Response to Request for Information Relating to Notification of Changes to Comprehensive Recovery Plan
ML18268A134
Person / Time
Site: Pilgrim
Issue date: 09/21/2018
From: Brian Sullivan
Entergy Nuclear Operations
To: David Lew
NRC Region 1
References
2.18.054
Download: ML18268A134 (4)


Text

  • ~Entergx Entergy Nuclear Operations, Inc.

Pilgrim Nuclear Power Station 600 Rocky Hill Road Plymouth, MA 02360 Brian R. Sullivan Site Vice President Letter Number 2.18.054 September 21, 2018 Mr. David C. Lew Regional Administrator, Region I U.S. Nuclear Regulatory Commission 2100 Renaissance Blvd, Suite 100 King of Prussia, PA 19406-2713

SUBJECT:

Response to Request for Information Relating to Notification of Changes to Comprehensive Recovery Plan Pilgrim Nuclear Power Station Docket No. 50-293 Renewed License No. DPR-35

REFERENCES:

1. NRG letter to Entergy, "Confirmatory Action Letter - Pilgrim Nuclear Power Station," dated August 2, 2017 (ML17214A088)
2. Entergy letter to NRG, "Notification of Changes to Comprehensive Recovery Plan," dated August 9, 2018

Dear Mr. Lew:

On August 2, 2017, the NRG transmitted the Pilgrim Nuclear Power Station (PNPS) Confirmatory Action Letter (CAL) (Reference 1) which confirmed the actions PNPS planned to take in accordance with our Comprehensive Recovery Plan (CRP). Based on ongoing review, PNPS identified that CRP action changes were appropriate. Notification of these changes to the CRP was provided to the NRG pursuant to the CAL in a letter dated August 9, 2018 (Reference 2).

Subsequently, during the CAL inspecti9n, additional information was requested by the NRG relating to the timing for actions to mitigate an identified single point vulnerability (SPV). As a result, after further review, PNPS has concluded that one of the items should not have been included in the CRP because the SPV had previously been mitigated: This effects CAL item ER-3.2. ER-3.2 is one of the nine proposed changes or clarifications to the CAL that NRG is reviewing during this CAL inspection. Accordingly, a clarification to ER-3.2 is provided in Attachment 1.

11~/\SD_i A-oo 1 _

R. tN-.1.

f\J ~/(

/

Entergy Nuclear Operations, Inc. Letter No. 2.18.054 Pilgrim Nuclear Power Station Page 2 of 2 If you have any questions or require additional information, please contact Mr. Peter J. Miner at (508) 830-7127. .

Sincerely, Brian R. Sullivan Site Vice President BRS/mp cc:

U.S. Nuclear Regulatory Commission ATIN: Document Control Desk Washington, DC 20555-0001 Mr. John Lamb, Senior Project Manager Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Mail Stop 0-8C2A Washington, DC 20555-0001 NRC Senior Resident Inspector Pilgrim Nuclear Power Station

Attachment 1 Letter Number 2.18.054 Response to Request for Information Relating to Notification of Changes to Comprehensive Recovery Plan

Response to Request for Information Relating to Notification of Changes to Comprehensive Recovery Plan

    • *CAL Current CAL Action

-Action

_,./ ... Descfiption: ._ .

.Proposed CAL Action Description .. Reason, for. Change

  1. . . '. .\ . .* -:* ..

Track the completion of the Track the completion of the mitigation The Startup transformer CCVTs have been mitigation strategies for the 4 strategies for the 3 open unmitigated removed from the list of unmitigated single open unmitigated Single Point Single Point Vulnerabilities at PNPS. point vulnerabilities (SPVs) and the number Vulnerabilities at PNPS. These These are scheduled to be completed of unmitigated SPVs has been reduced to 3.

are scheduled to be completed during RF021 and include the following: The SUT CCTVs were replaced and remain during RF021 and include the

  • Replace Feedwater Level A/8 within their approved preventive maintenance following: Channel Selector Switch (604-301 ), if periodicity. ,
  • Replace Feedwater Level A/8 required based on scheduled testing Channel Selector Switch (604-
  • Replace Feedwater Level Control 301 ), if required based on Single Element I Three Element ER-3.2 scheduled testing Selector Switch {604- 302), if required
  • Replace Feedwater Level based on scheduled testing Control Single Element I T,hree
  • Perform Motor Rewind on Sea Water Element Selector Switch (604- Pump 8 (P-1058) 302), if required based on scheduled testing
  • Perform Motor Rewind on Sea Water Pump 8 (P-1058)
  • Perform Startup Transformer CCVT Inspections and Testing (X4)

Letter Number 2.18.054 Attachment 1 Page 1 of 1