.5.1, "Fire Protection Program," and Section 7.4, "Systems Required for Safe Shutdown")

ML18228A835 *via e-mail OFFICE DORULPL2-1/PM DORULPL2-1 /LA DRA/APLB/BC* DORL/LPL2-1 /BC DORULPL2-1 /PM NAME JHall KGoldstein GCasto MMarkley JHall DATE 8/20/18 08/20/18 8/21/18 8/22/18 8/22/18