See 10 CFR 50.72(b)(3)(ii)(B), Unanalyzed Condition
Topic |
---|
|
|
10 CFR | |
---|
All by date | | Start date | Site | Title |
---|
ENS 57373 | 10 October 2024 14:45:00 | Davis Besse | Unanalyzed Condition | ML24284A326 | 10 October 2024 | Hermes | Kairos Power LLC Responses to Commission Hearing Questions | ML24284A125 | 10 October 2024 | Hermes | NRC Staff Responses to Commission Hearing Questions | NUREG-1022, Rev. 3, Supplement 2, Event Report Guidelines 10 CFR 50.72(b)(3)(ii) and 10 CFR 50.73(a)(2)(ii) Final Report | 30 September 2024 | | NUREG-1022, Rev. 3, Supplement 2, Event Report Guidelines 10 CFR 50.72(b)(3)(ii) and 10 CFR 50.73(a)(2)(ii) Final Report | ML24269A212 | 25 September 2024 | Hermes | Order (Transmitting Hearing Questions) | ML24197A131 | 9 September 2024 | | NUREG 1022 Rev 3 Supplement 2 Comment Resolution Memo.Docx | ML24219A049 | 15 August 2024 | | Enclosure 2 - NRC Documents (Interpretive Rules Category) | IR 05000440/2024002 | 8 August 2024 | Perry | Integrated Inspection Report 05000440/2024002 | ML24213A123 | 31 July 2024 | | Draft Reactor Accident Analysis Modernization (Raam) Report | RA-24-0092, Application to Revise Technical Specification 3.7.7, Low Pressure Service Water (LPSW) System, to Extend the Completion Time for One Required LPSW Pump Inoperable on a One-Time Basis | 29 July 2024 | Oconee | Application to Revise Technical Specification 3.7.7, Low Pressure Service Water (LPSW) System, to Extend the Completion Time for One Required LPSW Pump Inoperable on a One-Time Basis |
|
---|