ML18268A134: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
(4 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML18268A134
| number = ML18268A134
| issue date = 09/21/2018
| issue date = 09/21/2018
| title = Pilgrim Nuclear Power Station - Response to Request for Information Relating to Notification of Changes to Comprehensive Recovery Plan
| title = Response to Request for Information Relating to Notification of Changes to Comprehensive Recovery Plan
| author name = Sullivan B R
| author name = Sullivan B
| author affiliation = Entergy Nuclear Operations, Inc
| author affiliation = Entergy Nuclear Operations, Inc
| addressee name = Lew D C
| addressee name = Lew D
| addressee affiliation = NRC/RGN-I
| addressee affiliation = NRC/RGN-I
| docket = 05000293
| docket = 05000293
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:* ~Entergx Letter Number 2.18.054 September 21, 2018 Mr. David C. Lew Regional Administrator, Region I U.S. Nuclear Regulatory Commission 2100 Renaissance Blvd, Suite 100 King of Prussia, PA 19406-2713 Entergy Nuclear Operations, Inc. Pilgrim Nuclear Power Station 600 Rocky Hill Road Plymouth, MA 02360 Brian R. Sullivan Site Vice President
{{#Wiki_filter:*~Entergx                                                                         Entergy Nuclear Operations, Inc.
Pilgrim Nuclear Power Station 600 Rocky Hill Road Plymouth, MA 02360 Brian R. Sullivan Site Vice President Letter Number 2.18.054 September 21, 2018 Mr. David C. Lew Regional Administrator, Region I U.S. Nuclear Regulatory Commission 2100 Renaissance Blvd, Suite 100 King of Prussia, PA 19406-2713


==SUBJECT:==
==SUBJECT:==
Response to Request for Information Relating to Notification of Changes to Comprehensive Recovery Plan Pilgrim Nuclear Power Station Docket No. 50-293 Renewed License No. DPR-35  
Response to Request for Information Relating to Notification of Changes to Comprehensive Recovery Plan Pilgrim Nuclear Power Station Docket No. 50-293 Renewed License No. DPR-35


==REFERENCES:==
==REFERENCES:==
: 1. NRG letter to Entergy, "Confirmatory Action Letter -Pilgrim Nuclear Power Station," dated August 2, 2017 (ML 17214A088)  
: 1. NRG letter to Entergy, "Confirmatory Action Letter - Pilgrim Nuclear Power Station," dated August 2, 2017 (ML17214A088)
: 2. Entergy letter to NRG, "Notification of Changes to Comprehensive Recovery Plan," dated August 9, 2018


==Dear Mr. Lew:==
==Dear Mr. Lew:==
: 2. Entergy letter to NRG, "Notification of Changes to Comprehensive Recovery Plan," dated August 9, 2018 On August 2, 2017, the NRG transmitted the Pilgrim Nuclear Power Station (PNPS) Confirmatory Action Letter (CAL) (Reference  
 
: 1) which confirmed the actions PNPS planned to take in accordance with our Comprehensive Recovery Plan (CRP). Based on ongoing review, PNPS identified that CRP action changes were appropriate.
On August 2, 2017, the NRG transmitted the Pilgrim Nuclear Power Station (PNPS) Confirmatory Action Letter (CAL) (Reference 1) which confirmed the actions PNPS planned to take in accordance with our Comprehensive Recovery Plan (CRP). Based on ongoing review, PNPS identified that CRP action changes were appropriate. Notification of these changes to the CRP was provided to the NRG pursuant to the CAL in a letter dated August 9, 2018 (Reference 2).
Notification of these changes to the CRP was provided to the NRG pursuant to the CAL in a letter dated August 9, 2018 (Reference 2). Subsequently, during the CAL inspecti9n, additional information was requested by the NRG relating to the timing for actions to mitigate an identified single point vulnerability (SPV). As a result, after further review, PNPS has concluded that one of the items should not have been included in the CRP because the SPV had previously been mitigated:
Subsequently, during the CAL inspecti9n, additional information was requested by the NRG relating to the timing for actions to mitigate an identified single point vulnerability (SPV). As a result, after further review, PNPS has concluded that one of the items should not have been included in the CRP because the SPV had previously been mitigated: This effects CAL item ER-3.2. ER-3.2 is one of the nine proposed changes or clarifications to the CAL that NRG is reviewing during this CAL inspection. Accordingly, a clarification to ER-3.2 is provided in Attachment 1.
This effects CAL item ER-3.2. ER-3.2 is one of the nine proposed changes or clarifications to the CAL that NRG is reviewing during this CAL inspection.
11~/\SD_i A-oo 1 _
Accordingly, a clarification to ER-3.2 is provided in Attachment  
R. tN-.1.
: 1. 11~/\SD_i A-oo 1 _ R. tN-.1. f\J ~/(
f\J ~/(
Entergy Nuclear Operations, Inc. Pilgrim Nuclear Power Station / Letter No. 2.18.054 Page 2 of 2 If you have any questions or require additional information, please contact Mr. Peter J. Miner at (508) 830-7127. . Sincerely, Brian R. Sullivan Site Vice President BRS/mp cc: U.S. Nuclear Regulatory Commission A TIN: Document Control Desk Washington, DC 20555-0001 Mr. John Lamb, Senior Project Manager Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Mail Stop 0-8C2A Washington, DC 20555-0001 NRC Senior Resident Inspector Pilgrim Nuclear Power Station Attachment 1 Letter Number 2.18.054 Response to Request for Information Relating to Notification of Changes to Comprehensive Recovery Plan
 
** *CAL -Action #. ER-3.2 Response to Request for Information Relating to Notification of Changes to Comprehensive Recovery Plan Current CAL Action _,./ ... Descfiption:  
                                                  /
._ .. Track the completion of the mitigation strategies for the 4 open unmitigated Single Point Vulnerabilities at PNPS. These are scheduled to be completed during RF021 and include the following:
Entergy Nuclear Operations, Inc.                                     Letter No. 2.18.054 Pilgrim Nuclear Power Station                                                Page 2 of 2 If you have any questions or require additional information, please contact Mr. Peter J. Miner at (508) 830-7127.                                                                           .
* Replace Feedwater Level A/8 Channel Selector Switch (604-301 ), if required based on scheduled testing
Sincerely, Brian R. Sullivan Site Vice President BRS/mp cc:
* Replace Feedwater Level Control Single Element I T,hree Element Selector Switch (604-302), if required based on scheduled testing
U.S. Nuclear Regulatory Commission ATIN: Document Control Desk Washington, DC 20555-0001 Mr. John Lamb, Senior Project Manager Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Mail Stop 0-8C2A Washington, DC 20555-0001 NRC Senior Resident Inspector Pilgrim Nuclear Power Station
 
Attachment 1 Letter Number 2.18.054 Response to Request for Information Relating to Notification of Changes to Comprehensive Recovery Plan
 
Response to Request for Information Relating to Notification of Changes to Comprehensive Recovery Plan
** *CAL Current CAL Action
-Action
_,./ ... Descfiption: ._ .
                                                  .Proposed    CAL Action  Description ..                Reason, for. Change
    #.                                                      .  '.            .\ .                      .* -:* ..
Track the completion of the          Track the completion of the mitigation      The Startup transformer CCVTs have been mitigation strategies for the 4     strategies for the 3 open unmitigated      removed from the list of unmitigated single open unmitigated Single Point        Single Point Vulnerabilities at PNPS.       point vulnerabilities (SPVs) and the number Vulnerabilities at PNPS. These      These are scheduled to be completed         of unmitigated SPVs has been reduced to 3.
are scheduled to be completed        during RF021 and include the following:    The SUT CCTVs were replaced and remain during RF021 and include the
* Replace Feedwater Level A/8              within their approved preventive maintenance following:                           Channel Selector Switch (604-301 ), if      periodicity.              ,
* Replace Feedwater Level A/8       required based on scheduled testing Channel Selector Switch (604-
* Replace Feedwater Level Control 301 ), if required based on         Single Element I Three Element ER-3.2  scheduled testing                   Selector Switch {604- 302), if required
* Replace Feedwater Level           based on scheduled testing Control Single Element I T,hree
* Perform Motor Rewind on Sea Water Element Selector Switch (604-       Pump 8 (P-1058) 302), if required based on scheduled testing
* Perform Motor Rewind on Sea Water Pump 8 (P-1058)
* Perform Motor Rewind on Sea Water Pump 8 (P-1058)
* Perform Startup Transformer CCVT Inspections and Testing (X4) . Proposed CAL Action Description
* Perform Startup Transformer CCVT Inspections and Testing (X4)
.. . '. .\ . Track the completion of the mitigation strategies for the 3 open unmitigated Single Point Vulnerabilities at PNPS. These are scheduled to be completed during RF021 and include the following:
Letter Number 2.18.054 Attachment 1                                                                                       Page 1 of 1}}
* Replace Feedwater Level A/8 Channel Selector Switch (604-301 ), if required based on scheduled testing
* Replace Feedwater Level Control Single Element I Three Element Selector Switch {604-302), if required based on scheduled testing
* Perform Motor Rewind on Sea Water Pump 8 (P-1058) Reason, for. Change .* -:* .. The Startup transformer CCVTs have been removed from the list of unmitigated single point vulnerabilities (SPVs) and the number of unmitigated SPVs has been reduced to 3. The SUT CCTVs were replaced and remain within their approved preventive maintenance periodicity. , Letter Number 2.18.054 Attachment 1 Page 1 of 1}}

Latest revision as of 15:14, 20 October 2019

Response to Request for Information Relating to Notification of Changes to Comprehensive Recovery Plan
ML18268A134
Person / Time
Site: Pilgrim
Issue date: 09/21/2018
From: Brian Sullivan
Entergy Nuclear Operations
To: David Lew
NRC Region 1
References
2.18.054
Download: ML18268A134 (4)


Text

  • ~Entergx Entergy Nuclear Operations, Inc.

Pilgrim Nuclear Power Station 600 Rocky Hill Road Plymouth, MA 02360 Brian R. Sullivan Site Vice President Letter Number 2.18.054 September 21, 2018 Mr. David C. Lew Regional Administrator, Region I U.S. Nuclear Regulatory Commission 2100 Renaissance Blvd, Suite 100 King of Prussia, PA 19406-2713

SUBJECT:

Response to Request for Information Relating to Notification of Changes to Comprehensive Recovery Plan Pilgrim Nuclear Power Station Docket No. 50-293 Renewed License No. DPR-35

REFERENCES:

1. NRG letter to Entergy, "Confirmatory Action Letter - Pilgrim Nuclear Power Station," dated August 2, 2017 (ML17214A088)
2. Entergy letter to NRG, "Notification of Changes to Comprehensive Recovery Plan," dated August 9, 2018

Dear Mr. Lew:

On August 2, 2017, the NRG transmitted the Pilgrim Nuclear Power Station (PNPS) Confirmatory Action Letter (CAL) (Reference 1) which confirmed the actions PNPS planned to take in accordance with our Comprehensive Recovery Plan (CRP). Based on ongoing review, PNPS identified that CRP action changes were appropriate. Notification of these changes to the CRP was provided to the NRG pursuant to the CAL in a letter dated August 9, 2018 (Reference 2).

Subsequently, during the CAL inspecti9n, additional information was requested by the NRG relating to the timing for actions to mitigate an identified single point vulnerability (SPV). As a result, after further review, PNPS has concluded that one of the items should not have been included in the CRP because the SPV had previously been mitigated: This effects CAL item ER-3.2. ER-3.2 is one of the nine proposed changes or clarifications to the CAL that NRG is reviewing during this CAL inspection. Accordingly, a clarification to ER-3.2 is provided in Attachment 1.

11~/\SD_i A-oo 1 _

R. tN-.1.

f\J ~/(

/

Entergy Nuclear Operations, Inc. Letter No. 2.18.054 Pilgrim Nuclear Power Station Page 2 of 2 If you have any questions or require additional information, please contact Mr. Peter J. Miner at (508) 830-7127. .

Sincerely, Brian R. Sullivan Site Vice President BRS/mp cc:

U.S. Nuclear Regulatory Commission ATIN: Document Control Desk Washington, DC 20555-0001 Mr. John Lamb, Senior Project Manager Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Mail Stop 0-8C2A Washington, DC 20555-0001 NRC Senior Resident Inspector Pilgrim Nuclear Power Station

Attachment 1 Letter Number 2.18.054 Response to Request for Information Relating to Notification of Changes to Comprehensive Recovery Plan

Response to Request for Information Relating to Notification of Changes to Comprehensive Recovery Plan

    • *CAL Current CAL Action

-Action

_,./ ... Descfiption: ._ .

.Proposed CAL Action Description .. Reason, for. Change

  1. . . '. .\ . .* -:* ..

Track the completion of the Track the completion of the mitigation The Startup transformer CCVTs have been mitigation strategies for the 4 strategies for the 3 open unmitigated removed from the list of unmitigated single open unmitigated Single Point Single Point Vulnerabilities at PNPS. point vulnerabilities (SPVs) and the number Vulnerabilities at PNPS. These These are scheduled to be completed of unmitigated SPVs has been reduced to 3.

are scheduled to be completed during RF021 and include the following: The SUT CCTVs were replaced and remain during RF021 and include the

  • Replace Feedwater Level A/8 within their approved preventive maintenance following: Channel Selector Switch (604-301 ), if periodicity. ,
  • Replace Feedwater Level A/8 required based on scheduled testing Channel Selector Switch (604-
  • Replace Feedwater Level Control 301 ), if required based on Single Element I Three Element ER-3.2 scheduled testing Selector Switch {604- 302), if required
  • Replace Feedwater Level based on scheduled testing Control Single Element I T,hree
  • Perform Motor Rewind on Sea Water Element Selector Switch (604- Pump 8 (P-1058) 302), if required based on scheduled testing
  • Perform Motor Rewind on Sea Water Pump 8 (P-1058)
  • Perform Startup Transformer CCVT Inspections and Testing (X4)